CN205502655U - Stability of basis when wasing train is improved integrated configuration body - Google Patents

Stability of basis when wasing train is improved integrated configuration body Download PDF

Info

Publication number
CN205502655U
CN205502655U CN201620203457.7U CN201620203457U CN205502655U CN 205502655 U CN205502655 U CN 205502655U CN 201620203457 U CN201620203457 U CN 201620203457U CN 205502655 U CN205502655 U CN 205502655U
Authority
CN
China
Prior art keywords
horizontal girder
steel
girder steel
train
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620203457.7U
Other languages
Chinese (zh)
Inventor
聂勇
童鹏程
刘坤
陈小文
高媛
刘奎
王玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of CTCE Group
Original Assignee
Construction Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of CTCE Group filed Critical Construction Engineering Co Ltd of CTCE Group
Priority to CN201620203457.7U priority Critical patent/CN205502655U/en
Application granted granted Critical
Publication of CN205502655U publication Critical patent/CN205502655U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Firm, the perishable problem of ground during to current washing train, the utility model provides a stability of basis when wasing train is improved integrated configuration body. Stability makes up, including left concrete colonnade, right concrete colonnade and rail, left horizontal girder steel group, right horizontal girder steel group, a left side horizontal girder steel group, right horizontal girder steel component do not comprise end to end's horizontal girder steel, be equipped with left horizontal girder steel group at the top of left concrete colonnade, the top of organizing at the horizontal girder steel in a left side is equipped with a rail, be equipped with right horizontal girder steel group at the top of right concrete colonnade, be equipped with 1 rail of another root at the top that the horizontal girder steel in the right side was organized, profitable technological effect: the utility model discloses the simple safety of stable in structure, easy to maintain, convenient to use has improved the abluent efficiency of train simultaneously, reduces safe risk scheduling problem.

Description

Improve the combinative structure body of stability of foundation when cleaning train
Technical field
This utility model belongs to railroad maintenance equipment technology field, is specifically related to improve basis when cleaning train steady Combinative structure body qualitatively.
Background technology
Along with the fast development of urban track traffic, a large amount of trains need periodically to carry out maintenance washes.To row During the cleaning maintenance of car, train stand should facilitate operation and the cleaning of staff, train simultaneously The structure of stand should be simple, firm, it is simple to installs, change.
Current common method is: uses armored concrete prefabricated crossbeam to be arranged on concrete column, then exists The rail of train driving is installed on cement beam, or crossbeam directly installation train row on concrete column is not installed The rail sailed, its defect mainly has the most several aspect:
1, armored concrete prefabricated crossbeam is the most affected by environment, is easily caused steel bar corrosion, coagulation Folk song, come off, add the maintenance cost of concrete beam, reduce service life.
2, the structural instability of concrete beam, is easily generated overturning, derailing etc. during the sailing into of train Security hidden trouble.
When 3, being mounted directly rail on concrete column, because of the flexible reason of rail, train is sailing into Time, for guaranteeing safety, the travel speed of train can be made to reduce, affect the efficiency that train cleans.
Utility model content
This utility model mainly solves in parking device when track train cleans, safety between rail and column It is reliably connected, improves train and clean stability and the efficiency of train cleaning of parking device, reduce security risk Etc. problem.
Improve the combinative structure body of stability of foundation when cleaning train, including left concrete colonnade, right concrete column Row and rail 10.Left concrete colonnade is parallel to each other with right concrete colonnade.Left concrete colonnade, right coagulation Earth pillar arranges and is formed by concrete column 9.In addition: be provided with left horizontal girder steel group, right horizontal girder steel group.Left horizontal girder steel group, Right horizontal girder steel group is made up of end to end horizontal girder steel 5 respectively.It is provided with left horizontal steel at the top of left concrete colonnade Beam group, is provided with a rail 10 at the top of left horizontal girder steel group.It is provided with right horizontal stroke at the top of right concrete colonnade Girder steel group, is provided with 1 rail 10 of another root at the top of right horizontal girder steel group.
This utility model advantage compared with prior art
This utility model Stability Analysis of Structures is simple and safe, be easily maintained, easy to use, improves train simultaneously and cleans Efficiency, reduce the problem such as security risk.
1, the Stability Analysis of Structures of gooseneck, is not likely to produce the safety such as overturning, derailing the most hidden during the sailing into of train Suffer from problem.
2, train before cleaning after speed can sail into or roll away from the most faster, reduce train the turnover time, Improve train cleaning efficiency.
3, surface was entered antiseptic gooseneck and was had good stability and durability, can with life-time service, It is not required to frequent maintaining, can be cost-effective.
Accompanying drawing explanation
Fig. 1 is schematic perspective view of the present utility model.
Fig. 2 is the solid linked together by adjacent horizontal girder steel 5 by billet 6 and connecting bolt 7 in Fig. 1 Schematic diagram.
Fig. 3 is the schematic perspective view of horizontal girder steel 5 in Fig. 2.
Fig. 4 is the schematic perspective view of single I-steel in Fig. 2.
Fig. 5 is the schematic perspective view of billet 6 in Fig. 2.
Fig. 6 is the schematic perspective view of connecting bolt 7 in Fig. 2.
Detailed description of the invention
See Fig. 1, improve the combinative structure body of stability of foundation when cleaning train, including left concrete colonnade, Right concrete colonnade and rail 10.Left concrete colonnade is parallel to each other with right concrete colonnade.Left concrete column Row, right concrete colonnade are formed by concrete column 9.In addition: be provided with left horizontal girder steel group, right horizontal girder steel group. Left horizontal girder steel group, right horizontal girder steel group are made up of end to end horizontal girder steel 5 respectively.Top in left concrete colonnade Portion is provided with left horizontal girder steel group, is provided with a rail 10 at the top of left horizontal girder steel group.In right concrete colonnade Top is provided with right horizontal girder steel group, is provided with 1 rail 10 of another root at the top of right horizontal girder steel group.
Seeing Fig. 1,2 and 3, furtherly, horizontal girder steel 5 is made up of 2 I-steel.2 I-steel are mutual Linking together of level, the cross section of the most horizontal girder steel 5 is in " II " shape.
See Fig. 1 and 2, furtherly, at adjacent horizontal girder steel 5, be provided with billet 6, by connecting spiral shell Billet 6 is fixed together by bolt 7 respectively with adjacent horizontal girder steel 5, thus realizes the head of horizontal girder steel 5 WEILIAN connects.
See Fig. 1, furtherly, be provided with fastener 2 at the top of horizontal girder steel 5, by fastener 2 by rail 10 It is fixed on the top of horizontal girder steel 5.
Seeing Fig. 1,2 and 3, furtherly, horizontal girder steel 5 is made up of 2 I-steel, and 2 I-steel are successively It is referred to as left I-steel and right I-steel.
Left I-steel and right I-steel the most flatly arrange.
The fixing connection in the long limit, right side of left I-steel and the long limit, left side of right I-steel.
Left side edge and the right side edge at right I-steel top at left I-steel top are evenly equipped with top bolt Hole 3.Fastener 2 it is furnished with in top bolt holes 3.The i.e. top at horizontal girder steel 5 is provided with 2 row fasteners 2.? Rail 10 it is fixed with between fastener 2.
End bottom left I-steel, left side edge has bottom bolts hole 4, and is furnished with connecting bolt 7. End bottom right I-steel, right side edge all has bottom bolts hole 4, and is furnished with connecting bolt 7. I.e. being respectively arranged at two ends with two and be provided with 2 connecting bolts 7 of length direction of horizontal girder steel 5.Pass through billet The connecting bolt 7 of 2 adjacent horizontal girder steel 5 ends is linked together by 6.
Furtherly, left I-steel, the height of right I-steel are 200mm, and length is 1.5m, and width is equal For 100mm.
The internal diameter of top bolt holes 3 is 15mm.
The internal diameter in bottom bolts hole 4 is 25mm.
The long 20cm of billet 6, wide 8cm, thick 1cm.
See Fig. 5, furtherly, billet 6 has two billet bolts hole 8.Described billet Bolt hole 8 is in order to be connected with connecting bolt 7, and the internal diameter of billet bolt hole 8 is 25mm.
Seeing Fig. 6, furtherly, connecting bolt 7 is the bolt of attaching the names of pre-determined candidates of diameter 25mm.
See Fig. 1 to 6, furtherly, stability of foundation when train is cleaned in raising described in the utility model The manufacture method of combinative structure body, is carried out as follows:
Step 1: use cutting machine to cut the I-steel of 2 segment length L=1.5m.
The top bolt holes 3 of internal diameter D1=15mm is drilled respectively in the side of the upper end of every section of I-steel.Often The section bottom of I-steel and the two ends of top bolt holes 3 homonymy, I-steel drill internal diameter D2=25mm respectively Bottom bolts hole 4.
Step 2: the side that two I-steel are not holed is welded to one another into horizontal girder steel 5.
Step 3: use cutting machine to make the billet 6 of long A=20cm, wide B=8cm, thickness H=1cm.? The billet bolt hole 8 of two internal diameter D3=25mm is drilled on billet 6.
Step 4: choose the connecting bolt 7 of diameter D4=25mm.By billet 6 and connecting bolt 7 by phase Adjacent horizontal girder steel 5 couples together.Obtain 2 in this way and arrange the horizontal girder steel 5 that joins end to end, be called left horizontal girder steel Group, right horizontal girder steel group.
Step 5: left horizontal girder steel group, right horizontal girder steel group are separately mounted on 1 group of vertical concrete column 9, A rail 10 is put respectively in left horizontal girder steel group, right horizontal girder steel group.And by being assemblied in top bolt holes 3 Fastener 2 rail 10 is fixed in left horizontal girder steel group or the right horizontal girder steel group of correspondence, thus it is clear to obtain raising The combinative structure body of stability of foundation when washing train.

Claims (10)

1. improve the combinative structure body of stability of foundation when cleaning train, including left concrete colonnade, right concrete colonnade and rail (10);Left concrete colonnade is parallel to each other with right concrete colonnade;Left concrete colonnade, right concrete colonnade are formed by concrete column (9);It is characterized in that: be provided with left horizontal girder steel group, right horizontal girder steel group;Left horizontal girder steel group, right horizontal girder steel group are made up of end to end horizontal girder steel (5) respectively;It is provided with left horizontal girder steel group at the top of left concrete colonnade, is provided with a rail (10) at the top of left horizontal girder steel group;It is provided with right horizontal girder steel group at the top of right concrete colonnade, is provided with 1 rail (10) of another root at the top of right horizontal girder steel group.
2. the combinative structure body of stability of foundation when train is cleaned in raising as claimed in claim 1, it is characterised in that: horizontal girder steel (5) is made up of 2 I-steel;Linking together of 2 mutual levels of I-steel, the cross section of the most horizontal girder steel (5) is in " II " shape.
3. the combinative structure body of stability of foundation when train is cleaned in raising as claimed in claim 1, it is characterized in that: be provided with billet (6) at adjacent horizontal girder steel (5) place, by connecting bolt (7), billet (6) is fixed together with adjacent horizontal girder steel (5) respectively, thus the head and the tail realizing horizontal girder steel (5) connect.
4. the combinative structure body of stability of foundation when improving cleaning train as described in claim 1,2 or 3, it is characterized in that: be provided with fastener (2) at the top of horizontal girder steel (5), by fastener (2), rail (10) is fixed on the top of horizontal girder steel (5).
5. the combinative structure body of stability of foundation when train is cleaned in raising as claimed in claim 4, it is characterised in that: horizontal girder steel (5) is made up of 2 I-steel, and 2 I-steel are referred to as left I-steel and right I-steel successively;Left I-steel and right I-steel the most flatly arrange;The fixing connection in the long limit, right side of left I-steel and the long limit, left side of right I-steel;
Left side edge and the right side edge at right I-steel top at left I-steel top are evenly equipped with top bolt holes (3);Fastener (2) it is furnished with in top bolt holes (3);The i.e. top at horizontal girder steel (5) is provided with 2 row fasteners (2);Rail (10) it is fixed with between fastener (2);
End bottom left I-steel, left side edge has bottom bolts hole (4), and is furnished with connecting bolt (7);End bottom right I-steel, right side edge all has bottom bolts hole (4), and is furnished with connecting bolt (7);I.e. being respectively arranged at two ends with two and be provided with 2 connecting bolts (7) of length direction of horizontal girder steel (5);By billet (6), the connecting bolt (7) of 2 adjacent horizontal girder steel (5) ends is linked together.
6. the combinative structure body of stability of foundation when train is cleaned in raising as claimed in claim 5, it is characterised in that: left I-steel, the height of right I-steel are 200mm, and length is 1.5m, and width is 100mm;The internal diameter of top bolt holes (3) is 15mm;The internal diameter in bottom bolts hole (4) is 25mm;Billet (6) long 20cm, wide 8cm, thick 1cm.
7. the combinative structure body of stability of foundation when train is cleaned in raising as claimed in claim 6, it is characterised in that: left I-steel, the height of right I-steel are 200mm, and length is 1.5m, and width is 100mm.
8. the combinative structure body of stability of foundation when train is cleaned in raising as claimed in claim 7, it is characterised in that: the internal diameter of top bolt holes (3) is 15mm.
9. the combinative structure body of stability of foundation when train is cleaned in raising as claimed in claim 8, it is characterised in that: the internal diameter of bottom bolts hole (4) is 25mm.
10. the combinative structure body of stability of foundation when train is cleaned in raising as claimed in claim 9, it is characterised in that: on billet (6), have two billet bolts hole (8);Described billet bolt hole (8) is in order to be connected with connecting bolt (7), and the internal diameter of billet bolt hole (8) is 25mm.
CN201620203457.7U 2016-03-15 2016-03-15 Stability of basis when wasing train is improved integrated configuration body Expired - Fee Related CN205502655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620203457.7U CN205502655U (en) 2016-03-15 2016-03-15 Stability of basis when wasing train is improved integrated configuration body

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620203457.7U CN205502655U (en) 2016-03-15 2016-03-15 Stability of basis when wasing train is improved integrated configuration body

Publications (1)

Publication Number Publication Date
CN205502655U true CN205502655U (en) 2016-08-24

Family

ID=56728779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620203457.7U Expired - Fee Related CN205502655U (en) 2016-03-15 2016-03-15 Stability of basis when wasing train is improved integrated configuration body

Country Status (1)

Country Link
CN (1) CN205502655U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804449A (en) * 2016-03-15 2016-07-27 中铁四局集团建筑工程有限公司 Stability component for train cleaning and manufacturing method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804449A (en) * 2016-03-15 2016-07-27 中铁四局集团建筑工程有限公司 Stability component for train cleaning and manufacturing method thereof
CN105804449B (en) * 2016-03-15 2018-01-19 中铁四局集团建筑工程有限公司 Stability component when being cleaned for train and preparation method thereof

Similar Documents

Publication Publication Date Title
CN204282192U (en) A kind of double deck steel truss girder
CN102182332B (en) Seam type intercepting drain system on ground in front of garage door with track
CN201635019U (en) Detection mechanism for steel box girder bridge
CN103590316B (en) Public iron layering steel box-girder
CN109930435A (en) Straddle-type monorail PC track beam construction method in a kind of circular cross section tunnel
CN205502655U (en) Stability of basis when wasing train is improved integrated configuration body
CN208235233U (en) A kind of railway reinforced device
CN103132463B (en) Movable hanger operating platform and manufacturing, installing, using and removing methods thereof
CN105804449B (en) Stability component when being cleaned for train and preparation method thereof
CN203485929U (en) Barrier removing device of high-speed railway vehicle
CN107974951A (en) A kind of light-duty trackless Hanging Basket of bridge
CN205329518U (en) Embrace rail formula metro bridge system
CN201891075U (en) Amplitude modulation type bridge maintenance car with two foldable ends
CN204775244U (en) Side wall of box wagon
CN201152176Y (en) Existed electrified railroad tunnel lengthened section structure
CN207510385U (en) Construction site engineering vehicle self-stripping system
CN206289524U (en) The lift pillow device of track at a kind of beam seam
CN207405419U (en) A kind of novel truss track for empty iron
CN208266658U (en) Extended position truss-rigid-framed structure road and bridge
CN203425666U (en) Progressive scrap iron filtering device
CN204998529U (en) Special flatcar automobile body is maintained to railway contact net
CN200952101Y (en) Full-bainitic steel forge welding frog
CN210766210U (en) Double-line prestressed concrete track beam structure of suspension type monorail transit system
CN100506679C (en) Multifunctional car body transport equipment
CN207672429U (en) A kind of cast-in-place guardrail activity tool car of highway bridge

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20210315

CF01 Termination of patent right due to non-payment of annual fee