CN205531441U - Tooling jig frame - Google Patents
Tooling jig frame Download PDFInfo
- Publication number
- CN205531441U CN205531441U CN201620153819.6U CN201620153819U CN205531441U CN 205531441 U CN205531441 U CN 205531441U CN 201620153819 U CN201620153819 U CN 201620153819U CN 205531441 U CN205531441 U CN 205531441U
- Authority
- CN
- China
- Prior art keywords
- column
- crossbeam
- fixed plate
- moulding bed
- back timber
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model provides a tooling jig frame belongs to construction technical field, including first stand, second stand, back timber, crossbeam and mounting, first stand and second stand are vertical setting, and the both ends of back timber are connected with the top of first stand and second stand respectively, the crossbeam lies in between first stand and the second stand, and first stand and second stand all are provided with the mounting that is used for adjusting the crossbeam height, and the mounting can be dismantled with the tip of crossbeam and be connected, and vertical spaced apart two the at least regulation holes that are equipped with are followed to the mounting. The tooling jig frame of this kind of structure, simple structure, and stability is good, can strengthen the security of steel components are installed process, and simultaneously can be according to construction demand, the height and the position of quick nimble adjustment steel member for the installation progress, and can improve the installation quality.
Description
Technical field
This utility model relates to technical field of building construction, in particular to a kind of frock
Moulding bed.
Background technology
At present, in the construction operation of high-rise tubular truss, tubular truss steel beam column is all by tower crane
It is transported to flooring lift again, but owing to on-the-spot construction tower crane load is limited, it is impossible to will
Steel beam column the most disposably lifts, it is therefore desirable to makes moulding bed and spells on the spot in installation position
Track when steel loading component and steel beam column of mating formation transhipment, scene carries out assembly and installation.Existing
Some moulding beds stability when installing steel beam column is not enough, and can not adjust the height of steel beam column with
Position, progress that strong influence tubular truss is installed and quality.
Utility model content
This utility model provides a kind of frock moulding bed, it is intended to improve existing moulding bed in use
The height of steel beam column and the defect of position can not be adjusted flexibly according to demand.
This utility model is achieved in that
A kind of frock moulding bed, including the first column, the second column, back timber, crossbeam and fixing
Part, the first column and the second column are vertically arranged, and the two ends of back timber are stood with first respectively
The top of post and the second column connects;Crossbeam between the first column and the second column,
One column and the second column are provided with the fixture for regulating beam height, fixture with
The end of crossbeam removably connects, and fixture is the most spaced apart is provided with at least two adjustment hole.
Further, in this utility model preferred embodiment, crossbeam passes through bolt with solid
Locking member connects, and the end of crossbeam is provided with the installing hole corresponding with adjustment hole, and bolt includes spiral shell
Bar and nut, screw rod is embedded at the end spiral shell of installing hole and adjustment hole, nut and screw rod simultaneously
Stricture of vagina connects.
Further, in this utility model preferred embodiment, fixture includes that first is solid
Determining plate, the first fixed plate is the most spaced apart is provided with at least two adjustment hole.
Further, in this utility model preferred embodiment, fixture includes that first is solid
Determine plate and the second fixed plate, the first fixed plate and the second fixed plate the most vertically to arrange, first
Width between fixed plate and the second fixed plate matches with the width of crossbeam, and adjustment hole is arranged
In the first fixed plate and the second fixed plate, it is positioned at the adjustment hole of the first fixed plate and is positioned at second
The adjustment hole of fixed plate is corresponding.
Further, in this utility model preferred embodiment, the first column and second stands
The top of post is provided with a connecting piece, and back timber is connected by bolt and a connecting piece.
Further, in this utility model preferred embodiment, back timber and the first column it
Between be provided with the first cant beam, the two ends of the first cant beam are detachable with back timber and the first column respectively
Connect;Being provided with the second cant beam between back timber and the second column, the two ends of the second cant beam are respectively
Removably connect with back timber and the second column.
Further, in this utility model preferred embodiment, the two ends of the first cant beam set
Being equipped with the second connection sheet, second connects that sheet is fixing with the first column to be connected, second connect sheet and
First cant beam is bolted;The two ends of the second cant beam be provided with the 3rd connection sheet, the 3rd
Connecting sheet and the fixing connection of the second column, the 3rd connection sheet and the second cant beam are bolted.
Further, in this utility model preferred embodiment, the first column and second stands
The bottom of post is connected to the first pedestal and the second pedestal, the first pedestal and the second pedestal and exists
The projected area of horizontal plane is more than the first column or the perspective plane at horizontal plane of the second column
Long-pending.
Further, in this utility model preferred embodiment, the first pedestal includes first
Substrate and the first support bar, the bottom of first substrate and the first column connects, the first support bar
Two ends be connected to the sidewall of the first column and the end face of first substrate;Second pedestal bag
Including second substrate and the second support bar, the bottom of second substrate and the second column connects, and second
The two ends of support bar are connected to the sidewall of the second column and the end face of second substrate.
Further, in this utility model preferred embodiment, the end face of crossbeam is provided with
Block, the vertical cross-section of block is amassed L-shaped, block include the connecting portion that is sequentially connected and
Stop part, connecting portion is connected with crossbeam.
The beneficial effects of the utility model are: this utility model obtained by above-mentioned design one
Kind of frock moulding bed, when using at the construction field (site), fix in advance the first column, the second column and
Back timber, then by crossbeam by presetting that fixed plate is installed between the first column and the second column
Position;When needs lifting steel beam column, back timber is installed jack, utilizes jack by steel structure
Part is sling certain altitude, needs position to be mounted further according to steel beam column, to horizontal depth of beam
It is adjusted.Beam-end is removably connected with fixture by adjustment hole, when crossbeam is preset
Time highly more than actual demand height, crossbeam is moved down so that it is end and the tune of lower position
Knothole connects, otherwise, when crossbeam preset height is less than actual demand height, by crossbeam
Move so that it is end is connected with the adjustment hole of higher position, and then makes the steel structure being positioned on crossbeam
Part is in needs position to be mounted, so that steel beam column is carried out further soldering.
The frock moulding bed of this structure, simple in construction, it is possible to quickly assemble, and good stability,
The safety of steel beam column installation process can be strengthened.This frock moulding bed is by the first column
With fixture is set on the sidewall of the second column, and on fixture, offer adjustment hole, it is possible to
According to construction demand, the height adjusting steel beam column of fast and flexible and position, accelerate to be installed into
Degree, and installation quality can be improved.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of this utility model embodiment, below by right
In embodiment, the required accompanying drawing used is briefly described, it will be appreciated that the following drawings
Illustrate only some embodiment of the present utility model, be therefore not construed as the limit to scope
Fixed, for those of ordinary skill in the art, on the premise of not paying creative work,
Other relevant accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of frock moulding bed that in this utility model embodiment, embodiment 1 provides
Front view;
Fig. 2 is a kind of frock moulding bed that in this utility model embodiment, embodiment 1 provides
Left view;
Fig. 3 is a kind of frock moulding bed that in this utility model embodiment, embodiment 1 provides
Top view;
Fig. 4 is a kind of frock moulding bed that in this utility model embodiment, embodiment 2 provides
Top view;
Fig. 5 is in a kind of frock moulding bed that in this utility model embodiment, embodiment 3 provides
The structural representation of crossbeam.
Figure acceptance of the bid note is respectively as follows:
Frock moulding bed the 100, first column the 110, second column 120, back timber 130, first
Connect sheet 131, crossbeam 140, installing hole 141, block 142, stop part 143, connect
Portion's the 144, first pedestal 150, first substrate the 151, first support bar the 152, second pedestal
160, second substrate the 161, second support bar 162, fixture the 170, first fixed plate 171,
Second fixed plate 172, adjustment hole 173, bolt the 174, first cant beam 180, second connect
Sheet the 181, second cant beam the 190, the 3rd connects sheet 191.
Detailed description of the invention
For making the purpose of this utility model embodiment, technical scheme and advantage clearer,
Below in conjunction with the accompanying drawing in this utility model embodiment, to this utility model embodiment
In technical scheme be clearly and completely described, it is clear that described embodiment is
The a part of embodiment of this utility model rather than whole embodiments.Based on this practicality
Embodiment in novel, those of ordinary skill in the art are not before making creative work
Put the every other embodiment obtained, broadly fall into the scope of this utility model protection.
Therefore, below to the detailed description of the embodiment of the present utility model provided in the accompanying drawings also
It is not intended to be limiting claimed scope of the present utility model, but it is new to be merely representative of this practicality
The selected embodiment of type.Based on the embodiment in this utility model, the common skill in this area
The every other embodiment that art personnel are obtained under not making creative work premise,
Broadly fall into the scope of this utility model protection.
In description of the present utility model, it is to be understood that term " width ", " on ",
Orientation or the position relationship of the instruction such as D score, " end " are based on orientation shown in the drawings or position
Relation, is for only for ease of description this utility model and simplifies description rather than instruction or dark
Show that equipment or the element of indication must have specific orientation, with specific azimuth configuration and behaviour
Make, therefore it is not intended that to restriction of the present utility model.
Additionally, term " first ", " second " and " the 3rd " is only used for describing purpose, and can not
It is interpreted as instruction or hint relative importance or the implicit number indicating indicated technical characteristic
Amount.Thus, the feature defining " first ", " second " and " the 3rd " can be expressed or hidden
One or more this feature are included containing ground.In description of the present utility model, " multiple "
It is meant that two or more, unless otherwise expressly limited specifically.
In this utility model, unless otherwise clearly defined and limited, term " install ", " phase
Even ", " connection ", the term such as " fix " should be interpreted broadly, for example, it may be fix connection,
Can also be to removably connect, or integral;Can be to be joined directly together, it is also possible in by
Between medium be indirectly connected to, can be two element internals connection or the phase interaction of two elements
By relation.For the ordinary skill in the art, can understand as the case may be
Above-mentioned term concrete meaning in this utility model.
In this utility model, unless otherwise clearly defined and limited, fisrt feature is
Two features it " on " or D score can include that the first and second features directly contact, it is also possible to
It not directly contact but by the other feature between them including the first and second features
Contact.And, fisrt feature second feature " on ", " top " and " above " include
One feature is directly over second feature and oblique upper, or is merely representative of fisrt feature level height
Higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " include
Fisrt feature is immediately below second feature and obliquely downward, or it is high to be merely representative of fisrt feature level
Degree is less than second feature.
Embodiment 1, referring to figs. 1 through Fig. 3,
Present embodiments provide a kind of frock moulding bed, as it is shown in figure 1, frock moulding bed 100 wraps
Include first column the 110, second column 120, back timber 130, crossbeam 140 and fixture 170.
First column 110 and the second column 120 are vertically arranged, one end of back timber 130 and the
The top of one column 110 connects, the other end of back timber 130 and the top of the second column 120
Connect.Crossbeam 140 between the first column 110 and the second column 120, the first column
110 and second column 120 be provided with for regulate crossbeam 140 height fixture 170,
Fixture 170 removably connects with the end of crossbeam 140.Fixture 170 is vertically spaced
Offer multiple adjustment hole 173.
Can be fixing connection between back timber 130 with the first column 110 and the second column 120,
Can also be to removably connect.As it is shown on figure 3, fixture 170 is by welding or bolt
The fixed forms such as 174 are connected with the first column 110 and the second column 120, the length of fixed plate
Degree direction is consistent with the length direction of the first column 110 or the second column 120.Due to crossbeam
140 ends are removably connected with fixture 170 by adjustment hole 173, and fixture 170
Having multiple adjustment hole 173 vertically arranged, fixture 170 is enough by adjustment hole 173
Regulate the height of crossbeam 140.When needs lifting steel beam column, back timber 130 is installed
Jack, utilizes jack to be sling to by steel beam column certain altitude, needs to install further according to steel beam column
Position, the height of crossbeam 140 is adjusted.
The frock moulding bed 100 of this structure, simple in construction, it is possible to quickly assemble, stability
Good so that the safety in steel beam column installation process is improved.Simultaneously can be according to construction
Demand, the height adjusting steel beam column of fast and flexible and position, accelerate installation progress, improve
Installation quality.
Preferably, removably connecting between crossbeam 140 and fixture 170 is to pass through bolt
174 realize.Crossbeam 140 is connected with fixture 170 by bolt 174, crossbeam 140
End be provided with the installing hole 141 corresponding with adjustment hole 173.Bolt 174 includes screw rod
And nut, screw rod is embedded at installing hole 141 and adjustment hole 173, nut and screw rod simultaneously
End thread connects.It is at least one that every one end of crossbeam 140 arranges the number of installing hole 141
Individual.When the number of installing hole 141 is more than one, the arrangement mode of installing hole 141 and tune
Knothole 173 is consistent, is and is vertically spaced.Now, the two ends of crossbeam 140 are the most logical
Cross multiple vertically disposed bolt 174 be fixed on the first column 110 and the second column 120 it
Between, steadiness is strengthened, and greatly improves the weight capacity of crossbeam 140.
Further, fixture 170 includes the first fixed plate 171, the first fixed plate 171
The most spaced apart it is provided with at least two adjustment hole 173.When crossbeam 140 and the first fixed plate
During 171 connection, screw rod is embedded in installing hole 141 and adjustment hole 173 simultaneously, screw rod
End connects nut.
When back timber 130 and the first column 110 and the second column 120 removably connect, the
The top of one column 110 and the second column 120 is provided with a connecting piece 131, back timber
The two ends of 130 are connected with two a connecting piece 131 by bolt 174 respectively.
Additionally, for the stability improving frock moulding bed 100, back timber 130 and the first column
Be provided with the first cant beam 180 between 110, the two ends of the first cant beam 180 respectively with back timber 130
Removably connect with the first column 110.In the jig structure that some are concrete, this removable
Unloading and be connected as bolt 174 and connect, the two ends of the first cant beam 180 are provided with the second connection sheet
181, one of them second connects sheet 181 and fixes with the first column 110 and is connected, and another is the years old
Two connect sheet 181 is connected by bolt 174 with the first cant beam 180.
It is provided with the second cant beam 190, the second cant beam between back timber 130 and the second column 120
The two ends of 190 removably connect with back timber 130 and the second column 120 respectively.Preferably,
The two ends of the second cant beam 190 are provided with the 3rd connection sheet 191, one of them the 3rd connection
Sheet 191 is fixing with the second column 120 to be connected, and another the 3rd connection sheet 191 is oblique with second
Beam 190 is connected by bolt 174.
Further, as in figure 2 it is shown, the bottom of the first column 110 connects the first pedestal
150, the first pedestal 150 is more than the first column 110 at horizontal plane in the projected area of horizontal plane
Projected area.The bottom of the second column 120 connects the second pedestal 160, the second pedestal
160 in the projected area of horizontal plane more than the second column 120 in the projected area of horizontal plane.
First pedestal 150 is set and the second pedestal 160 can increase the first column 110 and second and stand
Post 120 and the contact area on ground, to improve the stability of this frock moulding bed 100 further.
Preferably, the first pedestal 150 includes first substrate 151 and the first support bar 152,
First substrate 151 is connected with the bottom of the first column 110, the two ends of the first support bar 152
It is connected to sidewall and the end face of first substrate 151 of the first column 110;Second pedestal
160 include second substrate 161 and the second support bar 162, second substrate 161 and the second column
The bottom of 120 connects, and the two ends of the second support bar 162 are connected to the second column 120
Sidewall and the end face of second substrate 161.
First substrate 151 and the shape of second substrate 161 and can with the contact area on ground
To set flexibly.In the present embodiment, the first support bar 152 has two, and two first
Support bar 152 is symmetrical arranged about the first column 110.Same, the second support bar 162
There are two, and two second support bars 162 are symmetrical arranged about the second column 120.When
So, the quantity of the first support bar 152 and the second support bar 162 can have multiple.Such as,
When the quantity of the first support bar 152 is two or more, multiple first support bars 152 are uniform
It is distributed in the opposite sides of the first column 110, or multiple first support bar 152 is around
One column 110 is evenly distributed.Similarly, the second support bar 162 may be used without same
Mode is arranged.This setup of first support bar 152 and the second support bar 162 is permissible
Make the first column 110 and the second column 120 stress evenly.
Embodiment 2, with reference to Fig. 4,
The frock moulding bed 100 that this utility model embodiment is provided, it realizes principle and generation
Technique effect identical with previous embodiment, for briefly describe, this frock moulding bed 100 is implemented
The not mentioned part of example part, refers to corresponding contents in previous embodiment.
The frock moulding bed 100 obtained by above-mentioned design can solve high-rise tubular truss peace substantially
In dress, moulding bed can not be adjusted flexibly highly and the problem of position, but the most a lot of large space
Steel beam column weight in tube truss structure is very big, and the weight capacity of frock moulding bed 100 is carried by this
Go out higher requirement.Based on this, this frock moulding bed 100 has been carried out further by designer
Improvement.
A kind of frock moulding bed 100 include first column the 110, second column 120, back timber 130,
Crossbeam 140 and fixture 170.First column 110 and the second column 120 are and vertically set
Putting, one end of back timber 130 is connected with the top of the first column 110, another of back timber 130
End is connected with the top of the second column 120.Crossbeam 140 is positioned at the first column 110 and second
Between column 120, the first column 110 and the second column 120 are provided with for regulating horizontal stroke
The fixture 170 of beam 140 height, fixture 170 detachably connects with the end of crossbeam 140
Connect.
Fixture 170 includes the first fixed plate 171 and the second fixed plate 172, such as Fig. 4 institute
Showing, the first fixed plate 171 and the second fixed plate 172 are the most vertically arranged.First fixed plate
171 and second width between fixed plate 172 match with the width of crossbeam 140.First
Fixed plate 171 and the second fixed plate 172 are the most vertically arranged at intervals with at least two adjustment hole
173, it is positioned at the adjustment hole 173 of the first fixed plate 171 and the tune being positioned at the second fixed plate 172
Knothole 173 is corresponding.
First fixed plate 171 and the second fixed plate 172 width with crossbeam 140 spaced apart
Spending corresponding, when mounted, crossbeam 140 intercalation is fixed in the first fixed plate 171 and second
Between plate 172.Between crossbeam 140 and the first fixed plate 171 and the second fixed plate 172 it is
Realize removably connecting by bolt 174.Crossbeam 140 is by bolt 174 and fixes
Part 170 connects, and the end of crossbeam 140 is provided with the installing hole 141 corresponding with adjustment hole 173.
Bolt 174 includes screw rod and nut, and screw rod is embedded at installing hole 141 and adjustment hole simultaneously
173, nut is connected with the end thread of screw rod.The every one end of crossbeam 140 arranges installing hole 141
Number be at least one, when the number of installing hole 141 is more than one, installing hole 141
Arrangement mode consistent with adjustment hole 173, be and be vertically spaced, now, crossbeam
The two ends of 140 are all fixed on the first column 110 He by multiple vertically disposed bolts 174
Between second column 120, steadiness is strengthened, and greatly improves the load-bearing energy of crossbeam 140
Power.
Embodiment 3, refers to Fig. 5,
The frock moulding bed 100 that this utility model embodiment is provided, it realizes principle and generation
Technique effect identical with first embodiment, for briefly describe, this frock moulding bed 100 is implemented
The not mentioned part of example part, refers to corresponding contents in first embodiment.
The frock moulding bed 100 obtained by above-mentioned design can solve high-rise tubular truss peace substantially
In dress, moulding bed can not be adjusted flexibly the problem of height and position, but due to the steel of usual tubular truss
Component is column type, when this steel beam column be placed on carry out welded and installed on crossbeam 140 time, hold
Easily roll, affect installation quality, cause certain difficulty to construction simultaneously.Based on this, if
Meter person has carried out further improvement to this frock moulding bed 100.
A kind of frock moulding bed 100 include first column the 110, second column 120, back timber 130,
Crossbeam 140 and fixture 170.First column 110 and the second column 120 are and vertically set
Putting, one end of back timber 130 is connected with the top of the first column 110, another of back timber 130
End is connected with the top of the second column 120.Crossbeam 140 is positioned at the first column 110 and second
Between column 120, the first column 110 and the second column 120 are provided with for regulating horizontal stroke
The fixture 170 of beam 140 height, fixture 170 detachably connects with the end of crossbeam 140
Connect.Fixture 170 is the most spaced apart is provided with multiple adjustment hole 173.
Block 142 it is provided with, as it is shown in figure 5, block 142 is vertical horizontal on crossbeam 140
Sectional area is L-shaped, and block 142 includes connecting portion 144 and the stop part 143 being sequentially connected,
Connecting portion 144 is connected with crossbeam 140, can be fixing connection, it is also possible to be to be slidably connected.
Stop part 143 is fixedly linked with connecting portion 144, and stop part 143 is block, block 142
In in working order, stop part 143 contacts with steel beam column sidewall, and stop part 143 can
Steel beam column is avoided to laterally move.When steel beam column is adjusted to required height and position,
Block 142 is installed in the both sides of steel beam column, prevents from rolling, to ensure pipe purlin about steel beam column
The installation quality of frame.
The frock moulding bed 100 of this structure, simple in construction, it is possible to quickly assemble, and stable
Property good, it is possible to strengthen steel beam column installation process safety.This frock moulding bed 100 passes through
The sidewall of the first column 110 and the second column 120 arranges fixture 170, and solid
Adjustment hole 173 is offered, it is possible to according to construction demand, the adjustment of fast and flexible in locking member 170
The height of steel beam column and position, accelerate installation progress, and can improve installation quality.
The foregoing is only preferred implementation of the present utility model, be not limited to
This utility model, for a person skilled in the art, this utility model can have various
Change and change.All within spirit of the present utility model and principle, any amendment of being made,
Equivalent, improvement etc., within should be included in protection domain of the present utility model.
Claims (10)
1. a frock moulding bed, it is characterised in that include the first column, the second column, top
Beam, crossbeam and fixture, described first column and described second column are vertically arranged,
Top with described first column and described second column respectively, the two ends of described back timber is connected;
Described crossbeam between described first column and described second column, described first column and
Described second column is provided with the fixture for regulating described beam height, described fixing
Part removably connects with the end of described crossbeam, described fixture is the most spaced apart be provided with to
Few two adjustment holes.
Frock moulding bed the most according to claim 1, it is characterised in that described crossbeam leads to
Crossing bolt to be connected with described fixture, the end of described crossbeam is provided with and described adjustment hole pair
The installing hole answered, it is described that described bolt includes that screw rod and nut, described screw rod are embedded at simultaneously
Installing hole and described adjustment hole, described nut is connected with the end thread of described screw rod.
Frock moulding bed the most according to claim 1, it is characterised in that described fixture
Including the first fixed plate, described first fixed plate is the most spaced apart is provided with at least two regulation
Hole.
Frock moulding bed the most according to claim 1, it is characterised in that described fixture
Including the first fixed plate and the second fixed plate, described first fixed plate and described second fixed plate
The most vertically arrange, the width between described first fixed plate and described second fixed plate and institute
The width stating crossbeam matches, and described adjustment hole is arranged at described first fixed plate and described
Two fixed plates, the described adjustment hole being positioned at described first fixed plate is fixed with being positioned at described second
The described adjustment hole of plate is corresponding.
Frock moulding bed the most according to claim 1, it is characterised in that described first stands
The top of post and described second column is provided with a connecting piece, described back timber by bolt with
Described a connecting piece is connected.
Frock moulding bed the most according to claim 1, it is characterised in that described back timber with
Be provided with the first cant beam between described first column, the two ends of described first cant beam respectively with institute
State back timber and described first column removably connects;Between described back timber and described second column
Be provided with the second cant beam, the two ends of described second cant beam respectively with described back timber and described second
Column removably connects.
Frock moulding bed the most according to claim 6, it is characterised in that described first oblique
The two ends of beam are provided with the second connection sheet, and described second connects sheet fixes with described first column
Connecting, described second connects sheet is bolted with described first cant beam;Described second oblique
The two ends of beam are provided with the 3rd connection sheet, and the described 3rd connects sheet fixes with described second column
Connecting, the described 3rd connects sheet is bolted with described second cant beam.
Frock moulding bed the most according to claim 1, it is characterised in that described first stands
The bottom of post and described second column is connected to the first pedestal and the second pedestal, and described
One pedestal and described second pedestal are more than described first column or institute in the projected area of horizontal plane
State the projected area at horizontal plane of the second column.
Frock moulding bed the most according to claim 8, it is characterised in that described first base
Seat includes the end of first substrate and the first support bar, described first substrate and described first column
End connect, the two ends of described first support bar be connected to described first column sidewall and
The end face of described first substrate;Described second pedestal includes second substrate and the second support bar,
Described second substrate is connected with the bottom of described second column, the two ends of described second support bar
It is connected to sidewall and the end face of described second substrate of described second column.
Frock moulding bed the most according to claim 1, it is characterised in that described crossbeam bag
Including block, the vertical cross-section of described block is amassed L-shaped, and described block includes being sequentially connected
Connecting portion and stop part, described connecting portion is connected with described crossbeam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620153819.6U CN205531441U (en) | 2016-03-01 | 2016-03-01 | Tooling jig frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620153819.6U CN205531441U (en) | 2016-03-01 | 2016-03-01 | Tooling jig frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205531441U true CN205531441U (en) | 2016-08-31 |
Family
ID=56780110
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620153819.6U Active CN205531441U (en) | 2016-03-01 | 2016-03-01 | Tooling jig frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205531441U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589526A (en) * | 2018-06-06 | 2018-09-28 | 中铁宝桥集团有限公司 | A kind of railway deck block making device |
CN109505411A (en) * | 2018-10-31 | 2019-03-22 | 共享钢构有限责任公司 | Tube truss structure roofing installation method |
-
2016
- 2016-03-01 CN CN201620153819.6U patent/CN205531441U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108589526A (en) * | 2018-06-06 | 2018-09-28 | 中铁宝桥集团有限公司 | A kind of railway deck block making device |
CN109505411A (en) * | 2018-10-31 | 2019-03-22 | 共享钢构有限责任公司 | Tube truss structure roofing installation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110722318A (en) | Precise adjustable steel truss assembling jig frame and assembling method | |
CN109779269B (en) | Large-span truss sectional hoisting high-altitude folding measure device and construction method | |
CN205531441U (en) | Tooling jig frame | |
CN106351462A (en) | Temporary steel pipe supported prestressed reinforcement structure and construction method thereof | |
CN213897557U (en) | Reinforced steel structure mounted in multiple ways | |
CN103803446B (en) | Bracing or strutting arrangement | |
CN206512931U (en) | A kind of working iron railing stool of building floor | |
CN212384891U (en) | Accurate adjustable steel truss assembles bed-jig | |
CN209722744U (en) | A kind of Bracing Systems for steel box girder assembling | |
CN109779002A (en) | Overall assembled framework house | |
CN208831988U (en) | A kind of machine cabinet load-bearing para-seismic support | |
CN110657977A (en) | Loading support for detecting structural performance of assembled prefabricated staircase | |
CN106012861A (en) | Mounting positioning device and construction method of corrugated steel web | |
CN105696782A (en) | Novel mobile operation platform | |
CN202672689U (en) | Adjustable vertical cylinder-shaped storage tank lifter roof rack | |
CN202689585U (en) | Ground fitting up assembly mould of large steel truss | |
CN202055506U (en) | Umbrella-shaped platform easy to assemble and disassemble for top construction in spherical container | |
CN106368322B (en) | A kind of installation method for the bi-directional symmetrical inclination steel column between super high-rise building conversion layer | |
CN208361753U (en) | A kind of tower crane supporting leg anchoring pre-buried structure and tower crane | |
CN201124290Y (en) | Combination welding device for girder of stair | |
CN210976074U (en) | Steel structure building component | |
CN201052950Y (en) | Crane | |
CN210002826U (en) | detachable welding platform for steel column construction | |
CN210563435U (en) | Slope supporting device for top rising of inclined heavy-load steel net rack | |
CN205369877U (en) | Elevartor shaft removes and protects operation platform firmly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |