CN205500690U - Hydrocushion erection equipment - Google Patents

Hydrocushion erection equipment Download PDF

Info

Publication number
CN205500690U
CN205500690U CN201620310647.9U CN201620310647U CN205500690U CN 205500690 U CN205500690 U CN 205500690U CN 201620310647 U CN201620310647 U CN 201620310647U CN 205500690 U CN205500690 U CN 205500690U
Authority
CN
China
Prior art keywords
hydro
oil cylinder
cylinder
center
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620310647.9U
Other languages
Chinese (zh)
Inventor
楼洪亮
汤卫国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangnan Shipyard Group Co Ltd
Original Assignee
Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiangnan Changxing Heavy Industry Co Ltd filed Critical Shanghai Jiangnan Changxing Heavy Industry Co Ltd
Priority to CN201620310647.9U priority Critical patent/CN205500690U/en
Application granted granted Critical
Publication of CN205500690U publication Critical patent/CN205500690U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Fluid-Damping Devices (AREA)

Abstract

The utility model relates to a hydrocushion erection equipment, including a base, to sit on the base and be equipped with a central hydro -cylinder and at least three balanced hydro -cylinder, each balanced hydro -cylinder around the Center hydro -cylinder is arranged, the center hydro -cylinder all includes the pars contractilis with balanced hydro -cylinder, and a carousel seat is connected on the pars contractilis top of central hydro -cylinder, and a carousel is installed in the pars contractilis top of each balanced hydro -cylinder on the carousel seat on the lower surface of carousel seat, and the upper surface of carousel is perpendicular with the axis of central hydro -cylinder. Center hydro -cylinder and balanced hydro -cylinder can be jointly with carousel seat and the carousel jack -up that makes progress, when installation large sized part, central hydro -cylinder can provide jacking power for large sized part with balanced hydro -cylinder, and, install the carousel on the carousel seat, the carousel can support large sized part and provide rotary motion. The utility model discloses a hydrocushion erection equipment specially adapted is like large size bearing, large -scale nut from down upwards toward the occasion of spindle nose, threaded rod installation.

Description

Equipment is installed in a kind of hydro-cushion
Technical field
This utility model relates to a kind of hydro-cushion and installs equipment.
Background technology
In the manufacture process of the Large-Scale Equipments such as boats and ships, when some large-scale parts are installed, need by part vertically and smoothly to Upper jack-up, such as when shipbuilding, rudder stock nut is the hugest, the heaviest, needs hydraulic nut of rudder stock during installation Upwards jack-up and simultaneously rotate nut nut is screwed on the screw thread of rudder stock.Currently used installation tool for hydraulic nut of rudder stock is Mechanical type, in installation process, owing to the weight of nut is very big, nut and rudder stock centering, that nut is threaded to fixed position is the most suitable Difficulty;Current mounting tool can not provide axial top lift constantly, and the total weight of nut is all carried on rudder stock screw thread, Easily cause rudder stock thread damage.The huge weight of nut self causes nut self screw thread very big with the frictional force of rudder stock screw thread, Substantially increasing the installation difficulty of nut, installation process labor intensity is big, takes time and effort.
Utility model content
In order to overcome defect of the prior art, this utility model provides a kind of hydro-cushion to install equipment, it is possible in installation process In provide axial top lift and rotary motion for heavy parts, reduce installation difficulty, reduce labor intensity.
In order to achieve the above object and relevant purpose, a kind of hydro-cushion of the present utility model is installed equipment and is adopted the following technical scheme that Equipment is installed in a kind of hydro-cushion, including a base, base is sat and is provided with a center oil cylinder and at least three balancing cylinder, each flat Weighing apparatus oil cylinder is arranged around center oil cylinder;Center oil cylinder peace weighing apparatus oil cylinder all includes pars contractilis, and the pars contractilis top of center oil cylinder connects One rotary disk basement, the pars contractilis top of each balancing cylinder withstands on the lower surface of rotary disk basement, and rotary disk basement is installed a rotating disk, rotating disk Upper surface is vertical with the axis of center oil cylinder.
Preferably, described base upper surface is plane, and described center oil cylinder can translate along base upper surface;Set on base upper surface The adjusting screw rod of three Y-shaped layouts, the axis of each adjusting screw rod is had to be mutually 120 degree of angles, during the front end of adjusting screw rod withstands on On the sidewall of heart oil cylinder.
Preferably, described base upper surface being provided with three fixed blocks, fixed block is provided with regulation screwed hole, described three tune Joint screw rod is located in three regulation screwed holes respectively.
Preferably, described rotary disk basement is fixed on the pars contractilis top of center oil cylinder, is provided with a thrust between described rotating disk and rotary disk basement Bearing.
Preferably, described base, rotary disk basement and rotating disk are the most in disk form, and base, rotary disk basement and rotating disk are coaxially disposed.
Preferably, the pars contractilis top of described center oil cylinder is provided with an axis hole, and rotary disk basement lower surface connects a ring flange, flange The center of dish is provided with first spindle nose extended downwardly from, and described first spindle nose is inserted in axis hole.
Further, the center of described ring flange is additionally provided with the second spindle nose protruded upward, described second spindle nose through rotary disk basement and Rotating disk also exposes from the upper surface of rotating disk, and a clamp nut is installed in the end of the second spindle nose, and clamp nut is pressed in the upper surface of rotating disk On.
Further, described base is provided with the top lifting screwed hole that the axis of three Ge Rao center oil cylinders is uniform, and top lifting screwed hole runs through Base upper and lower surface, is provided with one and plays screw in each top lifting screwed hole.
Further, center oil cylinder be provided around three balancing cylinders, three balancing cylinders are around center oil cylinder symmetrically cloth Put.
Based on technique scheme, a kind of hydro-cushion of the present utility model is installed equipment and is had the advantages that this practicality is new A kind of hydro-cushion of type is installed equipment and is had a center oil cylinder and at least three balancing cylinder, and center oil cylinder peace weighing apparatus oil cylinder can Jointly by rotary disk basement and rotating disk upwards jack-up, when installing heavy parts, oil cylinder peace weighing apparatus oil cylinder in center can be heavy parts Top lift is provided;And, rotary disk basement is provided with rotating disk, rotating disk can support heavy parts and provide rotary motion.This practicality Novel hydro-cushion installation equipment is particularly well-suited to such as large size bearing, large-scale nut and pacifies on spindle nose, threaded rod from bottom to top The occasion of dress.
Accompanying drawing explanation
Fig. 1 is shown as a kind of hydro-cushion of the present utility model and installs the front view of equipment.
Fig. 2 is shown as a kind of hydro-cushion of the present utility model and installs the schematic perspective view of equipment.
Fig. 3 is shown as a kind of hydro-cushion of the present utility model and installs the exploded perspective view of equipment.
Reference
1 base 9 ring flange
2 screw 10 first spindle noses
3 center oil cylinder 11 second spindle noses
4 pars contractilis 12 rotating disks
5 axis hole 13 clamp nuts
6 balancing cylinder 14 adjusting screw rods
7 pars contractilis 15 fixed blocks
8 rotary disk basement 16 thrust bearings
Detailed description of the invention
Below in conjunction with the accompanying drawings detailed description of the invention of the present utility model is described in further detail.These embodiments are only used for Bright this utility model, and be not limitation of the utility model.
In description of the present utility model, it should be noted that term " " center ", " longitudinally ", " laterally ", " on ", D score, The orientation of the instruction such as "front", "rear", "left", "right", " vertically ", " level ", " top ", " end " " interior ", " outward " or position Relation is based on orientation shown in the drawings or position relationship, be for only for ease of description this utility model and simplify describe rather than Instruction or hint indication device or element must have specific orientation, with specific azimuth configuration and operation, therefore can not manage Solve as to restriction of the present utility model.Additionally, term " first ", " second " are only used for describing purpose, and it is not intended that refer to Show or imply relative importance.
In description of the present utility model, it should be noted that unless otherwise clearly defined and limited, term " is installed ", " phase Even ", " connection " should be interpreted broadly, for example, it may be fixing connection, it is also possible to be to removably connect, or be integrally connected; Can be to be mechanically connected, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, permissible It it is the connection of two element internals.For the ordinary skill in the art, can understand that above-mentioned term is at this with concrete condition Concrete meaning in utility model.
Additionally, in description of the present utility model, except as otherwise noted, " multiple " are meant that two or more.
As depicted in figs. 1 and 2, equipment is installed in a kind of hydro-cushion of the present utility model, including a base 1, base 1 is sat and sets A center oil cylinder 3 and at least three balancing cylinder 6, each balancing cylinder 6 is had to arrange around center oil cylinder 3;Center oil cylinder 3 He Balancing cylinder 6 all includes pars contractilis, and pars contractilis 4 (see Fig. 3) top of center oil cylinder 3 connects a rotary disk basement 8, each equilibrium oil Pars contractilis 7 top of cylinder 6 withstands on the lower surface of rotary disk basement 8, and rotary disk basement 8 is installed a rotating disk 12, the upper table of rotating disk 12 The axis of Mian Yu center oil cylinder 3 is vertical.A kind of hydro-cushion of the present utility model is installed equipment and is had a center oil cylinder and at least Three balancing cylinders, balancing cylinder is for support rotary disk basement around the oil cylinder of center, when rotating disk carries heavy parts, Balancing cylinder makes rotary disk basement keep balance, center oil cylinder peace weighing apparatus oil cylinder jointly by rotary disk basement and rotating disk upwards jack-up, installing During heavy parts, oil cylinder peace weighing apparatus oil cylinder in center can provide top lift for heavy parts;And, rotary disk basement is provided with rotating disk, Rotating disk can support heavy parts and provide rotary motion.Hydro-cushion of the present utility model is installed equipment and is particularly well-suited to as large-scale Bearing, large-scale nut are from bottom to top toward the occasion of installation on spindle nose, threaded rod.
Base 1, rotary disk basement 8 and rotating disk 12 can be arranged to disc, and base 1, rotary disk basement 8 and rotating disk 12 coaxially set Putting, so, base 1, rotary disk basement 8, rotating disk 12 are easy to processing and install, and good looking appearance.During balancing cylinder 6 is arranged on Heart oil cylinder 3 around, in order to rotating disk 12 keeps poised state, at least should arrange three equilibrium oils around center oil cylinder 3 Cylinder 6, each balancing cylinder 6 should be symmetrically dispersed in around center oil cylinder 3;In the embodiment of Fig. 1, Fig. 2, Fig. 3, in Heart oil cylinder 3 be provided around three balancing cylinders 6, three balancing cylinders 6 are symmetrically arranged around center oil cylinder 3.
When carrying heavy parts on rotating disk 12, if center oil cylinder 3 off-center position, owing to heavy parts weight is very big, Rotating disk 12 will be unable to keep balance, for the ease of adjusting the position of center oil cylinder 3, base 1 upper surface can be set to plane, The bottom of center oil cylinder 3 coordinates with base 1 upper surface slide, and center oil cylinder 3 can translate along base 1 upper surface;Such as Fig. 3 institute Show, the adjusting screw rod 14 of three Y-shaped layouts can be set on base 1 upper surface, and on base 1 upper surface, install three Individual fixed block 15, fixed block 15 is provided with regulation screwed hole, and three adjusting screw rods 14 are located in three regulation screwed holes respectively, The axis of each adjusting screw rod 14 is mutually 120 degree of angles, and the front end of adjusting screw rod 14 withstands on the sidewall of center oil cylinder 3, rotates Three regulation bolts can make each adjusting screw rod 14 move axially, and makes center oil cylinder 3 translate to adjust on the upper surface of base 1 The center of whole center oil cylinder 3.
Rotary disk basement 8 can be fixed on pars contractilis 4 top of center oil cylinder 3, stretches with center oil cylinder 3 for the ease of rotary disk basement 8 The connection in portion 4, as it is shown on figure 3, an axis hole 5 can be arranged on pars contractilis 4 top of center oil cylinder 3, rotary disk basement 8 times Connecting a ring flange 9 on surface, the center of ring flange 9 is provided with first spindle nose 10 extended downwardly from, and described first spindle nose 10 is inserted In axis hole 5.The second spindle nose 11 that can also protrude upward centrally disposed the one of ring flange 9, when mounted, the second spindle nose 11 expose through rotary disk basement 8 and rotating disk 12 upper surface from rotating disk 12, and a clamp nut is installed in the end of the second spindle nose 11 13, clamp nut 13 is pressed on the upper surface of rotating disk 12.Rotate on rotary disk basement 8 for the ease of rotating disk 12, can be at rotating disk Being provided with a thrust bearing 16 between 12 and rotary disk basement 8, thrust bearing 16 is set on the second spindle nose 11.
When installing heavy parts, it is sometimes necessary to adjust the center position of heavy parts, such as, by heavy bearing from lower to When going up installation on spindle nose, need to align brearing bore with the axis of spindle nose, be at this moment accomplished by adjusting the levelness of base 1, In order to be able to solve the problems referred to above, as it is shown on figure 3, uniform the rising of axis that three Ge Rao center oil cylinders 3 can be set on base 1 Top screwed hole (not marking in figure), top lifting screwed hole runs through base 1 upper and lower surface, is provided with one and rises in each top lifting screwed hole Screw 2, so, just can adjust the levelness of base 1 by adjusting three screws 2.
The above is only preferred implementation of the present utility model, it is noted that for those skilled in the art For, on the premise of without departing from this utility model know-why, it is also possible to make some improvement and replacement, these improve and replace Change and also should be regarded as protection domain of the present utility model.

Claims (9)

1. an equipment is installed in hydro-cushion, it is characterized in that:
Including a base (1), the upper seat of base (1) is provided with a center oil cylinder (3) and at least three balancing cylinder (6), each flat Weighing apparatus oil cylinder (6) is arranged around center oil cylinder (3);Center oil cylinder (3) and balancing cylinder (6) all include pars contractilis (4,7), Pars contractilis (4) top of center oil cylinder (3) connects a rotary disk basement (8), pars contractilis (7) top of each balancing cylinder (6) Withstanding on the lower surface of rotary disk basement (8), rotary disk basement (8) is upper installs a rotating disk (12), the upper surface of rotating disk (12) and center The axis of oil cylinder (3) is vertical.
2. equipment is installed in hydro-cushion as claimed in claim 1, it is characterized in that: described base (1) upper surface is plane, described Center oil cylinder (3) can translate along base (1) upper surface;Base (1) upper surface is provided with the regulation spiral shell of three Y-shaped layouts Bar (14), the axis of each adjusting screw rod (14) is mutually 120 degree of angles, and the front end of adjusting screw rod (14) withstands on center oil cylinder (3) Sidewall on.
3. equipment is installed in hydro-cushion as claimed in claim 2, it is characterized in that: be provided with three on described base (1) upper surface Fixed block (15), fixed block (15) is provided with regulation screwed hole, and described three adjusting screw rods (14) are located in three tune respectively In joint screwed hole.
4. equipment is installed in hydro-cushion as claimed in claim 1, it is characterized in that: described rotary disk basement (8) is fixed on center oil cylinder (3) Pars contractilis (4) top, be provided with a thrust bearing (16) between described rotating disk (12) and rotary disk basement (8).
5. equipment is installed in hydro-cushion as claimed in claim 1, it is characterized in that: described base (1), rotary disk basement (8) and rotating disk (12) the most in disk form, and base (1), rotary disk basement (8) and rotating disk (12) be coaxially disposed.
6. equipment is installed in hydro-cushion as claimed in claim 1, it is characterized in that: pars contractilis (4) top at described center oil cylinder (3) End be provided with an axis hole (5), rotary disk basement (8) lower surface connects a ring flange (9), the center of ring flange (9) be provided with one to Under the first spindle nose (10) of stretching out, described first spindle nose (10) is inserted in axis hole (5).
7. equipment is installed in hydro-cushion as claimed in claim 6, it is characterized in that: the center of described ring flange (9) is additionally provided with upwards The second spindle nose (11) stretched out, described second spindle nose (11) passes rotary disk basement (8) and rotating disk (12) and from rotating disk (12) Upper surface expose, a clamp nut (13) is installed in the end of the second spindle nose (11), and clamp nut (13) is pressed in rotating disk (12) Upper surface on.
8. equipment is installed in hydro-cushion as claimed in claim 1, it is characterized in that: described base (1) is provided with three around center oil The top lifting screwed hole that the axis of cylinder (3) is uniform, top lifting screwed hole runs through base (1) upper and lower surface, in each top lifting screwed hole It is provided with one and plays screw (2).
9. equipment is installed in hydro-cushion as claimed in claim 1, it is characterized in that: center oil cylinder (3) be provided around three balances Oil cylinder (6), three balancing cylinders (6) are symmetrically arranged around center oil cylinder (3).
CN201620310647.9U 2016-04-14 2016-04-14 Hydrocushion erection equipment Active CN205500690U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620310647.9U CN205500690U (en) 2016-04-14 2016-04-14 Hydrocushion erection equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620310647.9U CN205500690U (en) 2016-04-14 2016-04-14 Hydrocushion erection equipment

Publications (1)

Publication Number Publication Date
CN205500690U true CN205500690U (en) 2016-08-24

Family

ID=56715198

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620310647.9U Active CN205500690U (en) 2016-04-14 2016-04-14 Hydrocushion erection equipment

Country Status (1)

Country Link
CN (1) CN205500690U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505453A (en) * 2018-07-04 2018-09-07 重庆三峡学院 A kind of Bridge Rotation Construction Technique balance lifting seat
CN109911812A (en) * 2019-01-29 2019-06-21 中建四局第六建筑工程有限公司 A kind of anti-eccentric balancing cylinder of lifting platform support box beam
CN110013895A (en) * 2019-05-16 2019-07-16 福州大学 A kind of experiment porch auxiliary support apparatus and its working method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505453A (en) * 2018-07-04 2018-09-07 重庆三峡学院 A kind of Bridge Rotation Construction Technique balance lifting seat
CN109911812A (en) * 2019-01-29 2019-06-21 中建四局第六建筑工程有限公司 A kind of anti-eccentric balancing cylinder of lifting platform support box beam
CN110013895A (en) * 2019-05-16 2019-07-16 福州大学 A kind of experiment porch auxiliary support apparatus and its working method

Similar Documents

Publication Publication Date Title
CN205500690U (en) Hydrocushion erection equipment
CN105958345A (en) Power distribution box overhauling manipulator
CN115026758B (en) High-efficient dust-tight type motor seals assembly fixture
CN203949899U (en) A kind of probe bracket
CN101890607B (en) Multi-blade and multi-angle welding die
CN202481969U (en) Support leg plate and crane provided with same
CN201760726U (en) Mold for multi-blade multi-angle welding
CN205973616U (en) But moving motor assists assembly quality
CN208254756U (en) A kind of reliability test universal fixturing
CN209737538U (en) Machine-building workstation
CN206230230U (en) A kind of main shaft installs positioning tool
CN210040957U (en) Balance base of low-voltage power distribution cabinet
CN210536452U (en) A shaft lifting mechanism for replacing a sliding bearing bush is arranged on a motor bearing seat
CN207485888U (en) A kind of bearing dismounting device
CN110202367B (en) Rudder stock hydraulic nut installation device
CN201949967U (en) Height-adjustable rotary tooling platform
CN203053704U (en) Engine adjustable support
CN214924065U (en) Nut installation tool
CN208854010U (en) A kind of welding platform
CN215931455U (en) Liquid distributor for chemical analysis and detection
CN219293920U (en) Tilting multifunctional valve repairing machine
CN204075700U (en) A kind of motorcycle fitter's bench
CN219464965U (en) Vertical milling machine for precisely machining gears
CN208914022U (en) The lower round nut of large size assembles device
CN218026611U (en) Novel machine leg mechanism

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181220

Address after: 201913 No. 988 Changxing Jiangnan Avenue, Chongming County, Shanghai

Patentee after: Jiannan Shipbuilding (Group) Co., Ltd.

Address before: 201913 1888 Jiangnan Avenue, Changxing Township, Chongming County, Shanghai

Patentee before: Shanghai Jiangnan Changxing Heavy Industry Co.,Ltd.