CN205540836U - Building complete period construction information management device - Google Patents

Building complete period construction information management device Download PDF

Info

Publication number
CN205540836U
CN205540836U CN201620238359.7U CN201620238359U CN205540836U CN 205540836 U CN205540836 U CN 205540836U CN 201620238359 U CN201620238359 U CN 201620238359U CN 205540836 U CN205540836 U CN 205540836U
Authority
CN
China
Prior art keywords
complete period
management
construction information
manager
management terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620238359.7U
Other languages
Chinese (zh)
Inventor
陈代莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chen Yue construction project management group Limited by Share Ltd
Original Assignee
Chengdu Chenyue Project Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Chenyue Project Construction Management Co Ltd filed Critical Chengdu Chenyue Project Construction Management Co Ltd
Priority to CN201620238359.7U priority Critical patent/CN205540836U/en
Application granted granted Critical
Publication of CN205540836U publication Critical patent/CN205540836U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Time Recorders, Dirve Recorders, Access Control (AREA)

Abstract

The utility model discloses a building complete period construction information management device, including manager and the memory of connection on the manager, the manager on be connected with still that the device is typeeed to the contract, device, storage management terminal, personnel management terminal and process management terminal are typeeed to the material, it is convenient for to the many -sided management of building information to in the management to the engineering.

Description

A kind of building complete period construction information managing device
Technical field
This utility model relates to building construction information managing device field, in particular it relates to a kind of building complete period construction information managing device.
Background technology
The construction of building is a long-term engineering, and it relates to many knowledge, such as human resource management, public information management, construction note management, quality control management, security control management, store keeping, contract management, cost management etc. aspect.Existing architecture information managing device, its function singleness, when the complete period information of building is managed, how to realize building the management of holocyclic multi-aspect information so that management to engineering, it appears particularly significant.
Utility model content
This utility model provides one building complete period construction information managing device to solve above-mentioned technical problem, and it is easy to management many to architecture information, in order to the management to engineering.
The technical scheme in the invention for solving the above technical problem is:
A kind of building complete period construction information managing device, including manager and connection memorizer on the manager, described manager is also associated with contract inputting device, material input device, warehousing management terminal, personal management terminal and management of process terminal.This utility model utilizes contract inputting all kinds of contract of device typing, and the typing of contract being stored in memorizer such as including occurrences in human life contract, material purchase contract, the contract information of its typing covers all contracts that construction project has been planned for;Material input device carries out typing to building the collection that relates to of each stage, including the material such as architectural drawing, Item announcements and store it in memorizer;Warehouse is managed and communicates information to manager by warehousing management terminal;Workmen is managed by personal management terminal, and it relates to construction project and goes into operation to completing overall process;Management of process terminal is acquired management to each stage progress information in work progress.The apparatus for management of information of this programme, its management relates to construction work starting to the aspects of contents terminated and overall process, it is simple to management many to architecture information, in order to the management to engineering.
As preferably, described personal management terminal includes Time Attendance Device.
Further, described Time Attendance Device is face recognition work-checking machine.Utilize face recognition work-checking machine that workmen is managed, it is simple to personnel are managed, strengthen the mandatory of personal management, and use recognition of face that personnel are carried out work attendance, there is certain advantage, such as compared to fingerprint attendance, it is to avoid the situation of the injured None-identified of personnel's fingerprint.Workmen is in work progress, and fingerprint is often subject to abrasion, and it has certain limitation i.e. to use fingerprint recognition.
As preferably, described personal management terminal include information cover build FR position transmitter, storage has No. ID and the RFID label tag of variable position information, for reading the RFID reader of FRID label information.Use RFID label tag that personnel are marked, its No. ID and workmen's one_to_one corresponding, the signal of position transmitter covers the gamut of building, after workmen enters construction place, the positional information of position transmitter can be obtained, RFID reader information will can realize the management to personnel by wireless network transmissions to manager, manager after getting No. ID of RFID label tag and positional information.
As preferably, described contract inputting device includes scanning device.
To sum up, the beneficial effects of the utility model are:
This utility model sets up contract inputting device, material input device, warehousing management terminal, personal management terminal and management of process terminal on the basis of managing device, its management relates to construction work starting to the aspects of contents terminated and overall process, it is easy to management many to architecture information, in order to the management to engineering.
Accompanying drawing explanation
Fig. 1 is theory diagram of the present utility model.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of this utility model protection.
Embodiment 1:
A kind of building complete period construction information managing device as shown in Figure 1, including manager and connection memorizer on the manager, it is characterised in that: it is also associated with contract inputting device, material input device, warehousing management terminal, personal management terminal and management of process terminal on described manager.
Embodiment 2:
A kind of building complete period construction information managing device as shown in Figure 1, the present embodiment refines on the basis of above-described embodiment, and the most described personal management terminal includes Time Attendance Device.
Described Time Attendance Device is face recognition work-checking machine.
Described personal management terminal include information cover build FR position transmitter, storage has No. ID and the RFID label tag of variable position information, for reading the RFID reader of FRID label information.Position transmitter can arrange multiple, the location label of each position transmitter is different, when RFID label tag enters in certain position transmitter signal cover, then its positional information becomes the positional information of this position transmitter, and RFID reader reads the information of RFID label tag and sends manager to.
Described contract inputting device includes scanning device.Contract inputting device and material input device may be configured as same equipment, for the ease of the storage respectively to contract information and material information, can separately use two different equipment.
Warehousing management terminal and management of process terminal all can use existing equipment to realize, and repeat the most one by one at this.
As it has been described above, this utility model can preferably be realized.

