CN205412645U - Novel multitower desulfurization is removed dust device - Google Patents

Novel multitower desulfurization is removed dust device Download PDF

Info

Publication number
CN205412645U
CN205412645U CN201620193717.7U CN201620193717U CN205412645U CN 205412645 U CN205412645 U CN 205412645U CN 201620193717 U CN201620193717 U CN 201620193717U CN 205412645 U CN205412645 U CN 205412645U
Authority
CN
China
Prior art keywords
desulfurization
dust chamber
desulfurization dust
clean room
flue gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620193717.7U
Other languages
Chinese (zh)
Inventor
钟祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhidan clean tech Petroleum Technology Services Limited liability company
Original Assignee
Qingliuliangjian Environment Protection Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingliuliangjian Environment Protection Technology Development Co Ltd filed Critical Qingliuliangjian Environment Protection Technology Development Co Ltd
Priority to CN201620193717.7U priority Critical patent/CN205412645U/en
Application granted granted Critical
Publication of CN205412645U publication Critical patent/CN205412645U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a novel multitower desulfurization is removed dust device, insert mouth, discharge port, follower, discharge tube, dust remover, active force machine case, water pipe and chimney including third desulfurization clean room, flue gas, first desulfurization clean room and second desulfurization clean room are installed in proper order to third desulfurization clean room left side, and third desulfurization clean room upside internally mounted has the desulfurizer to hold the box, the dust remover is installed at first desulfurization clean room, second desulfurization clean room and third desulfurization clean room upside, water tank and desulfurization clean room are connected respectively to the water pipe both sides, third desulfurization clean room and reaction tank are connected respectively to both sides about the discharge port, the chimney is installed at dust remover right -hand member upside. This novel multitower desulfurization is removed dust device sets up three desulfurization clean room, and a plurality of desulfurization clean rooms carry out the flue gas simultaneously to be handled, has prevented because of smoke concentration too highly, leads to in the flue gas harmful gas etc. Clean for handling, handles more thoroughly to the flue gas.

Description

A kind of novel many tower desulfurizing and dust removing units
Technical field
This utility model relates to a kind of desulfurization and dedusting technology field, is specially a kind of novel many tower desulfurizing and dust removing units.
Background technology
Sulfur dioxide with who combine produce sulfurous acid be acid rain mainly comprise composition, acid rain not only produces harm to vegetation, the ecosystem of soil can also be directly influenced, cause the deterioration of Land Environment, therefore desulfurating dust-removing equipment just arises at the historic moment, and existing desulfurating dust-removing equipment is generally Wet type desulfurizing dust removing equipment, wet type desulfurizing dedusting has moisture film desulfurization and dedusting, impact water bath desulfurization and dedusting etc., but existing desulfurating dust-removing equipment overall structure floor space is the biggest, and resource utilization is the most insufficient, cause corresponding waste, gas after cleaned is also easy to cause secondary pollution.
Utility model content
The purpose of this utility model is to provide a kind of novel many tower desulfurizing and dust removing units, with the problem solving to propose in above-mentioned background technology.
nullFor achieving the above object,This utility model provides following technical scheme a kind of novel many tower desulfurizing and dust removing units,Including the 3rd desulfurization dust chamber、Flue gas access port、Floss hole、Follower、Discharge tube、Cleaner unit、Active force cabinet、Water pipe and chimney,It is sequentially installed with the first desulfurization dust chamber and the second desulfurization dust chamber on the left of described 3rd desulfurization dust chamber,And the 3rd desulfurization dust chamber's upper interior desulfurizing agent holding box is installed,Described flue gas access port is fixed in the middle part of the 3rd desulfurization dust chamber,Described cleaner unit is arranged on the first desulfurization dust chamber、On the upside of second desulfurization dust chamber and the 3rd desulfurization dust chamber,Described water pipe both sides connect water tank and desulfurization dust chamber respectively,The upper and lower both sides of described floss hole connect the 3rd desulfurization dust chamber and reaction tank respectively,Described follower is arranged in reaction tank,Described active force cabinet is arranged on first desulfurization dust chamber's bottom left,On described discharge tube, the pump housing is installed,Described chimney is arranged on the upside of cleaner unit right-hand member.
Preferably, described first desulfurization dust chamber, the second desulfurization dust chamber are the most identical with the 3rd desulfurization dust chamber, and are mounted on independent flue gas access port.
Preferably, described cleaner unit length more than the first desulfurization dust chamber, the second desulfurization dust chamber and the 3rd desulfurization dust chamber's width and, and use high-pressure electrostatic precipitation.
Preferably, described desulfurizing agent holding box is arranged on desulfurization dust chamber's upper inside, and is positioned at immediately below water pipe.
Preferably, the described pump housing is arranged on discharge tube.
Compared with prior art, the beneficial effects of the utility model are: these novel many tower desulfurizing and dust removing units arrange in three desulfurization dust chamber and structure identical, and it is mounted on independent flue gas access port, multiple desulfurization dust chamber carry out fume treatment simultaneously, it is therefore prevented that because flue gas concentration is too high, cause in flue gas harmful gas etc. clean for processing, more thorough to fume treatment, and use high-pressure electrostatic precipitation, it is possible to sufficiently the dust in flue gas is cleared up, flue gas is carried out efficiency of dust collection higher.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
In figure: 1, the first desulfurization dust chamber, the 2, second desulfurization dust chamber, the 3, the 3rd desulfurization dust chamber, 4, desulfurizing agent holding box, 5, flue gas access port, 6, floss hole, 7, follower, 8, reaction tank, 9, the pump housing, 10, discharge tube, 11, cleaner unit, 12, active force cabinet, 13, water tank, 14, water pipe, 15, chimney.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
nullRefer to Fig. 1,A kind of technical scheme of this utility model offer: a kind of novel many tower desulfurizing and dust removing units,Including the 3rd desulfurization dust chamber 3、Flue gas access port 5、Floss hole 6、Follower 7、Discharge tube 10、Cleaner unit 11、Active force cabinet 12、Water pipe 14 and chimney 15,The first desulfurization dust chamber 1 and the second desulfurization dust chamber 2 it is sequentially installed with on the left of 3rd desulfurization dust chamber 3,And the 3rd desulfurization dust chamber 3 upper interior desulfurizing agent holding box 4 is installed,Flue gas access port 5 is fixed in the middle part of the 3rd desulfurization dust chamber 3,Cleaner unit 11 is arranged on the first desulfurization dust chamber 1、On the upside of second desulfurization dust chamber 2 and the 3rd desulfurization dust chamber 3,Water pipe 14 both sides connect water tank 13 and desulfurization dust chamber respectively,First desulfurization dust chamber 1、Second desulfurization dust chamber 2 is the most identical with the 3rd desulfurization dust chamber 3,And it is mounted on independent flue gas access port 5,So arrange,Multiple desulfurization dust chamber carry out fume treatment simultaneously,Prevent because flue gas concentration is too high,Cause in flue gas harmful gas etc. clean for processing,More thorough to fume treatment,Cleaner unit 11 length is more than the first desulfurization dust chamber 1、Second desulfurization dust chamber 2 and the 3rd desulfurization dust chamber 3 width and,And use high-pressure electrostatic precipitation,So arrange,Sufficiently the dust in flue gas can be cleared up,Flue gas is carried out efficiency of dust collection higher,Floss hole about 6 both sides connect the 3rd desulfurization dust chamber 3 and reaction tank 8 respectively,Follower 7 is arranged in reaction tank 8,Active force cabinet 12 is arranged on the first desulfurization dust chamber 1 bottom left,The pump housing 9 is installed on discharge tube 10,Chimney 15 is arranged on the upside of cleaner unit 11 right-hand member,Desulfurizing agent holding box 4 is arranged on desulfurization dust chamber's upper inside,And be positioned at immediately below water pipe 14,So arrange,Conveniently go out the sulfur dioxide in flue gas,More abundant to the utilization rate of desulfurizing agent,The pump housing 9 is arranged on discharge tube 10,So arrange,Discharge is more quick,The saving time.
nullOperation principle: when using these novel many tower desulfurizing and dust removing units to carry out flue gas desulfurization and dedusting,Flue gas is accessed by chimney 15,Flue gas respectively enters the first desulfurization dust chamber 1、Second desulfurization dust chamber 2 and the 3rd desulfurization dust chamber 3,First desulfurization dust chamber 1、Second desulfurization dust chamber 2 is the most identical with the 3rd desulfurization dust chamber 3,And it is mounted on independent flue gas access port 5,Multiple desulfurization dust chamber carry out fume treatment simultaneously,Prevent because flue gas concentration is too high,Cause in flue gas harmful gas etc. clean for processing,More thorough to fume treatment,After desulfurization and dedusting indoor carry out desulfurization and dedusting,Use high-pressure electrostatic precipitation,Sufficiently the dust in flue gas can be cleared up,Flue gas is carried out efficiency of dust collection higher,Desulfurizing agent holding box 4 is arranged on desulfurization dust chamber's upper inside,And be positioned at immediately below water pipe 14,Conveniently go out the sulfur dioxide in flue gas,More abundant to the utilization rate of desulfurizing agent,The flue gas being cleaned is discharged by chimney 15.
Although this utility model being described in detail with reference to previous embodiment; for a person skilled in the art; technical scheme described in foregoing embodiments still can be modified by it; or wherein portion of techniques feature is carried out equivalent; all within spirit of the present utility model and principle; the any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (5)

  1. null1. novel many tower desulfurizing and dust removing units,Including the 3rd desulfurization dust chamber (3)、Flue gas access port (5)、Floss hole (6)、Follower (7)、Discharge tube (10)、Cleaner unit (11)、Active force cabinet (12)、Water pipe (14) and chimney (15),It is characterized in that: described 3rd desulfurization dust chamber (3) left side is sequentially installed with the first desulfurization dust chamber (1) and the second desulfurization dust chamber (2),And the 3rd desulfurization dust chamber (3) upper interior desulfurizing agent holding box (4) is installed,Described flue gas access port (5) is fixed on the 3rd desulfurization dust chamber (3) middle part,Described cleaner unit (11) is arranged on the first desulfurization dust chamber (1)、Second desulfurization dust chamber (2) and the 3rd desulfurization dust chamber (3) upside,Described water pipe (14) both sides connect water tank (13) and desulfurization dust chamber respectively,Described floss hole (6) connects the 3rd desulfurization dust chamber (3) and reaction tank (8) in both sides up and down respectively,Described follower (7) is arranged in reaction tank (8),Described active force cabinet (12) is arranged on the first desulfurization dust chamber (1) bottom left,The pump housing (9) is installed on described discharge tube (10),Described chimney (15) is arranged on the upside of cleaner unit (11) right-hand member.
  2. The novel many tower desulfurizing and dust removing units of one the most according to claim 1, it is characterized in that: described first desulfurization dust chamber (1), the second desulfurization dust chamber (2) are the most identical with the 3rd desulfurization dust chamber (3), and are mounted on independent flue gas access port (5).
  3. The novel many tower desulfurizing and dust removing units of one the most according to claim 1, it is characterized in that: described cleaner unit (11) length more than the first desulfurization dust chamber (1), the second desulfurization dust chamber (2) and the 3rd desulfurization dust chamber (3) width with, and use high-pressure electrostatic precipitation.
  4. The novel many tower desulfurizing and dust removing units of one the most according to claim 1, it is characterised in that: described desulfurizing agent holding box (4) is arranged on desulfurization dust chamber's upper inside, and is positioned at immediately below water pipe (14).
  5. The novel many tower desulfurizing and dust removing units of one the most according to claim 1, it is characterised in that: the described pump housing (9) is arranged on discharge tube (10).
CN201620193717.7U 2016-03-14 2016-03-14 Novel multitower desulfurization is removed dust device Expired - Fee Related CN205412645U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620193717.7U CN205412645U (en) 2016-03-14 2016-03-14 Novel multitower desulfurization is removed dust device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620193717.7U CN205412645U (en) 2016-03-14 2016-03-14 Novel multitower desulfurization is removed dust device

Publications (1)

Publication Number Publication Date
CN205412645U true CN205412645U (en) 2016-08-03

Family

ID=56534836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620193717.7U Expired - Fee Related CN205412645U (en) 2016-03-14 2016-03-14 Novel multitower desulfurization is removed dust device

Country Status (1)

Country Link
CN (1) CN205412645U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106621781A (en) * 2017-03-13 2017-05-10 哈尔滨蔚蓝环保设备制造有限公司 Desulfurizing and flue gas purifying device
CN107198949A (en) * 2017-06-27 2017-09-26 苏州克莱尔环保科技有限公司 A kind of tail gas desulfurization device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106621781A (en) * 2017-03-13 2017-05-10 哈尔滨蔚蓝环保设备制造有限公司 Desulfurizing and flue gas purifying device
CN106621781B (en) * 2017-03-13 2023-02-28 哈尔滨蔚蓝环保设备制造有限公司 Desulfurization smoke purification device
CN107198949A (en) * 2017-06-27 2017-09-26 苏州克莱尔环保科技有限公司 A kind of tail gas desulfurization device

Similar Documents

Publication Publication Date Title
CN2912772Y (en) Waste gas treatment apparatus
CN205412645U (en) Novel multitower desulfurization is removed dust device
CN201930706U (en) Simple boiler desulfurizing and dedusting system
CN204911089U (en) Environment -friendly desulfurization gas wash tower
CN204017585U (en) Dust treatment equipment
CN203777867U (en) Waste gas purification device
CN104315605A (en) Office environment control structure
CN104888743B (en) A kind of mercurous load detached apparatus and method of sulfur activated coke regenerative process hydrargyrum
CN108126464A (en) Boiler desulphurization denitration dedusting minimum discharge system and its desulphurization denitration dust removal method
CN208340493U (en) A kind of horizontal multi-stage desulfurizer
CN203764127U (en) Tunnel kiln desulfurizing tower
CN203764054U (en) Micro-pore type water-mist dust extraction device
CN210385433U (en) Dust removal SOx/NOx control device for coal fired boiler room
CN205598918U (en) Novel high -efficient desulfurization dusting tower
CN205412528U (en) Novel high -efficient desulfurization dust remover
CN205412646U (en) Flue gas wet flue gas desulfurization dust remover
CN205007815U (en) Desulfurization device
CN205109356U (en) Collect desulfurization, denitration, demercuration in gas cleaning of an organic whole device
CN203281157U (en) Water-spraying desulfurization and denitrification bag-type dust remover
CN202893171U (en) Boiler spray desulphurization and dust-removal device
CN206176434U (en) Desulfurization wastewater treatment device
CN104941360A (en) Environment-friendly desulfurization and dust collection tower
CN201940166U (en) Desulfurizing and dedusting purifier
CN204268587U (en) A kind of working environment control device
CN205586708U (en) Double -deck atomizing desulfurization dust collector of circulated flue gas

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Liu Enfeng

Inventor before: Zhong Xiang

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170829

Address after: 717500 energy and chemical industry park, Yanan, Shaanxi, Zhidan

Patentee after: Zhidan clean tech Petroleum Technology Services Limited liability company

Address before: 365300 Fujian province Sanming City Qingliu County Longjin Town Street shop No. 123

Patentee before: Qingliuliangjian Environment Protection Technology Development Co., Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20210314

CF01 Termination of patent right due to non-payment of annual fee