CN205482908U - Novel bridge health data monitoring system - Google Patents

Novel bridge health data monitoring system Download PDF

Info

Publication number
CN205482908U
CN205482908U CN201620276302.6U CN201620276302U CN205482908U CN 205482908 U CN205482908 U CN 205482908U CN 201620276302 U CN201620276302 U CN 201620276302U CN 205482908 U CN205482908 U CN 205482908U
Authority
CN
China
Prior art keywords
input
module
outfan
electrically connected
high speed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620276302.6U
Other languages
Chinese (zh)
Inventor
常开洪
林海
刘劲志
毛卫秀
杨育彪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Vocational Technology College Of Electronics & Information
Original Assignee
Guizhou Vocational Technology College Of Electronics & Information
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Vocational Technology College Of Electronics & Information filed Critical Guizhou Vocational Technology College Of Electronics & Information
Priority to CN201620276302.6U priority Critical patent/CN205482908U/en
Application granted granted Critical
Publication of CN205482908U publication Critical patent/CN205482908U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)
  • Testing Or Calibration Of Command Recording Devices (AREA)

Abstract

The utility model discloses a novel bridge health data monitoring system, including data acquisition system, the high -speed tester of meeting an emergency, input module, solar cell panel, perpendicular aerogenerator and commercial power, data acquisition system's the output and the input electric connection of the high -speed tester of meeting an emergency, the output of the tester of highly meeting an emergency and the soft analysis module's of MATLAB input electric connection, input module's output and the input electric connection of MATLAB software analysis module, the output of MATLAB software analysis module respectively with long -range wireless communication module and SD card storage module's input electric connection, the output of solar cell panel, perpendicular aerogenerator, commercial power passes through the input electric connection of controller and battery, hold the battery output end through the controller respectively with the input electric connection of high -speed meet an emergency tester and MATLAB software analysis module. The utility model discloses not only monitoring results is accurate, green moreover, and it is on duty to need not personnel.

Description

A kind of novel bridge health data monitoring system
Technical field
This utility model relates to bridge monitoring technical field, a kind of novel bridge health number According to monitoring system.
Background technology
Along with the highway terminating Guizhou Province of " 135 " developing goal, high-speed railway is open to traffic total kilometrage will Marching toward new step, Guizhou Province will become logistics center's dough-making powder the going to sea greatly to east coupling southwest Mouthful, big logistics distribution centre.Therefore for existing practical situation, southwest is especially adapted to Guizhou Medium and small bridges Monitoring system development under geological conditions and the task of building are particularly urgent, have realistic meaning. But existing research and scheme are for the health of the medium and small bridges of especially Guizhou province, west area, interior ground The system of data collection and analysis is very few (wherein exists cost the most expensive, data analysis sync rates Low, response speed is slow, the problem that contingency question diagnosis scheme is on the low side), and along with China native country is manufacturing Promoting and new mechanics of communication, the upgrading of the network technology, the especially arrival of cloud data age, for former It is lower that the bridge health data monitoring scheme of this costliness provides cost, and data analysis faster, responds cleverer Quick, equipment carries more portable opportunity.
Summary of the invention
The deficiency existed for above-mentioned prior art, the purpose of this utility model is to provide a kind of novel bridge Beam health data monitoring system.
To achieve these goals, this utility model be the technical scheme is that
A kind of novel bridge health data monitoring system, including data collecting system, high speed strain test Instrument, input module, solar panel, vertical wind power generator and civil power, described data collecting system The input of outfan and high speed strain tester be electrically connected with, highly the outfan of strain testing instrument with The input of MATLAB soft analysis module is electrically connected with, the outfan of described input module and MATLAB software Analyze module input be electrically connected with, the outfan of MATLAB software analysis module respectively with long distance wireless Communication module and SD card store the input of module and are electrically connected with, the output of described remote wireless communication module End is electrically connected with the input of mobile phone remote monitoring software and cloud Data Analysis Platform respectively, the described sun Energy cell panel, vertical wind power generator, the outfan of civil power pass through the input electricity of controller and accumulator Property connect, the outfan of accumulator is divided with high speed strain tester and MATLAB software respectively by controller The input of analysis module is electrically connected with.
Further, described data collecting system is connected with high speed strain tester by transmission line, and is passing Five class six core shielded cables are installed on defeated line.
Further, described high speed strain tester is uniformly arranged on target bridge, and high speed strain test Test Network is formed by bus group net between instrument.
Further, described controller is provided with intelligent recharge and discharge module.
Use after technique scheme, this utility model the most advantageously:
Novel bridge health data monitoring system described in the utility model, owing to data collecting system is led to Cross transmission line to be connected with high speed strain tester, and five class six core shielded cables be installed on the transmission line, Reduce the interference source impact on test result to greatest extent, by adding accumulator, it is to avoid monitoring system The system loss of data that unexpected off-grid causes when remotely monitoring, prevents continuous data collection and analysis from occurring breaking The situation of shelves, affect test result, and uses honourable mains hybrid technology to carry out energy storage, environmental protection, Use SD card as memorizer, it is simple to when running into vile weather, the data of backup in SD card to be read Taking, it is to avoid cause the loss of data, monitoring result is accurate, uses wireless telecommunication technology, it is not necessary to people Member is on duty, and can be analyzed this system in real time and detect target bridge.
Accompanying drawing explanation
With embodiment, this utility model is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is system block diagram of the present utility model.
In reference: 1-data collecting system;2-high speed strain tester;3-MATLAB software analysis Module;4-input module;5-remote wireless communication module;6-mobile phone remote controls software;7-cloud data Analysis platform;8-solar panel;9-vertical wind power generator;10-civil power;11-controller;12- Accumulator;13-SD card stores module.
Detailed description of the invention
The following stated is only preferred embodiment of the present utility model, the most therefore limits of the present utility model Protection domain.
Embodiment, as it is shown in figure 1, a kind of novel bridge health data monitoring system, including data acquisition Collecting system 1, high speed strain tester 2, input module 4, solar panel 8, vertical wind power generation Machine 9 and civil power 10, the outfan of data collecting system 1 is electrical with the input of high speed strain tester 2 Connecting, data collecting system 1 is connected with high speed strain tester 2 by transmission line, and on the transmission line Being provided with five class six core shielded cables, high speed strain tester 2 is uniformly arranged on target bridge, and high Test Network, the highly outfan of strain testing instrument 2 is formed by bus group net between speed strain testing instrument 2 The input of analysis module 3 soft with MATLAB is electrically connected with, the outfan of input module 4 and MATLAB The input of software analysis module 3 is electrically connected with, the outfan of MATLAB software analysis module 3 respectively with Remote wireless communication module 5 and SD card stores the input of module 13 and is electrically connected with, remote radio communication The outfan of module 5 is electric with the input of mobile phone remote monitoring software 6 and cloud Data Analysis Platform 7 respectively Property connect, solar panel 8, vertical wind power generator 9, the outfan of civil power 10 pass through controller 11 are electrically connected with the input of accumulator 12, the outfan of accumulator 12 by controller 11 respectively with The input of high speed strain tester 2 and MATLAB software analysis module 3 is electrically connected with, controller 11 In be provided with intelligent recharge and discharge module.
Operation principle: according to practical structures and the actual vehicle flowrate of target bridge, the measuring point of this bridge selected Distribution, installs high speed strain tester 2, mount point away from strong time variant voltage equipment, away from noise, electrostatic, Electromagnetic interference, then installs accumulator 12 and SD card, finally the vehicle flowrate situation of target bridge is passed through Input module 4 inputs in MATLAB software analysis module 3, right by MATLAB software analysis module 3 Data are estimated by the several of measurement process gained according to early stage vehicle flowrate investigation and analysis, will assess number simultaneously Send to mobile phone remote monitoring software 6 and cloud Data Analysis Platform 7 according to by remote wireless communication module 5 On, this system uses scene mains hybrid technology to be powered.
It is obvious to a person skilled in the art that this utility model is not limited to above-mentioned one exemplary embodiment Details, and in the case of without departing substantially from spirit or essential attributes of the present utility model, it is possible to other Concrete form realizes this utility model.Which point therefore, no matter from the point of view of, embodiment all should be regarded as Exemplary, and be nonrestrictive, scope of the present utility model by claims rather than on State bright restriction, it is intended that all changes that will fall in the implication of equivalency and scope of claim Change and include in this utility model.Any reference in claim should be considered as restriction involved Claim.
The above, preferred embodiment the most of the present utility model, not in order to limit this utility model, Every according to technical spirit of the present utility model, above example is made any trickle amendment, equivalent replace Change and improve, within should be included in the protection domain of technical solutions of the utility model.

Claims (4)

1. a novel bridge health data monitoring system, including data collecting system (1), at a high speed should Become tester (2), input module (4), solar panel (8), vertical wind power generator (9) and Civil power (10), it is characterised in that: the outfan of described data collecting system (1) is tested with high speed strain The input of instrument (2) is electrically connected with, highly the outfan of strain testing instrument (2) and the soft analysis of MATLAB The input of module (3) is electrically connected with, and the outfan of described input module (4) divides with MATLAB software Analysis module (3) input be electrically connected with, the outfan of MATLAB software analysis module (3) respectively with Remote wireless communication module (5) and SD card store the input of module (13) and are electrically connected with, described far The outfan of journey wireless communication module (5) respectively with mobile phone remote monitoring software (6) and cloud data analysis The input of platform (7) is electrically connected with, described solar panel (8), vertical wind power generator (9), The outfan of civil power (10) is electrically connected with by the input of controller (11) with accumulator (12), The outfan of accumulator (12) by controller (11) respectively with high speed strain tester (2) and MATLAB The input of software analysis module (3) is electrically connected with.
A kind of novel bridge health data monitoring system the most according to claim 1, its feature exists In: described data collecting system (1) is connected with high speed strain tester (2) by transmission line, and Five class six core shielded cables are installed on transmission line.
A kind of novel bridge health data monitoring system the most according to claim 1, its feature exists In: described high speed strain tester (2) is uniformly arranged on target bridge, and high speed strain tester (2) Between by bus group net formed Test Network.
A kind of novel bridge health data monitoring system the most according to claim 1, its feature exists In: described controller is provided with intelligent recharge and discharge module in (11).
CN201620276302.6U 2016-03-28 2016-03-28 Novel bridge health data monitoring system Expired - Fee Related CN205482908U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620276302.6U CN205482908U (en) 2016-03-28 2016-03-28 Novel bridge health data monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620276302.6U CN205482908U (en) 2016-03-28 2016-03-28 Novel bridge health data monitoring system

Publications (1)

Publication Number Publication Date
CN205482908U true CN205482908U (en) 2016-08-17

Family

ID=56646854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620276302.6U Expired - Fee Related CN205482908U (en) 2016-03-28 2016-03-28 Novel bridge health data monitoring system

Country Status (1)

Country Link
CN (1) CN205482908U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109872520A (en) * 2019-03-14 2019-06-11 江苏泓茂新能源科技有限公司 Bridge health monitoring system and its working method based on wireless sensor network

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109872520A (en) * 2019-03-14 2019-06-11 江苏泓茂新能源科技有限公司 Bridge health monitoring system and its working method based on wireless sensor network

Similar Documents

Publication Publication Date Title
CN103926512A (en) Method for simulating XLPE insulated cable partial discharge and simulation testing platform
CN102073017A (en) Intelligent testing platform of battery management system and testing method
CN105547373A (en) Contact network state on-line monitoring/detection device based on public network transmission
CN109188305A (en) A kind of power battery cycling durable test device and its test method
CN203786271U (en) Device for testing state of charge (SOC) of electric automobile battery pack
CN107576871A (en) Demand-side charging equipment of electric automobile security performance remote detection and diagnostic system and method
CN106168646A (en) A kind of cable local discharge monitoring system
CN103513137A (en) Traction power supply information acquisition system based on synchronous measurement
CN106569053B (en) A kind of simulation system and method for pure electric automobile on-vehicle battery external characteristics
CN202058289U (en) Inspection device for electricity utilization information acquisition terminal
CN205482908U (en) Novel bridge health data monitoring system
CN103941138A (en) OPGW whole-wire monitoring and diagnosing system and method
CN204882746U (en) Electric automobile alternating current -direct current stake examination conversion equipment that charges
CN105652098A (en) Ground resistance detection and analysis system adopting solar energy to supply power
CN202485714U (en) Power transmission line icing on-line monitoring system
CN202119821U (en) Recognizing device of polarity electrification of DC transmission circuit
CN207232755U (en) A kind of new energy vehicle BMS charging CAN communication test systems with real load
CN201927154U (en) Bridge safety warning system
CN201852889U (en) Movable detecting platform for large and medium sized photovoltaic power stations
CN204188712U (en) Based on transformer station's environmental impact assessment early warning system of compressed sensing restructing algorithm
CN203798990U (en) Charge state detection device of power battery pack of electromobile
CN102565877A (en) Weather monitoring device based on short message warning
CN207623425U (en) A kind of power drive system motor axial direction conducted emission test system of electric vehicle
CN205958653U (en) High voltage transmission line's corona loss measuring equipment
CN201697956U (en) Real-time on-line detection device for discharge current of ADSS optical cable

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20170328

CF01 Termination of patent right due to non-payment of annual fee