CN104942764A - High-position handling frame for churn drill - Google Patents
High-position handling frame for churn drill Download PDFInfo
- Publication number
- CN104942764A CN104942764A CN201510404673.8A CN201510404673A CN104942764A CN 104942764 A CN104942764 A CN 104942764A CN 201510404673 A CN201510404673 A CN 201510404673A CN 104942764 A CN104942764 A CN 104942764A
- Authority
- CN
- China
- Prior art keywords
- churn drill
- percussion drill
- vertical rod
- drill
- operation frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Percussive Tools And Related Accessories (AREA)
Abstract
The invention discloses a high-position handling frame for a churn drill. The high-position handling frame for the churn drill comprises a first upright rod, a second cross rod, a second upright rod and a first cross rod which are sequentially hinged to form a parallelogram frame, wherein the churn drill is arranged at the top of the first upright rod. According to the high-position handling frame for the churn drill, the distance between a lowest point and a highest point of the parallelogram frame is adjustable in a certain range by adjusting an included angle of each long side and the corresponding short side of the parallelogram frame, so that the churn drill is supported, and the recoil force produced during working of the churn drill can be buffered. All that is needed for a worker standing on the ground is to press a power supply switch of the churn drill, and the churn drill can be operated to drill into a ceiling; further, the high-position handling frame for the churn drill can be reused, is convenient to move and can be independently used by one worker, so that manpower and material resources are saved, the effect is improved, and the danger that the worker probably falls off when climbing to the high position is avoided.
Description
Technical field
The present invention relates to a kind of construction workpiece, particularly a kind of percussion drill high operation frame.
Background technology
In construction, often need to use percussion drill to punch at ceiling, the floor height of every floor usually all more than 3 meters, with the height of common laborer, not by the facility such as ladder or scaffold be operation less than.When workman uses ladder or scaffold, for the sake of security, need other people to assist, waste of manpower, and accidentally will fall, safe not.
Summary of the invention
The object of the invention is to provide a kind of percussion drill high operation frame, one or more in can solving the problem.
According to an aspect of the present invention, provide a kind of percussion drill high operation frame, comprise hinged, composition the first vertical rod of parallelogram lever successively, the second cross bar, the second vertical rod and the first cross bar; The top of the first vertical rod is located at by percussion drill.
Percussion drill high operation frame of the present invention is by regulating the long limit of parallelogram lever and the corner dimension of minor face, make the distance of the minimum point of parallelogram lever and peak adjustable within the specific limits, both served the effect to the capable support of percussion drilling, and also can be drilled in impact the recoil produced in work and cushion.Worker stands on the ground, presses the power switch of percussion drill, can punch on ceiling by switching impulse brill.And this percussion drill high operation frame is reusable, conveniently moving, singlely can uses alone, both saved manpower and materials, improve effect, it also avoid workman and to climb the danger fallen that can run into.
In some embodiments, one end of the second cross bar of the present invention is provided with and adds long handle.When carrying out drilling operation, the percussion drill at the first vertical rod top can be lifted to suitable height to pressing down lengthening handle by workman.
In some embodiments, the second vertical rod bottom of the present invention is provided with the second extension bar.Thus, parallelogram lever can be promoted certain height.
In some embodiments, the second extension bar lower end of the present invention is provided with tripod.By the support of tripod, high operation frame can be made more firm.
In some embodiments, the first vertical rod top of the present invention is provided with the first extension bar, and the top of the first extension bar is located at by percussion drill.Thus, can by height certain for the top lift of high operation frame.
In some embodiments, the present invention also comprises bracing piece hinged with the second vertical rod with the first vertical rod, parallel with the first cross bar respectively.The setting of bracing piece, can improve the steadiness of crosshead.
Accompanying drawing explanation
Fig. 1 is the structural representation of the percussion drill high operation frame of one embodiment of the present invention.
Fig. 2 is the structural representation of the rounding state of the percussion drill high operation frame shown in Fig. 1.
Detailed description of the invention
Below in conjunction with accompanying drawing, the present invention is further detailed explanation.
Fig. 1 and Fig. 2 show schematically show the structure of the percussion drill high operation frame according to one embodiment of the present invention.
As shown in Figure 1, this percussion drill high operation frame comprises the first vertical rod 20, second cross bar 40, second vertical rod 30 and the first cross bar 50.
First vertical rod 20, second cross bar 40, second vertical rod 30 and the first cross bar 50 hinged successively, form the framework of a parallelogram.Percussion drill 10 is arranged on the top of the first vertical rod 20, and drill bit upwards.This percussion drill high operation frame can by regulating the long limit of parallelogram lever and the corner dimension of minor face, make the distance of the minimum point of parallelogram lever and peak adjustable within the specific limits, the high-order effect supported is served to percussion drill, worker stands on the ground, press the power switch of percussion drill, can punch on ceiling by switching impulse brill.
Can also arrange in one end of the second cross bar 40 and add long handle 41.Workman pins downwards and adds long handle 41, and the first vertical rod 20 can be made to move up, and makes the percussion drill being arranged on the first vertical rod 20 upper end withstand ceiling, and along with punching the degree of depth progressively move up.The power switch 70 of percussion drill 10 also can be arranged on and add on long handle 41, is convenient to operative.
Because the first vertical rod 20, second cross bar 40, second vertical rod 30 and the first cross bar 50 are hinged successively, also can the recoil that percussion drill 10 produces at work be cushioned.
The second extension bar 31 can also be provided with in the second vertical rod 30 bottom.Parallelogram lever can be promoted certain height like this, a bar supports, mobile lighter.
Can also arrange tripod 60 in the second extension bar 31 lower end, three support bars of tripod 60 can be hinged on the bottom of the second extension bar 31 respectively.After being moved into place by this percussion drill high operation frame, open tripod 60, supported at three point is more steady.
Can also be provided with the first extension bar 21 on the first vertical rod 20 top, percussion drill 10 is arranged on the top of the first extension bar 21.Arrange the first extension bar 21 can, by height certain for the top lift of high operation frame, be applicable to hole on higher ceiling.
Bracing piece 51 hinged with the second vertical rod 30 with the first vertical rod 20, parallel with the first cross bar 50 respectively can also be set.The structure of parallelogram lever can be made so more firm, and in this case, the second cross bar 40 only can play support first vertical rod 20, and this high operation frame support to percussion drill can be made more stable.
In the present embodiment, high operation frame first vertical rod 20, second cross bar 40, second vertical rod 30 and the first cross bar 50, and add long handle 41, first extension bar 21, second extension bar 31 and tripod 60 all adopts batten to make.In other embodiments, these parts also can adopt the material such as bamboo or metallic rod to make.
Fig. 2 show schematically show the structure of the rounding state of the percussion drill high operation frame shown in Fig. 1.
As shown in Figure 2, long handle 41 will be added upwardly, this percussion drill high operation frame can be collapsed into the state of the smaller strip of volume, be convenient to carrying and storage.
Percussion drill high operation frame provided by the invention can in construction site field fabrication, and manufacture craft is simple, and material is easy to get, reusable, conveniently moving, can singlely use alone, both saved manpower and materials, improve effect, and it also avoid workman and to climb the danger fallen that can run into.
Above-described is only some embodiments of the present invention, not to the restriction of the present invention's design.For the person of ordinary skill of the art, without departing from the concept of the premise of the invention, can also make some distortion and improvement, these all belong to protection scope of the present invention.
Claims (6)
1. percussion drill high operation frame, is characterized in that, comprising: hinged, composition first vertical rod (20) of parallelogram lever successively, the second cross bar (40), the second vertical rod (30) and the first cross bar (50);
The top of described first vertical rod (20) is located at by percussion drill.
2. percussion drill high operation frame according to claim 1, is characterized in that: one end of described second cross bar (40) is provided with and adds long handle (41).
3. percussion drill high operation frame according to claim 1, is characterized in that: described second vertical rod (30) bottom is provided with the second extension bar (31).
4. percussion drill high operation frame according to claim 3, is characterized in that: described second extension bar (31) lower end is provided with tripod.
5. percussion drill high operation frame according to claim 1, is characterized in that: described first vertical rod (20) top is provided with the first extension bar (21), and the top of described first extension bar (21) is located at by percussion drill.
6. the percussion drill high operation frame according to any one of Claims 1 to 5, is characterized in that: also comprise bracing piece (51) hinged with the second vertical rod (30) with the first vertical rod (20), parallel with the first cross bar (50) respectively.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510404673.8A CN104942764A (en) | 2015-07-10 | 2015-07-10 | High-position handling frame for churn drill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510404673.8A CN104942764A (en) | 2015-07-10 | 2015-07-10 | High-position handling frame for churn drill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104942764A true CN104942764A (en) | 2015-09-30 |
Family
ID=54158100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510404673.8A Pending CN104942764A (en) | 2015-07-10 | 2015-07-10 | High-position handling frame for churn drill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104942764A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105537651A (en) * | 2016-03-08 | 2016-05-04 | 长沙市富湘建筑工程有限公司 | Lever hinge type drilling ladder and hole-forming construction method |
CN108838949A (en) * | 2018-07-09 | 2018-11-20 | 江苏铁锚工具有限公司 | A kind of electric hammer punching elevator |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5820317A (en) * | 1996-12-13 | 1998-10-13 | Van Troba; Steven K. | Apparatus for supporting a drill in an elevated position |
CN201186428Y (en) * | 2008-05-07 | 2009-01-28 | 中天建设集团有限公司 | Electric hammer carrier body |
CN201881357U (en) * | 2010-11-30 | 2011-06-29 | 中冶建工有限公司 | Mounting support of rebar planting impact drill |
KR20110097348A (en) * | 2010-02-25 | 2011-08-31 | 장기환 | High and low regulation supporter structure of hammer drill |
CN203062742U (en) * | 2013-02-04 | 2013-07-17 | 江苏双楼建设集团有限公司 | Climbing-free manual control lifting device for ceiling drilling |
CN203092502U (en) * | 2013-02-25 | 2013-07-31 | 中国十七冶集团有限公司 | Auxiliary concrete roof punching frame |
CN204339745U (en) * | 2014-12-19 | 2015-05-20 | 中建三局集团有限公司 | Lever top plate drilling device |
CN204748542U (en) * | 2015-07-10 | 2015-11-11 | 中铁建工集团有限公司 | Strike and bore high -order handling frame |
-
2015
- 2015-07-10 CN CN201510404673.8A patent/CN104942764A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5820317A (en) * | 1996-12-13 | 1998-10-13 | Van Troba; Steven K. | Apparatus for supporting a drill in an elevated position |
CN201186428Y (en) * | 2008-05-07 | 2009-01-28 | 中天建设集团有限公司 | Electric hammer carrier body |
KR20110097348A (en) * | 2010-02-25 | 2011-08-31 | 장기환 | High and low regulation supporter structure of hammer drill |
CN201881357U (en) * | 2010-11-30 | 2011-06-29 | 中冶建工有限公司 | Mounting support of rebar planting impact drill |
CN203062742U (en) * | 2013-02-04 | 2013-07-17 | 江苏双楼建设集团有限公司 | Climbing-free manual control lifting device for ceiling drilling |
CN203092502U (en) * | 2013-02-25 | 2013-07-31 | 中国十七冶集团有限公司 | Auxiliary concrete roof punching frame |
CN204339745U (en) * | 2014-12-19 | 2015-05-20 | 中建三局集团有限公司 | Lever top plate drilling device |
CN204748542U (en) * | 2015-07-10 | 2015-11-11 | 中铁建工集团有限公司 | Strike and bore high -order handling frame |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105537651A (en) * | 2016-03-08 | 2016-05-04 | 长沙市富湘建筑工程有限公司 | Lever hinge type drilling ladder and hole-forming construction method |
CN108838949A (en) * | 2018-07-09 | 2018-11-20 | 江苏铁锚工具有限公司 | A kind of electric hammer punching elevator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205577470U (en) | Simple and easy support frame of bradyseism formula construction machinery | |
CN204370781U (en) | One easily regulates scaffold | |
CN104942764A (en) | High-position handling frame for churn drill | |
CN204748542U (en) | Strike and bore high -order handling frame | |
CN204401994U (en) | A kind of travel(l)ing rest for building | |
CN205713057U (en) | A kind of slope is with consolidating anti-skidding scaffold | |
CN204199651U (en) | Foldable mobile scaffold | |
CN206915669U (en) | A kind of welding hoistable platform | |
CN204609261U (en) | Movable up-down builds scaffold by laying bricks or stones | |
CN210500860U (en) | Secondary structure constructional column top bar planting assistor | |
CN105525755A (en) | Steel bar planting hole drilling mechanical hand | |
CN204525381U (en) | A kind of lifting electric hammer combination pressure rod member for boring ceiling furred ceiling muscle hole | |
CN213827159U (en) | Simple punching device for top plate hanging hole | |
CN105537651A (en) | Lever hinge type drilling ladder and hole-forming construction method | |
CN111206752B (en) | Indoor wall architectural coatings whitewashes auxiliary device | |
CN203583897U (en) | Rebar-planting portable support | |
CN209868868U (en) | Plank nailing device for interior decoration | |
CN209817554U (en) | Novel communication tower | |
CN205531290U (en) | Light -duty simple and easy scaffold board support | |
CN205400600U (en) | Ceiling pore -forming construction equipment | |
CN203509120U (en) | Movable vertical-drilling support for building | |
CN214615340U (en) | Safe type removes scaffold frame with adjustable height | |
CN212551859U (en) | A simple and easy lifter for construction | |
CN214110275U (en) | Device convenient to face up drilling | |
CN204800006U (en) | Ceiling drilling appurtenance |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150930 |
|
RJ01 | Rejection of invention patent application after publication |