CN205479793U - Raceway prevents frostbite - Google Patents

Raceway prevents frostbite Download PDF

Info

Publication number
CN205479793U
CN205479793U CN201620295978.XU CN201620295978U CN205479793U CN 205479793 U CN205479793 U CN 205479793U CN 201620295978 U CN201620295978 U CN 201620295978U CN 205479793 U CN205479793 U CN 205479793U
Authority
CN
China
Prior art keywords
pipe
outer tube
tube
chamber
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620295978.XU
Other languages
Chinese (zh)
Inventor
潘能红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin golden Long Pipeline Engineering Co., Ltd.
Original Assignee
潘能红
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 潘能红 filed Critical 潘能红
Priority to CN201620295978.XU priority Critical patent/CN205479793U/en
Application granted granted Critical
Publication of CN205479793U publication Critical patent/CN205479793U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Thermal Insulation (AREA)

Abstract

The utility model discloses a raceway prevents frostbite, the female joint comprises an outer pipe, the isolation pipe is installed through supporting protrusion to the inner chamber of outer tube, and the real empty room of sealed formation between outer tube and the isolation pipe, keep apart the inner chamber of pipe and install the inner tube through supporting protrusion, just the sealed plenum chamber that forms between inner tube and the isolation pipe, the through -hole is shown to the first -class matrix of strutting arrangement, the left wall of plenum chamber is provided with temperature sensor, and the right -hand member face of plenum chamber installs heating device, the left end integrated into one piece of outer tube has the left end lid, and the right -hand member of outer tube to be connected with the installation protruding, this device can keep the temperature to be in more than the freezing point through setting up heating device in the raceway outer end at chilly weather with the thermal -insulated structure in vacuum, messenger's raceway inside to through the vacuum isolation, it is few to make the raceway dispel the heat after the heating, and the energy resource consumption significantly reduces, consequently has very high practical value.

