CN205614591U - A interfacing apparatus for petroleum pipeline flange installation - Google Patents

A interfacing apparatus for petroleum pipeline flange installation Download PDF

Info

Publication number
CN205614591U
CN205614591U CN201620419668.4U CN201620419668U CN205614591U CN 205614591 U CN205614591 U CN 205614591U CN 201620419668 U CN201620419668 U CN 201620419668U CN 205614591 U CN205614591 U CN 205614591U
Authority
CN
China
Prior art keywords
righting
wiper block
tapered
flange
petroleum pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620419668.4U
Other languages
Chinese (zh)
Inventor
贺昶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Xingzhi Zhihui Intellectual Property Operation Co Ltd
Original Assignee
Sichuan Xingzhi Zhihui Intellectual Property Operation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Xingzhi Zhihui Intellectual Property Operation Co Ltd filed Critical Sichuan Xingzhi Zhihui Intellectual Property Operation Co Ltd
Priority to CN201620419668.4U priority Critical patent/CN205614591U/en
Application granted granted Critical
Publication of CN205614591U publication Critical patent/CN205614591U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an interfacing apparatus for petroleum pipeline flange installation, including first right the piece and the second right the piece, first upper portion and the middle part of rightting a medial surface is provided with a tapered section of thick bamboo respectively, the first lower part of rightting a medial surface be provided with first flange and right the arch, first right to be provided with between two last tapered section of thick bamboos of piece right the lead screw, a medial surface was right to the second upper portion and middle part are provided with tapered arch respectively, tapered arch is mutually supported with a first tapered section of thick bamboo of rightting on the piece, the second is right and is set up adjust through hole between two last tapered archs of piece, the lower part that a medial surface was right to the second is provided with the second flange and rights the arch, the first lead screw of rightting on the piece of rightting is inserted in the adjust through hole who establishes on the piece is right to the second, right to be provided with on the lead screw and right the hand wheel.

Description

A kind of docking facilities installed for petroleum pipeline adpting flange
Technical field
This utility model relates to a kind of flange connecting hole docking righting field, is specifically related to a kind of docking facilities installed for petroleum pipeline adpting flange.
Background technology
In oil gas field production scene, utilizing flange is the current most widely used a kind of connected mode of staff to connect all kinds of device (pipeline), flange can make staff maintenance, change accessory time relatively quick, be readily achieved work.At present, in oil gas field production scene, it is a kind of conventional connected mode to connect all kinds of valve or other accessories that pipeline utilizes flange.In process of production, the weight factor of the Flange joint object owing to the pipeline in flow process is vibrated, on object compressing or pipeline, cause the phenomenon of pipeline bending, make flange connections can form two panels flange to stagger the most up and down, when maintenance, replacing accessory, staff is difficult to install adpting flange, and needs sled is shouldered and prized flange, connects to install after again coordinating two panels flange.This makes the work process of maintenance and installation flange waste time and energy, and reduces work efficiency, have impact on productivity effect.
Utility model content
The purpose of this utility model is i.e. to overcome the deficiencies in the prior art, it is provided that a kind of docking facilities installed for petroleum pipeline adpting flange, solves in oil and gas pipes installation and maintenance, and the bolt mounting holes of flange cannot the problem of light Dock With Precision Position.
Of the present utility model it is achieved through the following technical solutions: a kind of docking facilities installed for petroleum pipeline adpting flange, including the first wiper block and the second wiper block, the top of described first wiper block medial surface and middle part are respectively arranged with tapered barrel, and it is protruding that the bottom of the first described wiper block medial surface is provided with the first flange righting;It is provided with righting screw mandrel between two tapered barrels on the first described wiper block;Top and the middle part of described second wiper block medial surface are respectively arranged with tapered projection, described tapered projection cooperates with the tapered barrel on the first wiper block, arranging regulation through hole on described second wiper block between two tapered projections, it is protruding that the bottom of described second wiper block medial surface is provided with the second flange righting;Righting screw mandrel on described first wiper block is plugged in the regulation through hole on the second wiper block, and described righting screw mandrel is provided with righting handwheel.Outside the first described wiper block, lower end is provided with petroleum pipeline bracket, described petroleum pipeline bracket includes regulating riser and camber pipe support, described regulation riser is arranged on camber pipe support, being provided with bar shaped adjustment hole on described regulation riser, described petroleum pipeline bracket is fixed on the first wiper block in being plugged in bar shaped adjustment hole by regulation bolt.
Further, the first described wiper block arranges handle rack.
Further, the second described wiper block arranges handle rack.
Further, the termination of the first described flange righting projection is provided with righting tapered barrel, and the termination that the second described flange righting is protruding is provided with the tapered projection of righting, and described righting tapered barrel projection tapered with righting cooperates.
Further, the termination of the first described flange righting projection is provided with the tapered projection of righting, and the termination that the second described flange righting is protruding is provided with righting tapered barrel, and described righting tapered barrel projection tapered with righting cooperates.
Further, described regulation bolt includes that adjusting handle, screw mandrel and retaining ring, described adjusting handle are arranged on the termination of screw mandrel, and described retaining ring is fixed on screw mandrel.
This utility model compared with prior art, has such advantages as and beneficial effect:
1, by arranging the tapered barrel of the righting docking that cooperates and tapered projection on the first wiper block and the second wiper block, can accurately regulate and control the first flange righting projection and the docking of the second flange righting projection on the first wiper block and the second wiper block, so that two flange holes being in deviation dock completely, it is simple to install bolt;
2, on the first wiper block and the second wiper block, it is respectively provided with handle rack, it is simple to implement petroleum pipeline adpting flange righting docking;
3, the termination that the first flange righting is protruding being provided with the tapered projection of righting, be provided with righting tapered barrel in the termination that the second flange righting is protruding, righting tapered barrel and the tapered projection of righting cooperate and can make two flange hole Dock With Precision Positions;
4, by arranging petroleum pipeline bracket on the first wiper block, the first wiper block can be fixed on petroleum pipeline, it is simple to implement petroleum pipeline adpting flange righting docking, need not be the most hand steered the first wiper block.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing being further appreciated by this utility model embodiment, constitutes the part of the application, is not intended that the restriction to this utility model embodiment.In the accompanying drawings:
Fig. 1 is the structural representation of a kind of docking facilities installed for petroleum pipeline adpting flange of this utility model;
Fig. 2 is that this utility model carries out the view of righting adjustment to two flanges devious;
Fig. 3 is the view after two flange rightings devious are adjusted by this utility model;
Fig. 4 is the structural representation of this utility model petroleum pipeline bracket;
Fig. 5 is the structural representation of this utility model regulation bolt;
Labelling and corresponding parts title in accompanying drawing:
1-the first wiper block, 2-the second wiper block, 3-tapered barrel, 4-the first flange righting is protruding, 5-righting screw mandrel, the tapered projection of 6-, 7-regulates through hole, and 8-the second flange righting is protruding, 9-righting handwheel, 10-handle rack, 11-righting tapered barrel, the tapered projection of 12-righting, 13-petroleum pipeline bracket, 14-regulates riser, 15-camber pipe support, 16-bar shaped adjustment hole, 17-regulates bolt, 18-adjusting handle, 19-screw mandrel, 20-retaining ring.
Detailed description of the invention
For making the purpose of this utility model, technical scheme and advantage clearer, below in conjunction with embodiment and accompanying drawing, the utility model is described in further detail, exemplary embodiment of the present utility model and explanation thereof are only used for explaining this utility model, are not intended as restriction of the present utility model.
Embodiment 1
As Figure 1-4, a kind of docking facilities installed for petroleum pipeline adpting flange of this utility model, including the first wiper block 1 and the second wiper block 2, the top of the first wiper block 1 medial surface and middle part are respectively arranged with tapered barrel 3, and the bottom of the first wiper block 1 medial surface is provided with the first flange righting projection 4;It is provided with righting screw mandrel 5 between two tapered barrels 3 on first wiper block 1;Top and the middle part of the second wiper block 2 medial surface are respectively arranged with tapered protruding 6, on second wiper block 2 tapered protruding 6 cooperate with the tapered barrel 3 on the first wiper block 1 and dock, arranging regulation through hole 7 on second wiper block 2 between two tapered convex 6, the bottom of the second wiper block 2 medial surface is provided with the second flange righting projection 8;Righting screw mandrel 5 on first wiper block 1 is plugged in the regulation through hole 7 on the second wiper block 2, and righting screw mandrel 5 is provided with righting handwheel 9.Outside first wiper block 1, lower end is provided with petroleum pipeline bracket 13, petroleum pipeline bracket 13 includes regulating riser 14 and camber pipe support 15, regulation riser 14 is arranged on camber pipe support 15, being provided with bar shaped adjustment hole 16 on regulation riser 14, petroleum pipeline bracket 13 is fixed on the first wiper block 1 in being plugged in bar shaped adjustment hole 16 by regulation bolt 17.
nullAs Figure 2-3,During use,The flange hole being in deviation to two adjusts docking,First righting handwheel 9 is unclamped,Make the second wiper block 2 can move freely on righting screw mandrel 5,Then the first flange righting projection 4 on the first wiper block 1 is placed in the installing hole of one of them flange,Regulation regulation bolt 17 makes petroleum pipeline bracket 13 that first wiper block 1 is formed support,First wiper block 1 is fixed on petroleum pipeline,The second flange righting projection 8 on second wiper block 2 is placed in the installing hole of pre-docking of another flange,Then rotation hand wheel,Extrude the second wiper block 2 by handwheel to move to the first wiper block 1,On second wiper block 2 two tapered protruding 6 cooperate with two tapered barrels 3 on the first wiper block 1 and dock,If two tapered protruding 6 can complete to dock with two tapered barrels 3,Ensure that the first flange righting protruding 4 and the second flange righting protruding 8 drive flange to complete docking,After having docked,Petroleum pipeline can be carried out supporting,Then flange erection device is removed,Bolt is arranged on two flange connecting holes and i.e. completes docking.
By arranging the tapered barrel 3 and tapered protruding 6 of the righting docking that cooperates on the first wiper block 1 and the second wiper block 2, can accurately regulate and control the first flange righting on the first wiper block 1 and the second wiper block 2 convex 4 and protruding 8 docking of the second flange righting, so that two flange holes being in deviation dock completely, it is simple to install bolt.
Embodiment 2
As Figure 1-4, a kind of docking facilities installed for petroleum pipeline adpting flange of this utility model, on the basis of embodiment 1, the first wiper block 1 arranges handle rack 10.On second wiper block 2, handle rack 10 is set.First wiper block 1 and the second wiper block 2 are respectively provided with handle rack 10, it is simple to implement petroleum pipeline adpting flange righting docking.
Embodiment 3
As Figure 1-4, a kind of docking facilities installed for petroleum pipeline adpting flange of this utility model, on the basis of embodiment 1, the termination of the first flange righting projection 4 is provided with righting tapered barrel 11, the termination of the second flange righting projection 8 is provided with righting tapered protruding 12, and tapered with righting protruding 12 of righting tapered barrel 11 cooperates.Righting tapered barrel 11 and righting tapered protruding 12 cooperate and can make two flange hole Dock With Precision Positions.
Embodiment 4
As Figure 1-3, a kind of docking facilities installed for petroleum pipeline adpting flange of this utility model, on the basis of embodiment 1, the termination of the first flange righting projection 4 is provided with righting tapered protruding 12, the termination of the second flange righting projection 8 is provided with righting tapered barrel 11, and righting tapered barrel 11 tapered with righting protruding 12 cooperates.Righting tapered barrel 11 and righting tapered protruding 12 cooperate and can make two flange hole Dock With Precision Positions.
Embodiment 5
As shown in Figure 5, a kind of docking facilities installed for petroleum pipeline adpting flange of this utility model, on the basis of embodiment 1, regulation bolt 17 includes adjusting handle 18, screw mandrel 19 and retaining ring 20, adjusting handle 18 is arranged on the termination of screw mandrel 19, and retaining ring 20 is fixed on screw mandrel 19.Screw mandrel 19 can be driven to rotate by rotating adjusting handle 18, arranging retaining ring 20 on screw mandrel 19 is to need not just to extrude locked to petroleum pipeline bracket formation in a screw mandrel is all arranged on the first wiper block 1.
Above-described detailed description of the invention; the purpose of this utility model, technical scheme and beneficial effect are further described; it is it should be understood that; the foregoing is only detailed description of the invention of the present utility model; it is not used to limit protection domain of the present utility model; all within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. done, within should be included in protection domain of the present utility model.

Claims (6)

1. the docking facilities installed for petroleum pipeline adpting flange, including the first wiper block (1) and the second wiper block (2), it is characterized in that: the top of described first wiper block (1) medial surface and middle part are respectively arranged with tapered barrel (3), it is protruding (4) that the bottom of described the first wiper block (1) medial surface is provided with the first flange righting;It is provided with righting screw mandrel (5) between upper two tapered barrels (3) of described the first wiper block (1);
Top and the middle part of described second wiper block (2) medial surface are respectively arranged with tapered projection (6), described tapered projection (6) cooperates with the tapered barrel (3) on the first wiper block (1), arranging regulation through hole (7) between upper two the tapered projections (6) of described second wiper block (2), it is protruding (8) that the bottom of described second wiper block (2) medial surface is provided with the second flange righting;
Righting screw mandrel (5) on described first wiper block (1) is plugged in the regulation through hole (7) on the second wiper block (2) Nei, and described righting screw mandrel (5) is provided with righting handwheel (9);
Described lower end, the first wiper block (1) outside is provided with petroleum pipeline bracket (13), described petroleum pipeline bracket (13) includes regulating riser (14) and camber pipe support (15), described regulation riser (14) is arranged on camber pipe support (15), being provided with bar shaped adjustment hole (16) on described regulation riser (14), described petroleum pipeline bracket (13) is fixed on the first wiper block (1) in being plugged in bar shaped adjustment hole (16) by regulation bolt (17).
A kind of docking facilities installed for petroleum pipeline adpting flange the most according to claim 1, it is characterised in that: on described the first wiper block (1), handle rack (10) is set.
A kind of docking facilities installed for petroleum pipeline adpting flange the most according to claim 1, it is characterised in that: on described the second wiper block (2), handle rack (10) is set.
A kind of docking facilities installed for petroleum pipeline adpting flange the most according to claim 1, it is characterized in that: the termination of described the first flange righting protruding (4) is provided with righting tapered barrel (11), the termination of described the second flange righting protruding (8) is provided with the tapered projection of righting (12), and described righting tapered barrel (11) projection tapered with righting (12) cooperates.
A kind of docking facilities installed for petroleum pipeline adpting flange the most according to claim 1, it is characterized in that: the termination of described the first flange righting protruding (4) is provided with the tapered projection of righting (12), the termination of described the second flange righting protruding (8) is provided with righting tapered barrel (11), and described righting tapered barrel (11) projection tapered with righting (12) cooperates.
A kind of docking facilities installed for petroleum pipeline adpting flange the most according to claim 1, it is characterized in that: described regulation bolt (17) includes adjusting handle (18), screw mandrel (19) and retaining ring (20), described adjusting handle (18) is arranged on the termination of screw mandrel (19), and described retaining ring (20) is fixed on screw mandrel (19).
CN201620419668.4U 2016-05-11 2016-05-11 A interfacing apparatus for petroleum pipeline flange installation Expired - Fee Related CN205614591U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620419668.4U CN205614591U (en) 2016-05-11 2016-05-11 A interfacing apparatus for petroleum pipeline flange installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620419668.4U CN205614591U (en) 2016-05-11 2016-05-11 A interfacing apparatus for petroleum pipeline flange installation

Publications (1)

Publication Number Publication Date
CN205614591U true CN205614591U (en) 2016-10-05

Family

ID=57026196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620419668.4U Expired - Fee Related CN205614591U (en) 2016-05-11 2016-05-11 A interfacing apparatus for petroleum pipeline flange installation

Country Status (1)

Country Link
CN (1) CN205614591U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105751156A (en) * 2016-05-11 2016-07-13 四川行之智汇知识产权运营有限公司 Butting device used for mounting petroleum pipeline connection flange
CN107900945A (en) * 2017-11-28 2018-04-13 中国冶集团有限公司 Flue flange centering pressing device and method
CN109458506A (en) * 2018-12-20 2019-03-12 重庆天路电力设备有限公司 A kind of flanged joint equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105751156A (en) * 2016-05-11 2016-07-13 四川行之智汇知识产权运营有限公司 Butting device used for mounting petroleum pipeline connection flange
CN105751156B (en) * 2016-05-11 2018-12-04 四川行之智汇知识产权运营有限公司 A kind of docking adapter for the installation of petroleum pipeline connecting flange
CN107900945A (en) * 2017-11-28 2018-04-13 中国冶集团有限公司 Flue flange centering pressing device and method
CN107900945B (en) * 2017-11-28 2019-06-25 中国一冶集团有限公司 Flue flange centering pressing device and method
CN109458506A (en) * 2018-12-20 2019-03-12 重庆天路电力设备有限公司 A kind of flanged joint equipment
CN109458506B (en) * 2018-12-20 2020-09-18 重庆天路电力设备有限公司 Flange connecting device

Similar Documents

Publication Publication Date Title
CN105889627A (en) Hydraulic butt joint device for mounting connecting flange of petroleum pipeline
CN205614591U (en) A interfacing apparatus for petroleum pipeline flange installation
CN104029104A (en) Suspension type grinding machine rotation adjusting device
CN206846090U (en) A kind of ultra-large type GRP pipe counterpart installs interim holding card
CN104019284B (en) A kind of fixed pipeline support
CN204620250U (en) A kind of controllable spray equipment
CN105881002A (en) Centralizing device for connecting flange of petroleum pipeline
CN105751156A (en) Butting device used for mounting petroleum pipeline connection flange
CN204609070U (en) Adjustable steel adaptor
CN204096477U (en) The conduction band transmitting device of adjustable-angle
CN105751145A (en) Hydraulic centralizer for connection flange butting of petroleum pipelines
CN205896391U (en) Support pipeline support frame of different pipe diameters
CN204869415U (en) A quick fixture that is used for column type membrane shell to pour into a mould
CN113074278B (en) Pipeline auxiliary laying device with limiting function for civil engineering construction
CN205781372U (en) Pipeline support frame
CN203875514U (en) Welding torch adjusting mechanism of rod welding machine
CN207695392U (en) A kind of multipurpose horizontal bending machine
CN219413868U (en) Flange convenient to dismantle
CN212080349U (en) Copper-plated steel pipe convenient to adjust installation angle
CN205698238U (en) A kind of composite structure of material
CN111878650B (en) Pipeline flange interfacing apparatus for hydraulic engineering
CN206783263U (en) A kind of wall-attaching equipment
CN206643553U (en) A kind of H types drainpipe welding equipment
CN204238615U (en) The hull lifting guide device of multi-storied garage
CN104289569A (en) Channel steel bending device for circumferential fastening of crystallizing tank

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161005

Termination date: 20190511