CN205535723U - Combined evaporator - Google Patents
Combined evaporator Download PDFInfo
- Publication number
- CN205535723U CN205535723U CN201620141294.4U CN201620141294U CN205535723U CN 205535723 U CN205535723 U CN 205535723U CN 201620141294 U CN201620141294 U CN 201620141294U CN 205535723 U CN205535723 U CN 205535723U
- Authority
- CN
- China
- Prior art keywords
- tube bank
- vaporizer tube
- vaporizer
- combined
- bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
The utility model belongs to the technical field of the boiler part, concretely relates to combined evaporator, the structure includes the tube bank of first evaporimeter, the tube bank of second evaporimeter, support, bracket. The tube bank of first evaporimeter is arranged and is being fired cinder room bottom, the tube bank of second evaporimeter sets up in three flues bottom. The evaporimeter tube bank is imported and exported the direct water cold wall pipe with corresponding of end and is linked to each other to the fluting restricting orifice of packing into on the water cold wall pipe between importing and exporting. The tube bank other end is fixed in on the opposite side water -cooling wall through support, bracket. Adopt the utility model discloses an after the above -mentioned structure, can effectively reduce the imported gas temperature of over heater, the make full use of finite space effectively increases heating area, its compact structure, simple to operate, the hot side that receives that is applicable to multiple boiler is arranged.
Description
Technical field
Basis is the brightest belongs to boiler component technical field, is specifically related to a kind of combined-type evaporator.
Background technology
Along with improving constantly of living standards of the people, MSW heating value the most constantly raises.For tackling the change of refuse thermal value
Dynamic, garbage burning boiler need to increase heating surface accordingly.Generally large-sized boiler furnace chamber includes burner hearth, burning chamber, three flues, heating surface
Typically it is all disposed within three flues.The method of common increase heating surface has two kinds: lift boiler whole height, or reduces and be heated
Face pitch.But lift boiler height and can be greatly increased construction cost, reduce pitch then easy dust deposition, to high temperature superheater
Corrosion is produced Deng heating surface.Additionally, for the garbage burning boiler put into operation, along with the continuous rising of refuse thermal value, flue gas temperature
Spending more and more higher, high temperature corrosion is on the rise, and three flues often do not have sufficient space to increase heating surface, and transformation difficulty is relatively
Greatly.
Another aspect, the tube bank of common vaporizer is generally all with slanted angle, and connects header through water-cooling wall.This knot
It is big that structure occupies space, and inconvenience seals.
Utility model content
This utility model solve the technical problem that be to provide one make full use of space, be easy to seal, convenient for installation and maintenance
Combined-type evaporator.
In order to solve above-mentioned technical problem, the technical solution of the utility model is as follows:
A kind of combined-type evaporator, including the first vaporizer tube bank, the second vaporizer tube bank, support, bracket, described first
Vaporizer tube bank is arranged in bottom burning chamber, and the second vaporizer tube bank is arranged at three stack base, first, second vaporizer tube bank
Entrance end is directly connected with corresponding water screen tube, and the water screen tube between first, second vaporizer tube bank is imported and exported
Upper fluting loads restricting orifice, and the first, second vaporizer tube bank other end is equipped with pipe clamp, and is fixed on separately by support, bracket
On one side wall.
Further, first vaporizer tube bank be spaced one by one with partition wall water screen tube, second vaporizer tube bank and after
Bag wall water screen tube one_to_one corresponding is arranged.
Further, described first vaporizer tube bank, the second vaporizer tube bank are made up of multiple rows of bundle of parallel tubes.
Further, many pipeloops layout in shape restrained by described first, second vaporizer.
Further, described support is made up of comb plate, comb joint and gripper shoe, and comb plate, comb joint is arranged on first, second vaporizer tube bank
Lower section, and be fixed on water-cooling wall by gripper shoe.
Further, described bracket is made up of fill block, U-board and flange, and U-board is welded on water-cooling wall by fill block,
Being welded with flange in first, second vaporizer tube bank, flange is placed in U-board groove.
Further, described support, bracket use stainless steel material to make.
The beneficial effects of the utility model are as follows:
1. garbage burning boiler superheater import cigarette temperature must control below 650 °, due to improving constantly of refuse thermal value,
2 groups of vaporizers need to be arranged before superheater, be respectively arranged bottom burning chamber, three stack base, to reduce superheater import cigarette
Temperature.
2. by first vaporizer tube bank be arranged in bottom burning chamber, can space efficient, reduce boiler whole height, subtract
Few cost of investment.Additionally, the program is also applied for old boiler transformation, making full use of burning chamber's bottom space, construction is simple, it is simple to
Install.
3. the second vaporizer tube bank is directly connected with rear bag wall water-cooling wall, it is to avoid vaporizer tube bank is through rear bag wall water-cooled
Wall, is conducive to sealing.
4. support, carrier structure are simply, easy for installation, both can ensure that tube bank transverse pitch, and have also reserved expansion clearance.
Arrange pipe clamp at tube bank bend pipe end, it can be ensured that each pipeloop longitudinal pitch, be then conducive near support stress to support.
5. vaporizer bank of tubes is shape multitube ring formula, at utmost increases heating surface area, to reach in unit are
The purpose of high efficient heat exchanging.
6. being generally 80~100mm due to partition wall water-cooling wall pitch, the first vaporizer tube bank is with partition wall water screen tube one by one
It is spaced, widens pitch between pipe, it is to avoid dust stratification.
7. and rear water wall pitch is generally 150~180mm, second vaporizer tube bank with rear bag wall water screen tube one by one
Correspondence, can avoid dust stratification, increases tube bank quantity, strengthens heating surface area.
8. with traditional welding at the restricting orifice of inside tube compared with, import and export between water screen tube on fluting load
Restricting orifice, can weld outside pipe, simple and reliable for structure, difficult drop-off.
9. support, bracket use stainless steel material, corrosion-resistant and high-temperature resistant.
In sum, after using said structure of the present utility model, be conducive to controlling the inlet temperature of superheater;Fully profit
By the confined space, at utmost increase heating surface area;Its compact conformation, easy for installation, it is adaptable to the heating surface cloth of multiple boiler
Put.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is that the A-A of Fig. 1 cuts open schematic diagram;
Fig. 3 is that the B of Fig. 1 is to schematic diagram;
Fig. 4 is enlarged drawing at the I of Fig. 1.
Fig. 5 is enlarged drawing at the II of Fig. 1.
Detailed description of the invention
Below with reference to accompanying drawing, this utility model is further elaborated.
As Figure 1-5, combined-type evaporator of the present utility model, including first vaporizer tube bank the 1, second evaporator tube
Bundle 2, support 4, bracket 5.First vaporizer tube bank 1 is arranged in bottom burning chamber, and the second vaporizer tube bank 2 is arranged at the bottom of three flues
Portion, described first vaporizer tube bank, the second vaporizer tube bank are made up of multiple rows of bundle of parallel tubes.First, second vaporizer restrain into
The port of export is directly connected with corresponding water screen tube, and on the water screen tube between first, second vaporizer tube bank is imported and exported
Fluting loads restricting orifice 3.The first, second vaporizer tube bank other end is equipped with pipe clamp 6, and is fixed on by support 4, bracket 5
On opposite side water-cooling wall.First vaporizer tube bank 1 is spaced one by one with partition wall water screen tube, the second vaporizer tube bank and rear bag
Wall water screen tube one_to_one corresponding is arranged.
Described first, second vaporizer tube bank is many pipeloops layout in shape.
Described support 4 is made up of comb plate, comb joint and gripper shoe.Comb plate, comb joint is arranged on below tube bank, is fixed on water by gripper shoe
In cold wall.
Described bracket 5 is made up of fill block, U-board and flange.U-board is welded on water-cooling wall by fill block, and tube bank is welded
Flange, flange is had to be placed in U-board groove.
Described support 4, bracket 5 use stainless steel material.
Claims (7)
1. a combined-type evaporator, including the first vaporizer tube bank (1), the second vaporizer tube bank (2), support (4), bracket
(5), it is characterised in that: described first vaporizer tube bank (1) is arranged in bottom burning chamber, and the second vaporizer tube bank (2) is arranged at
Three stack base, first, second vaporizer tube bank entrance end is directly connected with corresponding water screen tube, and first, second
On water screen tube between vaporizer tube bank import and export, fluting loads restricting orifice (3), the first, second vaporizer tube bank other end
Equipped with pipe clamp (6), and it is fixed on opposite side water-cooling wall by support (4), bracket (5).
2. combined-type evaporator as claimed in claim 1, it is characterised in that: the first vaporizer tube bank (1) and partition wall water-cooling wall
Pipe is spaced one by one, and the second vaporizer tube bank (2) is arranged with rear bag wall water screen tube one_to_one corresponding.
3. combined-type evaporator as claimed in claim 1, it is characterised in that: described first vaporizer tube bank, the second vaporizer
Tube bank is made up of multiple rows of bundle of parallel tubes.
4. the combined-type evaporator as described in claim 1 or 3, it is characterised in that: described first, second vaporizer tube bank in
The many pipeloops of shape are arranged.
5. combined-type evaporator as claimed in claim 1, it is characterised in that: described support (4) is by comb plate, comb joint and gripper shoe group
Becoming, comb plate, comb joint is arranged on below first, second vaporizer tube bank, and is fixed on water-cooling wall by gripper shoe.
6. combined-type evaporator as claimed in claim 1, it is characterised in that: described bracket (5) is by fill block, U-board and flange
Composition, U-board is welded on water-cooling wall by fill block, and first, second vaporizer tube bank is welded with flange, and flange is placed in U-board
In groove.
7. combined-type evaporator as claimed in claim 1, it is characterised in that: described support (4), bracket (5) use rustless steel
Material is made.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620141294.4U CN205535723U (en) | 2016-02-25 | 2016-02-25 | Combined evaporator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620141294.4U CN205535723U (en) | 2016-02-25 | 2016-02-25 | Combined evaporator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205535723U true CN205535723U (en) | 2016-08-31 |
Family
ID=56779072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620141294.4U Withdrawn - After Issue CN205535723U (en) | 2016-02-25 | 2016-02-25 | Combined evaporator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205535723U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105605546A (en) * | 2016-02-25 | 2016-05-25 | 浙江伟明环保股份有限公司 | Combined evaporator |
-
2016
- 2016-02-25 CN CN201620141294.4U patent/CN205535723U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105605546A (en) * | 2016-02-25 | 2016-05-25 | 浙江伟明环保股份有限公司 | Combined evaporator |
CN105605546B (en) * | 2016-02-25 | 2017-09-08 | 浙江伟明环保股份有限公司 | A kind of combined-type evaporator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205717146U (en) | A kind of ultrahigh pressure coal gas boiler | |
CN109708096A (en) | A kind of intersection mixed flow superheater | |
CN205535723U (en) | Combined evaporator | |
CN206617920U (en) | Vertical liquefaction Burning Natural Gas In Boiler Chamber | |
CN105605546B (en) | A kind of combined-type evaporator | |
CN106482331A (en) | A kind of energy-conserving and environment-protective gas-heating and hot-water boiler | |
CN205245115U (en) | Novel gasifier with burn burning furnace exhaust -heat boiler | |
CN110118356A (en) | A kind of high parameter fire grate garbage burning boiler | |
CN204625576U (en) | A kind of Novel water cooling wall for coal gasifier | |
CN201611090U (en) | Waste-heat boiler superheater | |
CN205842615U (en) | A kind of biomass efficient horizontal boiler | |
CN209541168U (en) | Coal dust organic heat carrier furnace in bulk | |
CN211600639U (en) | Membrane type water-cooling tunnel type waste heat boiler | |
CN208846753U (en) | It is a kind of to arrange water collecting device with efficient sealed burning boiler | |
CN209325748U (en) | A kind of lower air inlet gas fuel corner tube boiler of list drum inclined type injection | |
CN207394797U (en) | A kind of refuse incineration exhaust-heating boiler | |
CN2285867Y (en) | Steam and heat transfer oil boiler | |
CN201246892Y (en) | Combined hot pipe heating furnace | |
CN201731617U (en) | Horizontal pipe array hot water boiler | |
CN206222686U (en) | A kind of counter-burning type wellsite heater | |
CN104913498A (en) | High-efficiency energy-saving normal-pressure horizontal super-conducting gas boiler | |
CN212298959U (en) | Tail flue structure of high-capacity circulating fluidized bed hot water boiler | |
CN216716197U (en) | Sealing structure of waste incineration waste heat boiler superheater | |
CN205048996U (en) | Cold quick -witted exhaust -heat boiler of sintered ring | |
CN220981587U (en) | Combined boiler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20160831 Effective date of abandoning: 20170908 |