CN207232755U - A kind of new energy vehicle BMS charging CAN communication test systems with real load - Google Patents

A kind of new energy vehicle BMS charging CAN communication test systems with real load Download PDF

Info

Publication number
CN207232755U
CN207232755U CN201721192031.7U CN201721192031U CN207232755U CN 207232755 U CN207232755 U CN 207232755U CN 201721192031 U CN201721192031 U CN 201721192031U CN 207232755 U CN207232755 U CN 207232755U
Authority
CN
China
Prior art keywords
test
battery
charging
host computers
new energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721192031.7U
Other languages
Chinese (zh)
Inventor
张帅
张君鸿
高史贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Idrive Automobile Co Ltd
Original Assignee
Beijing Idrive Automobile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Idrive Automobile Co Ltd filed Critical Beijing Idrive Automobile Co Ltd
Priority to CN201721192031.7U priority Critical patent/CN207232755U/en
Application granted granted Critical
Publication of CN207232755U publication Critical patent/CN207232755U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Tests Of Electric Status Of Batteries (AREA)

Abstract

The utility model discloses a kind of new energy vehicle BMS charging CAN communication test systems with real load, including battery pack, high voltage distribution box, power cycles and test system, A-battery, DC charging power supply, demarcate measuring apparatus, test PC host computers, wherein battery management system and battery management carry out battery pack state monitoring in real time and control from control system, battery pack and power cycles and test system are connected with high voltage distribution box into horizontal high voltage, test PC host computers are connected with power cycles and test system by CAN lines, test PC host computers are connected with calibration measuring apparatus, A-battery is connected with DC charging power supply.

Description

A kind of new energy vehicle BMS charging CAN communication test systems with real load
Technical field
It the utility model is related to new-energy automobile field, more particularly to a kind of new energy vehicle BMS with real load The CAN communication that charges test system.
Background technology
The development prospect of new-energy automobile is wide, will necessarily become the main traffic trip instrument of future world.New energy One of main path for the problems such as automobile is widely regarded as solving automobile exhaust pollution and short petroleum-based energy, with new energy The technology of automobile improves, and market popularization and fast development, also put forward the properties of product, reliability, security of its key components and parts Go out increasingly higher demands.Battery pack and core component of the battery management system as new energy car, their performance determine Performance, safety and the service life of vehicle.Battery pack is responsible for the power producer of vehicle, and battery management system controls power battery Complicated charge and discharge process, is responsible for detection and reply processing to the various abnormalities of power battery, for ensureing power Cell safety, Effec-tive Function play decisive role.Therefore, comprehensive charging CAN communication is carried out to battery management system BMS to survey Examination is necessary.
The laboratory test to the charging CAN communication test of New-energy electric vehicle battery management system mainly passes through at present Hardware in loop equipment simulating charger tests battery management system, has lacked the signals such as battery cell voltage, temperature Actual physical changes, and being unable to battery management system BMS offers because can not provide real charging voltage with electric current really fills Electrical environment, make charging CAN communication test lack accuracy with it is comprehensive.
The problem of in correlation technique, not yet propose effective solution at present.
Utility model content
For the above-mentioned technical problem in correlation technique, the utility model proposes a kind of new energy car with real load BMS charging CAN communication test system.
The technical problem that the utility model is solved is realized using following technical scheme:
A kind of new energy vehicle BMS charging CAN communication test systems with real load, including power cycles and test System, calibration measuring apparatus, high voltage distribution box and battery pack, the battery pack include the battery management connected by internal CAN Unit B CU and battery management pass through from control unit MMU, the power cycles and test system and battery pack and high voltage distribution box High-voltage conducting wires are connected with each other, and the calibration measuring apparatus is connected by PTCAN connecting test PC host computers, the test PC host computers Host computer mainframe box is connected to, the high voltage distribution box, battery management unit BCU are connected with A-battery by primary cable, institute State A-battery and be connected with DC charging power supply, the test PC host computers are connected by PTCAN and power cycles and test system Connect and the power cycles and test system are controlled, the battery management unit BCU is also by PTCAN with testing on PC Position machine connects row information interaction of going forward side by side.
Further, the power cycles and test system fill the battery pack by simulating real charger Electricity.
Further, the test PC host computers are handed over by the PTCAN and power cycles and test system into row information Mutually, the power cycles and test system are adjusted(1)Output voltage and electric current.
Further, the calibration measuring apparatus, host computer mainframe box, A-battery and DC charging power supply integration It is encapsulated in cabinet.
Further, the cabinet and the test PC host computers form integrated monitor supervision platform.
The beneficial effects of the utility model are:Can be pure to new energy by power cycles and test system imitating charger The charging CAN communication of electric automobile BMS carry out more fully with real test, including normolineal communication function test and different The communication function for being often and troubleshooting test.Real battery pack and battery management are employed from control unit, true collection electricity Voltage, the temperature signal of pond monomer, the physical change of battery cell when more can really reflect charging;Employ and really fill Electrical environment carries out battery management system charging CAN communication test, enhances and battery management system and charger CAN communication are surveyed The accuracy of examination with it is comprehensive.
Brief description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Needed in attached drawing be briefly described.
Fig. 1 is a kind of new energy vehicle BMS charging CAN communication test system structure block diagrams with real load.
In figure:
1st, power cycles and test system;2nd, monitor supervision platform;3rd, PC host computers are tested;4th, cabinet;5th, measuring apparatus is demarcated; 6th, host computer mainframe box;7th, A-battery;8th, DC charging power supply;9th, high voltage distribution box;10th, battery pack;11st, battery management list First BCU;12nd, battery management from control unit MMU;13rd, inside CAN;14、PTCAN;15th, charge CAN;16th, primary cable;17th, it is high Press conducting wire.
Embodiment
Below in conjunction with specific embodiment, the utility model is described in further detail.
As shown in Figure 1, a kind of new energy vehicle BMS charging CAN communication test systems with real load, including electric energy Circulation and test system 1, calibration measuring apparatus 5, high voltage distribution box 9 and battery pack 10.The battery pack 10 includes passing through inside The battery management unit BCU 11 and battery management of the connections of CAN 13 from control unit MMU 12, the power cycles and test system 1 and battery pack 10 and high voltage distribution box 9 be connected with each other by high-voltage conducting wires 17.The calibration measuring apparatus 5 passes through PTCAN 14 are connected with test PC host computers 3, and the test PC host computers 3 are connected with host computer mainframe box 6, the high voltage distribution box 9, electricity Pond administrative unit BCU 11 is connected with A-battery 7 by primary cable 16, and the A-battery 7 is connected with DC charging power supply 8, the test PC host computers 3 are connected by PTCAN 14 with power cycles and test system 1 and to the power cycles and survey Test system 1 is controlled, and the battery management unit BCU 11 is also connected and carried out with test PC host computers 3 by PTCAN 14 Information exchange.
The calibration measuring apparatus 5 is connected by PTCAN 14 with test PC host computers 3, realizes data in test process Collection, calibration and accident analysis;The battery management unit BCU 11 is connected with high voltage distribution box 9 by high-voltage conducting wires 17, real Existing battery management unit BCU 11 is controlled relay in high voltage distribution box 9;The battery pack 10 passes through high-voltage conducting wires 17 It is connected with high voltage distribution box 9, while high voltage distribution box 9 is also connected by high-voltage conducting wires 17 with power cycles and test system 1, it is real Now real voltage and current environment is provided for BMS during the test;The test PC host computers 3 pass through PTCAN 14 and electricity Pond administrative unit BCU 11 is connected so that whole system forms signal closed loop in test process;The test PC host computers 3 pass through PTCAN 14 is connected with battery management unit BCU 11, and comprehensive, accurately survey can be carried out to the CAN communication in charging process Examination.
During specifically used the utility model, test PC host computers 3 by CAN communication to power cycles and test system 1 into Row control charges battery pack 10 with analog charge machine equipment;Adopted between calibration measuring apparatus 5 and test PC host computers 3 With the low CCP communications protocol of standard, these data simultaneously are used to control by the data that can be read and write in real time inside BMS system master units Winding and observation;The output signal of BMS systems, including hard signal, CAN signal are associated by harness, so as to fulfill letter Number closed loop;Test PC host computers are interacted with BMS systems by DC charging CAN, and imitating charger, which provides, really to be filled Electrical environment.
Battery management unit BCU 11, by the control to high voltage distribution box 9, so as to fulfill battery pack 10 and analog charge The power cycles and test system 1 of machine connect;Realize when charging operating mode, power cycles and test system 1 serve as charger pair Battery pack 10 charges, and test PC host computers 3 carry out CAN communication, battery management system 11 according to national standard and BMS systems 10 state of battery pack is continuously monitored, charge requirement is sent to test PC host computers 3 according to battery core voltage and temperature regime, Test PC host computers 3 are exported by the demand for controlling power cycles and test system 1 to carry out BMS systems to battery pack, whole A journey can be carried out fully according to the DC charging communications protocol of newest national regulations.
Charger is served as in power cycles and test system 1, simulation, and battery pack is as true negative in whole charging process Carry, test PC host computers 3, fill according to the signal instruction that battery management unit BCU 11 is sent on collection CAN lines to be controlled Discharge equipment.During the test, battery management main control unit 11 by battery management from control unit MMU 12 collection come electricity Core voltage and temperature signal, maximum allowable charging current, maximum allowable charging are sent by logic judgment to test PC host computers 3 The data such as voltage, BMS demand currents, BMS demand voltages, when test PC host computers 3 receive the CAN data that BMS systems send, Output control is carried out to charging/discharging apparatus by CAN communication.Whole test system provides real charging output side(Electric energy Circulation and test system 1)With real charging recipient(Battery pack 10), provided for the charging CAN tests of BMS system dcs true Real test environment, intactly can carry out battery management system normolineal communication function test and the communication work(for being extremely Energy and troubleshooting test.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on, should be included in the utility model Protection domain within.

Claims (5)

1. a kind of new energy vehicle BMS charging CAN communication test systems with real load, including power cycles and test system System(1), calibration measuring apparatus(5), high voltage distribution box(9)And battery pack(10), it is characterised in that the battery pack(10)Including Pass through internal CAN(13)The battery management unit BCU of connection(11)With battery management from control unit MMU(12), the electric energy follows Ring and test system(1)And battery pack(10)And high voltage distribution box(9)Pass through high-voltage conducting wires(17)It is connected with each other, the calibration Measuring apparatus(5)Pass through PTCAN(14)Connecting test PC host computers(3), the test PC host computers(3)It is connected with upper owner Cabinet(6), the high voltage distribution box(9), battery management unit BCU(11)Pass through primary cable(16)It is connected with A-battery (7), the A-battery(7)It is connected with DC charging power supply(8), the test PC host computers(3)Pass through PTCAN(14)With electricity It can circulate and test system(1)Connect and to the power cycles and test system(1)It is controlled, the battery management unit BCU(11)Also pass through PTCAN(14)With testing PC host computers(3)Connect row information interaction of going forward side by side.
2. the new energy vehicle BMS charging CAN communication test systems according to claim 1 with real load, it is special Sign is, the power cycles and test system(1)By simulating real charger to the battery pack(10)Charge.
3. the new energy vehicle BMS charging CAN communication test systems according to claim 2 with real load, it is special Sign is, the test PC host computers(3)Pass through the PTCAN(14)With power cycles and test system(1)Handed over into row information Mutually, the power cycles and test system are adjusted(1)Output voltage and electric current.
4. the new energy vehicle BMS charging CAN communication test systems according to claim 3 with real load, it is special Sign is, the calibration measuring apparatus(5), host computer mainframe box(6), A-battery(7)And DC charging power supply(8)One Change is encapsulated in cabinet(4)In.
5. the new energy vehicle BMS charging CAN communication test systems according to claim 4 with real load, it is special Sign is, the cabinet(4)With the test PC host computers(3)Form integrated monitor supervision platform(2).
CN201721192031.7U 2017-09-15 2017-09-15 A kind of new energy vehicle BMS charging CAN communication test systems with real load Expired - Fee Related CN207232755U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721192031.7U CN207232755U (en) 2017-09-15 2017-09-15 A kind of new energy vehicle BMS charging CAN communication test systems with real load

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721192031.7U CN207232755U (en) 2017-09-15 2017-09-15 A kind of new energy vehicle BMS charging CAN communication test systems with real load

Publications (1)

Publication Number Publication Date
CN207232755U true CN207232755U (en) 2018-04-13

Family

ID=61862413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721192031.7U Expired - Fee Related CN207232755U (en) 2017-09-15 2017-09-15 A kind of new energy vehicle BMS charging CAN communication test systems with real load

Country Status (1)

Country Link
CN (1) CN207232755U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108819732A (en) * 2018-04-28 2018-11-16 苏州正力蔚来新能源科技有限公司 BMS hardware capability test macro
CN109218335A (en) * 2018-11-14 2019-01-15 行云新能科技(深圳)有限公司 Data interactive method, terminal and storage medium based on battery management system
CN111123891A (en) * 2019-12-24 2020-05-08 国联汽车动力电池研究院有限责任公司 BMS-based quick charging test method, system, equipment and storage medium

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108819732A (en) * 2018-04-28 2018-11-16 苏州正力蔚来新能源科技有限公司 BMS hardware capability test macro
CN109218335A (en) * 2018-11-14 2019-01-15 行云新能科技(深圳)有限公司 Data interactive method, terminal and storage medium based on battery management system
CN111123891A (en) * 2019-12-24 2020-05-08 国联汽车动力电池研究院有限责任公司 BMS-based quick charging test method, system, equipment and storage medium
CN111123891B (en) * 2019-12-24 2021-05-28 国联汽车动力电池研究院有限责任公司 BMS-based quick charging test method, system, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN103941210B (en) The checking monitoring system of a kind of BMS and method thereof
CN104798283B (en) For testing and safeguarding the application of the facility of high-tension battery and the facility
CN207232755U (en) A kind of new energy vehicle BMS charging CAN communication test systems with real load
CN110134115B (en) Hardware-in-loop test platform and test method for new energy vehicle power battery management system
CN203689120U (en) New energy vehicle battery management system master and slave control board hardware-in-the-loop test system
CN103760896B (en) Hardware-in-loop test device and method for vehicle-mounted charger control device of new energy automobile
CN103760895B (en) Automobile-mounted charger of new energy control device hardware-in―the-loop test method
CN105759208A (en) Function detection platform for battery management system for battery pack
CN106443545B (en) Fault diagnosis and positioning system and method for battery management system of pure electric vehicle
CN108107373A (en) A kind of BMS test methods and system
CN107634277A (en) A kind of automobile high in the clouds battery management system based on wireless telecommunications battery core
CN207832980U (en) A kind of new energy vehicle power battery pack and battery management engine bench test system
CN109444614B (en) Off-vehicle charger detection device
CN206489447U (en) Battery management system hardware-in―the-loop test system
CN207965627U (en) A kind of special HIL testboard bay test adaptor harness speeded of meaning
CN207611129U (en) Battery pack tests system
CN107843848A (en) A kind of electrokinetic cell and battery management test stand system
CN107861071A (en) New energy vehicle BMS systems and the battery testing plateform system of battery bag joint test
CN207964986U (en) A kind of electric vehicle VCU and BMS joint test platforms
CN203689146U (en) New energy vehicle battery management system master and slave control board hardware-in-the-loop test system
CN206470600U (en) A kind of Vehicular battery management system test system of integrated form
CN103760891A (en) Hardware-in-loop testing device and method for automobile non-vehicle-mounted direct-current charging control device
CN109270471A (en) A kind of portable power battery device for fast detecting and system
CN215552655U (en) Electric automobile assembled battery detecting system and battery test machine
CN106569053B (en) A kind of simulation system and method for pure electric automobile on-vehicle battery external characteristics

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

Termination date: 20200915

CF01 Termination of patent right due to non-payment of annual fee