CN205600969U - Swift formula steel reinforcement cage mold processing of prefabricated tube coupling - Google Patents

Swift formula steel reinforcement cage mold processing of prefabricated tube coupling Download PDF

Info

Publication number
CN205600969U
CN205600969U CN201620102198.9U CN201620102198U CN205600969U CN 205600969 U CN205600969 U CN 205600969U CN 201620102198 U CN201620102198 U CN 201620102198U CN 205600969 U CN205600969 U CN 205600969U
Authority
CN
China
Prior art keywords
base
reinforcement cage
tube coupling
steel
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620102198.9U
Other languages
Chinese (zh)
Inventor
孟令东
郭悦宝
付军恩
王晶龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201620102198.9U priority Critical patent/CN205600969U/en
Application granted granted Critical
Publication of CN205600969U publication Critical patent/CN205600969U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a swift formula steel reinforcement cage mold processing of prefabricated tube coupling, the base is fixed firm with ground, and the die positioning stand is fixed on the base, and die positioning stand upper end adopts steel bar ring to fixed, and the die positioning stand fuses with the base, arranges the stand bolt according to the transverse reinforcement interval. The base be that thickness is 25mm, the Q345b steel sheet adopts D 22mm interval fixed for 20cm anchor reinforcing bar all around, welds between anchor reinforcing bar and the base. The utility model discloses an advantage: simple manufacture, the construction of being convenient for, it is with low costs, not restricted by place, environment, compensatied the not enough of traditional mode, the installation rate is fast, the precision is high, can make form setting, reinforcement, built -in fitting installation each other not influence, reaches concurrent operation, and whole ligature mould operation process is simple and easy, need not to carry out the secondary adjustment to the bar spacing, improves the efficiency of construction, hoist fastly, and the wholeness is strong, the efficiency of construction height.

Description

A kind of prefabricated tube coupling fast-type steel reinforcement cage processing mold
Technical field
This utility model relates to concrete prefabricated class construction aid, particularly to a kind of prefabricated tube coupling fast-type steel reinforcement cage processing mold.
Background technology
The prefabricated tube coupling of armored concrete has the particular advantages such as outer pressure resistance height, good endurance, length in service life, low, easy to make, the low price of production cost, city-building at home and abroad, municipal road construction, construction of water conservancy works are largely used to the pipelines such as rainwater, sewage, diversion, electric power and farmland discharging-irrigating, are widely used.Along with the development of urban construction, needing substantial amounts of large-diameter pipe, the tube coupling demand of current more than 3000mm sharply increases.Steel reinforcement cage colligation is an important step in armored concrete tube coupling prefabricated construction, the quality of steel reinforcement cage colligation quality, the speed of colligation speed, directly affect tube coupling total quality and apparent mass, therefore, in armored concrete tube coupling prefabricated construction, the abnormal quality of steel reinforcement cage colligation is important.
At present, traditional steel reinforcement cage colligation flow process is the most assembled interior template, assembling reinforcement cage in template, installing built-in fitting, finally install exterior sheathing, workmen's assembling reinforcement cage work surface in template is little, construction inconvenience, has a strong impact on efficiency of construction, and construction quality is difficult to ensure that.
Utility model content
The purpose of this utility model is to not interfere with each other between model sheetinstallat, installation of embedded parts and steel reinforcement cage colligation in armored concrete tube coupling prefabricated construction, reach parallel operations, improve traditional steel reinforcement cage colligation construction environment, improve the quality level of steel reinforcement cage colligation, spy provides a kind of prefabricated tube coupling fast-type steel reinforcement cage processing mold.
This utility model provides a kind of prefabricated tube coupling fast-type steel reinforcement cage processing mold, it is characterized in that: described prefabricated tube coupling fast-type steel reinforcement cage processing mold, base 1 and ground fixation, mould positioning vertical column 2 is fixed on base 1, mould positioning vertical column 2 upper end uses reinforcing bar 3 hoop to fix, mould positioning vertical column 2 is connected with base 1, arranges column latch 4 according to transverse steel spacing;
Described base 1 be thickness be 25mm, Q345b steel plate, surrounding use Ф 22mm spacing be that 20cm anchor bar is fixed, weld between anchor bar with base 1.
Described mould positioning vertical column 2 is 12 12# square steel, inside and outside each 6 arranged crosswise, is soldered on base 1, uses 50 steel pipes to carry out radian correction and connect between 12# square steel, and column top uses reinforcing bar 3 hoop to fix.
Described column latch 4 is the round steel of 14mm for diameter, arranges the circular hole of 16mm on 12# square steel according to circumferential reinforcement spacing.
Advantage of the present utility model:
Prefabricated tube coupling fast-type steel reinforcement cage processing mold described in the utility model, make simple, it is easy to construction, low cost, not by place, environment limits, compensate for the deficiency of traditional approach, steel reinforcement cage is at the outer overall binding of template, complete without waiting for model sheetinstallat, and installation rate is fast, precision is high, model sheetinstallat can be made, reinforcing bar binding, installation of embedded parts is independent of each other, reach parallel operations, steel reinforcement cage overall binding Mould operation process is simple, without bar spacing is carried out secondary adjustment, improve efficiency of construction, steel reinforcement cage overall binding mould uses the method for integral hoisting, lifting speed is fast, globality is strong, efficiency of construction is high.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings and this utility model is described in further detail by embodiment:
Fig. 1 is longitudinal view of prefabricated tube coupling fast-type steel reinforcement cage processing mold;
Fig. 2 is the transverse views of prefabricated tube coupling fast-type steel reinforcement cage processing mold.
Detailed description of the invention
Embodiment 1
Present embodiments provide a kind of prefabricated tube coupling fast-type steel reinforcement cage processing mold, it is characterized in that: described prefabricated tube coupling fast-type steel reinforcement cage processing mold, base 1 and ground fixation, mould positioning vertical column 2 is fixed on base 1, mould positioning vertical column 2 upper end uses reinforcing bar 3 hoop to fix, mould positioning vertical column 2 is connected with base 1, arranges column latch 4 according to transverse steel spacing;
Described base 1 be thickness be 25mm, Q345b steel plate, surrounding use Ф 22mm spacing be that 20cm anchor bar is fixed, weld between anchor bar with base 1.
Described mould positioning vertical column 2 is 12 12# square steel, inside and outside each 6 arranged crosswise, is soldered on base 1, uses 50 steel pipes to carry out radian correction and connect between 12# square steel, and column top uses reinforcing bar 3 hoop to fix.
Described column latch 4 is the round steel of 14mm for diameter, arranges the circular hole of 16mm on 12# square steel according to circumferential reinforcement spacing.
Embodiment 2
Present embodiments provide a kind of prefabricated tube coupling fast-type steel reinforcement cage processing mold, it is characterized in that: described prefabricated tube coupling fast-type steel reinforcement cage processing mold, base 1 and ground fixation, mould positioning vertical column 2 is fixed on base 1, mould positioning vertical column 2 upper end uses reinforcing bar 3 hoop to fix, mould positioning vertical column 2 is connected with base 1, arranges column latch 4 according to transverse steel spacing;
Described base 1 be thickness be 25mm, Q345b steel plate, surrounding use Ф 22mm spacing be that 20cm anchor bar is fixed, weld between anchor bar with base 1.
Described column latch 4 is the round steel of 14mm for diameter, arranges the circular hole of 16mm on 12# square steel according to circumferential reinforcement spacing.
Embodiment 3
Present embodiments provide a kind of prefabricated tube coupling fast-type steel reinforcement cage processing mold, it is characterized in that: described prefabricated tube coupling fast-type steel reinforcement cage processing mold, base 1 and ground fixation, mould positioning vertical column 2 is fixed on base 1, mould positioning vertical column 2 upper end uses reinforcing bar 3 hoop to fix, mould positioning vertical column 2 is connected with base 1, arranges column latch 4 according to transverse steel spacing;
Described base 1 be thickness be 25mm, Q345b steel plate, surrounding use Ф 22mm spacing be that 20cm anchor bar is fixed, weld between anchor bar with base 1.
Described mould positioning vertical column 2 is 12 12# square steel, inside and outside each 6 arranged crosswise, is soldered on base 1, uses 50 steel pipes to carry out radian correction and connect between 12# square steel, and column top uses reinforcing bar 3 hoop to fix.

Claims (4)

1. a prefabricated tube coupling fast-type steel reinforcement cage processing mold, it is characterized in that: described prefabricated tube coupling fast-type steel reinforcement cage processing mold, including base (1), mould positioning vertical column (2), reinforcing bar (3), column latch (4);
Wherein: base (1) and ground fixation, mould positioning vertical column (2) is fixed on base (1), mould positioning vertical column (2) upper end uses reinforcing bar (3) hoop to fix, mould positioning vertical column (2) is connected with base (1), arranges column latch (4) according to transverse steel spacing.
2. according to the prefabricated tube coupling fast-type steel reinforcement cage processing mold described in claim 1, it is characterized in that: described base (1) be thickness be 25mm, Q345b steel plate, surrounding uses Ф 22mm spacing to be that 20cm anchor bar is fixed, welds between anchor bar with base (1).
3. according to the prefabricated tube coupling fast-type steel reinforcement cage processing mold described in claim 1, it is characterized in that: described mould positioning vertical column (2) is 12 12# square steel, inside and outside each 6 arranged crosswise, it is soldered on base (1), using 50 steel pipes to carry out radian correction between 12# square steel to connect, column top uses reinforcing bar (3) hoop to fix.
4. according to the prefabricated tube coupling fast-type steel reinforcement cage processing mold described in claim 1, it is characterised in that: described column latch (4) be diameter be the round steel of 14mm, the circular hole of 16mm is set on 12# square steel according to circumferential reinforcement spacing.
CN201620102198.9U 2016-02-01 2016-02-01 Swift formula steel reinforcement cage mold processing of prefabricated tube coupling Active CN205600969U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620102198.9U CN205600969U (en) 2016-02-01 2016-02-01 Swift formula steel reinforcement cage mold processing of prefabricated tube coupling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620102198.9U CN205600969U (en) 2016-02-01 2016-02-01 Swift formula steel reinforcement cage mold processing of prefabricated tube coupling

Publications (1)

Publication Number Publication Date
CN205600969U true CN205600969U (en) 2016-09-28

Family

ID=56961409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620102198.9U Active CN205600969U (en) 2016-02-01 2016-02-01 Swift formula steel reinforcement cage mold processing of prefabricated tube coupling

Country Status (1)

Country Link
CN (1) CN205600969U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109127964A (en) * 2018-08-06 2019-01-04 中交第公路工程局有限公司 A kind of 6 DOF steel reinforcement cage support calibration apparatus
CN111660427A (en) * 2019-03-05 2020-09-15 石家庄通天管业有限公司 Core die vibrating double-rubber-ring steel bell and spigot reinforcement cage assembling die
CN112078002A (en) * 2020-09-26 2020-12-15 杨桂英 Concrete pipe pile pouring equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109127964A (en) * 2018-08-06 2019-01-04 中交第公路工程局有限公司 A kind of 6 DOF steel reinforcement cage support calibration apparatus
CN111660427A (en) * 2019-03-05 2020-09-15 石家庄通天管业有限公司 Core die vibrating double-rubber-ring steel bell and spigot reinforcement cage assembling die
CN111660427B (en) * 2019-03-05 2021-10-29 石家庄通天管业有限公司 Core die vibrating double-rubber-ring steel bell and spigot reinforcement cage assembling die
CN112078002A (en) * 2020-09-26 2020-12-15 杨桂英 Concrete pipe pile pouring equipment
CN112078002B (en) * 2020-09-26 2021-12-10 江苏省送变电有限公司 Concrete pipe pile pouring equipment

Similar Documents

Publication Publication Date Title
CN205600969U (en) Swift formula steel reinforcement cage mold processing of prefabricated tube coupling
CN203145197U (en) Extension-type concrete filled steel tube beam column node device
CN102704670B (en) Lower bowl-type coupler for bowl-type coupler scaffolding, and mounting method thereof
CN102493446B (en) Steel tube column capable of preventing concrete spillover and method for mounting steel tube column
CN104196023B (en) A kind of using method of the concrete precast pipe pile pile top of band mechanical connecting device
CN202220346U (en) Water-stopping seepage-proof wall of service entrance of optical fiber feeding room of basement
CN101839030A (en) Novel building assembled wall body and construction method
CN201526310U (en) Well cementation casing-cement sheath indoor analog manufacturer
CN106758663A (en) Buried rubber fastening band installs positioning construction method in one kind
CN103882840B (en) A kind of surge shaft Cast-in-place concrete assembling falsework and mounting method thereof
CN214169345U (en) Rainwater and sewage inspection well supporting and lifting die
CN206144034U (en) A unilateral awl mouthful positive and negative silk braid section of thick bamboo and prefabricated concrete structure component
CN209874074U (en) Porous inclined plane slip casting embedded pipe
CN103538147B (en) Special-shaped prestressing combination support pile punching block
CN102051888B (en) Method for constructing built-in foundation bolt regulating hole of equipment foundation
CN201990922U (en) Adjusting and mold fixing pile for road concrete mold
CN205934910U (en) End board
CN203755269U (en) Surge shaft cast-in-situ concrete assembling type formwork support
CN205421317U (en) Assembled basis mounting adjustment ware
CN204098031U (en) A kind of concrete precast pipe pile pile top with mechanical connecting device
CN205314128U (en) Plastic power communication well of integral type
CN202000908U (en) Connecting plate used on mast of rotary drilling rig
CN102632549A (en) Vertical type forming glass reinforced plastic composite pipe mould
CN208534038U (en) Plumbing hole to be provided reservation device
CN209943695U (en) Multi-pipe integrated waterproof steel sleeve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant