CN205558343U - Civil engineering construction support - Google Patents
Civil engineering construction support Download PDFInfo
- Publication number
- CN205558343U CN205558343U CN201620342986.5U CN201620342986U CN205558343U CN 205558343 U CN205558343 U CN 205558343U CN 201620342986 U CN201620342986 U CN 201620342986U CN 205558343 U CN205558343 U CN 205558343U
- Authority
- CN
- China
- Prior art keywords
- stay tube
- hole
- pipe
- bolt
- branch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to a civil engineering construction support, including last branch under with, it all is the three -way connecting pipe including the centre with branch down to go up branch, and there is the installation pipe at three -way connecting pipe 's left and right both ends threaded connection respectively, installs the intraductal stay tube I of having inserted, and the equipartition is gone up to stay tube I has a through -hole, the tip of installation pipe be equipped with can with the last fixed orifices through the bolt fastening behind arbitrary through -hole centering of stay tube I, the three -way pipe lower extreme of going up branch has the installation pipe with the equal threaded connection in three -way pipe upper end of branch down, and go up branch and insert respectively in upper and lower two and install intraductal stay tube II with being equipped with both ends down between branch, the equipartition is gone up to stay tube II has the cross bore and indulges the hole, stay tube II is through using the bolt fastening behind cross bore and the upper and lower two installations tub last fixed orifices centering. The utility model discloses installation convenient to use, height, width size are easily adjusted, and the suitability is strong, safe and reliable, the bolt part is difficult for losing, each stay tube investment regime, the exchange to use of being convenient for.
Description
Technical field
This utility model relates to building field, is specifically related to a kind of civil engineering work construction bracket.
Background technology
In building construction process, needing to build some construction supports at the construction field (site), currently used support is mostly to be lazy board, steel pipe support.Lazy board poor safety performance.Steel pipe is formed by connecting by steel tube fastener support in length and breadth, can reclaim and be used for multiple times.But owing to the length of steel pipe is lack of standardization, the installation site of fastener is not fixed, so, installation rate is slow, adjusts the consuming time long, the most also needs, by steel pipe cutting, to meet the requirement of support width.And fastener is easily lost when installing with striking, causes unnecessary loss.Its shortcoming is that its length can not adjust, in-convenience in use, poor safety performance.
Summary of the invention
This utility model is for the problems referred to above, it is provided that a kind of civil engineering work construction bracket.
This utility model is achieved by the following technical solution:
A kind of civil engineering work construction bracket, includes upper rack posts and lower fulcrum bar;Upper rack posts and lower fulcrum bar are all the three-limb tubes including centre, the left and right two ends of three-limb tube are the most threaded installation pipe, support pipe I it is inserted with in pipe is installed, being evenly equipped with through hole on stay tube I, installing that the end of pipe is provided with can be with the fixing hole that is bolted after arbitrary through hole centering on a stay tube I;All threadeding with the tee T upper end of lower fulcrum bar in the tee T lower end of upper rack posts has installation pipe, it is provided with two ends between upper rack posts and lower fulcrum bar and inserts in upper and lower two stay tube II installing in pipe respectively, being evenly equipped with cross-drilled hole and vertical hole on described stay tube II, described stay tube II is fixed with bolt after installing the upper fixing hole centering of pipe by cross-drilled hole with upper and lower two.
More preferably, tilting between stay tube II with a stay tube I of upper bracket to be connected has a stay tube III, and a stay tube III is evenly equipped with through hole, the through hole on a stay tube III and the vertical hole on a stay tube II, upper bracket the through hole centering propped up on stay tube I after be bolted;Propping up to tilt between stay tube III with a stay tube I of lower carriage to be connected and have a stay tube IV, a stay tube I of a stay tube IV and a stay tube III and lower carriage is by being bolted after centering through hole.
More preferably, in order to improve the interchangeability of a stay tube, convenient in making to install and use, a stay tube I, a stay tube III are an identical stay tube with a stay tube IV, and three has identical length, and the through hole on three's pipe shaft is equally spaced by same distance.
More preferably, in order to improve the interchangeability of a stay tube, convenient in making to install and use, a stay tube I, a stay tube II, a stay tube III are an identical stay tube with a stay tube IV, four have identical length, four pipe shafts are evenly equipped with cross-drilled hole and vertical hole and are equally spaced by same distance.
More preferably, the end installing pipe is provided with bolt nose, and this bolt BITONG crosses rope bolt the bolt for fixed support tube.
The beneficial effects of the utility model are: it is easy to install, highly, width dimensions can easily be accommodated, the suitability is strong, safe and reliable;Bolt member is difficult to lose, and each support pipe standards are unified, it is simple to exchange and use.
Accompanying drawing explanation
Below in conjunction with the accompanying drawings this utility model is further described.
Fig. 1 is structural representation of the present utility model.
In figure, 1 three-limb tube, 2 pipe, 3 stay tube I, 4 bolts, 5 cross-drilled holes are installed, 6 indulge hole, 7 bolt noses, 8 bolt chains, 9 stay tubes II, 10 stay tubes III, 11 stay tube IV, 12 upper rack posts, 13 lower fulcrum bars.
Detailed description of the invention
Accompanying drawing 1 is a kind of specific embodiment of the present utility model, and this embodiment includes upper rack posts 12 and lower fulcrum bar 13;Upper rack posts and lower fulcrum bar are all the three-limb tubes 1 including centre, the left and right two ends of three-limb tube are the most threaded installation pipe 2, support pipe I 3 it is inserted with in described installation pipe, being evenly equipped with through hole on described stay tube I, the end of described installation pipe is provided with can pass through the fixing fixing hole of bolt 4 after arbitrary through hole centering on a stay tube I;All threadeding with the tee T upper end of lower fulcrum bar in the tee T lower end of upper rack posts has installation pipe, it is provided with two ends between upper rack posts and lower fulcrum bar and inserts in upper and lower two stay tube II 9 installing pipe respectively, being evenly equipped with cross-drilled hole 5 and vertical hole 6 on described stay tube II, described stay tube II is fixed with bolt after installing the upper fixing hole centering of pipe by cross-drilled hole with upper and lower two.
Tilt between stay tube II with a stay tube I of upper bracket to be connected and have a stay tube III 10, a stay tube III is evenly equipped with through hole, the through hole on described stay tube III and the vertical hole on a stay tube II, upper bracket the through hole centering propped up on stay tube I after be bolted;Tilting between stay tube III with a stay tube I of lower carriage to be connected and have a stay tube IV 11, a stay tube I of described stay tube IV and a stay tube III and lower carriage is by being bolted after centering through hole.
Propping up stay tube I, a stay tube II, a stay tube III and a stay tube IV is an identical stay tube, and four have identical length, four pipe shafts are evenly equipped with cross-drilled hole and vertical hole and are equally spaced by same distance.
The end installing pipe is provided with bolt nose 7, and this bolt BITONG crosses rope 8 bolt the bolt 4 for fixed support tube.
The regulation of height dimension of the present utility model and width dimensions includes following two-stage and regulates:
One, because installing pipe with tee T for threadeding, the regulation of size can be realized by rotating installation pipe.
Two, fix and realize the regulation of size by installing the upper fixing hole of pipe and the centering of various location through hole on a stay tube.
Claims (5)
1. a civil engineering work construction bracket, it is characterised in that: include upper rack posts (12) and lower fulcrum bar (13);Described upper rack posts and lower fulcrum bar are all the three-limb tubes (1) including centre, the left and right two ends of described three-limb tube are the most threaded installation pipe (2), support pipe I (3) it is inserted with in described installation pipe, being evenly equipped with through hole on described stay tube I, the end of described installation pipe is provided with can pass through, after arbitrary through hole centering on a stay tube I, the fixing hole that bolt (4) is fixing;All threadeding with the tee T upper end of lower fulcrum bar in the tee T lower end of described upper rack posts has installation pipe, it is provided with two ends between described upper rack posts and lower fulcrum bar and inserts in upper and lower two stay tube II (9) installing pipe respectively, being evenly equipped with cross-drilled hole (5) and vertical hole (6) on described stay tube II, described stay tube II is fixed with bolt after installing the upper fixing hole centering of pipe by cross-drilled hole with upper and lower two.
