CN205621051U - Engineering cost progress management system - Google Patents
Engineering cost progress management system Download PDFInfo
- Publication number
- CN205621051U CN205621051U CN201620266213.3U CN201620266213U CN205621051U CN 205621051 U CN205621051 U CN 205621051U CN 201620266213 U CN201620266213 U CN 201620266213U CN 205621051 U CN205621051 U CN 205621051U
- Authority
- CN
- China
- Prior art keywords
- progress
- module
- wireless transmitter
- control unit
- main control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses an engineering cost progress management system, including input module, input module, main control unit, read module, progress information transmission module piece, wireless transmitter electric connection in proper order, a wireless transmitter and mobile terminal wireless connection, mobile terminal and the 2nd wireless transmitter wireless connection, and the 2nd wireless transmitter and main control unit electric connection, the main control unit respectively with output module and alarm module electric connection. This engineering cost progress management system, through input module to the current progress of accomplishing of main control unit input, the main control unit will be controlled and read the time that this progress should be accomplished among the pair of module progress information storage module, sends the cell -phone to the progress through a wireless transmitter simultaneously and monitors when enterprising in vogue, mobile terminal is through the 2nd wireless transmitter simultaneously, convey the main control unit to action and the thing that will hand over on to export through output module.
Description
Technical field
This utility model relates to the management systems technology field of bid enterprises, is specially a kind of construction costs progress control system.
Background technology
At present, the engineering accepted can be made construction costs before bid by the enterprise being responsible for bid, the information that existing cost flow process provides according to owner for staff, and the information oneself obtained to reconnaissance at criminal scene carries out the work of cost calculating to the engineering accepted, due to cost work loaded down with trivial details, need the work of cost staff is exercised supervision, and by related personnel, the cost work of cost staff can only be exercised supervision at present, do not meet the requirement now to office automatic, simultaneously need to extra work personnel, cause the waste of human resources, and monitoring constantly can not be carried out.
Utility model content
The purpose of this utility model is to provide a kind of construction costs progress control system, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, this utility model following technical scheme of offer: a kind of construction costs progress control system, including input module, described input module, main control unit, read module, progress msg delivery module, first wireless transmitter is electrically connected with successively, described progress msg delivery module includes progress msg bin and progress title bin, described first wireless transmitter and mobile terminal wireless connections, described mobile terminal and the second wireless transmitter wireless connections, and second wireless transmitter and main control unit be electrically connected with, described main control unit is electrically connected with output module and alarm modules respectively.
Preferably, described progress msg delivery module is electrically connected with backup device.
Preferably, described mobile terminal is mobile phone or panel computer.
Preferably, described first wireless transmitter and the second wireless transmitter are all by bluetooth or 4G and mobile terminal wireless connections.
Compared with prior art, the beneficial effects of the utility model are: this construction costs progress control system, by input module, main control unit is inputted the progress currently completed, main control unit will control the time that this progress in progress msg memory module should be completed by read module, by the first wireless transmitter, progress is sent on mobile phone monitor constantly simultaneously, mobile terminal passes through the second wireless transmitter simultaneously, job content and thing to be handed over are sent on main control unit, thus exported by output module, but also can be warned by alarm modules, exercise supervision work without other staff, effectively save human resources, and can monitor constantly, safe and reliable.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
In figure: 1, output module, 2, input module, 3, alarm modules, 4, main control unit, 5, read module, 6, backup device, 7, progress msg delivery module, 701, progress msg bin, 702, progress title bin, 8, the first wireless transmitter, 9, mobile terminal, the 10, second wireless transmitter.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
nullRefer to Fig. 1,A kind of technical scheme of this utility model offer: a kind of construction costs progress control system,Including input module 2,Described input module 2、Main control unit 4、Read module 5、Progress msg delivery module 7、First wireless transmitter 8 is electrically connected with successively,Described progress msg delivery module 7 includes progress msg bin 701 and progress title bin 702,Described progress msg delivery module 7 is electrically connected with backup device 6,The effect of backup device 6 is backup progress msg delivery module 7 content,Prevent progress msg delivery module 7 corrupted data or loss,Described first wireless transmitter 8 and mobile terminal 9 wireless connections,Described mobile terminal 9 and the second wireless transmitter 10 wireless connections,Described first wireless transmitter 8 and the second wireless transmitter 9 are all by 4G and mobile terminal 9 wireless connections,Described mobile terminal 9 is mobile phone,And second wireless transmitter 10 be electrically connected with main control unit 4,Described main control unit 4 is electrically connected with output module 1 and alarm modules 3 respectively.
The job schedule completed is inputed to main control unit 4 by input module 2 by staff, main control unit 4 controls the time that this progress in progress msg memorizer 7 should complete by read module 5 and transfers afterwards, thus be sent on mobile terminal 9 by the first wireless transmitter 8, it is sent on main control unit 4 by mobile terminal 9 and 10 job contents of the second wireless transmitter, thus inform staff by output module 1 output, if workload does not complete, it is also possible to by alarm modules 3, staff is warned.
Embodiment the most of the present utility model, for the ordinary skill in the art, being appreciated that in the case of without departing from principle of the present utility model and spirit and these embodiments can carry out multiple change, revise, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.
Claims (4)
1. a construction costs progress control system, including input module, it is characterized in that: described input module, main control unit, read module, progress msg delivery module, the first wireless transmitter are electrically connected with successively, described progress msg delivery module includes progress msg bin and progress title bin, described first wireless transmitter and mobile terminal wireless connections, described mobile terminal and the second wireless transmitter wireless connections, and second wireless transmitter and main control unit be electrically connected with, described main control unit is electrically connected with output module and alarm modules respectively.
A kind of construction costs progress control system the most according to claim 1, it is characterised in that: described progress msg delivery module is electrically connected with backup device.
A kind of construction costs progress control system the most according to claim 1, it is characterised in that: described mobile terminal is mobile phone or panel computer.
A kind of construction costs progress control system the most according to claim 1, it is characterised in that: described first wireless transmitter and the second wireless transmitter are all by bluetooth or 4G and mobile terminal wireless connections.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620266213.3U CN205621051U (en) | 2016-04-04 | 2016-04-04 | Engineering cost progress management system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620266213.3U CN205621051U (en) | 2016-04-04 | 2016-04-04 | Engineering cost progress management system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205621051U true CN205621051U (en) | 2016-10-05 |
Family
ID=57028898
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620266213.3U Expired - Fee Related CN205621051U (en) | 2016-04-04 | 2016-04-04 | Engineering cost progress management system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205621051U (en) |
-
2016
- 2016-04-04 CN CN201620266213.3U patent/CN205621051U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11581732B2 (en) | Establishing communication and power sharing links between components of a distributed energy system | |
CN104239132A (en) | Wakeup synchronization method, device and terminal | |
CN102781119A (en) | Wireless ubiquitous network application terminal system and software component application process management method | |
CN104517168A (en) | Engineering project construction cost schedule management system | |
CN203782384U (en) | Intelligent operation panel for industrial sewing machine | |
CN205621051U (en) | Engineering cost progress management system | |
CN107070955A (en) | The transmission method and device of a kind of electric power system data | |
CN207638902U (en) | A kind of integrated communication system | |
CN209214761U (en) | A kind of noise monitoring system | |
CN203673478U (en) | Data line with data processing function | |
CN202838174U (en) | Forensic system with power distribution device | |
CN205384717U (en) | Earthquake forecasting of school circuit | |
CN104363108A (en) | Website background system | |
CN201528399U (en) | Wireless audio/video monitoring device | |
CN201204667Y (en) | Image-adjusting instrument | |
CN204679804U (en) | A kind of novel building fire protection facility Sampling network system based on mobile phone app | |
CN206195855U (en) | Data security mobile phone motherboard | |
CN204808320U (en) | Big data information management device | |
CN207037425U (en) | A kind of robot control system for teenager's science popularization | |
CN204836425U (en) | Wide area monitoring device | |
CN103927287A (en) | Data line with data processing function and data processing method of data line | |
CN117435442B (en) | Automatic matching monitoring method and system for online computer resources and computing UPS | |
CN202995413U (en) | A constructional engineering material delivery device based on construction progress monitoring | |
CN204291129U (en) | A kind of networking telephone recorder | |
CN204697207U (en) | A kind of camera supervised intersection control routine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161005 Termination date: 20190404 |
|
CF01 | Termination of patent right due to non-payment of annual fee |