CN205604194U - Ecological flow that high dam slows down low warm water structure of temporarily releasing - Google Patents

Ecological flow that high dam slows down low warm water structure of temporarily releasing Download PDF

Info

Publication number
CN205604194U
CN205604194U CN201620426201.2U CN201620426201U CN205604194U CN 205604194 U CN205604194 U CN 205604194U CN 201620426201 U CN201620426201 U CN 201620426201U CN 205604194 U CN205604194 U CN 205604194U
Authority
CN
China
Prior art keywords
gate
water
releasing
ecological flow
slows down
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620426201.2U
Other languages
Chinese (zh)
Inventor
杨敬
李永红
游湘
刘宇
蔡庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201620426201.2U priority Critical patent/CN205604194U/en
Application granted granted Critical
Publication of CN205604194U publication Critical patent/CN205604194U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

The utility model relates to an ecological flow that high dam slows down low warm water structure of temporarily releasing of the storehouse water that temperature and natural river state be close is got to water conservancy water and electricity trade, especially a make full use of laminated water taking's advantage. Ecological flow that high dam slows down low warm water structure of temporarily releasing includes the water intaking structure of releasing, be provided with first gate and the second gate that can distinguish free switch in the water intaking structure of releasing, wherein first gate sets up in the water intaking structure bottom of releasing, the second gate sets up to be hugged closely with first gate top in first gate top and second gate bottom, release the water intaking from a supreme water level index mark, the 2nd water level index mark and the 3rd water level index mark of being provided with respectively down in the structure, highly being higher than first gate and being less than the second gate an of water level index mark wherein, the 2nd water level index mark highly is higher than second gate height. The utility model discloses be particularly useful for among ecological flow was released temporarily among the hydraulic and hydroelectric engineering the engineering.