Claims (5)

1. a building complete period construction information managing device, including manager and connection memorizer on the manager, it is characterised in that: it is also associated with contract inputting device, material input device, warehousing management terminal, personal management terminal and management of process terminal on described manager.
A kind of building complete period construction information managing device the most according to claim 1, it is characterised in that: described personal management terminal includes Time Attendance Device.
A kind of building complete period construction information managing device the most according to claim 2, it is characterised in that: described Time Attendance Device is face recognition work-checking machine.
A kind of building complete period construction information managing device the most according to claim 1, it is characterised in that: described personal management terminal include information cover build FR position transmitter, storage has No. ID and the RFID label tag of variable position information, for reading the RFID reader of FRID label information.
A kind of building complete period construction information managing device the most according to claim 1, it is characterised in that: described contract inputting device includes scanning device.
CN201620238359.7U 2016-03-28 2016-03-28 Building complete period construction information management device Active CN205540836U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620238359.7U CN205540836U (en) 2016-03-28 2016-03-28 Building complete period construction information management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620238359.7U CN205540836U (en) 2016-03-28 2016-03-28 Building complete period construction information management device

Publications (1)

Publication Number Publication Date
CN205540836U true CN205540836U (en) 2016-08-31

Family

ID=56785023

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620238359.7U Active CN205540836U (en) 2016-03-28 2016-03-28 Building complete period construction information management device

Country Status (1)

Country Link
CN (1) CN205540836U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105825370A (en) * 2016-03-28 2016-08-03 成都晨越建设项目管理股份有限公司 Building complete period construction informatization management device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105825370A (en) * 2016-03-28 2016-08-03 成都晨越建设项目管理股份有限公司 Building complete period construction informatization management device

Similar Documents

Publication Publication Date Title
CN103390255B (en) A kind of building site digital management system and its application process
CN103810576A (en) Workshop production management method and system based on Internet of Things
CN110503362A (en) A kind of intelligent repository management method and system based on block chain
CN105848086A (en) Internet of things system and control method thereof
CN100530225C (en) Intelligent industry patrolling picking instrument, patrolling picking system and intelligent patrolling picking method
CN107527078A (en) Logistics information collection monitoring system based on network technology
CN106845899A (en) A kind of electric power warehousing system asset count equipment and its method of work
CN105023372A (en) File management method
CN105307061A (en) Passive intelligent optical fiber network management system
CN205540836U (en) Building complete period construction information management device
CN105894237A (en) Intelligent distributing and recycling management method with functions of voice guide and face recognition
CN204856612U (en) Steel construction construction management system based on mobile internet
CN203808726U (en) Intelligent safe deposit box system based on Internet of Things technology
CN105825370A (en) Building complete period construction informatization management device
CN204631936U (en) Calligraphy artwork Antiforge system
CN103839137A (en) Passive box body management system based on internet of things
CN103676878A (en) Workshop production process control system
CN106919872A (en) A kind of Power Line Inspection System based on RFID technique
CN105844310A (en) Tunnel construction safety monitoring device
CN206743291U (en) Medical treatment or the Internet of things system of beauty appliance
CN206224485U (en) A kind of computer network supervisory systems
CN207882954U (en) Intelligent movable Warehouse Management System based on technology of Internet of things
CN103646373A (en) Equipment room asset managing and monitoring system based on RFID technology
CN203311460U (en) Intelligent archive management system based on Internet of Things
CN206039940U (en) Intelligence commodity circulation teaching system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 610000 Chengdu high tech Zone Tianfu Avenue science and technology incubator, Sichuan Province, No. eight

Patentee after: Chen Yue construction project management group Limited by Share Ltd

Address before: 610000 Chengdu high tech Zone Tianfu Avenue science and technology incubator, Sichuan Province, No. eight

Patentee before: CHENGDU CHENYUE PROJECT CONSTRUCTION MANAGEMENT CO., LTD.