Civil engineering work construction bracket the most according to claim 1, it is characterized in that: described stay tube II has a stay tube III (10) with tilting between a stay tube I of upper bracket to be connected, be evenly equipped with through hole on described stay tube III, the through hole on described stay tube III and the vertical hole on a stay tube II, upper bracket a stay tube I on through hole centering after be bolted;Described stay tube III has a stay tube IV (11) with tilting between a stay tube I of lower carriage to be connected, and a stay tube I of described stay tube IV and a stay tube III and lower carriage is by being bolted after centering through hole.
Civil engineering work construction bracket the most according to claim 1, it is characterised in that: described stay tube I, a stay tube III are an identical stay tube with a stay tube IV, and three has identical length, and the through hole on three's pipe shaft is equally spaced by same distance.
Civil engineering work construction bracket the most according to claim 3, it is characterized in that: described stay tube I, a stay tube II, a stay tube III are an identical stay tube with a stay tube IV, four have identical length, four pipe shafts are evenly equipped with cross-drilled hole and vertical hole and are equally spaced by same distance.
Civil engineering work construction bracket the most according to claim 1, it is characterised in that: the end of described installation pipe is provided with bolt nose (7), and this bolt BITONG crosses rope (8) bolt the bolt (4) for fixed support tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620342986.5U CN205558343U (en) | 2016-04-22 | 2016-04-22 | Civil engineering construction support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620342986.5U CN205558343U (en) | 2016-04-22 | 2016-04-22 | Civil engineering construction support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205558343U true CN205558343U (en) | 2016-09-07 |
Family
ID=56806265
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620342986.5U Expired - Fee Related CN205558343U (en) | 2016-04-22 | 2016-04-22 | Civil engineering construction support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205558343U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219476A (en) * | 2019-06-22 | 2019-09-10 | 宁波鄞州竹创信息科技有限公司 | A kind of civic building special-purpose supporting frame |
-
2016
- 2016-04-22 CN CN201620342986.5U patent/CN205558343U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219476A (en) * | 2019-06-22 | 2019-09-10 | 宁波鄞州竹创信息科技有限公司 | A kind of civic building special-purpose supporting frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205371829U (en) | A multilayer pipeline gallows convenient to equipment | |
CN202704877U (en) | Hoisting device with adjustable cantilever | |
CN205558343U (en) | Civil engineering construction support | |
CN102926554B (en) | Steel hanging seat formwork support and construction method thereof | |
CN210374024U (en) | Intelligent air conditioner easy to assemble | |
CN2674802Y (en) | Handy hanger | |
CN206693617U (en) | A kind of building template securing device | |
CN202082489U (en) | Pipe gallery horizontal pipeline installation device of taking one's place | |
CN204689709U (en) | A kind of submersible water impeller | |
CN215760281U (en) | Scaffold frame that building engineering construction was with quick detach | |
CN219827984U (en) | Hydropower installation engineering piping lane mount | |
CN109859645A (en) | A kind of hung type LED screen mounting structure and installation method | |
CN205804988U (en) | Prefabricated thermal insulation structural wall board installs special mould clamp | |
CN216276168U (en) | Building steel structure supporting beam | |
CN217350395U (en) | Simple device for lifting and mounting pipeline | |
CN220957126U (en) | Utility tunnel pipeline installation assembled support | |
CN218479516U (en) | Fixing tool suitable for building steel pipe scaffold on I-steel | |
CN221119172U (en) | Telescopic heightening piece for attached lifting scaffold | |
CN220911657U (en) | Steel structure platform for factory building | |
CN211089098U (en) | Lightning arrester for transmission tower | |
CN219365513U (en) | Attached detachable 'lifeline' support | |
CN211713739U (en) | Construction warning baffle with adjustable municipal works are used | |
CN220080090U (en) | Cantilever type retaining wall shaping die carrier structure | |
CN216007774U (en) | Simple and easy adjustable stores pylon device | |
CN204627396U (en) | Steel vertical ladder quick suspension device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160907 Termination date: 20170422 |
|
CF01 | Termination of patent right due to non-payment of annual fee |