Description

High dam slows down the interim discharge structure of ecological flow of water at low temperature
Technical field
This utility model relates to water conservancy and hydropower industry, and a kind of high dam slows down the interim discharge structure of ecological flow of water at low temperature.
Background technology
Along with country's demand to water power clean energy resource, build substantial amounts of high dam, affected by factors such as the cutout of water-retention phase or long tail water, Section, dam downstream part will appear from short-term or the impact of long-term cutout.According to State Environmental Protection Administration's associated documents requirement, impacted Need to release corresponding ecological flow in section, and ecological flow should meet maintenance aquatic ecosystem and stablize institute's water requirement, maintenance river The minimum dilution and purification water yield, industrial and agricultural production and the domestic consumption of quality of water environment, view (containing shipping) water consumption.Class at present Use the pattern that ecological generating set or corresponding discharge orifice are set to release ecological flow like engineering.
In practice, there are following FAQs: one, the situation that section, dash dam downstream part stops for a long time, typically Arrange ecological generating set to release ecological flow in dam downstream, owing to this water body head is higher, and need to release for a long time, therefore In conjunction with power energy economy analysis, the unit that installation is less can be set, both met releasing of ecological flow, and possessed again certain economy Effect.If but the situation of section, dam downstream part short-term cutout, ecological unit is set and will cause investing too high, be unsatisfactory for economy Evaluate requirement.Two, when tail water building is close to dash dam, can use and let out ecological flow under diversion and power building normal power generation Amount.For ensureing that the lower temperature that sluices uses stratified pumping pattern close to natural river state, powerplant intakes.But affected by operation of power networks, Being likely to occur electrical network and abandon lotus, unit short-term can not generate electricity, it is impossible to transfers ecological flow by diversion and power building.Three, dam After water-retention completes, being affected by the big storehouse of high dam, in reservoir, water temperature vertical distribution is different, and nearly dam outlet structure escape works are generally bank tunnel Hole or flood relief through dam aperture, limited by each drainage gallery input elevation, and the water temperature let out under certain period is less than natural river shape State, easily under the influence of swimming fish class, crops and ecosystem.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of advantage making full use of stratified pumping, gets water temperature with natural The high dam of the storehouse water that river state is close slows down the interim discharge structure of ecological flow of water at low temperature.
This utility model solves the technical scheme is that high dam of its technical problem to be slowed down the ecological flow of water at low temperature and releases temporarily Structure, including water intaking structure of releasing, described in release water intaking structure in be provided with the first gate and the second lock that can distinguish free switch Door, wherein the first gate locating is in water intaking structural base of releasing, and described second gate locating is above the first gate and the second gate Bottom is close to the first gate top;The first level scale, the second water it is respectively arranged with from bottom to up in described water intaking structure of releasing Position scale and the 3rd level scale, wherein the height of the first level scale is higher than the first gate and less than the second gate, the second water level The height of scale is higher than the second gate height.
Further, including mouth of a river elevation scale, described mouth of a river elevation scale is less than the height of the first gate.
Further, the downstream of water intaking structure of releasing described in is provided with pressure pipeline.
Further, the downstream end of described pressure pipeline is provided with energy dissipation control device.
The beneficial effects of the utility model are: when actually used, and when operating water level is less than the first level scale, power station intakes Mouth is without gate;When operating water level is between the first level scale and the second level scale, powerplant intakes puts down the first gate, Thus allow the water body above more than the first gate height be passed through;When operating water level is carved between the second level scale and the 3rd water level When spending, powerplant intakes puts down the second gate, thus allows the water body above more than the second gate height be passed through.So far, This utility model achieves accurately and technique effect to stratified pumping easily, let out under sound assurance ecological flow water temperature with Natural river state is close, meets downstream Fish, crops and ecosystem needs.This utility model is particularly suited for water conservancy water Among the engineering that in electrical engineering, ecological flow is released temporarily.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Figure is labeled as: pressure pipeline the 1, first gate the 2, second gate 3, release water intaking structure 4, energy dissipation control device 5, Mouth of a river elevation scale z0, the first level scale z1, the second level scale z2, the 3rd level scale z3, operating water level z4.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further illustrated.
High dam as shown in Figure 1 slows down the interim discharge structure of ecological flow of water at low temperature, including release water intaking structure 4, described in let out Being provided with the first gate 2 and the second gate 3 that can distinguish free switch in taking water-bound 4, wherein the first gate 2 is arranged at Bottom water intaking structure 4 of releasing, described second gate 3 be arranged at above the first gate 2 and bottom the second gate 3 with the first gate 2 tops are close to;The first level scale z1, the second level scale z2 it is respectively arranged with from bottom to up in described water intaking structure 4 of releasing With the 3rd level scale z3, wherein the height of the first level scale z1 is higher than the first gate 2 and less than the second gate 3, the second water The height of position scale z2 is higher than the second gate 3 height.
Structure of the present utility model design very ingenious, in that context it may be convenient to realize the needs of stratified pumping.General, the mouth of a river is high Cheng Kedu z0 is less than the height of the first gate 2, and when operating water level z4 is less than the first level scale z1, water inlet is without gate; When operating water level z4 is between the first level scale z1 and the second level scale z2, as shown in Figure 1, powerplant intakes Put down the first gate 2, owing to the height of the first level scale z1 is higher than the first gate 2 and less than the second gate 3, so permissible Realize allowing and pass through more than the water body of the first gate 2 height;When operating water level z4 carves between the second level scale z2 and the 3rd water level Time between degree z3, then select to put down the first gate 2 and the second gate 3 simultaneously, as shown in Figure 1, the most then can realize allowing Pass through more than the water body of the second gate 3 height.Owing to the second gate 3 is arranged at above the first gate 2 and bottom the second gate 3 It is close to the first gate 2 top, therefore, when the first gate 2 and the second gate 3 simultaneously close off, the height of water level of current limliting It is the first gate 2 and height sum of the second gate 3.
Owing to being affected by effect high water head, in order to ensure the reliable and stable of downstream stress condition, preferably described in release water intaking structure The downstream of 4 is provided with pressure pipeline 1.Meanwhile, it is also possible to select the downstream end at described pressure pipeline 1 that energy dissipating is set Controlling device 5, the water reducing downstream can the excessive and damaging influence to surrounding that produces.
This utility model takes full advantage of the advantage of stratified pumping, can get the storehouse water that water temperature is close with natural river state.In reality When border uses, even if diversion system occurs abnormal, ecological flow remains to be played a role by independent intake.Additionally, temporarily Discharge structure build is simple, is provided without ecological generating set, can save construction investment, and described interim discharge structure uses manometer tube Channel type, flexible arrangement.

Claims (4)

1. high dam slows down the interim discharge structure of ecological flow of water at low temperature, it is characterised in that: include water intaking structure (4) of releasing, institute The first gate (2) and the second gate (3) that can distinguish free switch it is provided with in stating water intaking structure (4) of releasing, wherein first Gate (2) be arranged at release water intaking structure (4) bottom, described second gate (3) be arranged at the first gate (2) top and Second gate (3) bottom is close to the first gate (2) top;It is respectively provided with from bottom to up in described water intaking structure (4) of releasing There are the first level scale (z1), the second level scale (z2) and the 3rd level scale (z3), wherein the first level scale (z1) Height higher than the first gate (2) and less than the second gate (3), the height of the second level scale (z2) is higher than the second gate (3) Highly.
2. high dam as claimed in claim 1 slows down the interim discharge structure of ecological flow of water at low temperature, it is characterised in that: include water Mouth elevation scale (z0), described mouth of a river elevation scale (z0) is less than the height of the first gate (2).
3. high dam as claimed in claim 1 or 2 slows down the interim discharge structure of ecological flow of water at low temperature, it is characterised in that: institute The downstream stating water intaking structure (4) of releasing is provided with pressure pipeline (1).
4. high dam as claimed in claim 3 slows down the interim discharge structure of ecological flow of water at low temperature, it is characterised in that: described pressure The downstream end of hydraulic piping (1) is provided with energy dissipation control device (5).
CN201620426201.2U 2016-05-11 2016-05-11 Ecological flow that high dam slows down low warm water structure of temporarily releasing Active CN205604194U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620426201.2U CN205604194U (en) 2016-05-11 2016-05-11 Ecological flow that high dam slows down low warm water structure of temporarily releasing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620426201.2U CN205604194U (en) 2016-05-11 2016-05-11 Ecological flow that high dam slows down low warm water structure of temporarily releasing

Publications (1)

Publication Number Publication Date
CN205604194U true CN205604194U (en) 2016-09-28

Family

ID=56966256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620426201.2U Active CN205604194U (en) 2016-05-11 2016-05-11 Ecological flow that high dam slows down low warm water structure of temporarily releasing

Country Status (1)

Country Link
CN (1) CN205604194U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804027A (en) * 2016-05-11 2016-07-27 中国电建集团成都勘测设计研究院有限公司 Temporary discharge structure reducing ecological flow of low-temperature water for high dam

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804027A (en) * 2016-05-11 2016-07-27 中国电建集团成都勘测设计研究院有限公司 Temporary discharge structure reducing ecological flow of low-temperature water for high dam

Similar Documents

Publication Publication Date Title
CN104179159B (en) Power station bright flowing full tail water system
CN203546687U (en) Hydropower station tail water surge chamber capable of automatically adapting to changes in tail water level
CN204703125U (en) A kind of flood storage formula ecological embankment
CN203373809U (en) Vertical well type laminated water taking structure
CN207316160U (en) A kind of municipal aqueduct for protecting water hammer effect
CN103205950A (en) Reservoir control method for guaranteeing water supply safety of downstream river-converged lakes
CN205604194U (en) Ecological flow that high dam slows down low warm water structure of temporarily releasing
CN105257454A (en) Diversion type vortex flow power generation system
CN105133690A (en) Pipeline water delivery gravity flow system with online high-pressure switching and flow dividing function
CN204959679U (en) Fishway experimental apparatus
CN105804027A (en) Temporary discharge structure reducing ecological flow of low-temperature water for high dam
CN201358449Y (en) Circulating tube type hydropower station
CN204282317U (en) Power station free pressure flow replaces tailrace tunnel
CN103603315B (en) River irrigation by pumping multifunctional landscape waterfall dam
CN206752427U (en) A kind of power station ground power house tailrace outlet structure and its power station
CN102493391A (en) Multi-spot water storage flood control method
CN204849678U (en) Novel butyl dam structure
CN207812402U (en) A kind of ecological block
CN211922550U (en) Improve power station tailrace tunnel open-full flow influence's adverse slope weir structure
CN208990117U (en) A kind of pumping plant Novel firefighting water system
CN210459143U (en) Utilize integrated configuration of river levee and lock to realize crossing fish function
CN210621637U (en) Prevent gushing damp dew top formula plane gate
CN202899089U (en) Lifting rigid float-intercepting system applicable to intakes of large power stations
CN208151985U (en) Sluice " L " type trash rack pier and its " zigzag " arragement construction
CN206408582U (en) Water conservancy diversion structure structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant