CN205577446U - High altitude building work platform - Google Patents
High altitude building work platform Download PDFInfo
- Publication number
- CN205577446U CN205577446U CN201620348174.1U CN201620348174U CN205577446U CN 205577446 U CN205577446 U CN 205577446U CN 201620348174 U CN201620348174 U CN 201620348174U CN 205577446 U CN205577446 U CN 205577446U
- Authority
- CN
- China
- Prior art keywords
- platform
- platform body
- studio
- main platform
- activity box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model discloses a high altitude building work platform, including platform main part and bracing piece, the platform main part is provided with studio, tool room, platform door, debris box, the end that ventilates, activity frame, connecting rod, guard net and rotation and colludes, the studio sets up the centre in the platform main part, tool room has two, sets up the left and right sides in the studio respectively, the platform door sets up the front side in the platform main part, debris box rigid coupling is in the apex angle department of the up end right back of studio, utility model's studio is the shared space of staff, required instrument when tool room is used for placing high altitude construction, the platform door is opened the staff of being convenient for and is got into the platform, the debris box is used for placing the used small tool of some staff, the end studio's circulation of air of being convenient for at the bottom of for the net of ventilating prevents that hot weather studio is overheated, the activity frame is at perpendicular rotation in surface, movable frame is convenient for pack up by the connecting rod, reduces the shared space of work platform, the guard net is used for preventing the accident.
Description
Technical field
This utility model relates to a kind of Architectural Equipment, specifically a kind of high-altitude constructions work platform.
Background technology
High buildings and large mansions of today, it is required for carrying out nursing maintenance, the cleaning that these skyscrapers carry out alien invasion is accomplished by work high above the ground with maintenance, work high above the ground needs aerial work platform, people stand in when carrying out cleaning work on aerial work platform, most important is safety problem, and platform need to have good service behaviour simultaneously.
Utility model content
The purpose of this utility model is to provide a kind of high-altitude constructions work platform, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, the following technical scheme of this utility model offer:
A kind of high-altitude constructions work platform, including main platform body and support bar;Described main platform body is provided with at the bottom of operating room, toolroom, platform door, undertray, ventilation, activity box, connecting rod, catch net and rotation hook;Described operating room is arranged on the centre of main platform body;Described toolroom has two, is separately positioned on the left and right sides of operating room;Described platform door is arranged on the front side of main platform body;Described undertray is fixed at the drift angle of right back, upper surface of operating room;The bottom of operating room it is arranged at the bottom of described ventilation;Described activity box has three, is connected to be arranged on rear three sides in left and right, lower surface of main platform body by removable pin respectively;Before and after described activity box, dual-side is provided with connecting rod;Described connecting rod one end is connected to activity box by removable pin, and the other end is connected to the vertical side edge of main platform body by removable pin;Described catch net is arranged on activity box;The centre position, upper end of side, described activity box place is provided with rotation and hooks;Described support bar is provided with fixing cylinder, motion bar, gim peg, fastener head and waterproof cloth;Described support bar has four, is respectively perpendicular and is arranged at four, the upper surface drift angle of main platform body;Described fixing cylinder is fixed at four, the upper end drift angle of main platform body;Described motion bar is inserted in fixing cylinder;Described fastener head is arranged on the upper end of motion bar;Four angles of described waterproof cloth are connected on the fastener head on four motion bars;Described fastener head is provided with binding groove, thread groove, fastening bolt and screw thread;Described binding groove is arranged on the centre of fastener head;Described thread groove is arranged on the upside of binding groove;Described fastening bolt enters in binding groove through thread groove.
As further program of the utility model: described fixing cylinder is provided with gim peg.
As this utility model further scheme: be provided with screw thread on the outer wall of described fastening bolt.
Compared with prior art, the beneficial effects of the utility model are:
Operating room of the present utility model is taken up space by staff;Toolroom is for placing instrument required during work high above the ground;Platform door is opened and is easy to staff and enters platform;Undertray is for placing the small tool used by a few thing personnel;The ventilation end is that grid bottom is easy to operating room's air circulation, prevents hot weather operating room overheated;Activity box is at vertical rotation in surface;Connecting rod is easy to pack up activity box, reduces the space shared by job platform;Catch net is used for preventing accident;Rotate to hook and rotate on side, place, for fixing the activity box packed up;Gim peg is pressed on motion bar through the sidewall of fixing cylinder, fixes motion bar, prevents from coming off;Waterproof cloth covers job platform, it is simple to the overcast and rainy operation of staff;Binding groove is easy to the drift angle of waterproof cloth and is filled in;Fastening bolt is for compressing the waterproof cloth in binding groove;Screw thread is easy to fastening bolt and is rotatably compressed, thus does not falls off;Design simple in construction of the present utility model, favorable working performance, practical, fully present the feature of modernization instrument, development prospect is the best.
Accompanying drawing explanation
Fig. 1 is the structural representation of high-altitude constructions work platform.
Fig. 2 is high-altitude constructions work platform plan structure schematic diagram.
Fig. 3 is the structural representation of fastener head in the constructions work platform of high-altitude.
In figure: 1-main platform body, 2-connecting rod, 3-activity box, 4-catch net; 5-support bar, 6-platform door, 7-fixes cylinder, 8-gim peg; 9-toolroom, 10-motion bar, 11-fastener head; 12-waterproof cloth, 13-undertray, 14-fastening bolt; 15-screw thread, 16-thread groove, 17-binding groove; 18-ventilates at the end, and 19-rotates hook, 20-operating room.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the technical scheme of this patent is described in more detail.
Referring to Fig. 1-3, a kind of high-altitude constructions work platform, including main platform body 1 and support bar 5;Described main platform body 1 is provided with operating room 20, toolroom 9, platform door 6, undertray 13, the end 18 that ventilates, activity box 3, connecting rod 2, catch net 4 and rotates hook 19;Described operating room 20 is arranged on the centre of main platform body 1, and operating room 20 is taken up space by staff;Described toolroom 9 has two, is separately positioned on the left and right sides of operating room 20, and toolroom 9 is for placing instrument required during work high above the ground;Described platform door 6 is arranged on the front side of main platform body 1, and platform door 6 is opened and is easy to staff and enters platform;Described undertray 13 is fixed at the drift angle of right back, upper surface of operating room 20, and undertray 13 is for placing the small tool used by a few thing personnel;At the bottom of described ventilation, 18 are arranged on the bottom of operating room 20, and operating room 20 air circulation is easy to for grid bottom in the end 18 that ventilates, and prevents hot weather operating room 20 overheated;Described activity box 3 has three, is connected to be arranged on rear three sides in left and right, lower surface of main platform body 1 by removable pin respectively, and activity box 3 is at vertical rotation in surface;Before and after described activity box 3, dual-side is provided with connecting rod 2;Described connecting rod 2 one end is connected to activity box 3 by removable pin, and the other end is connected to the vertical side edge of main platform body 1 by removable pin, and connecting rod 2 is easy to pack up activity box 3, reduces the space shared by job platform;Described catch net 4 is arranged on activity box 3, and catch net 4 is used for preventing accident;The centre position, upper end of side, described activity box 3 place is provided with rotation hook 19, rotates and hooks 19 rotations on side, place, for fixing the activity box 3 packed up;Described support bar 5 is provided with fixing cylinder 7, motion bar 10, gim peg 8, fastener head 11 and waterproof cloth 12;Described support bar 5 has four, is respectively perpendicular and is arranged at four, the upper surface drift angle of main platform body 1;Described fixing cylinder 7 is fixed at four, the upper end drift angle of main platform body 1;Described motion bar 10 is inserted in fixing cylinder 7;Described fixing cylinder 7 is provided with gim peg 8, and gim peg 8 is pressed on motion bar 10 through the sidewall of fixing cylinder 7, fixes motion bar 10, prevents from coming off;Described fastener head 11 is arranged on the upper end of motion bar 10;Four angles of described waterproof cloth 12 are connected on the fastener head 11 on four motion bars 10, and waterproof cloth 12 covers job platform, it is simple to the overcast and rainy operation of staff;Described fastener head 11 is provided with binding groove 17, thread groove 16, fastening bolt 14 and screw thread 15;Described binding groove 17 is arranged on the centre of fastener head 11, and binding groove 17 is easy to the drift angle of waterproof cloth 12 and is filled in;Described thread groove 16 is arranged on the upside of binding groove 17;Described fastening bolt 14 enters in binding groove 17 through thread groove 16, and fastening bolt 14 is for compressing the waterproof cloth 12 in binding groove 17;Being provided with screw thread 15 on the outer wall of described fastening bolt 14, screw thread 15 is easy to fastening bolt 14 and is rotatably compressed, thus does not falls off.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment, in the ken that one skilled in the relevant art is possessed, it is also possible to make a variety of changes on the premise of without departing from this patent objective.
Claims (3)
1. a high-altitude constructions work platform, including main platform body and support bar;It is characterized in that, described main platform body is provided with at the bottom of operating room, toolroom, platform door, undertray, ventilation, activity box, connecting rod, catch net and rotation hook;Described operating room is arranged on the centre of main platform body;Described toolroom has two, is separately positioned on the left and right sides of operating room;Described platform door is arranged on the front side of main platform body;Described undertray is fixed at the drift angle of right back, upper surface of operating room;The bottom of operating room it is arranged at the bottom of described ventilation;Described activity box has three, is connected to be arranged on rear three sides in left and right, lower surface of main platform body by removable pin respectively;Before and after described activity box, dual-side is provided with connecting rod;Described connecting rod one end is connected to activity box by removable pin, and the other end is connected to the vertical side edge of main platform body by removable pin;Described catch net is arranged on activity box;The centre position, upper end of side, described activity box place is provided with rotation and hooks;Described support bar is provided with fixing cylinder, motion bar, gim peg, fastener head and waterproof cloth;Described support bar has four, is respectively perpendicular and is arranged at four, the upper surface drift angle of main platform body;Described fixing cylinder is fixed at four, the upper end drift angle of main platform body;Described motion bar is inserted in fixing cylinder;Described fastener head is arranged on the upper end of motion bar;Four angles of described waterproof cloth are connected on the fastener head on four motion bars;Described fastener head is provided with binding groove, thread groove, fastening bolt and screw thread;Described binding groove is arranged on the centre of fastener head;Described thread groove is arranged on the upside of binding groove;Described fastening bolt enters in binding groove through thread groove.
High-altitude the most according to claim 1 constructions work platform, it is characterised in that described fixing cylinder is provided with gim peg.
High-altitude the most according to claim 1 constructions work platform, it is characterised in that be provided with screw thread on the outer wall of described fastening bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620348174.1U CN205577446U (en) | 2016-04-20 | 2016-04-20 | High altitude building work platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620348174.1U CN205577446U (en) | 2016-04-20 | 2016-04-20 | High altitude building work platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205577446U true CN205577446U (en) | 2016-09-14 |
Family
ID=56860180
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620348174.1U Expired - Fee Related CN205577446U (en) | 2016-04-20 | 2016-04-20 | High altitude building work platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205577446U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503556A (en) * | 2017-08-29 | 2017-12-22 | 深圳市蓝豆芽科技有限公司 | A kind of high stable signal tower for being easy to maintenance |
CN108383057A (en) * | 2018-02-24 | 2018-08-10 | 苏州市优福通铝合金升降机械有限公司 | A kind of Junk prevention hoistable platform |
CN113863641A (en) * | 2021-09-03 | 2021-12-31 | 中国二十冶集团有限公司 | Construction platform and construction platform system |
-
2016
- 2016-04-20 CN CN201620348174.1U patent/CN205577446U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107503556A (en) * | 2017-08-29 | 2017-12-22 | 深圳市蓝豆芽科技有限公司 | A kind of high stable signal tower for being easy to maintenance |
CN108383057A (en) * | 2018-02-24 | 2018-08-10 | 苏州市优福通铝合金升降机械有限公司 | A kind of Junk prevention hoistable platform |
CN113863641A (en) * | 2021-09-03 | 2021-12-31 | 中国二十冶集团有限公司 | Construction platform and construction platform system |
CN113863641B (en) * | 2021-09-03 | 2023-09-26 | 中国二十冶集团有限公司 | Construction platform and construction platform system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205577446U (en) | High altitude building work platform | |
CN203559572U (en) | Folding hanging basket | |
CN209523524U (en) | A kind of folding sunshade rain-proof tent | |
CN107013052B (en) | A kind of building engineering construction scene protection canopy | |
CN205000518U (en) | Take combination formula floor board in stair hole | |
CN204676865U (en) | A kind of building scaffold | |
CN206903256U (en) | Assembled integral concrete shear wall structure regularization safety net | |
CN210598087U (en) | Decoration hanging flower basket for building | |
CN205531079U (en) | Sunshade canopy | |
CN109084154A (en) | A kind of liquid crystal display | |
CN210955216U (en) | Outdoor attendance machine of new forms of energy | |
CN210217327U (en) | Sanitary tent with strong stability | |
CN210828479U (en) | Portable removal safety worker canopy | |
CN209145399U (en) | A kind of tent ceiling and its grenadine | |
CN106419198B (en) | A kind of more lunch break working spaces of compound staggered floor | |
CN218759155U (en) | Square lower leg pipe of anticreep lining skin | |
CN207033040U (en) | A kind of fixed mount for puting on display fluffy room | |
CN105201271A (en) | Emergency rescue tent used for high-temperature windy desert area | |
CN207878903U (en) | Suspension platform device | |
CN205728865U (en) | A kind of double slideway Novel mosquito net support frame and mosquito net | |
CN220151052U (en) | Camping tent with protection function | |
CN217999161U (en) | Novel tent height-adjustable device | |
CN217631178U (en) | Hanging basket for construction that barrier propterty is good | |
CN211421806U (en) | Suspension device of wall-attached scaffold for building construction | |
CN219318863U (en) | Mat for air drying pollen pini |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160914 Termination date: 20190420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |