CN205598918U - Novel high -efficient desulfurization dusting tower - Google Patents

Novel high -efficient desulfurization dusting tower Download PDF

Info

Publication number
CN205598918U
CN205598918U CN201620193757.1U CN201620193757U CN205598918U CN 205598918 U CN205598918 U CN 205598918U CN 201620193757 U CN201620193757 U CN 201620193757U CN 205598918 U CN205598918 U CN 205598918U
Authority
CN
China
Prior art keywords
desulfurization
tower body
oxidation tank
absorption chamber
flue gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620193757.1U
Other languages
Chinese (zh)
Inventor
钟祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai HS Technology Co., Ltd.
Original Assignee
Qingliuliangjian Environment Protection Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingliuliangjian Environment Protection Technology Development Co Ltd filed Critical Qingliuliangjian Environment Protection Technology Development Co Ltd
Priority to CN201620193757.1U priority Critical patent/CN205598918U/en
Application granted granted Critical
Publication of CN205598918U publication Critical patent/CN205598918U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a novel high -efficient desulfurization dusting tower, including the desulfurization dusting tower body, clean room, observation window, absorption chamber, hopcalite canister, inspection hole and unable adjustment base, desulfurization dusting tower body upper end right side is passed through the connecting tube and is connected with the chimney, and installs the draught fan on the connecting tube, install special electric current device in the clean room, the absorption chamber right side is connected the flue gas and is inserted the pipeline, the hopcalite canister downside is provided with the discharge port, the inspection hole sets up on the hopcalite canister right side, unable adjustment base fixes at the draught fan downside. This novel high -efficient desulfurization dusting tower adopts high voltage static to remove dust, drives more thoroughly to the dust in the flue gas, and efficiency is higher, and absorption chamber and hopcalite canister constitute desulphurization unit jointly, to concentrating the desulfurization after the flue gas absorption, and desulfurization more thoroughly not only, efficiency is higher in addition, and the effect is showing more, and structurally more firm, the working process is more steady.

Description

A kind of new and effective desulfurized dust collection column
Technical field
This utility model relates to a kind of desulfurization and dedusting technology field, a kind of new and effective desulfurized dust collection column.
Background technology
Flue gas ash removal is the flue dust produced by fuel and other substance combustion processes, and solid material is crushed, sieves and flue dust that the mechanical process such as conveying produces, dedusting is exactly the process these particles separated from flue dust and trapped, reclaim, cleaner unit is of a great variety, at present, structure design not reasonableization of existing wet dust separater, operation complexity, it is the most convenient to use, and dust removing effects is poor, and the purification efficiency of flue dust is low, SR is big, service life of equipment is short, and performance is less reliable, can not meet the use demand of people.
Utility model content
The purpose of this utility model is to provide a kind of new and effective desulfurized dust collection column, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, this utility model provides following technical scheme a kind of new and effective desulfurized dust collection column, including desulfurization and dedusting tower body, dirt pocket, observation window, absorption chamber, oxidation tank, manhole and firm banking, it is connected with chimney by connection pipeline on the right side of described desulfurization and dedusting tower body upper end, and on connection pipeline, air-introduced machine is installed, specific current device is installed in described dirt pocket, flue gas access conduit is connected on the right side of described absorption chamber, it is provided with floss hole on the downside of described oxidation tank, described manhole is arranged on the right side of oxidation tank, described firm banking is fixed on the downside of air-introduced machine, described specific current device is the electrostatic precipitation system of high-pressure electrostatic precipitation.
Preferably, described absorption chamber and oxidation tank collectively form desulfurizer.
Preferably, described desulfurization and dedusting tower body and oxidation tank are in tubular structure in overall structure, and desulfurization and dedusting tower body barrel dliameter is more than oxidation tank barrel dliameter.
Preferably, described observation window is fixed in the middle part of desulfurization and dedusting tower body.
Compared with prior art, the beneficial effects of the utility model are: this new and effective desulfurized dust collection column uses high-pressure electrostatic precipitation, dust in flue gas is removed more thorough, in hgher efficiency, absorption chamber and oxidation tank collectively form desulfurizer, to carrying out after smoke absorption concentrating desulfurization, not only desulfurization is more thorough, and it is in hgher efficiency, effect is more significantly, and desulfurization and dedusting tower body and oxidation tank are in tubular structure in overall structure, and desulfurization and dedusting tower body barrel dliameter is more than oxidation tank barrel dliameter, the most firm, work process is more steady.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
In figure: 1, desulfurization and dedusting tower body, 2, dirt pocket, 3, specific current device, 4, flue gas access conduit, 5, observation window, 6, absorption chamber, 7, oxidation tank, 8, floss hole, 9, manhole, 10, connect pipeline, 11, air-introduced machine, 12, firm banking, 13, chimney.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
nullRefer to Fig. 1,A kind of technical scheme of this utility model offer: a kind of new and effective desulfurized dust collection column,Including desulfurization and dedusting tower body 1、Dirt pocket 2、Observation window 5、Absorption chamber 6、Oxidation tank 7、Manhole 9 and firm banking 12,It is connected with chimney 13 by connection pipeline 10 on the right side of desulfurization and dedusting tower body 1 upper end,And on connection pipeline 10, air-introduced machine 11 is installed,Specific current device 3 is installed in dirt pocket 2,Specific current device 3 is the electrostatic precipitation system of high-pressure electrostatic precipitation,So arrange,Dust in flue gas is removed more thorough,In hgher efficiency,Flue gas access conduit 4 is connected on the right side of absorption chamber 6,Floss hole 8 it is provided with on the downside of oxidation tank 7,Manhole 9 is arranged on the right side of oxidation tank 7,Absorption chamber 6 and oxidation tank 7 collectively form desulfurizer,So arrange,To carrying out after smoke absorption concentrating desulfurization,Not only desulfurization is more thorough,And it is in hgher efficiency,Effect is more significantly,Desulfurization and dedusting tower body 1 and oxidation tank 7 in overall structure in tubular structure,And desulfurization and dedusting tower body 1 barrel dliameter is more than oxidation tank 7 barrel dliameter,So arrange,The most firm,Work process is more steady,Firm banking 12 is fixed on the downside of air-introduced machine 11,Observation window 5 is fixed in the middle part of desulfurization and dedusting tower body 1,So arrange,Conveniently check dust treatment situation in tower.
Operation principle: when using this new and effective desulfurized dust collection column to carry out flue gas desulfurization and dedusting, first, by flue gas access conduit 4, flue gas is introduced in absorption chamber 6, sulfur removal technology process is carried out by oxidation tank 7, flue gas after desulfurization diffuses up, enter in dirt pocket 2, by specific current device 3, flue gas is carried out dedusting, specific current device 3 is electrostatic precipitation system, use high-pressure electrostatic precipitation, dust in flue gas is removed more thorough, in hgher efficiency, absorption chamber 6 and oxidation tank 7 collectively form desulfurizer, to carrying out after smoke absorption concentrating desulfurization, not only desulfurization is more thorough, and it is in hgher efficiency, effect is more significantly, flue gas after purification is discharged by chimney 13.
Although this utility model being described in detail with reference to previous embodiment; for a person skilled in the art; technical scheme described in foregoing embodiments still can be modified by it; or wherein portion of techniques feature is carried out equivalent; all within spirit of the present utility model and principle; the any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (4)

  1. null1. a new and effective desulfurized dust collection column,Including desulfurization and dedusting tower body (1)、Dirt pocket (2)、Observation window (5)、Absorption chamber (6)、Oxidation tank (7)、Manhole (9) and firm banking (12),It is characterized in that: be connected with chimney (13) by connection pipeline (10) on the right side of described desulfurization and dedusting tower body (1) upper end,And in connection pipeline (10), air-introduced machine (11) is installed,Specific current device (3) is installed in described dirt pocket (2),Described absorption chamber (6) right side connects flue gas access conduit (4),Described oxidation tank (7) downside is provided with floss hole (8),Described manhole (9) is arranged on oxidation tank (7) right side,Described firm banking (12) is fixed on air-introduced machine (11) downside,Described specific current device (3) is the electrostatic precipitation system of high-pressure electrostatic precipitation.
  2. The new and effective desulfurized dust collection column of one the most according to claim 1, it is characterised in that: described absorption chamber (6) and oxidation tank (7) collectively form desulfurizer.
  3. The new and effective desulfurized dust collection column of one the most according to claim 1, it is characterized in that: described desulfurization and dedusting tower body (1) and oxidation tank (7) are in tubular structure in overall structure, and desulfurization and dedusting tower body (1) barrel dliameter is more than oxidation tank (7) barrel dliameter.
  4. The new and effective desulfurized dust collection column of one the most according to claim 1, it is characterised in that: described observation window (5) is fixed on desulfurization and dedusting tower body (1) middle part.
CN201620193757.1U 2016-03-14 2016-03-14 Novel high -efficient desulfurization dusting tower Expired - Fee Related CN205598918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620193757.1U CN205598918U (en) 2016-03-14 2016-03-14 Novel high -efficient desulfurization dusting tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620193757.1U CN205598918U (en) 2016-03-14 2016-03-14 Novel high -efficient desulfurization dusting tower

Publications (1)

Publication Number Publication Date
CN205598918U true CN205598918U (en) 2016-09-28

Family

ID=56962845

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620193757.1U Expired - Fee Related CN205598918U (en) 2016-03-14 2016-03-14 Novel high -efficient desulfurization dusting tower

Country Status (1)

Country Link
CN (1) CN205598918U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018218920A1 (en) * 2017-05-27 2018-12-06 盐城市兰丰环境工程科技有限公司 Dust remover capable of desulfuration and denitration

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018218920A1 (en) * 2017-05-27 2018-12-06 盐城市兰丰环境工程科技有限公司 Dust remover capable of desulfuration and denitration

Similar Documents

Publication Publication Date Title
CN204911163U (en) Separation of liquid vapour and air filtration system of waste disposal equipment
CN205392061U (en) Environmental protection dust collector between weaving processing vehicle
CN207308101U (en) A kind of high-voltage electrostatic dust separator
CN204601913U (en) A kind of complex dust collector
CN204996283U (en) Boiler exhaust -gas treatment apparatus
CN205598918U (en) Novel high -efficient desulfurization dusting tower
CN204147689U (en) A kind of filter drum type precipitator
CN206730759U (en) A kind of novel atomizing deduster
CN205893307U (en) Dust removing device for gas of blast furnace
CN205412645U (en) Novel multitower desulfurization is removed dust device
CN204208418U (en) A kind of Multi-function smoke-removing clarifier
CN210385302U (en) Dust removal equipment for boiler desulfurization device
CN205412579U (en) Novel desulfurization dust remover
CN209392967U (en) A kind of high-pressure ion removes the purification device of glance coal
CN105413342A (en) Smog dust removal system
CN205007775U (en) Novel wet dedusting device
CN203227376U (en) Boiler smoke processing device
CN205925266U (en) Industrial boiler flue dust collector
CN205412646U (en) Flue gas wet flue gas desulfurization dust remover
CN209033957U (en) A kind of boiler dusting clarifier
CN213699315U (en) Wet-type dispersion dust collector
CN207462973U (en) A kind of desulfurizer in fume treatment
CN205412577U (en) Novel pipeline formula flue gas desulfurization and dust removal device
CN210631882U (en) Filter cartridge type dust remover
CN209501191U (en) A kind of novel zirconium material filter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Ren Wanlin

Inventor before: Zhong Xiang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170629

Address after: 1, 2, building 302, 323 Renmin West Road, Xiangzhou District, Guangdong, Zhuhai, 519070

Patentee after: Zhuhai HS Technology Co., Ltd.

Address before: 365300 Fujian province Sanming City Qingliu County Longjin Town Street shop No. 123

Patentee before: Qingliuliangjian Environment Protection Technology Development Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160928

Termination date: 20180314