CN205590738U - Small furnace tuyere stock water -cooling sphere and contact flange - Google Patents

Small furnace tuyere stock water -cooling sphere and contact flange Download PDF

Info

Publication number
CN205590738U
CN205590738U CN201620288626.1U CN201620288626U CN205590738U CN 205590738 U CN205590738 U CN 205590738U CN 201620288626 U CN201620288626 U CN 201620288626U CN 205590738 U CN205590738 U CN 205590738U
Authority
CN
China
Prior art keywords
water
elbow
sphere
cooled
rustless steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620288626.1U
Other languages
Chinese (zh)
Inventor
戴冬芒
柏德春
陈开泉
陈�胜
袁铭杰
颜伟
韦兵
吴启剑
冯六发
卢永凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaogang Songshan Co Ltd Guangdong
Original Assignee
Shaogang Songshan Co Ltd Guangdong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaogang Songshan Co Ltd Guangdong filed Critical Shaogang Songshan Co Ltd Guangdong
Priority to CN201620288626.1U priority Critical patent/CN205590738U/en
Application granted granted Critical
Publication of CN205590738U publication Critical patent/CN205590738U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model relates to a small furnace tuyere stock water -cooling sphere and contact flange, including a water -cooling stainless steel sphere, this water -cooling stainless steel sphere passes through fixed the linking to each other of blast furnace tuyere stock of a plurality of fixing bolt side by side and rear end, at blast furnace tuyere stock's the other end then through fixing bolt and elbow contact flange stationary phase even. Elbow after the transformation and blowpipe and well festival all contact and very tightly can not leak out, greatly reduced the air leakage rate of blast furnace, can guarantee the blast air kinetic energy of blast furnace to do benefit to the intensive smelting of blast furnace.

Description

A kind of small furnace eyesight elbow water-cooled sphere and engagement flange
Technical field
This utility model belongs to roughing runner Removal Technology field, relates to a kind of small furnace eyesight elbow water-cooled sphere and engagement flange.
Background technology
Small furnace tuyere device is different with big blast furnace, big blast-furnace tuyere belly pipe comprises elbow (entirety that belly pipe is fixing with elbow bolt), and small furnace tuyere device belly pipe is to be connected by pull bar with elbow, by ball face sealing (cast iron sphere, the resistance to material of internal filling), elbow is connected with joint and bustle pipe gooseneck in top, forms air-supply arrangement.
This structure also exists several obvious shortcoming: one, the castable inside elbow sphere is washed away through the hot blast of high pressure after a while, high-temperature and is etched, castable is etched that the palintrope head shoot face that comes off is the most rubescent, deformation or scaling loss (life-span short 2-3 month, the longest can be with 1 year).Two, elbow leaks out with the easy scaling loss of resistance to material of middle joint connecting place, needs to change whole elbow cost big (life-span is typically at about 1-3) after scaling loss.Three, easily leak out with middle joint connecting place due to elbow, scaling loss, rubescent the most easily occurs, even occurs burning, cause maintenance to change frequently, normal production is caused the biggest impact.Four, replacing significantly increases the labor intensity of workman frequently, adds cost of labor.
Utility model content
In order to overcome the disadvantages mentioned above of prior art, this utility model provides a kind of small furnace eyesight elbow water-cooled sphere and engagement flange, rustless steel water-cooled sphere contacts with tuyere blast pipes tightly, do not leak out, the service life making this sphere after using circulating water instead significantly extends, and improved elbow sphere is generally available 2-7;If scaling loss is leaked out after elbow top and middle joint connecting place set up flange, only need to change flange, it is not necessary to change whole elbow, greatly saved production cost, if the not slagging scorification of improved elbow or filling slag can be with the generation furnace life of blast furnace;Improved elbow all contacts with blowpipe and middle joint and the most tightly will not leak out, and greatly reduces the air leak rate of air curtain of blast furnace, it is ensured that the strengthening smelting of the blast energy of blast furnace, beneficially blast furnace.
This utility model solves its technical problem and be the technical scheme is that a kind of small furnace eyesight elbow water-cooled sphere and engagement flange, including a water-cooled rustless steel sphere, this water-cooled rustless steel sphere is fixedly linked by the blast-furnace tuyere elbow of several fixing bolts side by side with rear end, and the other end at blast-furnace tuyere elbow is then fixedly linked with elbow engagement flange by fixing bolt.
The in the reverse direction being connected with water-cooled rustless steel sphere at described elbow is provided with an air port peep-hole.
Water-cooled rustless steel sphere is provided with water-cooled rustless steel sphere water inlet pipe and water-cooled rustless steel sphere outlet pipe.
The beneficial effects of the utility model are: rustless steel water-cooled sphere being contacted tightly with tuyere blast pipes, does not leaks out, make significantly extend the service life of this sphere after using circulating water instead, improved elbow sphere is generally available 2-7;If scaling loss is leaked out after elbow top and middle joint connecting place set up flange, only need to change flange, it is not necessary to change whole elbow, greatly saved production cost, if the not slagging scorification of improved elbow or filling slag can be with the generation furnace life of blast furnace;Improved elbow all contacts with blowpipe and middle joint and the most tightly will not leak out, and greatly reduces the air leak rate of air curtain of blast furnace, it is ensured that the strengthening smelting of the blast energy of blast furnace, beneficially blast furnace.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is eyesight elbow engagement flange top view;
Fig. 3 is water-cooled rustless steel sphere top view.
In figure: 1-blast-furnace tuyere elbow, 2-elbow engagement flange, 3-fixes bolt, 4-water-cooled rustless steel sphere, 5-water-cooled rustless steel sphere water inlet pipe, 6-water-cooled rustless steel sphere outlet pipe, 7-air port peep-hole.
Detailed description of the invention
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings.
See Fig. 1~Fig. 3, a kind of small furnace eyesight elbow water-cooled sphere and engagement flange, including a water-cooled rustless steel sphere 4, this water-cooled rustless steel sphere 4 is fixedly linked by the blast-furnace tuyere elbow 1 of several fixing bolts 3 side by side with rear end, and the other end at blast-furnace tuyere elbow 1 is then fixedly linked with elbow engagement flange 2 by fixing bolt 3.
The in the reverse direction being connected with water-cooled rustless steel sphere 4 at described elbow is provided with an air port peep-hole 7.
Water-cooled rustless steel sphere 4 is provided with water-cooled rustless steel sphere water inlet pipe 5 and water-cooled rustless steel sphere outlet pipe 6.
Rustless steel water-cooled sphere being contacted tightly with tuyere blast pipes, does not leaks out, make significantly extend the service life of this sphere after using circulating water instead, improved elbow sphere is generally available 2-7;If scaling loss is leaked out after elbow top and middle joint connecting place set up flange, only need to change flange, it is not necessary to change whole elbow, greatly saved production cost, if the not slagging scorification of improved elbow or filling slag can be with the generation furnace life of blast furnace;Improved elbow all contacts with blowpipe and middle joint and the most tightly will not leak out, and greatly reduces the air leak rate of air curtain of blast furnace, it is ensured that the strengthening smelting of the blast energy of blast furnace, beneficially blast furnace.

Claims (3)

1. a small furnace eyesight elbow water-cooled sphere and engagement flange, including a water-cooled rustless steel sphere, it is characterized in that: this water-cooled rustless steel sphere is fixedly linked by the blast-furnace tuyere elbow of several fixing bolts side by side with rear end, and the other end at blast-furnace tuyere elbow is then fixedly linked with elbow engagement flange by fixing bolt.
2. small furnace eyesight elbow water-cooled sphere as claimed in claim 1 and engagement flange, is characterized in that: the in the reverse direction being connected with water-cooled rustless steel sphere at described elbow is provided with an air port peep-hole.
3. small furnace eyesight elbow water-cooled sphere as claimed in claim 1 and engagement flange, is characterized in that: be provided with water-cooled rustless steel sphere water inlet pipe and water-cooled rustless steel sphere outlet pipe on water-cooled rustless steel sphere.
CN201620288626.1U 2016-04-09 2016-04-09 Small furnace tuyere stock water -cooling sphere and contact flange Expired - Fee Related CN205590738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620288626.1U CN205590738U (en) 2016-04-09 2016-04-09 Small furnace tuyere stock water -cooling sphere and contact flange

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620288626.1U CN205590738U (en) 2016-04-09 2016-04-09 Small furnace tuyere stock water -cooling sphere and contact flange

Publications (1)

Publication Number Publication Date
CN205590738U true CN205590738U (en) 2016-09-21

Family

ID=56921866

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620288626.1U Expired - Fee Related CN205590738U (en) 2016-04-09 2016-04-09 Small furnace tuyere stock water -cooling sphere and contact flange

Country Status (1)

Country Link
CN (1) CN205590738U (en)

Similar Documents

Publication Publication Date Title
CN203602643U (en) Device for dismounting tuyere middle sleeve of blast furnace
CN101705319A (en) Cooling system for blast furnace
CN205590738U (en) Small furnace tuyere stock water -cooling sphere and contact flange
CN205347468U (en) Blast furnace stave prosthetic devices
CN202766547U (en) Cast copper cooling wall without buried pipe
CN201241163Y (en) Blast furnace cooling wall tube restoring apparatus
CN207537330U (en) A kind of cover-plate glass platinum channel throat tubular construction
CN108796155B (en) Blast furnace cast house slag iron Shui Yu sensible heat recovery energy-saving power generation system and power generation method
CN202297634U (en) Novel tuyere medium sleeve pressing device
CN202187018U (en) Tiny sleeve for blast-furnace tuyere
CN202610248U (en) Drill key for handling air leakage of contact surface between tuyere small sleeve and belly pipe of blast furnace
CN202849455U (en) Water supply device for cooling single blast furnace hearth
CN211999794U (en) Air supply arrangement of leak protection wind is used in blast furnace production
CN201560196U (en) Blast-furnace novel tuyere-belt cooling wall
CN201665685U (en) Cooling system for steel brick soft water of blast furnace throat
CN204874635U (en) Intensive condenser tube structure of wind gap cooling wall
CN204369911U (en) A kind of liquid high temperature sludge residual heat using device
CN206616244U (en) A kind of blast furnace air-supply arrangement
CN202936430U (en) Hydraulic gun water cooling device
CN218026179U (en) Air port sleeve pressing and flow monitoring device
CN201495244U (en) Blast furnace tuyere sleeve
CN214830447U (en) Temporary cooling and purging device for hot air outlet furnace shell of hot blast stove
CN104928422A (en) Repair method of blast furnace cold wall
CN217202802U (en) Special device for blast furnace tuyere operation
CN202705398U (en) Blanking barrel of water-cooling converter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160921

CF01 Termination of patent right due to non-payment of annual fee