Description

A kind of antifreeze water-supply-pipe
Technical field
This utility model relates to tap water transportation art, a kind of antifreeze water-supply-pipe.
Background technology
The Main Function of water-supply-pipe is the water resource in water tower to be transported to the various occasions needing to use water, but in reality During water delivery in addition to the corrosion resistance needing consideration water-supply-pipe and stiffness, in addition it is also necessary to consider the anti-freezing property of water-supply-pipe, Due to water at low temperatures can glaciation, this not only can hinder the proper flow of current, and when water becomes ice, volume also can increase Greatly, making to bear huge pressure inside water-supply-pipe, even by spalling, the most existing water-supply-pipe is especially in cold area work Water-supply-pipe be required for design time consider freezing tolerance, but the freeze proof measure of existing water-supply-pipe mainly use additional heat-insulation layer or Person adds the mode of antifreeze in current, and both effects when in the face of extremely cold environment are the most bad, and the latter also can carry Carry out potential health threat, if it is possible to a kind of more preferable water-supply-pipe of cryoprotective effects of invention just can effectively solve problems, for This we provides a kind of antifreeze water-supply-pipe.
Utility model content
The purpose of this utility model is to provide a kind of antifreeze water-supply-pipe, with solve in above-mentioned background technology propose ask Topic.
For achieving the above object, this utility model following technical scheme of offer: a kind of antifreeze water-supply-pipe, including outer tube, institute State the inner chamber of outer tube by support protrusion, sealing to be installed between isolated tube, and outer tube and isolated tube and form vacuum chamber, described every From pipe inner chamber by support protrusion be provided with between inner tube, and said inner tube and isolated tube sealing formed plenum chamber, described The first-class matrix of support arrangement shows through hole, and the left wall of described plenum chamber is provided with temperature sensor, and the right side of plenum chamber is installed Having heater, the left end of described outer tube is integrally formed with left end cap, and the right-hand member connection of outer tube has installation projection, described installation Protruding inner chamber is provided with controller, and the upper end of installation projection is at least provided with evacuation hole, air-filled pore and entrance hole, described Evacuation hole communicates with vacuum chamber, and is provided with the vacuum valve mated between evacuation hole and vacuum chamber, described air-filled pore with fill Air chamber communicates, and is provided with the ventilating control valve mated between air-filled pore with plenum chamber, the right-hand member one one-tenth that described installation is protruding Type has a right end cap, and is provided with, on right end cap and left end cap, the connecting hole being mutually matched, and described controller is electrically connected with Heater and temperature sensor.
Preferably, the outer end socket of described outer tube is provided with heat barrier foam pipe.
Preferably, described heater is Resistant heating device or induction heater.
Preferably, described support protrusion is that thermal insulation ceramics is protruding, and the aperture of through hole is not less than the two of support protrusion height / mono-.
Compared with prior art, the beneficial effects of the utility model are: this utility model is by arranging in water-supply-pipe outer end Heater and vacuum degree, make temperature to be kept to be in above freezing at arctic weather inside water-supply-pipe, and By vacuum insulation, making water-supply-pipe dispel the heat after the heating few, energy resource consumption greatly reduces, and therefore has the highest practical value.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is the sectional view of this utility model structure.
In figure: 1 right end cap, 2 installation projections, 3 evacuation holes, 4 outer tubes, 5 left end caps, 6 air-filled pores, 7 entrance holes, 8 connections Hole, 9 isolated tubes, 10 inner tubes, 11 temperature sensors, 12 heaters, 13 controllers, 14 support protrusion, 15 through holes, 16 inflations Room, 17 vacuum chambers, 18 vacuum valves, 19 ventilating control valves.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of this utility model rather than whole Embodiment.Based on the embodiment in this utility model, those of ordinary skill in the art are not under making creative work premise The every other embodiment obtained, broadly falls into the scope of this utility model protection.
Referring to Fig. 1-2, a kind of technical scheme of this utility model offer: a kind of antifreeze water-supply-pipe, including outer tube 4, outer tube 4 Outer end socket heat barrier foam pipe is installed, the inner chamber of outer tube 4 is provided with isolated tube 9 by support protrusion 14, and outer tube 4 with every Sealing between pipe 9 and form vacuum chamber 17, the inner chamber of isolated tube 9 is provided with inner tube 10 by support protrusion 14, and inner tube 10 with Sealing between isolated tube 9 and form plenum chamber 16, the first-class matrix of support means 14 shows through hole 15, and support protrusion 14 is thermal insulation ceramics Projection, and the aperture of through hole 15 is not less than 1/2nd of support protrusion 14 height, the left wall of plenum chamber 16 is provided with temperature and passes Sensor 11, and the right side of plenum chamber 16 is provided with heater 12, heater 12 is Resistant heating device or electromagnetism sense Answering formula heater, the left end of outer tube 4 is integrally formed with left end cap 5, and the right-hand member connection of outer tube 4 has installation protruding 2, installs convex The inner chamber playing 2 is provided with controller 13, and installs the upper end of projection 2 at least provided with evacuation hole 3, air-filled pore 6 and entrance hole 7, evacuation hole 3 communicates with vacuum chamber 17, and is provided with the vacuum valve 18 mated between evacuation hole 3 with vacuum chamber 17, inflation Hole 6 communicates with plenum chamber 16, and is provided with the ventilating control valve 19 mated between air-filled pore 6 with plenum chamber 16, installs protruding 2 Right-hand member is integrally formed with right end cap 1, and is provided with the connecting hole 8 being mutually matched, controller 13 on right end cap 1 and left end cap 5 Be electrically connected with heater 12 and temperature sensor 11, this device when mounted by vacuum state in vacuum chamber 17, And in plenum chamber 16, pour gases at high pressure, during work, controller 13 detects the temperature in plenum chamber 16 by temperature sensor 11 Degree, when temperature reaches design temperature, heater 12 will heat, and the gas in plenum chamber 16 can be rapidly by warm Amount is taken in whole plenum chamber 16, and vacuum chamber 17 then can effectively reduce scattering and disappearing of heat in plenum chamber 16, greatly reduces energy Amount loss, therefore this device has the highest practical value.
Embodiment the most of the present utility model, for the ordinary skill in the art, It is appreciated that in the case of without departing from principle of the present utility model and spirit and these embodiments can be carried out multiple change, repair Changing, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (4)

1. an antifreeze water-supply-pipe, including outer tube (4), it is characterised in that: the inner chamber of described outer tube (4) passes through support protrusion (14) Sealing is installed between isolated tube (9), and outer tube (4) and isolated tube (9) and forms vacuum chamber (17), described isolated tube (9) interior Chamber is provided with between inner tube (10), and said inner tube (10) and isolated tube (9) sealing by support protrusion (14) and forms plenum chamber (16), described support means (14) first-class matrix shows through hole (15), and the left wall of described plenum chamber (16) is provided with temperature sensing Device (11), and the right side of plenum chamber (16) is provided with heater (12), the left end of described outer tube (4) is integrally formed with left end Covering (5), and the right-hand member connection of outer tube (4) has installation protruding (2), the described inner chamber installing projection (2) is provided with controller (13), And the upper end of protruding (2) is installed at least provided with evacuation hole (3), air-filled pore (6) and entrance hole (7), described evacuation hole (3) Communicate with vacuum chamber (17), and between evacuation hole (3) with vacuum chamber (17), be provided with the vacuum valve (18) mated, described inflation Hole (6) communicates with plenum chamber (16), and is provided with the ventilating control valve (19) mated between air-filled pore (6) with plenum chamber (16), The described right-hand member of protruding (2) of installing integrally formed with right end cap (1), and right end cap (1) and left end cap (5) all on be provided with mutual The connecting hole (8) of coupling, described controller (13) is electrically connected with heater (12) and temperature sensor (11).
The antifreeze water-supply-pipe of one the most according to claim 1, it is characterised in that: the outer end socket of described outer tube (4) is installed There is heat barrier foam pipe.
The antifreeze water-supply-pipe of one the most according to claim 1, it is characterised in that: described heater (12) is that resistance wire adds Thermal or induction heater.
The antifreeze water-supply-pipe of one the most according to claim 1, it is characterised in that: described support protrusion (14) is thermal insulation ceramics Projection, and the aperture of through hole (15) is not less than 1/2nd of support protrusion (14) height.
CN201620295978.XU 2016-04-10 2016-04-10 Raceway prevents frostbite Expired - Fee Related CN205479793U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620295978.XU CN205479793U (en) 2016-04-10 2016-04-10 Raceway prevents frostbite

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620295978.XU CN205479793U (en) 2016-04-10 2016-04-10 Raceway prevents frostbite

Publications (1)

Publication Number Publication Date
CN205479793U true CN205479793U (en) 2016-08-17

Family

ID=56643967

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620295978.XU Expired - Fee Related CN205479793U (en) 2016-04-10 2016-04-10 Raceway prevents frostbite

Country Status (1)

Country Link
CN (1) CN205479793U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837731A (en) * 2017-03-02 2017-06-13 李爱冰 A kind of agricultural device of fetching water
CN108506644A (en) * 2017-02-28 2018-09-07 芜湖美的厨卫电器制造有限公司 Heat-insulating profile and water heater
CN109870044A (en) * 2017-12-04 2019-06-11 天津博帆科技发展有限公司 A kind of industrial production waste heat water cycle utilization device
CN110056735A (en) * 2019-04-16 2019-07-26 仪征市恒盛机械有限公司 A kind of antifreeze aluminum pipe
CN111114746A (en) * 2019-12-23 2020-05-08 北京空天技术研究所 Skin structure
CN112128480A (en) * 2020-09-10 2020-12-25 杨绪全 Anti-freezing water pipe device
CN112483772A (en) * 2020-11-26 2021-03-12 江西爱森德实业有限公司 Multipurpose corrugated pipe joint
CN112833270A (en) * 2021-02-05 2021-05-25 黄志中 Natural gas conveying pipeline

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108506644A (en) * 2017-02-28 2018-09-07 芜湖美的厨卫电器制造有限公司 Heat-insulating profile and water heater
CN108506644B (en) * 2017-02-28 2023-12-19 芜湖美的厨卫电器制造有限公司 Heat preservation section bar and water heater
CN106837731A (en) * 2017-03-02 2017-06-13 李爱冰 A kind of agricultural device of fetching water
CN109870044A (en) * 2017-12-04 2019-06-11 天津博帆科技发展有限公司 A kind of industrial production waste heat water cycle utilization device
CN110056735A (en) * 2019-04-16 2019-07-26 仪征市恒盛机械有限公司 A kind of antifreeze aluminum pipe
CN111114746A (en) * 2019-12-23 2020-05-08 北京空天技术研究所 Skin structure
CN112128480A (en) * 2020-09-10 2020-12-25 杨绪全 Anti-freezing water pipe device
CN112128480B (en) * 2020-09-10 2021-12-07 惠民力创水利科技有限公司 Anti-freezing water pipe device
CN112483772A (en) * 2020-11-26 2021-03-12 江西爱森德实业有限公司 Multipurpose corrugated pipe joint
CN112833270A (en) * 2021-02-05 2021-05-25 黄志中 Natural gas conveying pipeline

Similar Documents

Publication Publication Date Title
CN205479793U (en) Raceway prevents frostbite
CN107917459A (en) Integral type changes in temperature unit
CN107906583A (en) A kind of family expenses changes in temperature unit
CN103334985B (en) A kind of hydraulic oil cooling fuel tank
CN203674957U (en) Water tank with inclined temperature layer and for direct current power transmission converter valve
CN211060312U (en) Natural draft and mechanical exhaust combined comprehensive pipe trench ventilation system
CN201589396U (en) Wall-mounted gas boiler with antifreezing relief valve
CN202281390U (en) Solar water heater
CN202195116U (en) Energy-saving anti-freezing safety air valve of a solar energy water heater
CN201561541U (en) Wall-mounted gas boiler having anti-freezing device
CN102003553B (en) Medium transmission hydraulic combination linkage valve
CN107906739B (en) Heat preservation equipment of energy-saving electric boiler
CN201567807U (en) Energy-saving building
CN209279378U (en) Anti-cracking constant-temperature bin and gas water heater
CN108759546A (en) A kind of the package structure and hot water machine of expansion cracking proof
CN205897304U (en) Pipeline prevents frostbite in air -source heat pump energy storage water route
CN205296546U (en) Energy -saving and environment -friendly exterior wall brick
CN212747942U (en) Anti-freezing water meter box
CN210237658U (en) Novel expansion tank
CN101598465B (en) Antifreeze solar water heater with combined insulation tube and water tank
CN201589401U (en) Gas water heater with antifreezing pressure limited valve
CN208457374U (en) A kind of warm ventilation pipe with good buckling performance
CN103701298B (en) Inclined temperature layer water tank for direct current transmission converter valve
CN215721368U (en) Anti-freezing water pipe, anti-freezing device and system
CN211693840U (en) Cold and hot water pipe and cold and hot water pipe assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Li Shuangzhe

Inventor before: Pan Nenghong

CB03 Change of inventor or designer information
TR01 Transfer of patent right

Effective date of registration: 20170605

Address after: 301700 No. 2 Tianbao Road, Da Bai street, Baodi District, Tianjin

Patentee after: Tianjin golden Long Pipeline Engineering Co., Ltd.

Address before: 311815 Zhejiang city of Shaoxing province Zhuji city Ciwu town Huang Tong Village

Patentee before: Pan Nenghong

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20190410

CF01 Termination of patent right due to non-payment of annual fee