CN205587720U - Strike and bore high -order handling frame - Google Patents
Strike and bore high -order handling frame Download PDFInfo
- Publication number
- CN205587720U CN205587720U CN201620387584.7U CN201620387584U CN205587720U CN 205587720 U CN205587720 U CN 205587720U CN 201620387584 U CN201620387584 U CN 201620387584U CN 205587720 U CN205587720 U CN 205587720U
- Authority
- CN
- China
- Prior art keywords
- support
- scale
- impact
- strike
- high operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a strike and bore high -order handling frame, including the support, locate support upper portion, with support sliding connection's telescopic link to reach and locate the scale on the support perpendicularly. The utility model discloses a strike and bore high -order handling frame can be according to the length of the altitude mixture control telescopic link of ceiling, and the workman stands on the ground, presses and strike the power supply switching who bores, can switching impulse bores and punch on the ceiling. This strike and bore high -order handling frame repeatedly usable, it is convenient to remove, can singlely use alone, has both saved manpower and materials, has improved the efficiency, has also avoided the danger of falling that the workman climbed and to meet. Be equipped with the scale on the support, the wall body is withstood to the one end of scale, can guarantee that every drilling and the distance of wall body all keep unanimous.
Description
Technical field
This utility model relates to a kind of construction workpiece, bores high operation frame particularly to one impact.
Background technology
In construction, it is often necessary to use impact to be drilled in ceiling punching, the floor height of every floor is generally all more than 3 meters, with the height of common laborer, not by the facility such as ladder or scaffold be operate less than.When workman uses ladder or scaffold, for the sake of security, other people are needed to assist, waste of manpower, and accidentally will fall, the safest.And, punch position is not easy to measure.
Utility model content
The purpose of this utility model is to provide for a kind of impact and bores high operation frame, can solve one or more in the problems referred to above.According to an aspect of the present utility model, it is provided that high operation frame is bored in a kind of impact, including support, is located at the expansion link that frame upper is connected, and the scale being vertical on support with bracket slide.
Impact brill high operation frame of the present utility model can be according to the length of the altitude mixture control expansion link of ceiling, and worker stands on the ground, presses the power switch that impact is bored, and can bore punching on ceiling by switching impulse.It is reusable that high operation frame is bored in this impact, and conveniently moving single can be used alone, both saved manpower and materials, improve effect, it also avoid workman and climbs the danger fallen that can run into.Support is provided with scale, and body of wall is withstood in one end of scale, it is ensured that each boring keeps consistent with the distance of body of wall.
In some embodiments, this utility model also includes the depression bar hinged with support;One end of depression bar is connected with the lower end of expansion link by rope.Operator is pressed downward against the other end of dynamic pressure bar, expansion link can be driven to be moved upward to the height of needs with the rope being connected bottom depression bar one end and expansion link, it is also possible to recoil when shock absorbing driller makees.
In some embodiments, this utility model also includes the gear being provided with on support, and expansion link is provided with the tooth bar adaptive with gear.Operator rotates gear, and wheel and rack engages, and drives expansion link to be moved upward to the height needed, it is also possible to recoil when shock absorbing driller makees.
In some embodiments, scale bar of the present utility model is connected with bracket slide.Can the length of regulation scale as required, thus adjust the distance of boring and body of wall.
In some embodiments, this utility model also includes being located at scale bar one end and being perpendicular to the horizontal ruler of scale bar.Horizontal ruler may be used for measuring the distance between boring and boring.
In some embodiments, this utility model horizontal ruler is slidably connected with scale.The length of horizontal ruler can be regulated as required.
In some embodiments, frame bottom of the present utility model is provided with universal wheel.It is easy to mobile operating frame.
Accompanying drawing explanation
Fig. 1 is the structural representation of the impact brill high operation frame of a kind of embodiment of this utility model.
Fig. 2 is the structural representation of the lifting mechanism of the impact brill high operation frame of a kind of embodiment of this utility model.
Fig. 3 is the structural representation of the lifting mechanism of the impact brill high operation frame of this utility model another embodiment.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is described in further detail.
Fig. 1 and Fig. 2 show schematically show the impact according to a kind of embodiment of the present utility model and bore the structure of high operation frame.
As it is shown in figure 1, high operation frame is bored in this impact includes support 10, expansion link 20 and scale 30.Expansion link 20 is arranged on the top of support 10, is slidably connected with support 10.Scale 30 arranges over the mount 10, and scale 30 is vertical with support 10.
The top of expansion link 20 is provided with impact and bores clamping device 80.
After crosshead moves, one end of scale 30 keeps withstanding body of wall, it is ensured that each boring keeps consistent with the distance of body of wall.Scale bar 30 and support 10 can be slidably connected, can the length of regulation scale as required, thus adjust the distance of boring and body of wall.Can make between scale bar 30 with support 10 to be screwed relative position.
Expansion link 20 lifting mechanism can be set on support 10, in the present embodiment, as in figure 2 it is shown, lifting mechanism includes depression bar 40 and rope 50.The middle part of depression bar 40 is hinged with support 10, and one end of depression bar 40 is connected by rope 50 with the bottom of expansion link 20.Operator is pressed downward against the other end of dynamic pressure bar 40, and rope 50 can drive expansion link 20 to be moved upward to the height needed, it is also possible to recoil when shock absorbing driller makees.
In another embodiment, as it is shown on figure 3, lifting mechanism includes the gear 61 arranged on support 10, and the tooth bar 62 adaptive with gear arranged on expansion link 20.Operator rotates the crank 60 being connected with gear 61, and gear 61 engages with tooth bar 62, drives expansion link 20 to be moved upward to the height needed, recoil when this set can be made with shock absorbing driller.The rotation of gear 61 can also drive by arranging motor.
Expansion link 20 can be an independent shaft being slidably connected with support 10, it is also possible to be the structure of an outer bar 21 piece bar 22 of inner sleeve, bar 22 is provided with multiple through hole 23 at a certain distance, outer bar 21 is arranged and is also provided with through hole.When outer bar 21 is transferred to suitable position with bar 22, inserted link 24 is used to be inserted simultaneously into the through hole of outer bar 21 and bar 22, the length of fixing expansion link 20.Impact brill can be risen to basic suitably position, then by being pressed downward against the other end of dynamic pressure bar 40, coordinates the propelling that impact is bored first according to the height of ceiling, impact bored and be progressively lifted up by this set.
The free end of scale 30 can also arrange the horizontal ruler 31 being perpendicular to scale bar 30.Horizontal ruler 31 can measure the distance between boring and boring by measuring the distance that the parallel body of wall of crosshead moves.Horizontal ruler 31 is slidably connected with scale 30, can regulate the length of horizontal ruler 31 as required, thus adjust the distance between boring and boring.The position being screwed between horizontal ruler 31 and scale 30 can be made.
Universal wheel 70 can also be set bottom support 10, it is simple to mobile operating frame.Hound 11 can also be set on support 10, for reinforced liner.Counterweight 12 can also be set on support 10, for improving the stability of support.
High operation frame is bored in the impact that this utility model provides can be in construction site field fabrication, and processing technology is simple, and material is easy to get, reusable, conveniently moving, can single be used alone, both saved manpower and materials, improve effect, and it also avoid workman and climb the danger fallen that can run into.
Above-described is only embodiments more of the present utility model, not the restriction to this utility model design.For the person of ordinary skill of the art, on the premise of creating design without departing from this utility model, it is also possible to making some deformation and improvement, these broadly fall into protection domain of the present utility model.
Claims (7)
1. high operation frame is bored in impact, it is characterized in that, including: support (10), it is located at the expansion link (20) that frame upper is connected with bracket slide, and the scale (30) being vertical on described support (10), it is additionally provided with the lifting mechanism being connected respectively with support (10) and expansion link (20).
High operation frame is bored in impact the most according to claim 1, it is characterized in that: described lifting mechanism includes the depression bar (40) hinged with described support (10), one end of described depression bar (40) is connected with the lower end of described expansion link (20) by rope.
High operation frame is bored in impact the most according to claim 1, it is characterized in that: described lifting mechanism includes the gear (61) being located on described support (10), described expansion link (20) is provided with the tooth bar (62) adaptive with described gear (61).
High operation frame is bored in impact the most according to claim 1, it is characterised in that: described scale bar (30) is slidably connected with described support (10).
High operation frame is bored in impact the most according to claim 4, it is characterised in that: also include being located at described scale bar one end and being perpendicular to the horizontal ruler (31) of described scale bar (30).
High operation frame is bored in impact the most according to claim 5, it is characterised in that: described horizontal ruler (31) is slidably connected with described scale (30).
7. bore high operation frame according to the impact described in any one of claim 1~6, it is characterised in that: described support (10) bottom is provided with universal wheel (70).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620387584.7U CN205587720U (en) | 2016-04-29 | 2016-04-29 | Strike and bore high -order handling frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620387584.7U CN205587720U (en) | 2016-04-29 | 2016-04-29 | Strike and bore high -order handling frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205587720U true CN205587720U (en) | 2016-09-21 |
Family
ID=56933423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620387584.7U Expired - Fee Related CN205587720U (en) | 2016-04-29 | 2016-04-29 | Strike and bore high -order handling frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205587720U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106378476A (en) * | 2016-12-01 | 2017-02-08 | 唐浩 | Long rod perforating machine and multi-functional long rod |
CN107669297A (en) * | 2017-11-17 | 2018-02-09 | 魏征 | A kind of knee jerk reaction nerve percussion device |
CN107738227A (en) * | 2017-10-27 | 2018-02-27 | 中国建筑第八工程局有限公司 | Exempt from auxiliary punch device of ascending a height |
-
2016
- 2016-04-29 CN CN201620387584.7U patent/CN205587720U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106378476A (en) * | 2016-12-01 | 2017-02-08 | 唐浩 | Long rod perforating machine and multi-functional long rod |
CN106378476B (en) * | 2016-12-01 | 2018-04-27 | 唐浩 | A kind of stock puncher and Multifunction long rod |
CN107738227A (en) * | 2017-10-27 | 2018-02-27 | 中国建筑第八工程局有限公司 | Exempt from auxiliary punch device of ascending a height |
CN107669297A (en) * | 2017-11-17 | 2018-02-09 | 魏征 | A kind of knee jerk reaction nerve percussion device |
CN107669297B (en) * | 2017-11-17 | 2021-03-23 | 中南大学湘雅医院 | Knee jerk reaction nerve percussion device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205587720U (en) | Strike and bore high -order handling frame | |
CN201552557U (en) | Novel drilling device | |
HK1054730A1 (en) | Device for carrying out work in an elevator shaft | |
CN205189386U (en) | A adjustable platform for building operation | |
CN204802923U (en) | Lifting operation platform | |
CN203696028U (en) | Liftable laser-positioning high-space suspender punching device | |
CN207377100U (en) | A kind of electronic lifting operation platform of elevator | |
CN210453296U (en) | Drilling mechanism for suspended ceiling and concrete roof | |
CN110586985A (en) | Top plate drilling lifting frame | |
CN204159929U (en) | Mobile adjustable drilling sectional shelf-unit | |
CN107790787A (en) | The lengthening support that a kind of packaged type electric drill drills vertically upward | |
CN205116671U (en) | Single ceiling assembly and disassembly tools | |
CN204585571U (en) | Multifunctional wall drilling equipment | |
CN101987445B (en) | Accessory tool of impact drill | |
CN205444137U (en) | Pressure regulating well construction operation platform | |
CN215254409U (en) | Scaffold for elevator well | |
CN204748542U (en) | Strike and bore high -order handling frame | |
CN204525381U (en) | A kind of lifting electric hammer combination pressure rod member for boring ceiling furred ceiling muscle hole | |
CN105525755A (en) | Steel bar planting hole drilling mechanical hand | |
CN204800006U (en) | Ceiling drilling appurtenance | |
CN206824913U (en) | One kind, which is ascended a height, assembles device | |
CN208396644U (en) | A kind of tunnel punching vehicle | |
CN104942764A (en) | High-position handling frame for churn drill | |
CN105442826A (en) | Elevating construction assisting device | |
CN203281933U (en) | Lifting type top plate perforating machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |