- CN205502055U CN205502055U CN201620258564.XU CN201620258564U CN205502055U CN 205502055 U CN205502055 U CN 205502055U CN 201620258564 U CN201620258564 U CN 201620258564U CN 205502055 U CN205502055 U CN 205502055U
- Authority
- CN
- China
- Prior art keywords
- location
- plate
- angle steel
- angle
- plates
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a buried bolt structure in advance for tower crane foundation location, it is including four locating plates that are located the four corners respectively, the locating plate is square plate, is square plate's thickness 1cm 1.2cm, edge's welding of locating plate has the angle clip, connect through a root length angle steel between two adjacent locating plates, four locating plates are connected through four root length angle steel and are enclosed and synthesize a square frame frame, four locating plates are located the four corners of square frame frame respectively, the tip of long angle steel passes through the screw rod and is connected with the marginal angle clip of locating plate, it is equipped with an angle stiffener to be located between two locating plates on the square frame frame diagonal. Utilizing the thick locating plate of four 1cm and five angle steel to enclose and closing a constitution frame construction, the equipment is convenient, has effectively solved the orientation problem of tower crane foundation pre -cast screw at pre -buried in -process, and component manufacturing is with low costs to can use repeatedly, use the location steel sheet that 1cm is thick, and all have the lug on every locating plate.
Description
Technical field
This utility model relates to the technical field of construction, a kind of pre-buried for tower crane location
Bolt arrangement, particularly to its mechanical connecting structure.
Background technology
Tower crane foundation pre embedded bolt can run into pre-buried inconvenience during pre-buried and position inaccurate problem,
General employing fastener inserts realizes precise positioning, and existing fastener inserts structure exists problems, as bulk strength is enough
No, packaging technology is complicated, and construction cost is higher, and fastener inserts removes the problems such as difficulty is big.
Summary of the invention
The purpose of this utility model is to provide a kind of pre-embedded bolt structure for tower crane location, efficiently solves
Tower crane foundation pre embedded bolt orientation problem during pre-buried, this positioning component is simple and practical, and it is convenient to assemble,
It is convenient to dismantle, low cost, can Reusability, overcome shortcoming and defect present in prior art.
To achieve these goals: the technical solution of the utility model is: a kind of pre-buried spiral shell for tower crane location
Stud structure, it is characterised in that: it includes the four pieces of location-plates laying respectively at corner, and location-plate is square plate, square plate
Thickness is 1cm-1.2cm, and the edge of location-plate is welded with angle clip, by a root length angle steel between two pieces of adjacent location-plates
Connecting, four pieces of location-plates by four root length Bolted angle connection and enclose a square frame, and four pieces of location-plates just lay respectively at
The corner of quadra, the end of long angle steel is connected with the angle clip at location-plate edge by screw rod, is positioned at square frame pair
Being provided with one between two pieces of location-plates on linea angulata and strengthen angle steel, half section of above-mentioned angle clip is weldingly fixed on location-plate edge
Place, another half section of angle clip protrudes from outside location-plate in hanging shape, and described location-plate respectively offers a hole, location at corner,
Location-plate is respectively provided with a hanger at foursquare two drift angles, and this hanger uses the bar bending of 6mm-8mm to become semicircle
Ring-type.
The utility model discloses a kind of pre-embedded bolt structure for tower crane location, utilize thick the determining of four pieces of 1cm
Position plate and five angle steel enclose composition one frame structure, easy to assembly, efficiently solve tower crane foundation pre embedded bolt and exist
Orientation problem during pre-buried, establishment of component low cost, and can Reusability, use fixing steel plate thick for 1cm, using
Journey is not easy to deformation, and on every piece of location-plate, has hanger, workman easily to remove, be effectively improved assembly bulk strength,
Stability, convenience.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Fig. 2 is shackle structure schematic diagram.
Wherein:
1, location-plate;
2, angle clip;
3, long angle steel;
4, screw rod;
5, angle steel is strengthened;
6, hole, location;
7, hanger.
Detailed description of the invention
With reference to the accompanying drawings, this utility model is further described below.
The utility model discloses a kind of pre-embedded bolt structure for tower crane location, it is different from prior art and exists
In: it includes the four pieces of location-plates 1 laying respectively at corner, and location-plate 1 is square plate, and the thickness of square plate is 1cm-
1.2cm, the edge of location-plate 1 is welded with angle clip 2, is connected by a root length angle steel 3 between two pieces of adjacent location-plates 1,
Four pieces of location-plates 1 connect and enclose a square frame by four root length angle steel 3, and four pieces of location-plates 1 lay respectively at pros
The corner of shape framework, the end of long angle steel 3 is connected with the angle clip 2 at location-plate 1 edge by screw rod 4, is positioned at square frame
Being provided with one between two pieces of location-plates 1 on diagonal and strengthen angle steel 5, half section of above-mentioned angle clip 2 is weldingly fixed on location-plate 1
Edge, another half section of angle clip 2 protrudes from outside location-plate 1 in hanging shape, and described location-plate 1 respectively offers one at corner
Hole 6, location, location-plate 1 is respectively provided with a hanger 7 at foursquare two drift angles, and this hanger 7 uses the reinforcing bar of 6mm-8mm
Bend to semi-annular shape.
In the specific implementation, the end of described long angle steel 3 is connected by the angle clip 2 of two screw rods 4 with location-plate 1 edge
Connect.
Above content is to combine concrete preferred implementation further detailed description of the utility model, it is impossible to
Assert that this utility model is embodied as being confined to these explanations above-mentioned.Common skill for this utility model art
For art personnel, without departing from the concept of the premise utility, it is also possible to make some simple deduction or replace, all should
It is considered as belonging to protection domain of the present utility model.
Claims (2)
1. the pre-embedded bolt structure for tower crane location, it is characterised in that: it includes lay respectively at corner four pieces
Location-plate (1), location-plate (1) is square plate, and the thickness of square plate is 1cm-1.2cm, edge's welding of location-plate (1)
Having angle clip (2), connected by a root length angle steel (3) between two pieces of adjacent location-plates (1), four pieces of location-plates (1) are by four
Root length angle steel (3) connects and encloses a square frame, and four pieces of location-plates (1) lay respectively at the corner of square frame,
The end of long angle steel (3) is connected with the angle clip (2) at location-plate (1) edge by screw rod (4), is positioned at square frame diagonal
On two pieces of location-plates (1) between be provided with one strengthen angle steel (5), half section of above-mentioned angle clip (2) is weldingly fixed on location-plate
(1) edge, another half section of angle clip (2) protrudes from location-plate (1) outward in hanging shape, and described location-plate (1) is at corner
Respectively offering a hole, location (6), location-plate (1) is respectively provided with a hanger (7), this hanger at foursquare two drift angles
(7) bar bending of 6mm-8mm is used to become semi-annular shape.
A kind of pre-embedded bolt structure for tower crane location the most according to claim 1, it is characterised in that: described length
The end of angle steel (3) is connected with the angle clip (2) at location-plate (1) edge by two screw rods (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620258564.XU CN205502055U (en) | 2016-03-31 | 2016-03-31 | A buried bolt structure in advance for tower crane foundation location |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620258564.XU CN205502055U (en) | 2016-03-31 | 2016-03-31 | A buried bolt structure in advance for tower crane foundation location |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205502055U true CN205502055U (en) | 2016-08-24 |
Family
ID=56735601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620258564.XU Active CN205502055U (en) | 2016-03-31 | 2016-03-31 | A buried bolt structure in advance for tower crane foundation location |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205502055U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108118694A (en) * | 2018-01-31 | 2018-06-05 | 深圳市奇见科技有限公司 | The positioning fixture and its localization method of a kind of basic buried plate of vertical circulating garage |
CN108149866A (en) * | 2017-12-26 | 2018-06-12 | 中国十七冶集团有限公司 | PC stair cast-in-place node pre-cast bolt positioning devices and method |
-
2016
- 2016-03-31 CN CN201620258564.XU patent/CN205502055U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108149866A (en) * | 2017-12-26 | 2018-06-12 | 中国十七冶集团有限公司 | PC stair cast-in-place node pre-cast bolt positioning devices and method |
CN108118694A (en) * | 2018-01-31 | 2018-06-05 | 深圳市奇见科技有限公司 | The positioning fixture and its localization method of a kind of basic buried plate of vertical circulating garage |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204589793U (en) | A kind of bridge pad | |
CN205502055U (en) | A buried bolt structure in advance for tower crane foundation location | |
WO2016004887A1 (en) | Lightweight steel structure residential framework system | |
CN202969628U (en) | Hole reinforcing node for shear wall | |
CN205421715U (en) | Novel I -shaped carrier bar excels in | |
CN204590589U (en) | Precast facade level connection joint ater-casting steel template | |
CN203834906U (en) | Triangular operation platform used for capital construction slope face | |
CN205502054U (en) | A buried bolt subassembly in advance for tower crane foundation location | |
CN103407904A (en) | Hoop type wall-attached connection piece for tower crane and construction method thereof | |
CN203654717U (en) | Fastener structure, fastener and door-shaped reinforcing frame for round steel pipe | |
CN204001741U (en) | Clear-water concrete connects wall column formwork | |
CN207420026U (en) | Part bracing means is poured after a kind of superimposed sheet | |
CN202359816U (en) | Layering reinforcing and supporting device for on-situ concrete casting template | |
CN206360358U (en) | A kind of external corner connecting elements | |
CN203742083U (en) | Steel bar mechanical joint element for precast reinforced concrete member | |
CN205063338U (en) | Be used for stupefied device of reinforced (rfd) adjustable back of body of post template | |
CN204040052U (en) | A kind of outer posture fixed mount being applicable to framework foundation built-in bolt and fixing | |
CN207525900U (en) | Prefabricated panel | |
CN203050146U (en) | Steel tube latticed column connecting device | |
CN205908904U (en) | A connection structure that is used for company of combined type tube coupling to stride between vault arc slab | |
CN206646824U (en) | A kind of concreting building template reinforcement assembly | |
CN204225141U (en) | The fastening devices of oblique inserting angle steel | |
CN205063321U (en) | Building cross fastener | |
CN103669635A (en) | Pre-stress angle steel plate reinforcing device | |
CN206034905U (en) | Board combination design mould falls in bathroom |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 571924 station 050, 1st floor, building a25, Hainan Ecological Software Park, Chengmai County, Haikou City, Hainan Province Patentee after: Hainan pangyuan Mechanical Engineering Co., Ltd Address before: 1-1-302, East District, government service center building, No. 8, Yantian Road, Yangpu Economic Development Zone, Hainan Province Patentee before: HAINAN PANGYUAN CONSTRUCTION MACHINERY LEASING Co.,Ltd. |
|
CP03 | Change of name, title or address |