CN205555442U - Perpendicular diverging device is used in commodity circulation - Google Patents

Perpendicular diverging device is used in commodity circulation Download PDF

Info

Publication number
CN205555442U
CN205555442U CN201620318941.4U CN201620318941U CN205555442U CN 205555442 U CN205555442 U CN 205555442U CN 201620318941 U CN201620318941 U CN 201620318941U CN 205555442 U CN205555442 U CN 205555442U
Authority
CN
China
Prior art keywords
connecting rod
single channel
pipeline
shunting
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620318941.4U
Other languages
Chinese (zh)
Inventor
何泳
张纯
林嘉俊
杨宇
唐军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OPTICS-MECHANICS-ELECTRICITY TECHNOLOGY
Original Assignee
OPTICS-MECHANICS-ELECTRICITY TECHNOLOGY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OPTICS-MECHANICS-ELECTRICITY TECHNOLOGY filed Critical OPTICS-MECHANICS-ELECTRICITY TECHNOLOGY
Priority to CN201620318941.4U priority Critical patent/CN205555442U/en
Application granted granted Critical
Publication of CN205555442U publication Critical patent/CN205555442U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a perpendicular diverging device is used in commodity circulation aims at providing the perpendicular diverging device is used in commodity circulation that a maintenance cost is low. It includes frame, single channel transfer chain and reposition of redundant personnel transport group, the single channel transfer chain carries the group to set gradually in the frame with the reposition of redundant personnel, and the group was carried in the reposition of redundant personnel one end and hinged rack are kept away from to the single channel transfer chain, the reposition of redundant personnel carries the group to include two reposition of redundant personnel transfer chains that set up side by side from top to bottom, and on two reposition of redundant personnel transfer chains, close on between the one end of single channel transfer chain articulated through first connecting rod, the other end and the hinged rack of reposition of redundant personnel transfer chain, the single channel transfer chain carries the abutting end of group to pass through the swing mechanism connection with the reposition of redundant personnel, swing mechanism includes the oscillating axle, and an at least pole portion is fixed to be set up in the epaxial swing arm of swing, hinges respectively in the second connecting rod and the third connecting rod at swing arm both ends, and the motor in the frame is fixed in to fixed the setting in the epaxial first pendulum rod of swing, hinges in the epaxial second pendulum rod of motor output to and fourth connecting rod.

Description

A kind of vertical part flow arrangement of logistics
Technical field
This utility model relates to handling and conveying equipment technical field, especially relates to a kind of vertical part flow arrangement of logistics.
Background technology
At present, the shunting lane-change on box handling and conveying line on market is usually taken artificial mode, artificial, fork truck is i.e. used to be transported by the casing on supplied materials pipeline to pipeline corresponding to two or three, labor intensity is big and the operating time is long, anthropic factor is big, uncontrollability is strong, it is impossible to ensure the stability of subsequent delivery.According to the mode of automatization, i.e. elevator shunting, the most existing Structure of hoist is complicated, maintaining cost is high, and efficiency is low.
Utility model content
This utility model overcomes shortcoming of the prior art, it is provided that the vertical part flow arrangement of logistics that a kind of simple in construction, maintaining low cost and efficiency are high.
In order to solve above-mentioned technical problem, this utility model is achieved through the following technical solutions:
A kind of vertical part flow arrangement of logistics, including frame, single channel pipeline and shunting pipeline group;Described single channel pipeline and shunting pipeline group are set in turn in frame, and described single channel pipeline is hinged with frame away from one end of shunting pipeline group;Described shunting pipeline group includes about two the shunting pipelines being set up in parallel, and on two shunting pipelines, close between one end of single channel pipeline hinged by first connecting rod, the other end of described shunting pipeline is hinged with frame;The abutting end of described single channel pipeline and shunting pipeline group is connected by swing mechanism;Described swing mechanism includes rotating the swinging axle being installed on frame lower, the swing arm that at least bar portion is fixedly installed on swinging axle, it is hingedly connected to second connecting rod and the third connecting rod at swing arm two ends, the first fork being fixedly installed on swinging axle, the motor being fixed in frame, the second fork being articulated with on motor output shaft, and two ends are respectively articulated with the first swing link end part and the second swing link end part, constitute the fourth link of quadric chain;Described second connecting rod is positioned at single channel pipeline side and hinged with this end of single channel pipeline, and lower floor's shunting pipeline end of described third connecting rod and shunting pipeline group is hinged.
Preferably, described swing arm is two, is symmetricly set in the vicinity, two ends of swinging axle.
Preferably, described swing arm is arranged at the center of swinging axle.
Preferably, described first connecting rod is adjustable rod.
Preferably, described second connecting rod and third connecting rod are adjustable rod.
Preferably, described single channel pipeline is hinged with frame by rolling bearing units.
Preferably, described shunting pipeline is hinged with frame by rolling bearing units.
Preferably, the two ends of described first connecting rod are connected by oscillating bearing and two shunting pipelines respectively.
Preferably, the two ends of described second connecting rod are connected with single channel pipeline and swing arm by oscillating bearing respectively.
Preferably, the two ends of described third connecting rod are connected with shunting pipeline and swing arm by oscillating bearing respectively.
Compared with prior art, this utility model has the advantage that
This utility model simple in construction, manipulate easy, easy to maintenance, automaticity is high, can be effectively improved shunting speed and the efficiency of box logistics.
Accompanying drawing explanation
In order to be illustrated more clearly that this utility model embodiment or technical scheme of the prior art, the accompanying drawing used required in embodiment or description of the prior art will be briefly described below, apparently, accompanying drawing in describing below is only embodiments more of the present utility model, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is structural representation of the present utility model.
Fig. 2 is front view of the present utility model.
Fig. 3 is the A-A sectional view in Fig. 2.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not paying creative work premise, broadly fall into the scope of this utility model protection.
The vertical part flow arrangement of logistics shown in Fig. 1-3, including frame 1, single channel pipeline 2 and shunting pipeline group 3;Described single channel pipeline 2 and shunting pipeline group 3 are set in turn in frame 1, and described single channel pipeline 2 is hinged with frame 1 away from one end of shunting pipeline group 3;Described shunting pipeline group 3 includes about two the shunting pipelines 4 being set up in parallel, and on two shunting pipelines 4, close between one end of single channel pipeline 2 hinged by first connecting rod 5, the other end of described shunting pipeline 4 is hinged with frame 1;The abutting end of described single channel pipeline 2 and shunting pipeline group 3 is connected by swing mechanism 6;Described swing mechanism 6 includes rotating the swinging axle 61 being installed on frame 1 bottom, the swing arm 62 that two bar portions are fixedly installed on swinging axle 61, it is hingedly connected to second connecting rod 63 and the third connecting rod 64 at swing arm 62 two ends, the first fork 65 being fixedly installed on swinging axle 61, the motor 66 being fixed in frame 1, the second fork 67 being articulated with on motor 66 output shaft, and two ends are respectively articulated with the first fork 65 end and the second fork 67 end, constitute the fourth link 68 of quadric chain;Described second connecting rod 63 is positioned at single channel pipeline 2 side and hinged with this end of single channel pipeline 2, and lower floor's shunting pipeline 4 end of described third connecting rod 64 and shunting pipeline group 3 is hinged.
Wherein, two described swing arms 62 are symmetricly set in the vicinity, two ends of swinging axle 61, it is simple to the balance of support, it is clear that swing arm arrange quantity can according to the requirement of born weight, be set to one or three and more than.
Wherein, described swing arm 62 is arranged at the center of swinging axle 61, makes uniform force.Described first connecting rod 5 is adjustable rod, and described second connecting rod 63 and third connecting rod 64 are adjustable rod, it is simple to single channel pipeline and the accurate regulation of shunting pipeline cohesive position.
Wherein said single channel pipeline 2 is hinged with frame 1 by rolling bearing units.Described shunting pipeline 4 is hinged with frame 1 by rolling bearing units.The two ends of described first connecting rod 5 are connected by oscillating bearing and two shunting pipelines 4 respectively.The two ends of described second connecting rod 63 are connected with single channel pipeline 2 and swing arm 62 by oscillating bearing respectively.The two ends of described third connecting rod 64 are connected with shunting pipeline 4 and swing arm 62 by oscillating bearing respectively.
Single channel pipeline 2 in this utility model is the pipeline of band independent driving motor with shunting pipeline 4.
This utility model simple in construction, manipulate easy, easy to maintenance, automaticity is high, can be effectively improved shunting speed and the efficiency of box logistics.
The foregoing is only preferred embodiment of the present utility model; not in order to limit this utility model; all within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. made, within should be included in protection domain of the present utility model.

Claims (10)

1. the vertical part flow arrangement of logistics, including frame, single channel pipeline and shunting pipeline group;It is characterized in that: described single channel pipeline and shunting pipeline group are set in turn in frame, and described single channel pipeline is hinged with frame away from one end of shunting pipeline group;Described shunting pipeline group includes about two the shunting pipelines being set up in parallel, and on two shunting pipelines, close between one end of single channel pipeline hinged by first connecting rod, the other end of described shunting pipeline is hinged with frame;The abutting end of described single channel pipeline and shunting pipeline group is connected by swing mechanism;Described swing mechanism includes rotating the swinging axle being installed on frame lower, the swing arm that at least bar portion is fixedly installed on swinging axle, it is hingedly connected to second connecting rod and the third connecting rod at swing arm two ends, the first fork being fixedly installed on swinging axle, the motor being fixed in frame, the second fork being articulated with on motor output shaft, and two ends are respectively articulated with the first swing link end part and the second swing link end part, constitute the fourth link of quadric chain;Described second connecting rod is positioned at single channel pipeline side and hinged with this end of single channel pipeline, and lower floor's shunting pipeline end of described third connecting rod and shunting pipeline group is hinged.
The vertical part flow arrangement of logistics the most according to claim 1, it is characterised in that: described swing arm is two, is symmetricly set in the vicinity, two ends of swinging axle.
The vertical part flow arrangement of logistics the most according to claim 1 and 2, it is characterised in that: described swing arm is arranged at the center of swinging axle.
The vertical part flow arrangement of logistics the most according to claim 3, it is characterised in that: described first connecting rod is adjustable rod.
The vertical part flow arrangement of logistics the most according to claim 4, it is characterised in that: described second connecting rod and third connecting rod are adjustable rod.
The vertical part flow arrangement of logistics the most according to claim 5, it is characterised in that: described single channel pipeline is hinged with frame by rolling bearing units.
The vertical part flow arrangement of logistics the most according to claim 6, it is characterised in that: described shunting pipeline is hinged with frame by rolling bearing units.
The vertical part flow arrangement of logistics the most according to claim 1 and 2, it is characterised in that: the two ends of described first connecting rod are connected by oscillating bearing and two shunting pipelines respectively.
The vertical part flow arrangement of logistics the most according to claim 1 and 2, it is characterised in that: the two ends of described second connecting rod are connected with single channel pipeline and swing arm by oscillating bearing respectively.
The vertical part flow arrangement of logistics the most according to claim 1 and 2, it is characterised in that: the two ends of described third connecting rod are connected with shunting pipeline and swing arm by oscillating bearing respectively.
CN201620318941.4U 2016-04-15 2016-04-15 Perpendicular diverging device is used in commodity circulation Active CN205555442U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620318941.4U CN205555442U (en) 2016-04-15 2016-04-15 Perpendicular diverging device is used in commodity circulation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620318941.4U CN205555442U (en) 2016-04-15 2016-04-15 Perpendicular diverging device is used in commodity circulation

Publications (1)

Publication Number Publication Date
CN205555442U true CN205555442U (en) 2016-09-07

Family

ID=56808051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620318941.4U Active CN205555442U (en) 2016-04-15 2016-04-15 Perpendicular diverging device is used in commodity circulation

Country Status (1)

Country Link
CN (1) CN205555442U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108394695A (en) * 2018-04-27 2018-08-14 无锡凯乐士科技有限公司 A kind of cargo shunting pipeline
CN108394668A (en) * 2018-04-27 2018-08-14 无锡凯乐士科技有限公司 A kind of linkage swing arm conveying mechanism of shunting pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108394695A (en) * 2018-04-27 2018-08-14 无锡凯乐士科技有限公司 A kind of cargo shunting pipeline
CN108394668A (en) * 2018-04-27 2018-08-14 无锡凯乐士科技有限公司 A kind of linkage swing arm conveying mechanism of shunting pipeline

Similar Documents

Publication Publication Date Title
CN205555442U (en) Perpendicular diverging device is used in commodity circulation
CN205170288U (en) Over -and -under type steel bottle oxygenates car
CN105947614A (en) Equipment convenient to acquire supervision code for turning over whole box of medicines
CN104003211A (en) Rail transfer type double-vertical screw ship unloader
CN205419021U (en) Perpendicular diverging device
FI126525B (en) Crane
CN206427690U (en) One-to-two power drum logistics delivery line
CN205202283U (en) Container bag conveying mechanism
CN207061702U (en) A kind of flat arm tower crane lifting of ultra-large type becomes multiplying power wiring system
CN204689418U (en) A kind of dolly trailer coupling of bridge-type blending reclaimer
CN205526558U (en) Jacking moves carries device
CN105584826A (en) Perpendicular diversion device
CN202785397U (en) Crane
CN210592638U (en) Steel wire coil separating conveyor
CN205830773U (en) A kind of shunting oblique go out chicken system
CN204506889U (en) A kind of automatic cycle transport cableway
CN206050732U (en) Link type hangs chain
CN110526130A (en) A kind of Container Transport suspending protection device
CN205976423U (en) Adjustable large -scale hanging flower basket device
CN203095343U (en) Multifunctional construction hoist for cargoes
CN208532058U (en) All-electric balanced type folding crane
CN206088749U (en) Small prefabricated parts fixed point integrated gallows of jettisoninging
CN203877549U (en) Rail movement type double-vertical spiral ship unloader
CN209493230U (en) A kind of bridge crane trolley
CN205367482U (en) Non - rigid connection formula safety crane span structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant