CN205616461U - Double linkage hoist has surpassed straining device and hoist - Google Patents
Double linkage hoist has surpassed straining device and hoist Download PDFInfo
- Publication number
- CN205616461U CN205616461U CN201620056573.0U CN201620056573U CN205616461U CN 205616461 U CN205616461 U CN 205616461U CN 201620056573 U CN201620056573 U CN 201620056573U CN 205616461 U CN205616461 U CN 205616461U
- Authority
- CN
- China
- Prior art keywords
- double
- oil cylinder
- setting
- linkage
- assembly pulley
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model relates to a double linkage hoist has surpassed straining device and hoist, the double linkage hoist has surpassed straining device and has included: the double linkage hoist, with the arm head assembly pulley that has surpassed the assembly pulley and be connected with the davit arm head that has surpassed device end connection, behind the wire rope pile warp arm head assembly pulley that the double linkage hoist was drawn forth, walk around again and has surpassed the assembly pulley, then fix on the arm head assembly pulley, the double linkage hoist is realized having surpassed the device through receiving and releasing of control wire rope and is moved for the expansion and the tensioning of davit. This kind of straining device can come realize having surpassed the device through receiving and releasing of double linkage winch control wire rope for the expansion and tensioning action of davit, can realize two wire rope's the work of receiving and releasing simultaneously on same hoisting mechanism, surpassed the hoist by two double linkage hoist replacements and coordinated a plurality of hydro -cylinders, but greatly reduced has surpassed the manufacturing and the installation cost of device, and convenient operation, synchronism height, flexibility are strong in addition.
Description
Technical field
The utility model relates to technical field of engineering machinery, particularly relates to a kind of Double-linkage elevator and surpasses
Play strainer and crane.
Background technology
Setting-up is one of important feature part of mobilecrane, and the use of super lifting device can change
It is apt to the state of crane arm stress and crane arm lifting performance and complete machine stability are greatly improved, for
Lift crane lifting performance and complete machine stability play the role of important, are in particular in following
Two aspects: (1) applies the active force of a luffing plane in crane arm end, overcomes crane arm
Deformation in luffing plane, reduces the additional bending moment on crane arm dangerouse cross-section, thus reduces
Stress;(2) support is added in plane of rotation to crane arm, thus be greatly reduced crane arm
In the deformation that plane of rotation produces, greatly strengthen the lateral stability when lift heavy state for the crane arm
Property.
Effect in terms of in order to realize super lifting device two above, super lifting device is in the course of the work
Necessarily be in tensioning state, and the embodiment of setting-up tensioning is most important.Current large-tonnage is complete
The most mode using elevator to be placed in setting-up of Terrain Cranes realizes the tensioning of super lifting device,
As it is shown in figure 1, two elevators are individually placed to the end of setting-up, by folding and unfolding steel wire rope and
The cooperation of locking oil cylinder realizes the tensioning of setting-up, and setting-up launches oil cylinder and amplitude oil cylinder realizes simultaneously
The folding and unfolding of super lifting device, steel wire rope 1a is walked around arm head pulley 3a by setting-up elevator 2a releasing and fixes
On setting-up end hinge 4a, form setting-up strainer.When super lifting device luffing is deployed into one
After determining angle, after setting-up elevator 2a recovery steel wire rope 1a reaches certain tensioning, setting-up elevator
Lockable mechanism 5a starts the tensioning work that ratchet locking completes super lifting device.
But this kind of super lifting device needs by two setting-up elevators, and coordinate setting-up luffing oil
Cylinder, expansion oil cylinder and tensioning hydro-cylinder, owing to the sequencing of each cylinder action is relatively stricter,
Causing that action is loaded down with trivial details, time and effort consuming, operating personnel are difficult to operation, and to hydraulic control system
Synchronism require height;Quantity additionally, due to elevator and oil cylinder is too much, in less space
Parts layout is tight, causes super lifting device high cost, and maintenance difficult expense is too high.
Utility model content
The purpose of this utility model is to propose a kind of Double-linkage elevator setting-up strainer and lifting
Machine, can be realized folding and unfolding and the tensioning of super lifting device by Double-linkage elevator and assembly pulley.
For achieving the above object, the utility model first aspect provides a kind of Double-linkage elevator and surpasses
Play strainer, comprising: the setting-up that Double-linkage elevator 1 is connected with super lifting device 6 end is sliding
Wheels 4 and the arm head assembly pulley 5 being connected with arm arm head, described Double-linkage elevator 1 is drawn
After arm head assembly pulley 5 described in steel wire rope 3 pile warp, further around crossing described setting-up assembly pulley 4, then
Being fixed on described arm head assembly pulley 5, described Double-linkage elevator 1 is by control steel wire rope 3
Folding and unfolding realizes described super lifting device 6 relative to the expansion of described arm and tensioning action.
Further, also including lockable mechanism 2, described lockable mechanism 2 is arranged on described duplex
The side of dynamic elevator 1, is used for when described super lifting device 6 tensioning to described Double-linkage elevator 1
Carry out locking, to realize described steel wire rope 3 between described super lifting device 6 and described arm
Tensioning.
Further, it is provided with one between two elevators in parallel of described Double-linkage elevator 1 to turn
The dynamic circular bulkheads 21 with ratchet, described lockable mechanism 2 is by holding out against described circular bulkheads
The ratchet of 21 realizes locking action.
Further, described lockable mechanism 2 specifically includes: locking oil cylinder 22, described locking oil
One end of cylinder 22 for inserting the spine of described circular bulkheads 21 when described locking oil cylinder 22 stretches out
In tooth.
Further, described lockable mechanism 2 also includes amplitude oil cylinder 26, described amplitude oil cylinder
On the 26 cylinder barrel outer walls being arranged on described locking oil cylinder 22, can be made described by expanding-contracting action
Locking oil cylinder 22 luffing.
Further, the cylinder barrel outer wall of described locking oil cylinder 22 is additionally provided with flexible member 25,
For straining described locking oil cylinder 22, to prevent described locking oil cylinder 22 and described ratchet.
Further, also including: stroke detection element 23, described stroke detection element 23 sets
Putting on described locking oil cylinder 22, the cylinder rod that can detect described locking oil cylinder 22 stretches out stroke
Whether reach locking station.
Further, described Double-linkage elevator 1 and described lockable mechanism 2 are arranged at turntable 7
On.
Further, also including pulling force sensor 8, described pulling force sensor 8 is arranged on described
On stay cord between super lifting device 6 end and described setting-up assembly pulley 4.
For achieving the above object, the utility model second aspect provides a kind of crane, including
Double-linkage elevator setting-up strainer described in above-described embodiment.
Based on technique scheme, the Double-linkage elevator setting-up tensioning device of the utility model embodiment
Structure, by arranging Double-linkage elevator, and the steel wire rope pile warp arm head pulley drawn at linkage elevator
It after group, further around crossing setting-up assembly pulley, is then attached on arm head assembly pulley, duplex can be passed through
The folding and unfolding of dynamic rolling control steel wire rope realizes that super lifting device moves relative to expansion and the tensioning of arm
Make, same hoisting mechanism can realize the folding and unfolding work of two steel wire ropes simultaneously.By double
Linkage elevator replaces two setting-up elevators to coordinate multiple oil cylinder, can be substantially reduced the system of super lifting device
Make and installation cost, and easy to operate, synchronism is high, flexibility is strong.
Brief description
Accompanying drawing described herein is used for providing being further appreciated by of the present utility model, constitutes this
A part for application, schematic description and description of the present utility model is used for explaining this practicality
Novel, it is not intended that to improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is the structural representation of the setting-up strainer of hoister in large tonnage in prior art;
Fig. 2 is the side view of an embodiment of Double-linkage elevator setting-up strainer of the present invention;
Fig. 3 is the top view of an embodiment of Double-linkage elevator setting-up strainer of the present invention;
Fig. 4 is an embodiment of lockable mechanism in Double-linkage elevator setting-up strainer of the present invention
Structural representation.
Detailed description of the invention
The utility model described further below.In the following paragraphs, reality is defined in more detail
Execute the different aspect of example.The each side so limiting can be with any other aspect or multiple
Aspect combines, and not can be combined unless explicitly stated otherwise.Especially it is considered to be preferably or favourable
Any feature can one or more with other be considered as preferred or favourable combinations of features.
Term is merely for convenience retouches for " first ", " second " etc. occurring in the utility model
State, to distinguish the different building blocks with same names, be not offered as priority or primary-slave relation.
Of the present utility model describe in, it is to be understood that term " on ", D score,
The side of the instruction such as "front", "rear", "left", "right", " vertically " and " level "
Position or position relationship, for based on orientation shown in the drawings or position relationship, are for only for ease of description
The utility model, rather than instruction or hint indication device must have specific orientation, with
Specific azimuth configuration and operation, therefore it is not intended that limit to the utility model protection domain
System.
In the embodiment shown in Fig. 2 to Fig. 4, the utility model provides a kind of Double-linkage volume
Raise setting-up strainer, comprising: it is super that Double-linkage elevator 1 is connected with super lifting device 6 end
Play assembly pulley 4 and the arm head assembly pulley 5 being connected with arm (not shown in FIG.) arm head, double
After the steel wire rope 3 pile warp arm head assembly pulley 5 that linkage elevator 1 is drawn, further around setting-up assembly pulley excessively
4, it is then attached on arm head assembly pulley 5, Double-linkage elevator 1 is by controlling the receipts of steel wire rope 3
Put and realize that super lifting device 6, can be at same volume relative to the expansion of arm and tensioning action
Raise the folding and unfolding work that can simultaneously realize two steel wire ropes in mechanism.
In the structure shown here, setting-up assembly pulley 4 and arm head assembly pulley 5 can form many multiplying powers assembly pulley,
Engineering staff can select suitable multiplying power according to the demand of actual lift heavy for assembly pulley.And,
The pulling rope length being connected between setting-up assembly pulley 4 with super lifting device 6 end is constant, arm head pulley
The length of the stay cord being connected between group 5 and arm head is also constant, in the whole action of super lifting device 6
During, the length of the steel wire rope 3 only connecting between setting-up assembly pulley 4 and arm head assembly pulley 5
Degree is changing.
The Double-linkage elevator setting-up strainer of the utility model embodiment, by arranging Double-linkage
Elevator, and after the steel wire rope pile warp arm head assembly pulley that linkage elevator is drawn, sliding further around crossing setting-up
Wheels, are then attached on arm head assembly pulley, can realize on same hoisting mechanism simultaneously
Article two, the folding and unfolding work of the corresponding steel wire rope of side super lifting device, and realize many times of setting-up by assembly pulley
Rate tensioning, thus realize super lifting device relative to the expansion of arm and tensioning action.By Double-linkage
After elevator replaces two setting-up elevators of the prior art to coordinate multiple oil cylinder, it is not necessary to setting-up is set
Amplitude oil cylinder and setting-up tensioning hydro-cylinder, can realize that super lifting device relative to the expansion of arm and is opened
Tight action, can be substantially reduced manufacture and the installation cost of super lifting device, and easy to operate, same
Step property is high, flexibility is strong.
In another embodiment of the present utility model, as it is shown on figure 3, Double-linkage elevator setting-up
Strainer also includes lockable mechanism 2, and lockable mechanism 2 is arranged on the side of Double-linkage elevator 1,
For locking being carried out to Double-linkage elevator 1 when super lifting device 6 tensioning, to realize super lifting device
The tensioning of the steel wire rope 3 between 6 and arm requires.For example, lockable mechanism 2 is positioned at Double-linkage
Elevator 1 either side vertically, or it is positioned at the left side of Double-linkage elevator 1 or right side (to scheme
On the basis of 3).Preferably, after Double-linkage elevator 1 and lockable mechanism 2 are arranged on turntable 7
On afterbody.
The structure shape of the lockable mechanism 2 that a kind of those skilled in the art presented below can use
Formula, be provided with between two elevators in parallel of Double-linkage elevator 1 unitary rotation with ratchet
Circular bulkheads 21, parallel connection refers to be arranged side by side along axis, and lockable mechanism 2 is in steel wire rope 3 folding and unfolding
After putting in place, realize locking action by holding out against the ratchet of circular bulkheads 21.
Specifically, as shown in Figure 4, lockable mechanism 2 includes: locking oil cylinder 22, locking oil cylinder
One end of 22 is arranged in the mounting seat of Double-linkage elevator 1 side, and the other end is at locking oil
Cylinder 22 snaps in the ratchet of circular bulkheads 21 when stretching out, the tache motorice of locking oil cylinder 22 can be
The cylinder barrel of locking oil cylinder 22 or piston rod.In the diagram, the tache motorice of locking oil cylinder 22 to
On be obliquely installed, it is simple to meet install demand.In addition, those skilled in the art can be at lock
Only oil cylinder 22 connects extension bar 24 near one end of circular bulkheads 21, makes extension bar 24 snap in
In ratchet, to obtain bigger movement travel.
It owing to circular bulkheads 21 and locking oil cylinder 22 can exist certain error when mounted, is
In ensureing the ratchet that locking oil cylinder 22 can snap in circular bulkheads 21 exactly when stretching out,
Lockable mechanism 2 may also include amplitude oil cylinder 26, and the two ends of amplitude oil cylinder 26 are connected to base
On the cylinder barrel outer wall of seat and locking oil cylinder 22, locking oil cylinder 22 can be made to become by expanding-contracting action
Width is to adjust position.
Preferably, the cylinder barrel outer wall of locking oil cylinder 22 is additionally provided with flexible member 25, for example, draws
Spring, the two ends of flexible member 25 are connected on the cylinder barrel of pedestal and locking oil cylinder 22, use
In tension locking oil cylinder 22, preventing locking oil cylinder 22 and ratchet, thus ensure locking
The reliability of oil cylinder 22 locking, it is to avoid winching barrel 11 is rotated further and brings to crane job
Danger.
In order to know the lockup state of locking oil cylinder 22, then need to judge whether extension bar 24 blocks
Entering in ratchet, to this end, in another embodiment, Double-linkage elevator setting-up strainer also wraps
Including stroke detection element 23, stroke detection element 23 is arranged on locking oil cylinder 22, Neng Goujian
The cylinder rod surveying locking oil cylinder 22 stretches out whether stroke reaches locking station.For example, shown in Fig. 4
Embodiment in, stroke detection element 23 is fixed on cylinder barrel, and detection region and piston rod can
The region stretched out is corresponding, can detect the displacement of piston rod in real time.
In another embodiment, Double-linkage elevator setting-up strainer also includes pulling force sensor
8, pulling force sensor 8 is arranged on the stay cord between super lifting device 6 end and setting-up assembly pulley 4,
Can interpolate that the current tensioning state of setting-up, to judge the winching barrel in Double-linkage elevator 1
11 opportunitys stopping operating.Once steel wire rope 3 reaches predetermined tensile force, winching barrel 11
Then stop continuing tensioning, there is the hidden danger of overload to avoid steel wire rope 3 tensioning excessive, or
Steel wire rope 3 excessively relaxes and can not effectively strain arm.
In order to make those skilled in the art clearly understand the utility model Double-linkage elevator
The operation principle of setting-up strainer, is carried out below in conjunction with the embodiment shown in Fig. 2 to Fig. 4
Elaborate.After super lifting device 6 is installed, Double-linkage elevator 1 rotates recovery steel wire rope counterclockwise
3 by super lifting device 6 pull-up, and setting-up launches oil cylinder expansion simultaneously, when super lifting device 6 is perpendicular to
During arm, setting-up expansion oil cylinder, by super lifting device 6 locking, completes the expansion work of super lifting device 6
Make.
Then, Double-linkage elevator 1 turns clockwise and discharges steel wire rope 3, coordinates arm to complete to stretch
Arm is to appointment brachium.Then carrying out setting-up tensioning work, Double-linkage elevator 1 rotates back to counterclockwise
Receive steel wire rope 3, make the steel wire rope 3 between super lifting device 1 and arm by many multiplying powers assembly pulley
Tensioning, now lockable mechanism 2 works Double-linkage elevator 1 locking, to meet tensioning requirement,
The value of thrust control that the tensioning degree of steel wire rope 3 is detected by pulling force sensor 8.
When super lifting device 6 reclaims, lockable mechanism 2 discharges Double-linkage elevator 1, and Double-linkage is rolled up
Raise 1 and rotate recovery steel wire rope 3 counterclockwise, after completing the work of contracting arm, Double-linkage elevator 1 up time
Pin rotates release steel wire rope 3, and super lifting device 6 relies on Action of Gravity Field, falls back to above arm.
It can thus be seen that moved by the positive and negative rotation of Double-linkage elevator 1 and the locking of lockable mechanism 2
Work can complete folding and unfolding and the tensioning work of super lifting device 6.
Additionally, the utility model provides a kind of crane, including double described in above-described embodiment
Linkage elevator setting-up strainer.Preferably, this crane is full Terrain Cranes.By duplex
Dynamic elevator replaces setting-up elevator of the prior art and multiple oil cylinders, can be substantially reduced super lifting device
Cost, thus reduce the cost of crane, and only pass through Double-linkage elevator positive and negative rotation and
Lockable mechanism, can realize folding and unfolding and the tensioning of super lifting device, both sides super lifting device action same
Step property is preferable, makes crane tool for characteristic easy to operate, that synchronism is high and flexibility is strong.
Above to a kind of Double-linkage elevator setting-up strainer provided by the utility model and rise
Heavy-duty machine is described in detail.Specific embodiment used herein is to of the present utility model former
Reason and embodiment are set forth, and the explanation of above example is only intended to help and understands this reality
By novel method and core concept thereof.It should be pointed out that, the ordinary skill for the art
For personnel, on the premise of without departing from the utility model principle, can also be to the utility model
Carrying out some improvement and modification, these improve and modify and also fall into the utility model claim
In protection domain.
Claims (10)
1. a Double-linkage elevator setting-up strainer, it is characterised in that include: Double-linkage
Setting-up assembly pulley (4) that elevator (1) is connected with super lifting device (6) end and with arm arm
The arm head assembly pulley (5) that head connects, the steel wire rope (3) that described Double-linkage elevator (1) is drawn
After arm head assembly pulley (5) described in pile warp, further around crossing described setting-up assembly pulley (4), then solid
Being scheduled on described arm head assembly pulley (5), described Double-linkage elevator (1) is by control steel wire rope
(3) folding and unfolding realizes described super lifting device (6) relative to the expansion of described arm and tensioning
Action.
2. Double-linkage elevator setting-up strainer according to claim 1, its feature exists
In, also including lockable mechanism (2), described lockable mechanism (2) is arranged on described Double-linkage volume
Raise the side of (1), be used for when described super lifting device (6) tensioning to described Double-linkage elevator
(1) locking is carried out, to realize the described steel between described super lifting device (6) and described arm
The tensioning of cord (3).
3. Double-linkage elevator setting-up strainer according to claim 2, its feature exists
Be provided with between two elevators in parallel of, described Double-linkage elevator (1) unitary rotation with
The circular bulkheads (21) of ratchet, described lockable mechanism (2) is by holding out against described circular bulkheads (21)
Ratchet realize locking action.
4. Double-linkage elevator setting-up strainer according to claim 3, its feature exists
In described lockable mechanism (2) specifically includes: locking oil cylinder (22), described locking oil cylinder (22)
One end for inserting described circular bulkheads (21) when described locking oil cylinder (22) is stretched out
In ratchet.
5. Double-linkage elevator setting-up strainer according to claim 4, its feature exists
In described lockable mechanism (2) also includes amplitude oil cylinder (26), described amplitude oil cylinder (26)
It is arranged on the cylinder barrel outer wall of described locking oil cylinder (22), can be made by expanding-contracting action described
Locking oil cylinder (22) luffing.
6. Double-linkage elevator setting-up strainer according to claim 4, its feature exists
In being additionally provided with flexible member (25) on the cylinder barrel outer wall of described locking oil cylinder (22), be used for
Strain described locking oil cylinder (22), to prevent described locking oil cylinder (22) from taking off with described ratchet
Open.
7. the Double-linkage elevator setting-up strainer according to claim 4~6 is arbitrary, its
It is characterised by, also includes: stroke detection element (23), described stroke detection element (23)
It is arranged on described locking oil cylinder (22), the cylinder rod of described locking oil cylinder (22) can be detected
Stretch out whether stroke reaches locking station.
8. Double-linkage elevator setting-up strainer according to claim 2, its feature exists
In described Double-linkage elevator (1) and described lockable mechanism (2) are arranged on turntable (7).
9. the Double-linkage elevator setting-up strainer according to claim 1~6 is arbitrary, its
Being characterised by, also including pulling force sensor (8), described pulling force sensor (8) is arranged on institute
State on the stay cord between super lifting device (6) end and described setting-up assembly pulley (4).
10. a crane, it is characterised in that include that claim 1~9 is arbitrary described
Double-linkage elevator setting-up strainer.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520950393 | 2015-11-24 | ||
CN2015209503932 | 2015-11-24 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205616461U true CN205616461U (en) | 2016-10-05 |
Family
ID=57034748
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620056573.0U Active CN205616461U (en) | 2015-11-24 | 2016-01-20 | Double linkage hoist has surpassed straining device and hoist |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205616461U (en) |
-
2016
- 2016-01-20 CN CN201620056573.0U patent/CN205616461U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9725285B2 (en) | Method of raising a crane boom | |
CN105692470B (en) | Inner climbing crane tower and its operating method | |
CN201971572U (en) | Movable arm type tower crane with suspension arm possible of being folded for dismounting | |
CN103395695B (en) | Super-lifting winch control method and system for crane | |
CN207861753U (en) | A kind of arc crane boom telescoping mechanism and the lifting equipment with the mechanism | |
CN103640987A (en) | Folding arm hydraulic crane | |
CN103407908A (en) | Crane and front tensioning system of super lifting device thereof | |
CN203998736U (en) | A kind of heavier-duty telescoping boom | |
CN205616461U (en) | Double linkage hoist has surpassed straining device and hoist | |
CN103318774A (en) | Self-assembly/self-disassembly hoisting device, crane and self-assembly/self-disassembly method of hoister | |
CN210313246U (en) | Self-balancing hoisting apparatus and fire fighting device | |
CN205616473U (en) | Full direction control intelligent security's tower crane machine | |
CN202744232U (en) | Tower crane long suspension arm lifting steel rope supporting device | |
CN104649120A (en) | Balance hoisting equipment | |
CN203486776U (en) | Superlift winch control system of crane | |
CN207759922U (en) | Large span suspender | |
CN202322118U (en) | Rigid telescopic hydraulic separate counter weight crane | |
JP5871605B2 (en) | Load lifting device | |
CN205419572U (en) | Ranks spool way hoist device | |
CN104711964B (en) | Keep technique that is marine structure is upright or that tilt | |
CN101037175B (en) | Weight-balancing type lifting method and equipment | |
CN103641000A (en) | Crane and super-lifting device thereof | |
CN203715125U (en) | Crane as well as guying device thereof | |
CN106115516B (en) | Crane, super lifting device and its pretension steel wire rope control method and system | |
CN205132977U (en) | Movable swing arm tower machine installation wire rope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |