CN205590738U - Small furnace tuyere stock water -cooling sphere and contact flange - Google Patents
Small furnace tuyere stock water -cooling sphere and contact flange Download PDFInfo
- Publication number
- CN205590738U CN205590738U CN201620288626.1U CN201620288626U CN205590738U CN 205590738 U CN205590738 U CN 205590738U CN 201620288626 U CN201620288626 U CN 201620288626U CN 205590738 U CN205590738 U CN 205590738U
- Authority
- CN
- China
- Prior art keywords
- water
- elbow
- sphere
- cooled
- rustless steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 11
- 238000001816 cooling Methods 0.000 title abstract 4
- 229910000831 Steel Inorganic materials 0.000 claims description 25
- 239000010959 steel Substances 0.000 claims description 25
- 230000004438 eyesight Effects 0.000 claims description 9
- 238000003723 Smelting Methods 0.000 abstract description 4
- 229910001220 stainless steel Inorganic materials 0.000 abstract 2
- 239000010935 stainless steel Substances 0.000 abstract 2
- 230000005526 G1 to G0 transition Effects 0.000 abstract 1
- 230000009466 transformation Effects 0.000 abstract 1
- 210000001503 joint Anatomy 0.000 description 8
- 238000004519 manufacturing process Methods 0.000 description 4
- 210000001015 abdomen Anatomy 0.000 description 3
- 239000002893 slag Substances 0.000 description 3
- 238000005728 strengthening Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 229910001018 Cast iron Inorganic materials 0.000 description 1
- 244000261422 Lysimachia clethroides Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Landscapes
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
The utility model relates to a small furnace tuyere stock water -cooling sphere and contact flange, including a water -cooling stainless steel sphere, this water -cooling stainless steel sphere passes through fixed the linking to each other of blast furnace tuyere stock of a plurality of fixing bolt side by side and rear end, at blast furnace tuyere stock's the other end then through fixing bolt and elbow contact flange stationary phase even. Elbow after the transformation and blowpipe and well festival all contact and very tightly can not leak out, greatly reduced the air leakage rate of blast furnace, can guarantee the blast air kinetic energy of blast furnace to do benefit to the intensive smelting of blast furnace.
Description
Technical field
This utility model belongs to roughing runner Removal Technology field, relates to a kind of small furnace eyesight elbow water-cooled sphere and engagement flange.
Background technology
Small furnace tuyere device is different with big blast furnace, big blast-furnace tuyere belly pipe comprises elbow (entirety that belly pipe is fixing with elbow bolt), and small furnace tuyere device belly pipe is to be connected by pull bar with elbow, by ball face sealing (cast iron sphere, the resistance to material of internal filling), elbow is connected with joint and bustle pipe gooseneck in top, forms air-supply arrangement.
This structure also exists several obvious shortcoming: one, the castable inside elbow sphere is washed away through the hot blast of high pressure after a while, high-temperature and is etched, castable is etched that the palintrope head shoot face that comes off is the most rubescent, deformation or scaling loss (life-span short 2-3 month, the longest can be with 1 year).Two, elbow leaks out with the easy scaling loss of resistance to material of middle joint connecting place, needs to change whole elbow cost big (life-span is typically at about 1-3) after scaling loss.Three, easily leak out with middle joint connecting place due to elbow, scaling loss, rubescent the most easily occurs, even occurs burning, cause maintenance to change frequently, normal production is caused the biggest impact.Four, replacing significantly increases the labor intensity of workman frequently, adds cost of labor.
Utility model content
In order to overcome the disadvantages mentioned above of prior art, this utility model provides a kind of small furnace eyesight elbow water-cooled sphere and engagement flange, rustless steel water-cooled sphere contacts with tuyere blast pipes tightly, do not leak out, the service life making this sphere after using circulating water instead significantly extends, and improved elbow sphere is generally available 2-7;If scaling loss is leaked out after elbow top and middle joint connecting place set up flange, only need to change flange, it is not necessary to change whole elbow, greatly saved production cost, if the not slagging scorification of improved elbow or filling slag can be with the generation furnace life of blast furnace;Improved elbow all contacts with blowpipe and middle joint and the most tightly will not leak out, and greatly reduces the air leak rate of air curtain of blast furnace, it is ensured that the strengthening smelting of the blast energy of blast furnace, beneficially blast furnace.
This utility model solves its technical problem and be the technical scheme is that a kind of small furnace eyesight elbow water-cooled sphere and engagement flange, including a water-cooled rustless steel sphere, this water-cooled rustless steel sphere is fixedly linked by the blast-furnace tuyere elbow of several fixing bolts side by side with rear end, and the other end at blast-furnace tuyere elbow is then fixedly linked with elbow engagement flange by fixing bolt.
The in the reverse direction being connected with water-cooled rustless steel sphere at described elbow is provided with an air port peep-hole.
Water-cooled rustless steel sphere is provided with water-cooled rustless steel sphere water inlet pipe and water-cooled rustless steel sphere outlet pipe.
The beneficial effects of the utility model are: rustless steel water-cooled sphere being contacted tightly with tuyere blast pipes, does not leaks out, make significantly extend the service life of this sphere after using circulating water instead, improved elbow sphere is generally available 2-7;If scaling loss is leaked out after elbow top and middle joint connecting place set up flange, only need to change flange, it is not necessary to change whole elbow, greatly saved production cost, if the not slagging scorification of improved elbow or filling slag can be with the generation furnace life of blast furnace;Improved elbow all contacts with blowpipe and middle joint and the most tightly will not leak out, and greatly reduces the air leak rate of air curtain of blast furnace, it is ensured that the strengthening smelting of the blast energy of blast furnace, beneficially blast furnace.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is eyesight elbow engagement flange top view;
Fig. 3 is water-cooled rustless steel sphere top view.
In figure: 1-blast-furnace tuyere elbow, 2-elbow engagement flange, 3-fixes bolt, 4-water-cooled rustless steel sphere, 5-water-cooled rustless steel sphere water inlet pipe, 6-water-cooled rustless steel sphere outlet pipe, 7-air port peep-hole.
Detailed description of the invention
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
See Fig. 1~Fig. 3, a kind of small furnace eyesight elbow water-cooled sphere and engagement flange, including a water-cooled rustless steel sphere 4, this water-cooled rustless steel sphere 4 is fixedly linked by the blast-furnace tuyere elbow 1 of several fixing bolts 3 side by side with rear end, and the other end at blast-furnace tuyere elbow 1 is then fixedly linked with elbow engagement flange 2 by fixing bolt 3.
The in the reverse direction being connected with water-cooled rustless steel sphere 4 at described elbow is provided with an air port peep-hole 7.
Water-cooled rustless steel sphere 4 is provided with water-cooled rustless steel sphere water inlet pipe 5 and water-cooled rustless steel sphere outlet pipe 6.
Rustless steel water-cooled sphere being contacted tightly with tuyere blast pipes, does not leaks out, make significantly extend the service life of this sphere after using circulating water instead, improved elbow sphere is generally available 2-7;If scaling loss is leaked out after elbow top and middle joint connecting place set up flange, only need to change flange, it is not necessary to change whole elbow, greatly saved production cost, if the not slagging scorification of improved elbow or filling slag can be with the generation furnace life of blast furnace;Improved elbow all contacts with blowpipe and middle joint and the most tightly will not leak out, and greatly reduces the air leak rate of air curtain of blast furnace, it is ensured that the strengthening smelting of the blast energy of blast furnace, beneficially blast furnace.
Claims (3)
1. a small furnace eyesight elbow water-cooled sphere and engagement flange, including a water-cooled rustless steel sphere, it is characterized in that: this water-cooled rustless steel sphere is fixedly linked by the blast-furnace tuyere elbow of several fixing bolts side by side with rear end, and the other end at blast-furnace tuyere elbow is then fixedly linked with elbow engagement flange by fixing bolt.
2. small furnace eyesight elbow water-cooled sphere as claimed in claim 1 and engagement flange, is characterized in that: the in the reverse direction being connected with water-cooled rustless steel sphere at described elbow is provided with an air port peep-hole.
3. small furnace eyesight elbow water-cooled sphere as claimed in claim 1 and engagement flange, is characterized in that: be provided with water-cooled rustless steel sphere water inlet pipe and water-cooled rustless steel sphere outlet pipe on water-cooled rustless steel sphere.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620288626.1U CN205590738U (en) | 2016-04-09 | 2016-04-09 | Small furnace tuyere stock water -cooling sphere and contact flange |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620288626.1U CN205590738U (en) | 2016-04-09 | 2016-04-09 | Small furnace tuyere stock water -cooling sphere and contact flange |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205590738U true CN205590738U (en) | 2016-09-21 |
Family
ID=56921866
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620288626.1U Expired - Fee Related CN205590738U (en) | 2016-04-09 | 2016-04-09 | Small furnace tuyere stock water -cooling sphere and contact flange |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205590738U (en) |
-
2016
- 2016-04-09 CN CN201620288626.1U patent/CN205590738U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203602643U (en) | Device for dismounting tuyere middle sleeve of blast furnace | |
CN101705319A (en) | Cooling system for blast furnace | |
CN205590738U (en) | Small furnace tuyere stock water -cooling sphere and contact flange | |
CN205347468U (en) | Blast furnace stave prosthetic devices | |
CN202766547U (en) | Cast copper cooling wall without buried pipe | |
CN201241163Y (en) | Blast furnace cooling wall tube restoring apparatus | |
CN207537330U (en) | A kind of cover-plate glass platinum channel throat tubular construction | |
CN108796155B (en) | Blast furnace cast house slag iron Shui Yu sensible heat recovery energy-saving power generation system and power generation method | |
CN202297634U (en) | Novel tuyere medium sleeve pressing device | |
CN202187018U (en) | Tiny sleeve for blast-furnace tuyere | |
CN202610248U (en) | Drill key for handling air leakage of contact surface between tuyere small sleeve and belly pipe of blast furnace | |
CN202849455U (en) | Water supply device for cooling single blast furnace hearth | |
CN211999794U (en) | Air supply arrangement of leak protection wind is used in blast furnace production | |
CN201560196U (en) | Blast-furnace novel tuyere-belt cooling wall | |
CN201665685U (en) | Cooling system for steel brick soft water of blast furnace throat | |
CN204874635U (en) | Intensive condenser tube structure of wind gap cooling wall | |
CN204369911U (en) | A kind of liquid high temperature sludge residual heat using device | |
CN206616244U (en) | A kind of blast furnace air-supply arrangement | |
CN202936430U (en) | Hydraulic gun water cooling device | |
CN218026179U (en) | Air port sleeve pressing and flow monitoring device | |
CN201495244U (en) | Blast furnace tuyere sleeve | |
CN214830447U (en) | Temporary cooling and purging device for hot air outlet furnace shell of hot blast stove | |
CN104928422A (en) | Repair method of blast furnace cold wall | |
CN217202802U (en) | Special device for blast furnace tuyere operation | |
CN202705398U (en) | Blanking barrel of water-cooling converter |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160921 |
|
CF01 | Termination of patent right due to non-payment of annual fee |