CN205529849U - Bridge stop device - Google Patents

Bridge stop device Download PDF

Info

Publication number
CN205529849U
CN205529849U CN201620079515.XU CN201620079515U CN205529849U CN 205529849 U CN205529849 U CN 205529849U CN 201620079515 U CN201620079515 U CN 201620079515U CN 205529849 U CN205529849 U CN 205529849U
Authority
CN
China
Prior art keywords
plate
pin
shear
push plate
shearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620079515.XU
Other languages
Chinese (zh)
Inventor
徐鸿飞
刘进章
罗秋清
何家荣
叶明坤
李建波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Orient Engineering Rubber Products Co Ltd
Original Assignee
Liuzhou Orient Engineering Rubber Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Orient Engineering Rubber Products Co Ltd filed Critical Liuzhou Orient Engineering Rubber Products Co Ltd
Application granted granted Critical
Publication of CN205529849U publication Critical patent/CN205529849U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • E01D19/042Mechanical bearings
    • E01D19/047Pot bearings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model provides a bridge stop device, includes shearing mechanism and anti -wind benzvalene form support, shearing mechanism includes bottom plate, mounting panel, shearing pin, apron, shearing pin board and push plate, apron and shearing pin board parallel arrangement are on the mounting panel, and the apron passes through the fasteners and mounting panel fixed connection of both sides, and the shearing pin board is installed in the guide rail in the middle of the cover plate top surface, and the one end of shearing pin board is connected with the push plate of perpendicular setting, and when push plate was pushed away by the external force top, push plate drove shearing pin board along guide rail slip, shearing pin board and the interior installation shearing pin of the pinhole of apron, anti -wind benzvalene form support vertical installation is in push plate's the outside, its down steel sheet push plate of passing through bolt and shearing mechanism be connected. This stop device can adapt simultaneous the fluctuation and the rotation of abutment, when the bridge receives too big earthquake horizontal force, only needs to change shearing pin, needn't carry out the back timber and change whole support, and maintenance when having overcome stop device and destroying, replacement cycle be long, spend high shortcoming.

Description

A kind of bridge stopping means
Technical field
The utility model relates to belonging to bridge technology field, particularly relates to one and can adapt to abutment and move up and down, and has the bridge stopping means of the restriction lateral or longitudinal movement of certain corner requirement.
Background technology
At present, in science of bridge building field, under the effect of earthquake or other loads, in order to limit the horizontal displacement of beam body, generally we use the mode arranging horizontal limit devices.It is current that to apply most in engineering be the cross spacing measure arranged to prevent bridge lateral under geological process from falling beam or the security that ensures seat structure, the most wide variety of Antivibration block, Antivibration block is as stopping means, it is generally located on the anti-quaking structure thing being placed in beam-ends both sides on bridge pier or abutment, the buffer body such as chock or rubber cushion blocks is set between Antivibration block and beam body.Antivibration block typically has armored concrete and two kinds of forms of steel construction.
The problem existed:
1. it is designed as integrated mechanism owing to existing highway bridge bearing bears the positive stop of horizontal force with support body, when excessive horizontal earthquake power causes bearing positive stop to occur surrender even to destroy, overall bearing can not be continuing with (many bridge pads are all owing to block destruction or anchors shearing cause whole bridge pad can not continue to re-use), back timber must be carried out and change overall bearing, so, on the one hand huge manpower and materials are expended, on the other hand long due to maintenance or replacement cycle, it is unfavorable for that the fast quick-recovery of bridge is properly functioning;
2. in the actual application practice of science of bridge building, the particularly bridge majority of cable-stayed bridge is in floating and half floating state, therefore there will be and move up and down and the situation of small angle rotation, above general type stopping means cannot adapt to pontic and fluctuate and two conditions of small angle rotation.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of reasonable in design, and convenient maintenance and replacement can adapt to a kind of bridge stopping means that abutment fluctuates, rotates, to overcome the above-mentioned deficiency existing for prior art simultaneously.
Solve above technical problem to adopt the technical scheme that: a kind of bridge stopping means, including shear and wind resistance pot bearing;
Described shear includes base plate, supporting plate, shear pin, cover plate, shearing pin plate and push plate;Described supporting plate is connected in parallel at the top of base plate, cover plate and shearing pin plate are arranged on supporting plate, the cover plate being close to supporting plate is connected by the connection securing member of both sides and supporting plate are fixing, shear pin plate to be arranged in the guide rail in the middle of cover plate end face, one end of shearing pin plate is fixing with the push plate being vertically set on shear side to be connected, when push plate is by external force pushing tow, push plate drives shears pin plate along slide;
Have pin-and-hole on described shearing pin plate and cover plate, in described pin-and-hole, with embedded mode, shear pin is installed;
Described wind resistance pot bearing is mounted vertically in the outside of push plate, and including upper steel plate and lower steel plate, the lower steel plate of wind resistance pot bearing is connected with the push plate of shear by bolt.
Further technical scheme is: the pin-and-hole on described shearing pin plate and cover plate is 1~3, and being arranged on the shear pin in pin-and-hole accordingly is 1~3.
Further: on the base plate below described push plate, limited block is installed.
Being provided with the sliding friction pair being made up of tetrafluoro slide plate and corrosion resistant plate between upper steel plate and the lower steel plate of described wind resistance pot bearing, described corrosion resistant plate is welded on upper steel plate, and described tetrafluoro slide plate is embedded on lower steel plate.
Owing to taking above technical scheme, the one bridge stopping means of the utility model has the advantages that
1. the one bridge stopping means of the utility model includes wind resistance pot bearing and shear, abutment can be adapted to fluctuate and rotate simultaneously, the sliding pair that tetrafluoro slide plate in wind resistance pot bearing and corrosion resistant plate are formed meets the requirement that abutment moves up and down, and the intrinsic characteristic of wind resistance pot bearing can meet the requirement that abutment deflection is not more than 0.2rad;
2. an a kind of bridge stopping means includes wind resistance pot bearing and shear, when bridge force-bearing is more than the design destructive power of shear pin, push plate promotes shears pin plate by shear pin, only need to again change shear pin can normally use, the back timber operation that need not carry out complexity changes overall bearing, overcomes maintenance when stopping means destroys, replacement cycle length, spends the shortcomings such as high;And shear pin is arranged on embedded mode in the pin-and-hole shearing pin plate and cover plate, directly the shear pin after disrumpent feelings is taken out when changing shear pin and again embed new shear pin, change conveniently, efficient height, low cost.
With embodiment, the technical characteristic of a kind of bridge stopping means of the utility model is further described below in conjunction with the accompanying drawings.
Accompanying drawing explanation
Fig. 1 is the one bridge limit device structure schematic diagram of the utility model;
Fig. 2~Fig. 4 is shear structural representation:
Fig. 2 is front view, and Fig. 3 is the left view of Fig. 2, and Fig. 4 is the top view of Fig. 2;
Fig. 5 is wind resistance pot bearing structural representation;
Fig. 6 is that view (section view) installed and used by the one bridge stopping means of the utility model;
In figure:
11 wind resistance pot bearings, 11 lower steel plates, 12 upper steel plates, 13 tetrafluoro slide plates, 14 corrosion resistant plates, 2 shears, 21 base plates, 22 supporting plates, 23 connect securing member, 24 shear pins, 25 cover plates, 26 shear pin plate, 27 push plate, 28 guide rails, 29 limited blocks, 3 anchoring brackets, 4 pinners, 5 pre-embedded steel slabs.
Detailed description of the invention
A kind of bridge stopping means, including shear 2 and wind resistance pot bearing 1, described shear 2 includes base plate 21, supporting plate 22, shear pin 24, cover plate 25, shears pin plate 26 and push plate 27;
Described supporting plate 22 is connected in parallel at the top of base plate, cover plate and shearing pin plate are arranged on supporting plate 22, the cover plate 25 being close to supporting plate is connected by the connection securing member 23 of both sides is fixing with supporting plate 22, shear pin plate 26 to be arranged in the guide rail 28 in the middle of cover plate end face, the one end shearing pin plate is fixing with the push plate 27 being vertically set on shear side to be connected, when push plate is by external force pushing tow, push plate drives shears pin plate along the slip of guide rail level;
Having pin-and-hole on described shearing pin plate 26 and the corresponding position of cover plate 25, be provided with shear pin 24 with embedded mode in described pin-and-hole, shear pin pierces into shearing pin plate 26 and the pin-and-hole of cover plate 25;
Described wind resistance pot bearing 1 is mounted vertically in the outside of push plate 27, and including upper steel plate 12 and lower steel plate 11, the lower steel plate of wind resistance pot bearing is connected with the push plate 27 of shear 2 by bolt.
Described shearing pin plate 26 is 1~3 with the pin-and-hole on cover plate 25, and the shear pin 24 being arranged on accordingly in pin-and-hole is 1~3.
Limited block 29 is installed on the base plate below described push plate.
Being provided with, between upper steel plate 12 and the lower steel plate 11 of described wind resistance pot bearing 1, the sliding friction pair being made up of tetrafluoro slide plate 13 with corrosion resistant plate 14, described corrosion resistant plate is welded on upper steel plate 12, and described tetrafluoro slide plate is embedded on lower steel plate 11.
Install and use
A kind of bridge stopping means of the utility model is symmetrically mounted on the arranged on left and right sides of bridge anchoring bracket 3, and shear base plate 21 is by connector and pinner 4 stable connection;The upper steel plate 12 of wind resistance pot bearing 1 is connected with the pre-embedded steel slab 5 on anchoring bracket.
Operation principle
When bridge force-bearing is more than the design destructive power of shear pin, bridge anchoring bracket 3 promotes push plate 27 by wind resistance pot bearing 1, and push plate promotes shearing pin plate 26 to make shear pin 24 disrumpent feelings;Directly the shear pin after disrumpent feelings is taken out when changing shear pin and again embed new shear pin.
Above institute sequence is only the preferred embodiment that this use is novel, not novel in order to limit this use, and any amendment, equivalent and the improvement etc. made in all spirit novel in this use and principle, within should be included in the protection domain that this use is novel.

Claims (4)

1. a bridge stopping means, it is characterised in that: include shear (2) and wind resistance pot bearing (1);Described shear (2) includes base plate (21), supporting plate (22), shear pin (24), cover plate (25), shears pin plate (26) and push plate (27);
Described supporting plate (22) is connected in parallel at the top of base plate, cover plate and shearing pin plate are arranged on supporting plate (22), the cover plate (25) being close to supporting plate is connected by the connection securing member (23) of both sides and supporting plate (22) are fixing, shear pin plate (26) to be arranged in the guide rail (28) in the middle of cover plate end face, one end of shearing pin plate is fixing with the push plate (27) being vertically set on shear side to be connected, when push plate is by external force pushing tow, push plate drives shears pin plate along slide;
Have pin-and-hole on described shearing pin plate (26) and cover plate (25), in described pin-and-hole, with embedded mode, shear pin (24) is installed;
Described wind resistance pot bearing (1) is mounted vertically in the outside of push plate (27), and including upper steel plate (12) and lower steel plate (11), the lower steel plate of wind resistance pot bearing is connected with the push plate (27) of shear (2) by bolt.
A kind of bridge stopping means the most according to claim 1, it is characterised in that: the pin-and-hole on described shearing pin plate (26) and cover plate (25) is 1~3, and the shear pin (24) being arranged on accordingly in pin-and-hole is 1~3.
A kind of bridge stopping means the most according to claim 1 and 2, it is characterised in that: limited block (29) is installed on the base plate below described push plate.
A kind of bridge stopping means the most according to claim 3, it is characterized in that: between upper steel plate (12) and the lower steel plate (11) of described wind resistance pot bearing (1), be provided with the sliding friction pair being made up of tetrafluoro slide plate (13) and corrosion resistant plate (14), described corrosion resistant plate is welded on upper steel plate (12), and described tetrafluoro slide plate is embedded on lower steel plate (11).
CN201620079515.XU 2015-11-02 2016-01-27 Bridge stop device Withdrawn - After Issue CN205529849U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201520862895X 2015-11-02
CN201520862895 2015-11-02

Publications (1)

Publication Number Publication Date
CN205529849U true CN205529849U (en) 2016-08-31

Family

ID=55823911

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201610054810.4A Active CN105544379B (en) 2015-11-02 2016-01-27 Bridge limiting device
CN201620079515.XU Withdrawn - After Issue CN205529849U (en) 2015-11-02 2016-01-27 Bridge stop device

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201610054810.4A Active CN105544379B (en) 2015-11-02 2016-01-27 Bridge limiting device

Country Status (1)

Country Link
CN (2) CN105544379B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544379A (en) * 2015-11-02 2016-05-04 柳州东方工程橡胶制品有限公司 Bridge limiting device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067184A (en) * 2019-05-14 2019-07-30 华南理工大学 A kind of pin device constraining curved beam bridges horizontal displacement

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3921240A (en) * 1971-04-27 1975-11-25 Elastometal Ltd Structural bearings
CN2844211Y (en) * 2005-12-21 2006-12-06 中国路桥(集团)新津筑路机械厂 Elastic windproofing bridge stand
JP2008025180A (en) * 2006-07-20 2008-02-07 Nitta Ind Corp Horizontal support device
CN202626828U (en) * 2012-06-19 2012-12-26 衡水中铁建工程橡胶有限责任公司 Shock absorption and isolation support device
CN202787058U (en) * 2012-07-19 2013-03-13 武汉臣基工程科技有限公司 Wind-resistant seismic isolation rubber bearing
CN204252000U (en) * 2014-10-31 2015-04-08 上海市政工程设计研究总院(集团)有限公司 A kind of large across single pylon cable stayed bridge longitudinal restraint structure
CN104878686B (en) * 2015-06-04 2016-08-17 北京市市政工程研究院 Prevent the construction method of Curved Beam Bridge horizontal comparison device
CN105544379B (en) * 2015-11-02 2017-04-26 柳州东方工程橡胶制品有限公司 Bridge limiting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105544379A (en) * 2015-11-02 2016-05-04 柳州东方工程橡胶制品有限公司 Bridge limiting device

Also Published As

Publication number Publication date
CN105544379A (en) 2016-05-04
CN105544379B (en) 2017-04-26

Similar Documents

Publication Publication Date Title
CN106368115A (en) Novel shock insulation system suitable for medium and small-span beam bridges
KR100948359B1 (en) The bridge upper structure lifting method for which bridge upper structure lifter which does the bridge shue function and this were used
CN108612188A (en) a kind of assembled self-resetting prestressed concrete frame
KR101415908B1 (en) Incremental Launching Method for the Prestressed Composite Truss Girder
CN205529849U (en) Bridge stop device
CN104652253A (en) Buffer energy-consuming anti-drop-beam device for bridge
CN204000587U (en) New city viaduct Horizontal Seismic system
CN104846736A (en) Steel damping limiting unidirectional moving pot type rubber support seat
CN204530438U (en) A kind of bridge buffering energy-consumption anti-fall girder apparatus
KR101404818B1 (en) superstructure raise device of the bridge
CN108867352B (en) Expansion joint covering device for municipal bridge
KR100722220B1 (en) Bridge of pot beraing for aseismativ strengthened device
CN104499422B (en) A kind of friction energy-dissipating anti-fall girder apparatus
CN205242245U (en) Take plate rubber support of anti horizontal force device
CN203766764U (en) Subway platform reinforcing device
CN110005088A (en) A kind of civil engineering slide type multiple dimension shock-proof device
CN210066473U (en) Bridge seismic isolation and reduction system
KR100773715B1 (en) A spherical type bearing for bridge
CN210031352U (en) Supporting device
CN202787064U (en) Fast-assembled bridge expansion device
CN208702441U (en) A kind of gob side entry retaining Extendible spacing gear cash column
CN103422429B (en) Bridge pier separate type subtracts the construction method of shock insulation support system
CN107338722B (en) Assembled beam falling prevention structure, beam falling prevention device and bridge
CN106638650B (en) Fabricated concrete foundation structure
CN111851153A (en) Supporting device and using method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160831

Effective date of abandoning: 20170426

AV01 Patent right actively abandoned

Granted publication date: 20160831

Effective date of abandoning: 20170426

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned