CN205526555U - Machine is switched to bulk cargo flow under space is limited - Google Patents

Machine is switched to bulk cargo flow under space is limited Download PDF

Info

Publication number
CN205526555U
CN205526555U CN201620214806.5U CN201620214806U CN205526555U CN 205526555 U CN205526555 U CN 205526555U CN 201620214806 U CN201620214806 U CN 201620214806U CN 205526555 U CN205526555 U CN 205526555U
Authority
CN
China
Prior art keywords
belt feeder
steel construction
downstream
guide rail
bulk cargo
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620214806.5U
Other languages
Chinese (zh)
Inventor
林星铭
杨振凯
谢磊
余政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Harbor Consultants
Original Assignee
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Harbor Consultants filed Critical CCCC Third Harbor Consultants
Priority to CN201620214806.5U priority Critical patent/CN205526555U/en
Application granted granted Critical
Publication of CN205526555U publication Critical patent/CN205526555U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

The utility model discloses a machine is switched to bulk cargo flow under space is limited comprises scraper conveyor, elephant trunk, steel construction frame, running gear and steel construction guide rail. Scraper conveyor installs in steel construction frame top. The elephant trunk is installed in scraper conveyor's side, and fixes in the steel construction frame. Running gear is being supported to steel construction frame below, and running gear installs on the steel construction guide rail, can walk along the steel construction guide rail. The steel construction guide rail is installed subaerial. Scraper conveyor, elephant trunk and steel construction frame constitute an unit, and this unit passes through the running gear traction and walk on the steel construction guide rail. The upper reaches belt feeder that needs to switch the flow is fixed subaerial, and low reaches belt feeder, low reaches two -way belt feeder are all the way fixed subaerial. The utility model discloses a machine is switched to the bulk cargo flow, can be applied to the limited operation occasion in space, has very good economic nature and practicality.

Description

A kind of bulk cargo flow process switching machine under limited space
Technical field
This utility model relates to bulk cargo flow process switching field, particularly to the bulk cargo flow process switching machine under a kind of limited space.
Background technology
The major way of harbour bulk cargo (mainly including coal and iron ore) flow process switching at present has threeway branching device for multi and mobile belt machine etc., use threeway branching device for multi to have equipment and constitute the features such as simple, maintaining is easy, but space requirement is the highest, general floor height needs up to 7 ~ 8m.Use mobile belt facility to have and can realize, more than 2 switchings, being made up of parts such as cylinder, carrying roller, frames, there is the features such as highly versatile, maintaining are easy, while it is desirable to floor height is lower than threeway branching device for multi, but at least floor height also wants 4.5 ~ 5.5m.
Bulk cargo movement system need to be transformed by some harbour at present, limited space, floor height only below 4m in the case of a lot, is limited by this space, uses threeway branching device for multi and mobile belt machine all cannot meet arrangement requirement, and due to limited space, threeway branching device for multi cannot lay out sufficiently long range, even if using mobile belt machine, the bulk cargo of upstream belt feeder will directly rush at mobile belt machine, make the easy sideslip of mobile belt machine, abrasion big, reduce the service life of mobile belt machine.
For meeting bulk cargo flow process switched arrangement requirement under the conditions of limited space, improve the service life of switching equipment, a kind of novel bulk cargo flow process switching machine need to be used.
Summary of the invention
The purpose of this utility model, is the bulk cargo flow process switching machine developing under a kind of limited space so that use this arrangement under limited space, bulk cargo flow process not only can be made to be switched smoothly, also improve the service life of switching equipment.
The technical solution of the utility model is as follows:
Bulk cargo flow process switching machine under a kind of limited space is made up of scraper conveyor, elephant trunk, steel structure frame, walking mechanism and steel construction guide rail, it is characterised in that: described scraper conveyor is arranged on above steel structure frame;Elephant trunk is arranged on the side of scraper conveyor, and is fixed in steel structure frame;Being provided with walking mechanism below steel structure frame, walking mechanism is connected on steel construction guide rail, can walk along steel construction guide rail; Steel construction guide rails assembling is on the ground;Scraper conveyor, elephant trunk and steel structure frame constitute a unit, and this unit is walked on steel construction guide rail by the drive of walking mechanism; The upstream belt feeder needing switching flow is fixed on plate face, and downstream one road belt feeder, downstream two road belt feeder fix on the ground, and downstream one road belt feeder and downstream two road belt feeder are parallel to each other;Steel structure frame is positioned at downstream one road belt feeder and the side of downstream two road belt feeder, and upstream belt feeder is positioned at the top of elephant trunk;Thus facility is arranged in the conveying constituting solid.
It is preferred that the floor height distance between fixing plate face to the downstream one road belt feeder of described upstream belt feeder and the fixing ground of downstream two road belt feeder can ensure that the bulk cargo flow process switching requirement under limited space at 3.5 ~ 4m.
Bulk cargo flow process switching machine of the present utility model, during operation, scraper conveyor is moved by walking mechanism, travel to making scraper conveyor corresponding with upstream belt feeder, then the bulk cargo of upstream belt feeder can switch to downstream one tunnel trip belt feeder by scraper conveyor, owing to using scraper conveyor, bulk cargo directly impacts and does not results in sideslip.During switching flow, steel structure frame is moved by walking mechanism, travels to making elephant trunk corresponding with upstream belt feeder, and then the bulk cargo of upstream belt feeder switches to downstream two road belt feeder by elephant trunk, it is achieved thereby that flow process switching.
Beneficial effect: this utility model can be applicable to the different areas of activity of limited space, has extraordinary economy and practicality.
Accompanying drawing explanation
Fig. 1 is the floor map of the bulk cargo flow process switching machine under a kind of limited space of this utility model.
A-A shown in Fig. 2 is the sectional schematic diagram of bulk cargo flow process switching machine.
B-B shown in Fig. 3 is the sectional schematic diagram 1 that upstream belt feeder switches to downstream belt feeder.
C-C shown in Fig. 4 is the sectional schematic diagram 2 that upstream belt feeder switches to downstream belt feeder.
Detailed description of the invention
Seeing Fig. 1, Fig. 2, Fig. 3 and Fig. 4, bulk cargo flow process switching machine is made up of scraper conveyor 1, elephant trunk 5, steel structure frame 2, walking mechanism 3 and steel construction guide rail 1.Scraper conveyor 1 is arranged on above steel structure frame 2.Elephant trunk 5 is arranged on the side of scraper conveyor 1, and is fixed in steel structure frame 2.Steel structure frame 2 supported underneath walking mechanism 3, and walking mechanism 3 is arranged on steel construction guide rail 2, can walk along steel construction guide rail 2.Steel construction guide rail 2 is arranged on ground 4.Scraper conveyor 1, elephant trunk 5 and steel structure frame 2 constitute a unit, by walking mechanism 3 traction and walk on steel construction guide rail 2.
The upstream belt feeder 7 needing switching flow is fixed on plate face 8, downstream one road belt feeder 6, downstream two road belt feeder 9 are fixed on ground 4, this reality new arrangement is region between plate face 8 and ground 4, being positioned at a road belt feeder 6 below or downstream of upstream belt feeder 7, the top of downstream two road belt feeder 9, bulk cargo can be switched to downstream one road belt feeder 6 or downstream two road belt feeder 9 by this utility model by upstream belt feeder 7.
See Fig. 3, scraper conveyor 1 is moved by walking mechanism 3, travel to making scraper conveyor 1 and upstream belt feeder 7 corresponding, then the bulk cargo of upstream belt feeder 7 can switch to downstream one tunnel trip belt feeder 6 by scraper conveyor 1, owing to using scraper conveyor 1, bulk cargo directly impacts and does not results in sideslip.
Seeing Fig. 4, during switching flow, steel structure frame 10 is moved by walking mechanism 3, travels to making elephant trunk 5 corresponding with upstream belt feeder 7, and then the bulk cargo of upstream belt feeder 7 switches to downstream two road belt feeder 9 by elephant trunk 5, it is achieved thereby that flow process switching.
Using this flow process switching machine, the floor height distance between the fixing ground 4 of 8 to downstream, plate face belt feeder 6 and 7 that upstream belt feeder 7 is fixing can ensure that the bulk cargo flow process switching requirement under limited space at 3.5 ~ 4m.

Claims (2)

1. the bulk cargo flow process switching machine under a limited space is made up of scraper conveyor, elephant trunk, steel structure frame, walking mechanism and steel construction guide rail, it is characterised in that: described scraper conveyor is arranged on above steel structure frame; Elephant trunk is arranged on the side of scraper conveyor, and is fixed in steel structure frame;Being provided with walking mechanism below steel structure frame, walking mechanism is connected on steel construction guide rail, can walk along steel construction guide rail; Steel construction guide rails assembling is on the ground;Scraper conveyor, elephant trunk and steel structure frame constitute a unit, and this unit is walked on steel construction guide rail by the drive of walking mechanism; The upstream belt feeder needing switching flow is fixed on plate face, and downstream one road belt feeder, downstream two road belt feeder fix on the ground, and downstream one road belt feeder and downstream two road belt feeder are parallel to each other;Steel structure frame is positioned at downstream one road belt feeder and the side of downstream two road belt feeder, and upstream belt feeder is positioned at the top of elephant trunk.
Bulk cargo flow process switching machine under a kind of limited space the most as claimed in claim 1, it is characterized in that: the floor height distance between plate face to downstream one road belt feeder that described upstream belt feeder is fixing and the fixing ground of downstream two road belt feeder can ensure that the bulk cargo flow process switching requirement under limited space at 3.5 ~ 4m.
CN201620214806.5U 2016-03-21 2016-03-21 Machine is switched to bulk cargo flow under space is limited Withdrawn - After Issue CN205526555U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620214806.5U CN205526555U (en) 2016-03-21 2016-03-21 Machine is switched to bulk cargo flow under space is limited

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620214806.5U CN205526555U (en) 2016-03-21 2016-03-21 Machine is switched to bulk cargo flow under space is limited

Publications (1)

Publication Number Publication Date
CN205526555U true CN205526555U (en) 2016-08-31

Family

ID=56783207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620214806.5U Withdrawn - After Issue CN205526555U (en) 2016-03-21 2016-03-21 Machine is switched to bulk cargo flow under space is limited

Country Status (1)

Country Link
CN (1) CN205526555U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105731043A (en) * 2016-03-21 2016-07-06 中交第三航务工程勘察设计院有限公司 Bulk cargo process switching machine in limited space

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105731043A (en) * 2016-03-21 2016-07-06 中交第三航务工程勘察设计院有限公司 Bulk cargo process switching machine in limited space
CN105731043B (en) * 2016-03-21 2018-10-16 中交第三航务工程勘察设计院有限公司 A kind of bulk cargo flow switching machine under limited space

Similar Documents

Publication Publication Date Title
CN203332932U (en) Mobile material separating device used for material transferring
CN109098138A (en) Hopper collection sand formula railroad track removes sand vehicle
CN201496096U (en) Shield method construction lateral edge box culvert loop wheel machine
CN200974948Y (en) Longitudinal-moving platform car for railroad switch laying
CN205526555U (en) Machine is switched to bulk cargo flow under space is limited
CN109018829A (en) Cable pipe band structure for conveying and conveyer
CN209142964U (en) Tubular type track belt conveyor
CN205380048U (en) Three -layer screening plant
CN104264549B (en) Track quick track switching operating Operation Van and operational method thereof
CN105731043A (en) Bulk cargo process switching machine in limited space
CN204355738U (en) Based on the efficient gangue part flow arrangement of Adjustable Belt-conveyer
CN103213816A (en) Railway vehicle bogie midair crossing transport finger car
CN207276051U (en) Gantry crane transverse translation flat car
CN209523753U (en) The purlin vehicle of mating trolley translation after a kind of shield machine
CN204097810U (en) A kind of track quick track switching operating working vehicle
CN203962034U (en) A kind of rock gangway is reprinted belt conveyor by portable buffering
CN202642641U (en) Lifting type belt conveyor
CN208932236U (en) Cable pipe band structure for conveying and conveyer
CN208932360U (en) Cable belt conveying structure and conveyer
CN205295940U (en) Light -duty truss -like bridge wholeization layer full width construction equipment
CN202417529U (en) Side through synchronous lining trolley used for construction of continuous transport machine for tunnel
CN203613442U (en) Bituminous mixture paver
CN215580296U (en) Cable towing device for cloth rail car
CN204264874U (en) A kind of pellet grate blanking ramp
CN205437821U (en) Lateral movement device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160831

Effective date of abandoning: 20181016