CN205497413U - Maintenance frock of leading rig - Google Patents

Maintenance frock of leading rig Download PDF

Info

Publication number
CN205497413U
CN205497413U CN201620177647.6U CN201620177647U CN205497413U CN 205497413 U CN205497413 U CN 205497413U CN 201620177647 U CN201620177647 U CN 201620177647U CN 205497413 U CN205497413 U CN 205497413U
Authority
CN
China
Prior art keywords
piece
rig
semi
outer ring
inner ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620177647.6U
Other languages
Chinese (zh)
Inventor
孙立
孙伟平
孙威
沈国泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Mobile Hydraulic Power Technology Co ltd
Original Assignee
Zhejiang Mobile Hydraulic Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Mobile Hydraulic Power Technology Co ltd filed Critical Zhejiang Mobile Hydraulic Power Technology Co ltd
Priority to CN201620177647.6U priority Critical patent/CN205497413U/en
Application granted granted Critical
Publication of CN205497413U publication Critical patent/CN205497413U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a maintenance frock of leading rig which characterized in that: include two sets of roll -over stands, the one end of rig assembly before a set of roll -over stand is used for supporting, another organizes the other one end that roll -over stand is used for supporting preceding rig assembly, and each group's roll -over stand is formed by last semi -frame and lower semi -frame combination to it is fixed temporarily with it to be equipped with the cushion, adopts after the above -mentioned structure: shield tunnelling machine is very narrow and small in the job site space of excavating the tunnel, hydraulic pressure appears when leading rig, it is electric, during mechanical breakdown, can't directly maintain on shield tunnelling machine, need dismantle leading rig to get off to overhaul and maintain, the installation station of leading rig be the rock drill down, need utilize a dedicated auxiliary fixtures with the 180 back implementation maintenances of leading rig flip horizontal in tunnel construction, on shield tunnelling machine was installed with it to flip horizontal 180 again after the maintenance was accomplished.

Description

A kind of maintenance frock of advanced rig
Technical field
This utility model relates to the maintenance frock of a kind of advanced rig.It is mainly used in the job site of shield excavation machine tunneling, when the advanced rig of the assembly of shield excavation machine breaks down, an auxiliary maintaining frock is needed to support this advanced rig, by it inside tunnel on the spot flip horizontal 180 ° keep in repair, after being overturn 180 ° on the spot by this auxiliary mould again after having keeped in repair, advanced rig is installed on shield excavation machine.
Background technology
Shield excavation machine is the narrowest and small in the space, job site of tunneling, when hydraulic pressure occurs in advanced rig, electrically, during mechanical breakdown, directly cannot keep in repair on equipment, need to disassemble advanced rig to overhaul and safeguard, the installation station of advanced rig be rock drill down, need in construction tunnel with manually just implementing maintenance after advanced rig flip horizontal 180 °, in the case of not having frock, the work of this upset can consume relatively more manual labor, loop wheel machine equipment must be had to assist simultaneously, there is also security incidents such as easily colliding with, need a kind of special auxiliary mould inside tunnel by advanced rig supporting, carry out flip horizontal action on the spot, again can be easily by advanced rig flip horizontal after having keeped in repair, it is installed on shield excavation machine.
Summary of the invention
Technical problem to be solved in the utility model is: provide a kind of special auxiliary mould, will implement maintenance in construction tunnel after advanced rig flip horizontal 180 °.
This utility model can be realized by following technical proposal:
A kind of maintenance frock of advanced rig, it is characterized in that: include two groups of rollover stands, one group of rollover stand is for supporting one end of front rig assembly, another group rollover stand is for supporting the other end of front rig assembly, each group of rollover stand is combined by upper semi-frame and lower semi-frame, and is provided with cushion block and it is fixed temporarily.
Described upper semi-frame is welded to form by a piece of upper outer ring, many upper connecting rods, a piece of upper inner ring, a piece of upper backup pad, a piece of upper gussets, and upper outer ring, upper inner ring two ends are fixed with upper gusset, and upper link supports is between upper outer ring and upper inner ring.
Described lower semi-frame is welded to form by a piece of lower outer ring, many lower links, a piece of lower inner ring, a piece of lower supporting plate, a piece of lower web plates, and lower outer ring, lower inner ring two ends are fixed with lower web plate, and lower link is supported between lower outer ring and lower inner ring.
Described upper outer ring be a piece of diameter be 1700mm, wide 140mm, the semi-circular sheet steel of thick 6mm, upper connecting rod 1 is 30mm × 45mm, and thickness is the rectangular steel pipe of 4mm, upper inner ring be a piece of diameter be 700mm, wide 90mm, the semi-circular sheet steel of thick 6mm, upper backup pad is thickness 10mm, and five steel plate butt weldings of width 140mm form.
Described lower outer ring be a piece of diameter be 1700mm, wide 140mm, the semi-circular sheet steel of thick 6mm, lower link is 30mm × 45mm, and thickness is the rectangular steel pipe of 4mm, lower inner ring be a piece of diameter be 700mm, wide 90mm, the semi-circular sheet steel of thick 6mm, lower supporting plate is thickness 10mm, and nine steel plate butt weldings of width 140mm form.
After using said structure: shield excavation machine is the narrowest and small in the space, job site of tunneling, when advanced rig occur hydraulic pressure, electrically, mechanical breakdown time, directly cannot keep in repair on shield excavation machine, need to disassemble advanced rig to overhaul and safeguard, the installation station of advanced rig be rock drill down, needing to utilize a special auxiliary mould will to implement maintenance after advanced rig flip horizontal 180 ° in construction tunnel, after having keeped in repair, flip horizontal 180 ° attaches it on shield excavation machine again.
Accompanying drawing explanation
The maintenance frock explosive view of a kind of advanced rig of Fig. 1.
The maintenance frock operation schematic diagram of a kind of advanced rig of Fig. 2.
Specific implementation method
See accompanying drawing, a kind of maintenance frock of advanced rig, including two groups of rollover stands, one group of rollover stand is for supporting one end of front rig assembly, another group rollover stand is for supporting the other end of front rig assembly, and each group of rollover stand is made up of parts such as upper semi-frame 15, lower semi-frame 16, cushion block 12 and some nuts 6, bolts 7.
Described upper semi-frame 15 is welded to form by the upper connecting rod 1 in 3, three, a piece of upper outer ring, a piece of upper inner ring 2, a piece of upper backup pad 4, a piece of upper gusset 5.Upper outer ring 3, upper inner ring 2 two ends are fixed with upper gusset 5, and upper connecting rod 1 is supported between outer ring 3 and upper inner ring 2.
Described lower semi-frame 16 is welded to form by 9, three lower links 13 in a piece of lower outer ring, a piece of lower inner ring 11, a piece of lower supporting plate 8, a piece of lower web plate 10.Lower outer ring 9, lower inner ring 11 two ends are fixed with lower web plate 10, and lower link 13 is supported between lower outer ring 9 and lower inner ring 11.
Described upper outer ring 3 is 1700mm for a piece of diameter, wide 140mm, the semi-circular sheet steel of thick 6mm, upper connecting rod 1 is 30mm × 45mm, thickness is the rectangular steel pipe of 4mm, upper inner ring 2 is 700mm for a piece of diameter, wide 90mm, the semi-circular sheet steel of thick 6mm, upper backup pad 4 is thickness 10mm, five steel plate butt weldings of width 140mm form, and make a call to the hole of 16 a diameter of 13mm on upper backup pad 4, are used for installing bolt 7.
Described lower outer ring 9 is 1700mm for a piece of diameter, wide 140mm, the semi-circular sheet steel of thick 6mm, lower link 13 is 30mm × 45mm, thickness is the rectangular steel pipe of 4mm, lower inner ring 11 is 700mm for a piece of diameter, wide 90mm, the semi-circular sheet steel of thick 6mm, lower supporting plate 8 is thickness 10mm, nine steel plate butt weldings of width 140mm form, and make a call to the hole of 16 a diameter of 13mm on lower supporting plate 8, are used for installing bolt 7.
Described upper semi-frame 15,16, two cushion blocks 12 of lower semi-frame and 16 nuts 6, bolt 7 form the maintenance frock of one group of advanced rig, can support one end of front rig assembly 14, the maintenance frock of the advanced rig of another set can support the other end of front rig assembly 14.
In utilization, outer ring and lower outer ring are combined into the convenient flip horizontal that carried out by advanced rig assembly of construction features of whole circle, and it is fixed by recycling cushion block 12 temporarily, it is simple to maintenance, after having overhauled, remove cushion block, after advanced rig flip horizontal again, attach it on shield excavation machine.

Claims (5)

1. the maintenance frock of an advanced rig, it is characterized in that: include two groups of rollover stands, one group of rollover stand is used for supporting one end of front rig assembly (14), another group rollover stand is used for supporting the other end of front rig assembly (14), each group of rollover stand is combined by upper semi-frame (15) and lower semi-frame (16), and is provided with cushion block (12) and it is fixed temporarily.
The maintenance frock of a kind of advanced rig the most as claimed in claim 1, it is characterized in that: described upper semi-frame (15) is welded to form by a piece of upper outer ring (3), many upper connecting rods (1), a piece of upper inner ring (2), a piece of upper backup pad (4), a piece of upper gussets (5), upper outer ring (3), upper inner ring (2) two ends are fixed with upper gusset (5), and upper connecting rod (1) is supported between outer ring (3) and upper inner ring (2).
The maintenance frock of a kind of advanced rig the most as claimed in claim 1, it is characterized in that: described lower semi-frame (16) is welded to form by a piece of lower outer ring (9), many lower links (13), a piece of lower inner ring (11), a piece of lower supporting plate (8), a piece of lower web plates (10), lower outer ring (9), lower inner ring (11) two ends are fixed with lower web plate (10), and lower link (13) is supported between lower outer ring (9) and lower inner ring (11).
The maintenance frock of a kind of advanced rig the most as claimed in claim 2, it is characterized in that: described upper outer ring (3) be a piece of diameter be 1700mm, wide 140mm, the semi-circular sheet steel of thick 6mm, upper connecting rod (1) is 30mm × 45mm, thickness is the rectangular steel pipe of 4mm, upper inner ring (2) be a piece of diameter be 700mm, wide 90mm, the semi-circular sheet steel of thick 6mm, upper backup pad (4) is thickness 10mm, and five steel plate butt weldings of width 140mm form.
The maintenance frock of a kind of advanced rig the most as claimed in claim 3, it is characterized in that: described lower outer ring (9) be a piece of diameter be 1700mm, wide 140mm, the semi-circular sheet steel of thick 6mm, lower link (13) is 30mm × 45mm, thickness is the rectangular steel pipe of 4mm, lower inner ring (11) be a piece of diameter be 700mm, wide 90mm, the semi-circular sheet steel of thick 6mm, lower supporting plate (8) is thickness 10mm, and nine steel plate butt weldings of width 140mm form.
CN201620177647.6U 2016-03-09 2016-03-09 Maintenance frock of leading rig Active CN205497413U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620177647.6U CN205497413U (en) 2016-03-09 2016-03-09 Maintenance frock of leading rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620177647.6U CN205497413U (en) 2016-03-09 2016-03-09 Maintenance frock of leading rig

Publications (1)

Publication Number Publication Date
CN205497413U true CN205497413U (en) 2016-08-24

Family

ID=56727493

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620177647.6U Active CN205497413U (en) 2016-03-09 2016-03-09 Maintenance frock of leading rig

Country Status (1)

Country Link
CN (1) CN205497413U (en)

Similar Documents

Publication Publication Date Title
CN203201562U (en) Shield tunneling machine initial counter-force frame convenient to detach, install and transport
CN204530719U (en) A kind of quick assembled type suspension device for Support of Foundation Pit Excavation
CN205629765U (en) Group is assembled to device to large -scale welding H shaped steel roof beam
CN102418539A (en) Supporting process in soft rock mine roadway rush through construction tunneling
CN110748349A (en) Double-molecular originating method for small-clear-distance double-line tunnel shield
CN105781593A (en) Steel grating assisted diversion tunnel preliminary bracing structure and method
CN203412292U (en) Detachable discharging platform
CN109404009B (en) Integral dismounting structure for assembled type negative ring pipe slice of shield method connection channel
CN205497413U (en) Maintenance frock of leading rig
CN204326259U (en) A kind of steel column connector
CN103362527B (en) Speedy drivage mobile device and moving method thereof
CN110318797A (en) A kind of coal working face withdraws device and its application method
CN202659267U (en) Integral graded spanning-type walking bracket
CN201344038Y (en) Mining survival active supporting net
CN210714751U (en) Double-telescopic hydraulic flexible shield support
CN203409716U (en) Roller bearing fast dismounting and mounting tool for mine
CN108639933B (en) Overturning bracket and hoisting method of shield main drive
CN206144581U (en) Forestope rings
CN203188641U (en) Border protection sizing structure device in construction site
CN210977480U (en) Double-split originating station structure of small-clear-distance double-line tunnel shield
CN207606757U (en) A kind of large size coalcutter rack extracting tool
CN211058840U (en) Top connection device for advance support
CN204747123U (en) Mining multi -functional hydraulic pressure repairing machine
CN213392213U (en) Movable cross beam for self-propelled mine lower support
CN104878734B (en) A kind of ship lift Nut column removes frock and method for dismounting thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant