CN205486496U - Building complex is paid management system in advance - Google Patents
Building complex is paid management system in advance Download PDFInfo
- Publication number
- CN205486496U CN205486496U CN201620037771.2U CN201620037771U CN205486496U CN 205486496 U CN205486496 U CN 205486496U CN 201620037771 U CN201620037771 U CN 201620037771U CN 205486496 U CN205486496 U CN 205486496U
- Authority
- CN
- China
- Prior art keywords
- management
- main frame
- communication server
- guide rail
- building complex
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Small-Scale Networks (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model relates to a building complex is paid management system in advance, its characterized in that: it includes administration and supervision authorities (1), communication layer (2) and mechanical floor (3), including management host computer (1.1) in administration and supervision authorities (1), be provided with switch (2.1) and a plurality of communication server (2.4) in communication layer (2), on all management host computers (1.1) are received in communication server (2.4), mechanical floor (3) including a plurality of block terminals (3.1), one master switch (3.2) are equipped with in block terminal (3.1), the one end of master switch (3.2) is drawn forth during a plurality of circuits receive each user through guide rail ammeter (3.3) and circuit breaker (3.4) respectively to on every guide rail ammeter (3.3) all are connected to communication server (2.4) through RS485 bus (2.5). This kind of building complex is paid management system in advance is high -efficient economize artifical, can centralized management, can acquire the power consumption condition in real time, can remind the householder to collect fee, the suitability is stronger.
Description
Technical field
This utility model relates to a kind of building complex prepaid administration system, carries out concentrating electricity consumption settlement management in the large-scale synthesis buildings such as school, retail shop, apartment.
Background technology
In the large-scale synthesis buildings such as common school, retail shop, apartment, each household people needs ability electricity consumption after post-pay paystation, it is therefore desirable to the electricity consumption to each household is managed concentratedly, thus facilitates electricity consumption to settle accounts.It is typically by electrician, the ammeter of each household to be checked meter in the past, manages concentratedly after power information is added up.But such way to manage also exists bigger defect:
1, need to waste substantial amounts of manually.
2, the efficiency of management is low, it is impossible to obtain the electricity consumption situation at each family in time.
3, can not record and each supplement record with money.
4, when the electricity consumption at certain family occurs abnormal, it is impossible to lock its position in time.
5, householder can not be reminded in time to pay the electricity charge in advance, when householder forgets to pay, once automatically power off and can bring greatest loss to it.
6, when householder is changed in retail shop or apartment, it is impossible to change user profile in time.
Summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, it is provided that a kind of efficiently less manpower, can manage concentratedly, can obtain electricity consumption situation in real time, householder can be reminded to pay the fees, the building complex prepaid administration system that the suitability is stronger.
The purpose of this utility model is achieved in that
nullA kind of building complex prepaid administration system,It includes management level、Communication Layer and mechanical floor,Described management level are arranged in Control Room,Described management level include managing main frame,It is connected with ups power and printer on management main frame,And these management level are additionally provided with backup host,This backup host is connected with management main frame,It is also associated with SMS module on management main frame simultaneously,Described Communication Layer is provided with GPRS remote-transmission module and multiple communication server,Communication server is received on all management main frames,Described GPRS remote-transmission module is connected with management main frame,And GPRS remote-transmission module sends signal to GPRS network,Described mechanical floor includes multiple distribution box,Between the forceful electric power of one corresponding floor of distribution box,Equipped with a main switch in described distribution box,One end of described main switch is connected with the electric wire of electric substation,The other end is drawn multiple circuits and is received in each user by guide rail ammeter and chopper respectively,And each guide rail ammeter is all connected on communication server by RS485 bus.
Compared with prior art, the beneficial effects of the utility model are:
This building complex prepaid administration system by other power information of each household by sending management main frame to communication server after guide rail ammeter collection, thus can realize electricity consumption unified management, and it has the advantage that
1, without manual metering, save substantial amounts of manually.
2, the efficiency of management is higher, and obtains the electricity consumption situation at each family in real time.
3, after user supplements with money every time, management main frame can be recorded and each supplement record with money.
4, when the electricity consumption at certain family occurs abnormal, its position can be locked in time, thus process.
5, it is connected to SMS module on management main frame, can automatically send note, remind householder to pay the electricity charge in advance in time, it is to avoid when householder forgets to pay, to automatically power off the loss brought to it.
6, when householder is changed in retail shop or apartment, management main frame can change user profile in time.
7, manage in main frame equipped with transit module simultaneously, can receive in other management systems by agreement, as its subsystem, or use as its mother system, compatible with other system, thus without original management system is removed.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model building complex prepaid administration system.
Wherein: management level 1, management main frame 1.1, ups power 1.2, printer 1.3, backup host 1.4, SMS module 1.5, Communication Layer 2, GPRS remote-transmission module 2.1, router 2.2, GPRS network 2.3, communication server 2.4, RS485 bus 2.5, mechanical floor 3, distribution box 3.1, main switch 3.2, guide rail ammeter 3.3, chopper 3.4.
Detailed description of the invention
Seeing Fig. 1, this utility model relates to a kind of building complex prepaid administration system, and including management level 1, Communication Layer 2 and mechanical floor 3, described management level 1 are arranged in Control Room.
Described management level 1 include managing main frame 1.1, equipped with transit module in management main frame 1.1, can receive in other monitoring systems by agreement, as its subsystem, or use as its mother system, compatible with other system, it is connected with ups power 1.2 and printer 1.3 on management main frame 1.1, and these management level 1 are additionally provided with backup host 1.4, this backup host 1.4 is connected with management main frame 1.1, data for backup management main frame 1.1, it is also associated with SMS module 1.5 on management main frame 1.1 simultaneously, they pay the fees can to send messages to user reminding by SMS module 1.5.
Described Communication Layer 2 is provided with GPRS remote-transmission module 2.1 and multiple communication server 2.4, communication server 2.4 is received on all management main frames 1.1, described GPRS remote-transmission module 2.1 is for being connected this management system with other system, GPRS remote-transmission module 2.1 is connected with management main frame 1.1, and GPRS remote-transmission module 2.1 sends signal to GPRS network 2.3, signal in GPRS network 2.3 is received in its main frame by router 2.2 by other system, just can realize supporting the use of system.
Described mechanical floor 3 includes multiple distribution box 3.1, between the forceful electric power of one corresponding floor of distribution box 3.1, equipped with a main switch 3.2 in described distribution box 3.1, described one end of main switch 3.2 is connected with the electric wire of electric substation, the other end is drawn multiple circuits and is received in each user by guide rail ammeter 3.3 and chopper 3.4 respectively, and each guide rail ammeter 3.3 is all connected on communication server 2.4 by RS485 bus 2.5, thus pass to the electricity consumption situation at each family manage in main frame 1.1.
Claims (1)
- null1. a building complex prepaid administration system,It is characterized in that: it includes management level (1)、Communication Layer (2) and mechanical floor (3),Described management level (1) are arranged in Control Room,Described management level (1) include managing main frame (1.1),It is connected with ups power (1.2) and printer (1.3) in management main frame (1.1),And these management level (1) are additionally provided with backup host (1.4),This backup host (1.4) is connected with management main frame (1.1),Manage simultaneously and on main frame (1.1), be also associated with SMS module (1.5),Described Communication Layer (2) is provided with GPRS remote-transmission module (2.1) and multiple communication server (2.4),Communication server (2.4) is received on all management main frames (1.1),Described GPRS remote-transmission module (2.1) is connected with management main frame (1.1),And GPRS remote-transmission module (2.1) sends signal to GPRS network (2.3),Described mechanical floor (3) includes multiple distribution box (3.1),Between the forceful electric power of one corresponding floor of distribution box (3.1),Equipped with a main switch (3.2) in described distribution box (3.1),One end of described main switch (3.2) is connected with the electric wire of electric substation,The other end is drawn multiple circuits and is received in each user by guide rail ammeter (3.3) and chopper (3.4) respectively,And each guide rail ammeter (3.3) is all connected on communication server (2.4) by RS485 bus (2.5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620037771.2U CN205486496U (en) | 2016-01-15 | 2016-01-15 | Building complex is paid management system in advance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620037771.2U CN205486496U (en) | 2016-01-15 | 2016-01-15 | Building complex is paid management system in advance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205486496U true CN205486496U (en) | 2016-08-17 |
Family
ID=56669239
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620037771.2U Expired - Fee Related CN205486496U (en) | 2016-01-15 | 2016-01-15 | Building complex is paid management system in advance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205486496U (en) |
-
2016
- 2016-01-15 CN CN201620037771.2U patent/CN205486496U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11454659B2 (en) | Multi-purpose (multi-dwelling) electric metering system and method | |
CN105631947B (en) | Intelligent parking control system | |
CN201689120U (en) | Intelligent power-utilization information distributing electricity stealing prevention meter case | |
CN102484503A (en) | Smart grid over power line communication network | |
CN107230088A (en) | A kind of lithium battery is reviewed and lease management system | |
CN206400753U (en) | A kind of intelligent remote power meter-copy collector | |
CN102902255A (en) | Centralized management type electric vehicle alternating current charging system and monitoring method thereof | |
CN105391136A (en) | Intelligent electric motor car charging management system for community based on internet of things and charging management method | |
CN110544082A (en) | Business prepayment cloud platform system | |
CN106485835A (en) | A kind of intelligent charging method based on Third-party payment | |
CN205945535U (en) | Embedded communication power supply is upgraded and is inserted frame | |
CN108583301A (en) | A kind of electric motor intelligent charging system and method | |
CN201860163U (en) | Data center intelligent power supply control system | |
CN205486496U (en) | Building complex is paid management system in advance | |
CN205489523U (en) | Online system of paid management in advance of building complex | |
CN202331671U (en) | Terminal integrating recording and recharging | |
CN101931271B (en) | Recording and warning system of power theft events | |
CN203689621U (en) | Intelligent community self-service toll collection system | |
CN205246729U (en) | A device that is used for resident to take accuse table SMS notice collecting fee | |
CN108154608A (en) | A kind of practicality water meter management system | |
CN101026660A (en) | Mobile phone prepaid fee power management terminal | |
Lokre et al. | Implementation of IoT Based Electricity Controlled Prepaid Energy Meter Monitoring and Bill Payment System | |
CN203055001U (en) | Charging network system of electric bicycle | |
CN204116417U (en) | The control integrated electric energy metrical switch board of a kind of amount | |
CN202649304U (en) | Prepaid metering device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20200115 |