CN105751156A - Butting device used for mounting petroleum pipeline connection flange - Google Patents

Butting device used for mounting petroleum pipeline connection flange Download PDF

Info

Publication number
CN105751156A
CN105751156A CN201610306364.1A CN201610306364A CN105751156A CN 105751156 A CN105751156 A CN 105751156A CN 201610306364 A CN201610306364 A CN 201610306364A CN 105751156 A CN105751156 A CN 105751156A
Authority
CN
China
Prior art keywords
righting
wiper block
flange
tapered
petroleum pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610306364.1A
Other languages
Chinese (zh)
Other versions
CN105751156B (en
Inventor
贺昶明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yueyang Jianhua Engineering Co., Ltd.
Original Assignee
Sichuan Xingzhi Zhihui Intellectual Property Operation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Xingzhi Zhihui Intellectual Property Operation Co Ltd filed Critical Sichuan Xingzhi Zhihui Intellectual Property Operation Co Ltd
Priority to CN201610306364.1A priority Critical patent/CN105751156B/en
Publication of CN105751156A publication Critical patent/CN105751156A/en
Application granted granted Critical
Publication of CN105751156B publication Critical patent/CN105751156B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B27/00Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
    • B25B27/14Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same
    • B25B27/16Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same abutted flanges

Abstract

The invention discloses a butting device used for mounting a petroleum pipeline connection flange. The butting device comprises a first strengthening block and a second strengthening block, wherein conical cylinders are arranged at the upper part and in the middle of the inner side surface of the first strengthening block respectively; a first flange strengthening bulge is arranged at the lower part of the inner side surface of the first strengthening block; a strengthening screw rod is arranged between the two conical cylinders on the first strengthening block; conical bulges are arranged at the upper part and in the middle of the inner side surface of the second strengthening block respectively; the conical bulges are matched with the conical cylinders on the first strengthening block; an adjusting through hole is formed between the two conical bulges on the second strengthening block; a second flange strengthening bulge is arranged at the lower part of the inner side surface of the second strengthening block; the strengthening screw rod on the first strengthening block is inserted in the adjusting through hole in the second strengthening block; and a strengthening hand wheel is arranged on the strengthening screw rod.

Description

A kind of docking adapter installed for petroleum pipeline adpting flange
Technical field
The present invention relates to a kind of flange connecting hole docking righting field, be specifically related to a kind of docking adapter installed for petroleum pipeline adpting flange.
Background technology
In oil gas field production scene, utilizing flange is the current most widely used a kind of connected mode of staff to connect all kinds of device (pipeline), flange can make staff maintenance, change accessory time relatively quick, be readily achieved work.At present, in oil gas field production scene, it is a kind of conventional connected mode to connect all kinds of valve or other accessories that pipeline utilizes flange.In process of production, the weight factor of the Flange joint object owing to the pipeline in flow process is vibrated, on object compressing or pipeline, cause the phenomenon of pipeline bending, make flange connections can form two panels flange to stagger up and down to some extent, when maintenance, replacing accessory, staff is difficult to install adpting flange, it is necessary to shoulders with sled and prizes flange, connects to install after two panels flange carries out cooperation again.This makes the work process of maintenance and installation flange waste time and energy, and reduces work efficiency, have impact on productivity effect.
Summary of the invention
Namely the purpose of the present invention is in that to overcome the deficiencies in the prior art, it is provided that a kind of docking adapter installed for petroleum pipeline adpting flange, solves in oil and gas pipes installation and maintenance, and the bolt mounting holes of flange cannot the problem of light Dock With Precision Position.
The present invention is achieved through the following technical solutions: a kind of docking adapter installed for petroleum pipeline adpting flange, including the first wiper block and the second wiper block, the top of described first wiper block medial surface and middle part are respectively arranged with tapered barrel, and it is protruding that the bottom of the first described wiper block medial surface is provided with the first flange righting;The first described wiper block is provided with righting screw mandrel between two tapered barrels;Top and the middle part of described second wiper block medial surface are respectively arranged with tapered projection, described tapered projection cooperates with the tapered barrel on the first wiper block, arranging adjustment through hole on described second wiper block between two tapered projections, it is protruding that the bottom of described second wiper block medial surface is provided with the second flange righting;Righting screw mandrel on described first wiper block is plugged in the adjustment through hole on the second wiper block, and described righting screw mandrel is provided with righting handwheel.Outside the first described wiper block, lower end is provided with petroleum pipeline bracket, described petroleum pipeline bracket includes regulating riser and camber pipe support, described adjustment riser is arranged on camber pipe support, being provided with bar shaped adjustment hole on described adjustment riser, described petroleum pipeline bracket is plugged in bar shaped adjustment hole by adjusting bolt and is fixed on the first wiper block.
Further, the first described wiper block arranges handle rack.
Further, the second described wiper block arranges handle rack.
Further, the termination of the first described flange righting projection is provided with righting tapered barrel, and the termination of the second described flange righting projection is provided with the tapered projection of righting, and described righting tapered barrel and the tapered projection of righting cooperate.
Further, the termination of the first described flange righting projection is provided with the tapered projection of righting, and the termination of the second described flange righting projection is provided with righting tapered barrel, and described righting tapered barrel and the tapered projection of righting cooperate.
Further, described adjusting bolt includes adjusting handle, screw mandrel and retaining ring, and described adjusting handle is arranged on the termination of screw mandrel, and described retaining ring is fixed on screw mandrel.
The present invention compared with prior art, has such advantages as and beneficial effect:
1, by arranging the tapered barrel of the righting docking that cooperates and tapered projection on the first wiper block and the second wiper block, can accurately regulate and control the first flange righting projection and the docking of the second flange righting projection on the first wiper block and the second wiper block, so that two flange holes being in deviation dock completely, it is simple to install bolt;
2, on the first wiper block and the second wiper block, it is respectively provided with handle rack, it is simple to implement petroleum pipeline adpting flange righting docking;
3, the termination that the first flange righting is protruding being provided with the tapered projection of righting, be provided with righting tapered barrel in the termination that the second flange righting is protruding, righting tapered barrel and the tapered projection of righting cooperate and can make two flange hole Dock With Precision Positions;
4, by arranging petroleum pipeline bracket on the first wiper block, can the first wiper block be fixed on petroleum pipeline, it is simple to implement petroleum pipeline adpting flange righting docking, need not hand steered the first wiper block in real time.
Accompanying drawing explanation
Accompanying drawing described herein is used for providing being further appreciated by the embodiment of the present invention, constitutes the part of the application, is not intended that the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is the structural representation of a kind of docking adapter installed for petroleum pipeline adpting flange of the present invention;
Fig. 2 is that two flanges devious are carried out the view of righting adjustment by the present invention;
Fig. 3 is the view after two flange rightings devious are adjusted by the present invention;
Fig. 4 is the structural representation of petroleum pipeline bracket of the present invention;
Fig. 5 is the structural representation of adjusting bolt of the present invention;
Labelling and corresponding parts title in accompanying drawing:
1-the first wiper block, 2-the second wiper block, 3-tapered barrel, 4-the first flange righting is protruding, 5-righting screw mandrel, the tapered projection of 6-, 7-regulates through hole, and 8-the second flange righting is protruding, 9-righting handwheel, 10-handle rack, 11-righting tapered barrel, the tapered projection of 12-righting, 13-petroleum pipeline bracket, 14-regulates riser, 15-camber pipe support, 16-bar shaped adjustment hole, 17-adjusting bolt, 18-adjusting handle, 19-screw mandrel, 20-retaining ring.
Detailed description of the invention
For making the object, technical solutions and advantages of the present invention clearly understand, below in conjunction with embodiment and accompanying drawing, the present invention is described in further detail, and exemplary embodiment and the explanation thereof of the present invention are only used for explaining the present invention, not as a limitation of the invention.
Embodiment 1
As Figure 1-4, a kind of docking adapter installed for petroleum pipeline adpting flange of the present invention, including the first wiper block 1 and the second wiper block 2, top and the middle part of the first wiper block 1 medial surface are respectively arranged with tapered barrel 3, and the bottom of the first wiper block 1 medial surface is provided with the first flange righting projection 4;First wiper block 1 is provided with righting screw mandrel 5 between two tapered barrels 3;Top and the middle part of the second wiper block 2 medial surface are respectively arranged with tapered protruding 6, on second wiper block 2 tapered protruding 6 cooperate with the tapered barrel 3 on the first wiper block 1 and dock, arranging adjustment through hole 7 on second wiper block 2 between two tapered convex 6, the bottom of the second wiper block 2 medial surface is provided with the second flange righting projection 8;Righting screw mandrel 5 on first wiper block 1 is plugged in the adjustment through hole 7 on the second wiper block 2, and righting screw mandrel 5 is provided with righting handwheel 9.Outside first wiper block 1, lower end is provided with petroleum pipeline bracket 13, petroleum pipeline bracket 13 includes regulating riser 14 and camber pipe support 15, regulate riser 14 and be arranged on camber pipe support 15, regulating and be provided with bar shaped adjustment hole 16 on riser 14, petroleum pipeline bracket 13 is plugged in bar shaped adjustment hole 16 is fixed on the first wiper block 1 by adjusting bolt 17.
nullAs Figure 2-3,During use,Two are in the flange hole adjustment docking of deviation,First righting handwheel 9 is unclamped,Make the second wiper block 2 can move freely on righting screw mandrel 5,Then the first flange righting projection 4 on the first wiper block 1 is placed in the installing hole of one of them flange,Regulating adjusting bolt 17 makes petroleum pipeline bracket 13 that first wiper block 1 is formed support,First wiper block 1 is fixed on petroleum pipeline,The second flange righting projection 8 on second wiper block 2 is placed in the installing hole of pre-docking of another flange,Then rotation hand wheel,Extrude the second wiper block 2 by handwheel to move to the first wiper block 1,On second wiper block 2 two tapered protruding 6 cooperate with two tapered barrels 3 on the first wiper block 1 and dock,If two tapered protruding 6 can complete to dock with two tapered barrels 3,Ensure that the first flange righting protruding 4 and the second flange righting protruding 8 drive flange to complete docking,After having docked,Petroleum pipeline can be carried out supporting,Then flange erection device is removed,Bolt is arranged on two flange connecting holes and namely completes docking.
By arranging the tapered barrel 3 and tapered protruding 6 of the righting docking that cooperates on the first wiper block 1 and the second wiper block 2, can accurately regulate and control the first flange righting on the first wiper block 1 and the second wiper block 2 convex 4 and protruding 8 docking of the second flange righting, so that two flange holes being in deviation dock completely, it is simple to install bolt.
Embodiment 2
As Figure 1-4, a kind of docking adapter installed for petroleum pipeline adpting flange of the present invention, on the basis of embodiment 1, the first wiper block 1 arranges handle rack 10.Second wiper block 2 arranges handle rack 10.First wiper block 1 and the second wiper block 2 are respectively provided with handle rack 10, it is simple to implement petroleum pipeline adpting flange righting docking.
Embodiment 3
As Figure 1-4, a kind of docking adapter installed for petroleum pipeline adpting flange of the present invention, on the basis of embodiment 1, the termination of the first flange righting projection 4 is provided with righting tapered barrel 11, the termination of the second flange righting projection 8 is provided with righting tapered protruding 12, and righting tapered barrel 11 and tapered protruding 12 of righting cooperate.Righting tapered barrel 11 and righting tapered protruding 12 cooperate and can make two flange hole Dock With Precision Positions.
Embodiment 4
As Figure 1-3, a kind of docking adapter installed for petroleum pipeline adpting flange of the present invention, on the basis of embodiment 1, the termination of the first flange righting projection 4 is provided with righting tapered protruding 12, the termination of the second flange righting projection 8 is provided with righting tapered barrel 11, and righting tapered barrel 11 and righting tapered protruding 12 cooperate.Righting tapered barrel 11 and righting tapered protruding 12 cooperate and can make two flange hole Dock With Precision Positions.
Embodiment 5
As shown in Figure 5, a kind of docking adapter installed for petroleum pipeline adpting flange of the present invention, on the basis of embodiment 1, adjusting bolt 17 includes adjusting handle 18, screw mandrel 19 and retaining ring 20, adjusting handle 18 is arranged on the termination of screw mandrel 19, and retaining ring 20 is fixed on screw mandrel 19.Screw mandrel 19 can being driven to rotate by rotating adjusting handle 18, arranging retaining ring 20 on screw mandrel 19 is to screw mandrel be all arranged in the first wiper block 1 and just can extrude locked to petroleum pipeline bracket formation.
Above-described detailed description of the invention; the purpose of the present invention, technical scheme and beneficial effect have been further described; it is it should be understood that; the foregoing is only the specific embodiment of the present invention; the protection domain being not intended to limit the present invention; all within the spirit and principles in the present invention, any amendment of making, equivalent replacement, improvement etc., should be included within protection scope of the present invention.

Claims (6)

1. the docking adapter installed for petroleum pipeline adpting flange, including the first wiper block (1) and the second wiper block (2), it is characterized in that: the top of described first wiper block (1) medial surface and middle part are respectively arranged with tapered barrel (3), the bottom of described the first wiper block (1) medial surface is provided with the first flange righting protruding (4);It is provided with righting screw mandrel (5) between upper two tapered barrels (3) of described the first wiper block (1);
Top and the middle part of described second wiper block (2) medial surface are respectively arranged with tapered projection (6), described tapered projection (6) cooperates with the tapered barrel (3) on the first wiper block (1), described second wiper block (2) upper two tapered convex (6) arranges adjustment through hole (7) between rising, the bottom of described second wiper block (2) medial surface is provided with the second flange righting protruding (8);
Righting screw mandrel (5) on described first wiper block (1) is plugged in the adjustment through hole (7) on the second wiper block (2), and described righting screw mandrel (5) is provided with righting handwheel (9);
Described lower end, the first wiper block (1) outside is provided with petroleum pipeline bracket (13), described petroleum pipeline bracket (13) includes regulating riser (14) and camber pipe support (15), described adjustment riser (14) is arranged on camber pipe support (15), being provided with bar shaped adjustment hole (16) on described adjustment riser (14), described petroleum pipeline bracket (13) is plugged in bar shaped adjustment hole (16) by adjusting bolt (17) and is fixed on the first wiper block (1).
2. a kind of docking adapter installed for petroleum pipeline adpting flange according to claim 1, it is characterised in that: described the first wiper block (1) arranges handle rack (10).
3. a kind of docking adapter installed for petroleum pipeline adpting flange according to claim 1, it is characterised in that: described the second wiper block (2) arranges handle rack (10).
4. a kind of docking adapter installed for petroleum pipeline adpting flange according to claim 1, it is characterized in that: the termination of described the first flange righting protruding (4) is provided with righting tapered barrel (11), the termination of described the second flange righting protruding (8) is provided with the tapered projection of righting (12), and described righting tapered barrel (11) and the tapered projection of righting (12) cooperate.
5. a kind of docking adapter installed for petroleum pipeline adpting flange according to claim 1, it is characterized in that: the termination of described the first flange righting protruding (4) is provided with the tapered projection of righting (12), the termination of described the second flange righting protruding (8) is provided with righting tapered barrel (11), and described righting tapered barrel (11) and the tapered projection of righting (12) cooperate.
6. a kind of docking adapter installed for petroleum pipeline adpting flange according to claim 1, it is characterized in that: described adjusting bolt (17) includes adjusting handle (18), screw mandrel (19) and retaining ring (20), described adjusting handle (18) is arranged on the termination of screw mandrel (19), and described retaining ring (20) is fixed on screw mandrel (19).
CN201610306364.1A 2016-05-11 2016-05-11 A kind of docking adapter for the installation of petroleum pipeline connecting flange Active CN105751156B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610306364.1A CN105751156B (en) 2016-05-11 2016-05-11 A kind of docking adapter for the installation of petroleum pipeline connecting flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610306364.1A CN105751156B (en) 2016-05-11 2016-05-11 A kind of docking adapter for the installation of petroleum pipeline connecting flange

Publications (2)

Publication Number Publication Date
CN105751156A true CN105751156A (en) 2016-07-13
CN105751156B CN105751156B (en) 2018-12-04

Family

ID=56323853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610306364.1A Active CN105751156B (en) 2016-05-11 2016-05-11 A kind of docking adapter for the installation of petroleum pipeline connecting flange

Country Status (1)

Country Link
CN (1) CN105751156B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017193505A1 (en) * 2016-05-11 2017-11-16 四川行之智汇知识产权运营有限公司 Hydraulic butting apparatus mounted on petroleum pipe connecting flange

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2393795A (en) * 1944-09-08 1946-01-29 Herbert L Miller Flange spreader
US2420438A (en) * 1944-12-30 1947-05-13 Marshall M Morgan Flange jack
WO2002086372A1 (en) * 2001-04-24 2002-10-31 Future Alignments Limited Apparatus for spreading flanges of pipes________________________
JP2015160301A (en) * 2014-02-28 2015-09-07 日本建設工業株式会社 Flange outer circumferential surface alignment jig
CN204639999U (en) * 2015-02-28 2015-09-16 重庆智茂机械制造有限公司 Car limit fixture automation equipment
CN204640147U (en) * 2015-03-25 2015-09-16 陕煤集团神木红柳林矿业有限公司 For fastening and open the device of line connection flange
CN205614591U (en) * 2016-05-11 2016-10-05 四川行之智汇知识产权运营有限公司 A interfacing apparatus for petroleum pipeline flange installation

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2393795A (en) * 1944-09-08 1946-01-29 Herbert L Miller Flange spreader
US2420438A (en) * 1944-12-30 1947-05-13 Marshall M Morgan Flange jack
WO2002086372A1 (en) * 2001-04-24 2002-10-31 Future Alignments Limited Apparatus for spreading flanges of pipes________________________
JP2015160301A (en) * 2014-02-28 2015-09-07 日本建設工業株式会社 Flange outer circumferential surface alignment jig
CN204639999U (en) * 2015-02-28 2015-09-16 重庆智茂机械制造有限公司 Car limit fixture automation equipment
CN204640147U (en) * 2015-03-25 2015-09-16 陕煤集团神木红柳林矿业有限公司 For fastening and open the device of line connection flange
CN205614591U (en) * 2016-05-11 2016-10-05 四川行之智汇知识产权运营有限公司 A interfacing apparatus for petroleum pipeline flange installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2017193505A1 (en) * 2016-05-11 2017-11-16 四川行之智汇知识产权运营有限公司 Hydraulic butting apparatus mounted on petroleum pipe connecting flange

Also Published As

Publication number Publication date
CN105751156B (en) 2018-12-04

Similar Documents

Publication Publication Date Title
CN105889627A (en) Hydraulic butt joint device for mounting connecting flange of petroleum pipeline
CN205614591U (en) A interfacing apparatus for petroleum pipeline flange installation
CN206846090U (en) A kind of ultra-large type GRP pipe counterpart installs interim holding card
CN105751156A (en) Butting device used for mounting petroleum pipeline connection flange
CN210770990U (en) Open-air patching device of small-bore steel pipeline and repair structure
CN112495623B (en) Standpipe maintenance device with coating repairing function for ocean drilling platform
CN203068018U (en) Rapid sealing connector device of broken pipe
CN105881002A (en) Centralizing device for connecting flange of petroleum pipeline
CN105751145A (en) Hydraulic centralizer for connection flange butting of petroleum pipelines
CN205271271U (en) Bell and spigot steel ring welded auxiliary device
CN107650070A (en) A kind of cam shaft bush dismantling device of diesel engine
CN216577552U (en) Pipeline butt joint auxiliary fixtures
CN105643655A (en) Mechanical arm used for replacing spiral liner plate
CN204996952U (en) Roll extrusion connecting device is used in metal pipeline connection
CN204413495U (en) End face of flange processing unit (plant)
CN205896391U (en) Support pipeline support frame of different pipe diameters
CN210388993U (en) Chemical industry petroleum equipment pipe installation specialized tool
CN205380531U (en) Brill is adopted instrument and is restoreed interior surface weld way polisher
CN111878650B (en) Pipeline flange interfacing apparatus for hydraulic engineering
CN203784558U (en) Telescoping device for socket-and-spigot pipe replacement
CN112008621B (en) Auxiliary centering device for nut
CN203641207U (en) Expanded connection component
CN218927663U (en) Construction pipeline connection structure
CN205778600U (en) A kind of erection device of oil-extractor polish-rod
CN216657691U (en) Reinforcing apparatus for pipeline engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181205

Address after: 610000 Rong Ou, 144 Qingbaijiang Road, Chengdu, Sichuan.

Patentee after: Chengdu Zhi Rong Chuang Intellectual Property Operation Co., Ltd.

Address before: 610000 No. 10, 2 2, 88 Jiao Zi Road, Chengdu high tech Zone, Sichuan.

Patentee before: SICHUAN XINGZHI ZHIHUI INTELLECTUAL PROPERTY OPERATION CO., LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190715

Address after: 414000 Office Building of Jianhua Company in Qili Mountain Community of Baling Petrochemical Company, Yueyang Building District, Yueyang City, Hunan Province

Patentee after: Yueyang Jianhua Engineering Co., Ltd.

Address before: 610000 No. 144 Qingjiang Middle Road, Qingbaijiang District, Chengdu City, Sichuan Province (Chengou Pioneering Courtyard)

Patentee before: Chengdu Zhi Rong Chuang Intellectual Property Operation Co., Ltd.