CN105825370A - Building complete period construction informatization management device - Google Patents

Building complete period construction informatization management device Download PDF

Info

Publication number
CN105825370A
CN105825370A CN201610177186.7A CN201610177186A CN105825370A CN 105825370 A CN105825370 A CN 105825370A CN 201610177186 A CN201610177186 A CN 201610177186A CN 105825370 A CN105825370 A CN 105825370A
Authority
CN
China
Prior art keywords
management
complete period
manager
period construction
building complete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610177186.7A
Other languages
Chinese (zh)
Inventor
郑毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Chenyue Project Construction Management Co Ltd
Original Assignee
Chengdu Chenyue Project Construction Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Chenyue Project Construction Management Co Ltd filed Critical Chengdu Chenyue Project Construction Management Co Ltd
Priority to CN201610177186.7A priority Critical patent/CN105825370A/en
Publication of CN105825370A publication Critical patent/CN105825370A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Time Recorders, Dirve Recorders, Access Control (AREA)

Abstract

The present invention discloses a building complete period construction informatization management device. The device comprises a manager and a memory connected with the manager, and the manager is connected with a contract logging device, a material logging device, a storage management terminal, a personal management terminal and a process management terminal. The building complete period construction informatization management device is convenient for the management of many aspects of building information so as to facilitate engineering management.

Description

Building complete period construction information managing device
Technical field
The present invention relates to build construction information managing device field, in particular it relates to a kind of building complete period construction information managing device.
Background technology
The construction of building is a long-term engineering, and it relates to many knowledge, such as human resource management, public information management, construction note management, quality control management, security control management, store keeping, contract management, cost management etc. aspect.Existing architecture information managing device, its function singleness, when the complete period information of building is managed, how to realize building the management of holocyclic multi-aspect information so that management to engineering, it appears particularly significant.
Summary of the invention
The present invention is to solve that above-mentioned technical problem provides building complete period construction information managing device, it is easy to management many to architecture information, in order to the management to engineering.
The present invention solves the problems referred to above and be the technical scheme is that
A kind of building complete period construction information managing device, including manager and connection memorizer on the manager, described manager is also associated with contract inputting device, material input device, warehousing management terminal, personal management terminal and management of process terminal.The present invention utilizes contract inputting all kinds of contract of device typing, and the typing of contract being stored in memorizer such as including occurrences in human life contract, material purchase contract, the contract information of its typing covers all contracts that construction project has been planned for;Material input device carries out typing to building the collection that relates to of each stage, including the material such as architectural drawing, Item announcements and store it in memorizer;Warehouse is managed and communicates information to manager by warehousing management terminal;Workmen is managed by personal management terminal, and it relates to construction project and goes into operation to completing overall process;Management of process terminal is acquired management to each stage progress information in work progress.The apparatus for management of information of this programme, its management relates to construction work starting to the aspects of contents terminated and overall process, it is simple to management many to architecture information, in order to the management to engineering.
As preferably, described personal management terminal includes Time Attendance Device.
Further, described Time Attendance Device is face recognition work-checking machine.Utilize face recognition work-checking machine that workmen is managed, it is simple to personnel are managed, strengthen the mandatory of personal management, and use recognition of face that personnel are carried out work attendance, there is certain advantage, such as compared to fingerprint attendance, it is to avoid the situation of the injured None-identified of personnel's fingerprint.Workmen is in work progress, and fingerprint is often subject to abrasion, and it has certain limitation i.e. to use fingerprint recognition.
As preferably, described personal management terminal include information cover build FR position transmitter, storage has No. ID and the RFID label tag of variable position information, for reading the RFID reader of FRID label information.Use RFID label tag that personnel are marked, its No. ID and workmen's one_to_one corresponding, the signal of position transmitter covers the gamut of building, after workmen enters construction place, the positional information of position transmitter can be obtained, RFID reader information will can realize the management to personnel by wireless network transmissions to manager, manager after getting No. ID of RFID label tag and positional information.
As preferably, described contract inputting device includes scanning device.
To sum up, the invention has the beneficial effects as follows:
The present invention sets up contract inputting device, material input device, warehousing management terminal, personal management terminal and management of process terminal on the basis of managing device, its management relates to construction work starting to the aspects of contents terminated and overall process, it is easy to management many to architecture information, in order to the management to engineering.
Accompanying drawing explanation
Fig. 1 is the theory diagram of the present invention.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is only a part of embodiment of the present invention rather than whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art are obtained under not making creative work premise, broadly fall into the scope of protection of the invention.
Embodiment 1:
Building complete period construction information managing device as shown in Figure 1, including manager and connection memorizer on the manager, it is characterised in that: it is also associated with contract inputting device, material input device, warehousing management terminal, personal management terminal and management of process terminal on described manager.
Embodiment 2:
Building complete period construction information managing device as shown in Figure 1, the present embodiment refines on the basis of above-described embodiment, and the most described personal management terminal includes Time Attendance Device.
Described Time Attendance Device is face recognition work-checking machine.
Described personal management terminal include information cover build FR position transmitter, storage has No. ID and the RFID label tag of variable position information, for reading the RFID reader of FRID label information.Position transmitter can arrange multiple, the location label of each position transmitter is different, when RFID label tag enters in certain position transmitter signal cover, then its positional information becomes the positional information of this position transmitter, and RFID reader reads the information of RFID label tag and sends manager to.
Described contract inputting device includes scanning device.Contract inputting device and material input device may be configured as same equipment, for the ease of the storage respectively to contract information and material information, can separately use two different equipment.
Warehousing management terminal and management of process terminal all can use existing equipment to realize, and repeat the most one by one at this.
As it has been described above, the present invention can preferably be realized.

Claims (5)

1. building complete period construction information managing device, including manager and connection memorizer on the manager, it is characterised in that: it is also associated with contract inputting device, material input device, warehousing management terminal, personal management terminal and management of process terminal on described manager.
Building complete period construction information managing device the most according to claim 1, it is characterised in that: described personal management terminal includes Time Attendance Device.
Building complete period construction information managing device the most according to claim 2, it is characterised in that: described Time Attendance Device is face recognition work-checking machine.
Building complete period construction information managing device the most according to claim 1, it is characterised in that: described personal management terminal include information cover build FR position transmitter, storage has No. ID and the RFID label tag of variable position information, for reading the RFID reader of FRID label information.
Building complete period construction information managing device the most according to claim 1, it is characterised in that: described contract inputting device includes scanning device.
CN201610177186.7A 2016-03-28 2016-03-28 Building complete period construction informatization management device Pending CN105825370A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610177186.7A CN105825370A (en) 2016-03-28 2016-03-28 Building complete period construction informatization management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610177186.7A CN105825370A (en) 2016-03-28 2016-03-28 Building complete period construction informatization management device

Publications (1)

Publication Number Publication Date
CN105825370A true CN105825370A (en) 2016-08-03

Family

ID=56524640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610177186.7A Pending CN105825370A (en) 2016-03-28 2016-03-28 Building complete period construction informatization management device

Country Status (1)

Country Link
CN (1) CN105825370A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103366252A (en) * 2013-07-18 2013-10-23 攀枝花学院 Engineering information on-line management method
CN104573892A (en) * 2013-10-17 2015-04-29 王丽华 Whole process visual project management system for engineering construction
CN205540836U (en) * 2016-03-28 2016-08-31 成都晨越建设项目管理股份有限公司 Building complete period construction information management device

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103366252A (en) * 2013-07-18 2013-10-23 攀枝花学院 Engineering information on-line management method
CN104573892A (en) * 2013-10-17 2015-04-29 王丽华 Whole process visual project management system for engineering construction
CN205540836U (en) * 2016-03-28 2016-08-31 成都晨越建设项目管理股份有限公司 Building complete period construction information management device

Similar Documents

Publication Publication Date Title
CN100530225C (en) Intelligent industry patrolling picking instrument, patrolling picking system and intelligent patrolling picking method
CN103810576A (en) Workshop production management method and system based on Internet of Things
CN101894406A (en) Network access control system
CN102157038A (en) Centralized paper money box management system and centralized paper money box management method
CN110503362A (en) A kind of intelligent repository management method and system based on block chain
CN104200582A (en) Library self-service management system
CN106446990A (en) Bridge nameplate management system
CN102254258A (en) System for managing spare part
CN105023372A (en) File management method
CN107527078A (en) Logistics information collection monitoring system based on network technology
CN205788363U (en) A kind of multiple authentication Gate-ban Monitoring System of Home House
CN105307061A (en) Passive intelligent optical fiber network management system
CN104899955A (en) Method for intelligently receiving object and mailbox and system for receiving express
CN205540836U (en) Building complete period construction information management device
CN105894237A (en) Intelligent distributing and recycling management method with functions of voice guide and face recognition
CN108846459A (en) A kind of electronic seal control system and method
CN201662816U (en) Digital overhaul intelligent task management device
CN105825370A (en) Building complete period construction informatization management device
CN103839137A (en) Passive box body management system based on internet of things
CN106919872A (en) A kind of Power Line Inspection System based on RFID technique
CN204631936U (en) Calligraphy artwork Antiforge system
CN206743291U (en) Medical treatment or the Internet of things system of beauty appliance
CN105678389A (en) Detection method for operation, maintenance and management
CN107967524A (en) A kind of equipment management system, management method and server-side
CN107679693A (en) Device management platform based on the retrospect of two-dimensional code data interactive identification

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160803

RJ01 Rejection of invention patent application after publication