CN205555766U - Wall structure is controld to elevator - Google Patents
Wall structure is controld to elevator Download PDFInfo
- Publication number
- CN205555766U CN205555766U CN201620211410.5U CN201620211410U CN205555766U CN 205555766 U CN205555766 U CN 205555766U CN 201620211410 U CN201620211410 U CN 201620211410U CN 205555766 U CN205555766 U CN 205555766U
- Authority
- CN
- China
- Prior art keywords
- operation panel
- elevator
- connecting hole
- bending flange
- ups
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a wall structure is controld to elevator, including controing wall (1), seted up in the manipulation wall (1) operation panel mounting hole (11), a formation bend turn -ups (12) are turned over respectively backward on the left and right sides limit of operation panel mounting hole (11), bend and seted up connecting hole (121) on turn -ups (12). The utility model discloses a wall structure is controld to elevator reserves the turn -ups of bending that the punching has the connecting hole in operation panel mounting hole both sides when seting up the operation panel mounting hole, the later stage directly will be bent the turn -ups and turned over the book backward, connect the operation panel through the fastener behind the operation panel embedding operation panel mounting hole and fix with the turn -ups of bending. The utility model discloses a wall structure is controld to elevator simplifies more, has reduced preparation production technology step, and the cost is reduced has also avoided the risk of operation panel mounting sealing off, and is firm more, reliable.
Description
Technical field
This utility model relates to elevator operation wall, especially installs the elevator operation wall construction of operation panel.
Background technology
As shown in Figure 1, elevator operation wall of the prior art is all to offer an operation panel installing hole on elevator operation wall 10, then after the operation panel installing hole left and right sides, two operation panel fixtures 40 are fixed by welding manner, operation panel 30 embeds during installation operation panel installing hole, and then the bolt 20 by being connected on operation panel fixture 40 fixes operation panel 30.Existing operation panel fixture 40 is section bar, needs welding operation, have impact on the surface quality of operation wall 10, and technological process becomes more sophisticated, improves cost and error probability.It addition, employing welding manner, also easily in the later stage, the situations such as sealing-off occur, therefore there is the problem that reliability is not high enough.
Summary of the invention
In view of this, the purpose of this utility model be to provide a kind of make be easier to, cost is lower, it is more convenient to install and more firm elevator operation wall construction.
For reaching above-mentioned purpose, this utility model provides a kind of elevator operation wall construction, including operation wall, described operation wall offers operation panel installing hole, it is characterized in that: the limit, the left and right sides of described operation panel installing hole turns down formation bending flange respectively backward, and described bending flange offers connecting hole.
Preferably, described connecting hole is the strip hole of the length direction extension along described bending flange.
It is further preferred that on the described bending flange of each side, the quantity of described connecting hole is multiple.
Further, multiple described connecting holes are arranged along the length direction uniform intervals of described bending flange.
In order to make operation panel when fixing about stress balance, the connecting hole of the described bending flange in left side is symmetrical with the connecting hole of the described bending flange on right side.
Elevator operation wall construction of the present utility model, reserve two punching when opening operation panel installing hole in the middle of operation wall and have the bending flange of connecting hole, later stage turns down as the fixture installing operation panel immediately rearward, and operation panel is fixed by the securing member being connected on described connecting hole after embedding operation panel installing hole.Elevator operation wall construction of the present utility model decreases making production craft step, also reduces cost, it is not necessary to independent making and installation operation panel fixture, it also avoid the risk of operation panel fixture sealing-off, more firmly, reliably.
Accompanying drawing explanation
Fig. 1 is the longitudinal profile schematic diagram of prior art elevator operation wall construction.
Fig. 2 is the longitudinal profile schematic diagram of this utility model elevator operation wall construction.
Fig. 3 is the schematic perspective view of the operation wall in this utility model.
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in detail.
Referring to Fig. 2 and 3, a kind of elevator operation wall construction, including operation wall 1, offer operation panel installing hole 11 in operation wall 1, the limit, the left and right sides of operation panel installing hole 11 turns down formation bending flange 12 respectively backward, and bending flange 12 offers connecting hole 121.In the present embodiment, connecting hole 121 is the strip hole of the length direction extension along bending flange 12, and on the bending flange 12 of each side, the quantity of connecting hole 121 is 3.The quantity of connecting hole 121 can be configured according to the coupling mechanism force needed for the length of bending flange 12 and installation operation panel 3.3 connecting holes 121 are arranged along the length direction uniform intervals of bending flange 12.
In order to make operation panel when fixing about stress balance, the connecting hole 121 of the bending flange 12 in left side is symmetrical, as shown in Figure 3 with the connecting hole of the described bending flange 12 on right side.
This utility model is when making, first in the middle of operation wall, open operation panel installing hole 11, reserve two punching simultaneously and have the bending flange 12 of connecting hole 121, when operation panel is installed, bending flange 2 is turned down immediately rearward as the fixture installing operation panel 3, operation panel 3 is fixed by the securing member 2 being connected on the connecting hole 121 of bending flange 12 after embedding operation panel installing hole 11, and the securing member 2 in the present embodiment is bolt.
As can be seen here, relative to prior art, elevator operation wall construction of the present utility model decreases making production craft step, reduce cost, need not independently make and install operation panel fixture, it also avoid the risk of operation panel fixture sealing-off, more firmly, reliably.
Above-described embodiment is only for illustrating technology of the present utility model design and feature; its object is to allow person skilled in the art will appreciate that content of the present utility model and to implement according to this; protection domain of the present utility model can not be limited with this; all equivalence changes made according to this utility model spirit or modification, all should contain within protection domain of the present utility model.
Claims (5)
1. an elevator operation wall construction, including operation wall (1), described operation wall (1) offers operation panel installing hole (11), it is characterized in that: the limit, the left and right sides of described operation panel installing hole (11) turns down formation bending flange (12) respectively backward, and described bending flange (12) offers connecting hole (121).
Elevator operation wall construction the most according to claim 1, it is characterised in that: described connecting hole (121) is the strip hole of the length direction extension along described bending flange (12).
Elevator operation wall construction the most according to claim 1 and 2, it is characterised in that: on the described bending flange (12) of each side, the quantity of described connecting hole (121) is multiple.
Elevator operation wall construction the most according to claim 3, it is characterised in that: multiple described connecting holes (121) are arranged along the length direction uniform intervals of described bending flange (12).
Elevator operation wall construction the most according to claim 3, it is characterised in that: the connecting hole (121) of the described bending flange (12) in left side is symmetrical with the connecting hole of the described bending flange (12) on right side.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620211410.5U CN205555766U (en) | 2016-03-21 | 2016-03-21 | Wall structure is controld to elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620211410.5U CN205555766U (en) | 2016-03-21 | 2016-03-21 | Wall structure is controld to elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205555766U true CN205555766U (en) | 2016-09-07 |
Family
ID=56815138
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620211410.5U Active CN205555766U (en) | 2016-03-21 | 2016-03-21 | Wall structure is controld to elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205555766U (en) |
-
2016
- 2016-03-21 CN CN201620211410.5U patent/CN205555766U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2010108340A (en) | CONSTRUCTIVE COMPONENT AND METHOD FOR STRENGTHENING THE OUTSIDE | |
WO2009005233A3 (en) | Cable duct | |
CN106185568A (en) | The doorframe of lift appliance and assemble method thereof, use the lift appliance of this doorframe | |
CN104662352A (en) | Ear clamp | |
CN205555766U (en) | Wall structure is controld to elevator | |
CN106013669A (en) | Wallboard installation structure and method | |
CN209126498U (en) | The mounting structure and vehicle of the sealing strip of door for vehicle | |
CN205956152U (en) | A metal elastic connection module for installation of automotive interior plastic slab | |
CN205367417U (en) | Wall structure is controld to elevator | |
CN206489914U (en) | The insulator of many mounting bars | |
KR20150004061U (en) | Variable cable support | |
CN205534943U (en) | A mounting rack | |
CN201507102U (en) | Aluminum alloy section assembly | |
CN204118613U (en) | A kind of bent hinge for connecting wire casing | |
CN111247363A (en) | Valve bracket and four-way valve with same | |
CN216305089U (en) | Assembled drop-level ceiling with lower curtain hanging box | |
CN210628999U (en) | Connecting mechanism of metal junction box and junction tube | |
CN219606681U (en) | Display installation assembly and engineering mechanical equipment | |
CN204566008U (en) | A kind of mounting tool for sealing ring | |
CN215110979U (en) | Brake pipe fixing device and vehicle with same | |
KR200359194Y1 (en) | vinyl pad for vinyl house | |
CN201835502U (en) | Molding section material | |
CN207459271U (en) | Connector shell | |
CN108206482B (en) | Live replacement operation method for LF type yoke plate insulator without operation hole | |
CN205715096U (en) | Set pipe mounting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180525 Address after: 215122 28 Weixin Road, Suzhou Industrial Park, Suzhou, Jiangsu Patentee after: Jiangnan Jiajie Lift Co., Ltd., Jiangsu Address before: 215122 Weixin road 28, Suzhou Industrial Park, Jiangsu Province Patentee before: SJEC Corporation |