CN205530168U - Can carry out diversion tunnel structure that tunnel lock chamber section was overhauld - Google Patents

Can carry out diversion tunnel structure that tunnel lock chamber section was overhauld Download PDF

Info

Publication number
CN205530168U
CN205530168U CN201620300077.5U CN201620300077U CN205530168U CN 205530168 U CN205530168 U CN 205530168U CN 201620300077 U CN201620300077 U CN 201620300077U CN 205530168 U CN205530168 U CN 205530168U
Authority
CN
China
Prior art keywords
tunnel
maintenance
gate
lock chamber
diversion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620300077.5U
Other languages
Chinese (zh)
Inventor
梁娟
银登林
雷运华
孔科
张有山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201620300077.5U priority Critical patent/CN205530168U/en
Application granted granted Critical
Publication of CN205530168U publication Critical patent/CN205530168U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Barrages (AREA)

Abstract

The utility model discloses a can carry out diversion tunnel structure that tunnel lock chamber section was overhauld in hydraulic engineering field, this structure includes the diversion tunnel barrel, the upper reaches section of diversion tunnel barrel is by the maintenance tunnel, be equipped with the lock chamber structure in overhauing the tunnel, still include a maintenance water delivery tunnel, the import of overhauing the water delivery tunnel links to each other with the upper river, and the export of overhauing the water delivery tunnel links to each other with the diversion tunnel barrel, and hookup location is located the low reaches of lock chamber structure, is provided with in the barrel section of overhauing the water delivery tunnel and overhauls the lock chamber and install the gate. The utility model discloses a set up one on diversion tunnel barrel next door and overhaul the water delivery tunnel, utilize and overhaul the water delivery tunnel and overhaul the diversion tunnel lock chamber between the delivery period, guarantee under the diversion tunnel gate that the floodgate reaches power generation benefit smoothly, overhauld simultaneously under the diversion tunnel behind the floodgate, can guarantee that low reaches are ecological stable by overhauing the water delivery tunnel ecological flow in river course of releasing downriver.

Description

The diversion tunnel structure of tunnel lock chamber section maintenance can be carried out
Technical field
This utility model relates to hydraulic engineering field, particularly relates to a kind of diversion tunnel structure carrying out the maintenance of tunnel lock chamber section.
Background technology
In Hydraulic and Hydro-Power Engineering is built, especially when high-mountain gorge areas builds Hydraulic and Hydro-Power Engineering, tunnel is generally utilized to incite somebody to action Former streamflow, behind the leading downstream cofferdam of upstream cofferdam, makes permanent hydraulic structure can be maintained at dry construction on the ground.Work as construction After water conservancy diversion task terminates, need to carry out lock closure under diversion tunnel.Owing to diversion tunnel arranges that elevation is low, bed load erosion problem Prominent, easily cause tunnel lock chamber and embedded parts punching galls bad.For ensureing that under diversion tunnel, lock closure smoothly, needs in advance to tunnel Hole import lock chamber xoncrete structure and gate recess embedded part check comprehensively and repair, and existing diversion tunnel structure is general the most not Possesses maintenance condition.It addition, during the closure of water conservancy diversion outlet structure escape works, often cause Rive flood routing, affect the ecological ring in downstream Border, be there is a need to study the novel building structure scheme of a kind of technically reliable, economical rationality, to meet river, downstream of releasing Road ecology traffic requirement.
Utility model content
For overcoming existing diversion tunnel structure to cannot be carried out lock chamber maintenance, and the deficiencies such as downstream ecological environment can be affected after blocking tunnel, Technical problem to be solved in the utility model is: provides one can carry out lock chamber maintenance, and can be continuously downstream water supply Diversion tunnel structure.
This utility model solves its technical problem and be the technical scheme is that the diversion tunnel structure that can carry out the maintenance of tunnel lock chamber section, Including diversion tunnel barrel, the Upstream section of diversion tunnel barrel is by maintenance tunnel, described is provided with lock chamber structure, also in maintenance tunnel Including one maintenance water-conveyance tunnel, the import of described maintenance water-conveyance tunnel is connected with upper river, maintenance water-conveyance tunnel outlet and Diversion tunnel barrel is connected, and link position is positioned at the downstream of lock chamber structure, and the barrel section at maintenance water-conveyance tunnel is provided with maintenance lock Room is also provided with gate.
Further, the described position by maintenance tunnel inner brake cell structure is higher than barrel downstream, and tool in lock chamber structure There are two apertures, in each aperture, are equipped with gate.
Further, in two apertures of described diversion tunnel lock chamber structure, it is equipped with two gates, is respectively closure gate and inspection Repairing gate, wherein closure gate is positioned at the upstream of bulkhead gate.
Further, described closure gate and bulkhead gate being equipped with gate sealing, the gate sealing of closure gate is positioned at lock Passage downstream, the gate sealing of bulkhead gate is positioned at gate upstream.
Further, the described approach channel upstream by the water inlet of maintenance tunnel is provided with maintenance cofferdam.
The beneficial effects of the utility model are: by arranging a maintenance water-conveyance tunnel on diversion tunnel barrel side, utilize maintenance defeated Diversion tunnel lock chamber is overhauled during supplying water by water tunnel, can be under the diversion tunnel not possessing maintenance condition before lock, to water conservancy diversion Tunnel import lock chamber structure and gate recess embedded part overhaul, it is ensured that under diversion tunnel gate, lock is smoothly and power benefit, exists simultaneously After lock under maintenance diversion tunnel, can be by maintenance water-conveyance tunnel bleed downstream river channel ecology flow, it is ensured that downstream ecology is stable.
Accompanying drawing explanation
Fig. 1 is this utility model horizontal layout schematic diagram.
Fig. 2 is overhauled tunnel profilograph.
Fig. 3 is the profilograph of maintenance water-conveyance tunnel.
Being labeled as in figure, 1-diversion tunnel barrel, 2-lock chamber structure, 3-blocks gate, 4-bulkhead gate, and 5-overhauls water delivery Tunnel, 6-overhauls lock chamber, 7-gate, and 8-overhauls cofferdam, and 9-is overhauled tunnel.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further illustrated.
As it is shown in figure 1, this utility model includes diversion tunnel barrel 1, the Upstream section of barrel is by maintenance tunnel 9, by maintenance tunnel It is provided with lock chamber structure 2 in 9, is provided with a maintenance water delivery tunnel paralleled with by maintenance tunnel 9 with by the side of maintenance tunnel 9 Hole 5, the import of described maintenance water-conveyance tunnel 5 is connected with upper river, the outlet of maintenance water-conveyance tunnel 5 and diversion tunnel barrel 1 Being connected, and link position is positioned at the downstream of lock chamber structure 2, the integral position of maintenance water-conveyance tunnel 5 can be less than by maintenance tunnel 9 Position, the barrel section at maintenance water-conveyance tunnel 5 is provided with maintenance lock chamber 6 be provided with gate 7.The work that this use is novel Principle is: downstream sluiced by by maintenance tunnel 9 and diversion tunnel barrel 1 under normal circumstances, when needs are to by maintenance tunnel 9 Lock chamber structure 2 when overhauling, open the gate 7 in maintenance water-conveyance tunnel 5, utilize maintenance water-conveyance tunnel 5 that downstream is let out Water, thus realize the maintenance to lock chamber structure 2, and when overhauling, do not affect downstream ecological environment.
The described position by maintenance tunnel inner brake cell structure 2 is higher than barrel downstream, and has two holes in lock chamber structure 2 Mouthful, it is equipped with gate in each aperture.The position of lock chamber structure 2, higher than barrel downstream, can be carried out by certain gradient Transition, as in figure 2 it is shown, the water that its purpose is to prevent flowing through from maintenance water-conveyance tunnel 5 refluxes at diversion tunnel barrel 1 again In lock chamber structure 2, being smoothed out of impact maintenance.Two apertures are set in lock chamber structure 2, primarily to be easy to arrange Less gate, improves the stability of gate closure, and is also beneficial to maintenance.
Further, in two apertures of described diversion tunnel lock chamber structure 2, it is equipped with two gates, is respectively closure gate 3 With bulkhead gate 4, wherein closure gate 3 is positioned at the upstream of bulkhead gate 4.The purpose of two gates is set primarily to just In quickly discharging by the flowing water in maintenance tunnel 9 and avoiding river to flow backwards, its work process is: when needs carry out lock chamber knot When structure 2 overhauls, it is first turned on overhauling the gate 7 of water-conveyance tunnel 5, and simultaneously closes off the bulkhead gate 4 in lock chamber structure 2, Now river can only be drained from maintenance water-conveyance tunnel 5, and will not be back at diversion tunnel barrel 1 in lock chamber structure 2, treats After water level decreasing, the hydrops of lock chamber structure 2 Upstream section drained by available water pump, then carries out the maintenance to closure gate 3.
In order to improve closure gate 3 and the dash performance of bulkhead gate 4, described closure gate 3 and bulkhead gate 4 are all provided with Having gate sealing, the direction that root has main dash is different, and the position that gate sealing is arranged is the most different, and the gate of closure gate 3 is only Water level is in gate downstream, and the gate sealing of bulkhead gate 4 is positioned at gate upstream.
Further, in order to drain the river of lock chamber structure 2 Upstream section faster, can overhauled after 4 times locks of bulkhead gate The approach channel upstream of tunnel 9 water inlet is provided with maintenance cofferdam 8, blocks river course water, prevents river course water from entering by maintenance water conservancy diversion tunnel In hole 9 and lock chamber structure 2, to lock chamber xoncrete structure and gate recess after pump drainage falls the hydrops overhauled in tunnel 9 the most again Embedded parts etc. carry out major tune-up.After being completed by the maintenance service work such as tunnel 9 import lock chamber xoncrete structure and gate recess embedded part, Remove again by the maintenance cofferdam 8 of maintenance tunnel 9 import barrel upstream, and close the gate 7 overhauling water-conveyance tunnel 5, complete inspection Repair work.
This utility model solves to be needed to carry out tunnel makeup of the imports maintenance and unconditionally arrange the contradiction between access path, it is to avoid Because the tunnel makeup of the imports causes lower lock unsuccessfully to cause power benefit to lose without maintenance condition, under by maintenance tunnel after lock, can be by Maintenance water-conveyance tunnel bleed downstream river channel ecology water, this structure solves two technical barriers simultaneously, creates economic benefit Protect again ecological environment, there is good practicality and application prospect.

Claims (5)

1. can carry out the diversion tunnel structure of tunnel lock chamber section maintenance, including diversion tunnel barrel (1), diversion tunnel barrel (1) upper Trip section be by maintenance tunnel (9), described is provided with lock chamber structure (2) in overhauling tunnel (9), it is characterized in that: also include one Maintenance water-conveyance tunnel (5), the import of described maintenance water-conveyance tunnel (5) is connected with upper river, maintenance water-conveyance tunnel (5) Outlet is connected with diversion tunnel barrel (1), and link position is positioned at the downstream of lock chamber structure (2), in maintenance water-conveyance tunnel (5) Barrel section be provided with maintenance lock chamber (6) be provided with gate (7).
The diversion tunnel structure of tunnel lock chamber section maintenance can be carried out the most as claimed in claim 1, it is characterized in that: be described by maintenance tunnel The position of hole (9) inner brake cell structure (2) is higher than barrel downstream, and has two apertures in lock chamber structure (2), often It is equipped with gate in individual aperture.
The diversion tunnel structure of tunnel lock chamber section maintenance can be carried out the most as claimed in claim 2, it is characterized in that: described diversion tunnel lock It is equipped with two gates in two apertures of cell structure (2), respectively blocks gate (3) and bulkhead gate (4), Qi Zhongfeng Blocking gate (3) is positioned at the upstream of bulkhead gate (4).
The diversion tunnel structure of tunnel lock chamber section maintenance can be carried out the most as claimed in claim 3, it is characterized in that: described closure gate (3) and being equipped with gate sealing on bulkhead gate (4), the gate sealing of closure gate (3) is positioned at gate downstream, overhauls lock The gate sealing of door (4) is positioned at gate upstream.
5. the diversion tunnel structure of the carried out tunnel lock chamber section maintenance as described in Claims 1 to 4 any one claim, it is special Levy and be: the described approach channel upstream by the water inlet of maintenance tunnel (9) is provided with maintenance cofferdam (8).
CN201620300077.5U 2016-04-12 2016-04-12 Can carry out diversion tunnel structure that tunnel lock chamber section was overhauld Active CN205530168U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620300077.5U CN205530168U (en) 2016-04-12 2016-04-12 Can carry out diversion tunnel structure that tunnel lock chamber section was overhauld

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620300077.5U CN205530168U (en) 2016-04-12 2016-04-12 Can carry out diversion tunnel structure that tunnel lock chamber section was overhauld

Publications (1)

Publication Number Publication Date
CN205530168U true CN205530168U (en) 2016-08-31

Family

ID=56791320

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620300077.5U Active CN205530168U (en) 2016-04-12 2016-04-12 Can carry out diversion tunnel structure that tunnel lock chamber section was overhauld

Country Status (1)

Country Link
CN (1) CN205530168U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735215A (en) * 2016-04-12 2016-07-06 中国电建集团成都勘测设计研究院有限公司 Diversion tunnel structure capable of overhauling lock chamber sections of tunnels
CN107859009A (en) * 2017-11-14 2018-03-30 长江勘测规划设计研究有限责任公司 Diversion tunnel utilizes lock closure arrangement and method under permanent plug first section joint gate
CN109487764A (en) * 2018-10-18 2019-03-19 贵州省水利水电勘测设计研究院 A kind of flow control structure
CN116145627A (en) * 2023-04-23 2023-05-23 四川水发勘测设计研究有限公司 High-drop dual-channel energy dissipation system for long-distance water diversion project

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105735215A (en) * 2016-04-12 2016-07-06 中国电建集团成都勘测设计研究院有限公司 Diversion tunnel structure capable of overhauling lock chamber sections of tunnels
CN107859009A (en) * 2017-11-14 2018-03-30 长江勘测规划设计研究有限责任公司 Diversion tunnel utilizes lock closure arrangement and method under permanent plug first section joint gate
CN109487764A (en) * 2018-10-18 2019-03-19 贵州省水利水电勘测设计研究院 A kind of flow control structure
CN116145627A (en) * 2023-04-23 2023-05-23 四川水发勘测设计研究有限公司 High-drop dual-channel energy dissipation system for long-distance water diversion project

Similar Documents

Publication Publication Date Title
CN205530168U (en) Can carry out diversion tunnel structure that tunnel lock chamber section was overhauld
CN103410130B (en) Multi-purpose tunnel arrangement structure
CN103510493B (en) Low overflow dam cave depot type hydropower station
CN107740389B (en) Diversion tunnel structure and plugging construction method thereof
CN203594007U (en) Power station hub downstream water supply structure
CN108797526A (en) Multifunctional ecological for extra-high rock-fill dams is for water hole arrangement
CN203320497U (en) Tail water maintenance gate for power station
CN105386426B (en) The ecological drainage tunnel and method that diversion tunnel reconstruction controls for gates of segmental shape
CN106368185A (en) Hydropower station water inlet gallery desilting system and method
CN208604556U (en) Multifunctional ecological for extra-high rock-fill dams is for water hole arragement construction
CN205501944U (en) To downstream water supply structure suitable for high arch dam
CN103290804B (en) Method and the structure of downstream ecology flow are provided after lock under water conservancy diversion outlet structure escape works
CN108677892B (en) Reconstruction structure for ecological water supply tunnel by diversion tunnel construction branch tunnel
CN105735215A (en) Diversion tunnel structure capable of overhauling lock chamber sections of tunnels
CN104120692A (en) Construction layout method for one-cavity and double-layer combination of guiding cavity and emptying cavity
CN210621820U (en) Reservoir layering water intaking system
CN201978546U (en) Roadway through type underground water precipitation system
CN208088251U (en) Ecological flow discharge structure during lower lock water storage
CN205100175U (en) Structure for providing ecological flow of downstream river reach of hydraulic and hydroelectric engineering
CN206143743U (en) Husky corridor system is arranged to power station water inlet
CN210562058U (en) Ecological diversion tunnel structure capable of being used for flood season of main flood of ultra-high rock-fill dam
CN206721845U (en) A kind of diversion tunnel
CN204715318U (en) Diversion tunnel gate shaft structure in mountain
CN204982820U (en) A lock chamber arrangement structure that is used for high arch dam water conservancy diversion bottom outlet
CN209975486U (en) Diversion tunnel structure for hydraulic engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant