CN205477644U - Pass through shallow loose accumulation body longspan tunnel of bias voltage that buries and synthesize hole structure - Google Patents

Pass through shallow loose accumulation body longspan tunnel of bias voltage that buries and synthesize hole structure Download PDF

Info

Publication number
CN205477644U
CN205477644U CN201620233573.3U CN201620233573U CN205477644U CN 205477644 U CN205477644 U CN 205477644U CN 201620233573 U CN201620233573 U CN 201620233573U CN 205477644 U CN205477644 U CN 205477644U
Authority
CN
China
Prior art keywords
retaining wall
slurry
tunnel
solid
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620233573.3U
Other languages
Chinese (zh)
Inventor
王新泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deda Transportation Construction And Development Group Co ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201620233573.3U priority Critical patent/CN205477644U/en
Application granted granted Critical
Publication of CN205477644U publication Critical patent/CN205477644U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a pass through shallow loose accumulation body longspan tunnel of bias voltage that buries and synthesize hole structure: move towards the orientation and set up solid retaining wall of inboard thick liquid and the solid retaining wall of outside thick liquid along being on a parallel with the tunnel in that the tunnel is outside, set up the solid layer of top thick liquid, the solid layer of bottom thick liquid, the solid layer of side thick liquid respectively in tunnel top, bottom, side, set up bearing pile in the lower part of solid layer of bottom thick liquid, set up the back pressure retaining wall at the solid retaining wall of thick liquid outside, tunnel portal position, keep off the soil body from the back pressure retaining wall admittedly to the thick liquid and beat and establish slant anchor muscle and personally experience sth. Part of the body, in the loose accumulation body outside the slant is inserted through solid layer of top thick liquid with the muscle body. The utility model discloses not only can promote the stability of the peripheral loose accumulation body in tunnel comprehensively, can prevent moreover that the tunnel from taking place the seepage failure, can also promote the bearing capacity of the loose accumulation body in tunnel bottom.

Description

A kind of traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters hole structure
Technical field
This utility model relates to a kind of traversing shallow-buried bias incompact-deposit bodies longspan tunnel and comprehensively enters hole structure, both bias incompact-deposit bodies stability in the large can have been strengthened particularly to one, the tunnel that can promote again foundation capability comprehensively enters hole structure, belong to ground field, it is adaptable to Shallow-buried incompact-deposit bodies longspan tunnel comprehensively enters hole engineering.
Background technology
Along with the high speed development of China's economy and society, the situation relating to unfavorable geological condition in engineering construction gets more and more, and such as bad soil, scall etc., engineering construction not only can be had a negative impact by these unfavorable geological conditions, and can induce many engineering diseases.Meanwhile, in Tunnel Engineering, it enters position, hole and often relates to the practical problem such as shallow embedding, bias, structural instability easily occurs, deforms the engineering diseases such as excessive, local collapse.
In tunnel is constructed, generally using the structure of domatic whitewashing+Shed-pipe Advanced Support, this structural approach technique is simple, the scope of application is relatively wide, but this structure is on the low side to the supporting intensity of the loose rock soil body, local stability sex chromosome mosaicism easily occurs.
At present, existing a kind of artificial mountain mass constructing tunnel enters hole structure, it is characterised in that: it is biased against side at massif and builds artificial massif, balance original massif by artificial massif, then build tunnel portal section in balanced massif.This structure is by building artificial massif in original massif biased side, though tunnel mouth massif balance and stability can be realized, but structure construction quantities is big, is not directed to tunnel perimeter Rock And Soil reinforcing, it is difficult to meet incompact-deposit bodies section tunnel construction requirement.
A kind of accumulation body shallow tunnel advance support daguanpeng construction method, it is characterized in that: pipe canopy is to utilize steel pipe to support as transverse annular as longitudinal bracing, steel arch-shelf, constitute vertical, horizontal integral rigidity structure, play the effect of pre support before excavation, to ensure the safety in work progress.This structure make use of the advantage that pipe canopy rigidity is big, can stop and limit surrouding rock deformation to a certain extent, and can bear pressure from surrounding rock in early days in advance;But being difficult to solve the problem that tunnel support structure is biased by outside Rock And Soil, meanwhile, the confined pressure being better than incompact-deposit bodies section is relatively big, higher to pipe canopy requirement of strength.
In sum, though current existing tunnel structure can achieve preferable supporting effect under suitable operating mode, but remain certain shortcoming at aspects such as force-mechanism, structure composition, construction technologies, it is difficult to meet Shallow-buried incompact-deposit bodies tunnel safety and enter the requirement in hole.
Given this, for reducing construction costs, strengthening the stability in tunnel, give full play to the load-carrying properties of tunnel support structure, need invention one at present badly and both can improve tunnel support intensity, can reduce again bias impact, the one traversing shallow-buried bias incompact-deposit bodies longspan tunnel that also can strengthen tunnel safety comprehensively enters hole structure.
Summary of the invention
The novel purpose of this practicality be to provide one not only can General Promotion Shallow-buried incompact-deposit bodies stability in the large, but also can effectively control incompact-deposit bodies deflection, the traversing shallow-buried bias incompact-deposit bodies longspan tunnel still preventing tunnel generation seepage failure comprehensively enters hole structure and construction method.
For realizing above-mentioned technical purpose, this utility model have employed techniques below scheme:
A kind of traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters hole structure, it is characterized in that: move towards direction at tunnel outer the inner side solid retaining wall of slurry and the solid retaining wall of outside slurry are set along being parallel to tunnel, it is respectively provided with the solid layer of top slurry, the solid layer of bottom slurry, the solid layer of side slurry in tunnel top, bottom, side, bearing pile is set in the bottom of bottom slurry solid layer;Starch outside solid retaining wall in outside, tunnel portal position arranges back-pressure retaining wall, sets oblique anchor rib body from back-pressure retaining wall to the slurry gear soil body admittedly;Oblique reinforcing body is by the loosely-packed body outside the solid layer insertion of top slurry.
The solid retaining wall of described inner side slurry and the solid retaining wall of outside slurry are positioned at the outside of the solid layer of side, tunnel slurry, set downwards to lower stabilizer soil layer from incompact-deposit bodies upper surface, use 1~2 row's high-pressure rotary jet grouting piles;The loosely-packed body thickness at the solid retaining wall position of outside slurry is less than the loosely-packed body thickness at the solid retaining wall position of inner side slurry;It is respectively provided with Guan Liang at the top of the solid retaining wall of inner side slurry and the solid retaining wall of outside slurry.
The solid material of slurry that the solid layer of described top slurry, the solid layer of bottom slurry starch solid layer with side is identical, uses cement mortar or cement mortar or high polymer material.
Described back-pressure retaining wall uses cement concrete retaining wall or gravity retaining wall or flexible retaining wall;Oblique displacement hull and oblique anchor rib body is laid along metope Rock And Soil after wall.
Described bearing pile sets downwards from the solid layer of bottom slurry, and plane sets scope and includes bottom tunnel portal inner side and outer side, back-pressure retaining wall, uses high-pressure rotary jet grouting pile.
Described oblique displacement hull uses plastic drain-pipe, and its external part is positioned at outside the metope of back-pressure retaining wall.
This utility model has following feature and beneficial effect
(1) this utility model arranges inner side slurry retaining wall admittedly and the solid retaining wall of outside slurry in the outside of the solid layer of side, tunnel slurry, and incompact-deposit bodies outside retaining wall plays a gear, the effect of reduction bias.
(2) this utility model carries out sectional mud jacking to the incompact-deposit bodies outside tunnel support structure, the solid layer of top slurry, the solid layer of bottom slurry and the solid layer of side slurry is formed outside tunnel support structure, can effectively strengthen the globality of supporting construction periphery incompact-deposit bodies, reduce the soil pressure that supporting construction is born.
(3) this utility model arranges back-pressure retaining wall at the solid outside of retaining wall of outside slurry, tunnel portal position, contributes to strengthening the stability of hole part incompact-deposit bodies, prevents lateral stability sex chromosome mosaicism.
Accompanying drawing explanation
Fig. 1 is that this utility model traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters structure transverse face, hole figure.
Fig. 2 is this utility model back-pressure retaining wall portion structure profile.
In figure: the solid retaining wall of slurry inside 1-, the solid retaining wall of slurry outside 2-, the solid layer of 3-top slurry, the solid layer of slurry bottom 4-, the solid layer of 5-side slurry, 6-pipe canopy, the advanced conduit of 7-, 8-Guan Liang, 9-oblique reinforcing body 10-mud jacking hole, 11-bearing pile, 12-back-pressure retaining wall, 13-oblique anchor rib body, the oblique displacement hull of 14-, 15-back-pressure retaining wall basis, 16-incompact-deposit bodies, 17-steady soil.
Detailed description of the invention
Illustrate embodiment of the present utility model is described in further detail below in conjunction with accompanying drawing, but the present embodiment is not limited to this utility model, every employing analog structure of the present utility model and similar change thereof, all should list protection domain of the present utility model in.
Tunnel support structure design and construction technology requires, high-pressure rotary-spray constructs technology requirement, mud jacking construction technical requirement, DESIGN OF RETAINING WALLS and construction technical requirement etc., repeats no more in present embodiment, and emphasis illustrates that this utility model relates to the embodiment of structure.
Fig. 1 is that this utility model traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters structure transverse face, hole figure, and Fig. 2 is this utility model back-pressure retaining wall portion structure profile.With reference to shown in Fig. 1~Fig. 2, this utility model moves towards direction at tunnel outer and arranges the inner side solid retaining wall 1 of slurry and the solid retaining wall 2 of outside slurry along being parallel to tunnel, it is respectively provided with the solid layer 3 of top slurry, the solid layer 4 of bottom slurry, the solid layer 5 of side slurry in tunnel top, bottom, side, bearing pile 11 is set in the bottom of bottom slurry solid layer 4;Back-pressure retaining wall 12 is set at the solid retaining wall 1 of inner side slurry and the solid outside of retaining wall 2 of outside slurry, tunnel portal position, in the incompact-deposit bodies 16 that wall is carried on the back, sets oblique anchor rib body 13 and oblique displacement hull 14 from back-pressure retaining wall 12;Oblique reinforcing body 9 is by the incompact-deposit bodies 16 outside solid layer 3 insertion of top slurry.
The solid retaining wall 1 of inner side slurry and the solid retaining wall 2 of outside slurry all include two row's high-pressure rotary jet grouting piles, and the height of the solid retaining wall 1 of inner side slurry is 15m, and the height of the solid retaining wall 2 of outside slurry is 25m, and a diameter of 800mm of high-pressure rotary jet grouting pile, pile spacing is 1m, and slurry water gray scale is 1:1.
The solid layer 3 of top slurry, the solid layer 4 of bottom slurry, the thickness of the solid layer 5 of side slurry are 2m, and the solid material of slurry uses cement mortar, and cement mortar mix ratio is cement: sand: additive: water=1:2.7:0.018:0.38.
Pipe canopy 6 uses concrete reinforced pipe canopy, Shed-pipe Advanced Support arch beyond excavation contour line sets up many Pin I-steel, arch and the C30 concrete of arch wall gunite concrete thickness 28cm, inverted arch gunite concrete thickness is the C30 concrete of 28cm, arranges oblique reinforcing body 9 in the arch of pipe canopy 6 through hole.
Advanced conduit 7 uses external diameter 108mm, the hot rolled seamless steel tube of wall thickness 6mm, advanced conduit circumferential distance 40cm;Inclination angle: outer limb 1 °~3 °, injecting paste material: 1:1 cement mortar.
Hat beam 8 is located at the solid retaining wall 1 of inner side slurry and the top of the solid retaining wall 2 of outside slurry, and planar dimension is 2m × 0.5m, arranges steel reinforcement cage in beam.
Oblique reinforcing body 9 sets in tunnel support structure Inside To Outside loosely-packed body;Oblique reinforcing body uses full Grouted bolt, and anchor pole uses diameter 32mm, the hot rolled ribbed bars of intensity HRB335, the long 4m of anchor pole.
Mud jacking hole 10 uses 100 type rigs to be drilled with, and the aperture of boring is 110mm.
Bearing pile 11 uses high-pressure rotary jet grouting pile, sets downwards from the solid layer of bottom slurry, and plane sets scope and includes bottom tunnel portal inner side and outer side, back-pressure retaining wall, pile spacing 2m, diameter 800mm, the long 6m of stake.
Transverse drainage body, oblique displacement hull use plastic drain-pipe, the pvc pipe of a diameter of 30mm.The water inlet part of spilled water hole should arrange Coarse Aggregate loaded filter, in case duct is silted up.Spilled water hole should have the outward-dipping gradient.
Back-pressure retaining wall 12 uses gravity retaining wall, wall height 8m, and it is 0.25~0.5 that retaining wall top width is generally 0.5m, slope coefficient m, concrete bottom thickness of slab 0.6m, and the cantilevered out 0.4m in two ends, front toe needs configuration reinforcement.Retaining wall basis 15 uses reinforced concrete foundation, embedded depth of foundation 1m.
Oblique anchor rib body 13 sets in the wall back of the body soil body from back-pressure retaining wall 12 metope, and oblique anchor rib body uses full Grouted bolt, and anchor pole uses diameter 32mm, the hot rolled ribbed bars of intensity HRB335, the long 8m of anchor pole.
Oblique displacement hull 14 sets in the wall back of the body soil body from back-pressure retaining wall 12 metope, and oblique displacement hull 14 uses the plastic drain-pipe of diameter 130mm, and its external part stretches out 0.5m outside the metope of back-pressure retaining wall 12.
The gravelly soil that incompact-deposit bodies 16 is formed for early stage large volume landslide, thick 10-30m;Steady soil 17 is weak weathered granite.

Claims (6)

1. a traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters hole structure, it is characterised in that: on tunnel outer edge Be parallel to tunnel move towards direction and arrange the inner side solid retaining wall (1) of slurry and outside slurry retaining wall (2) admittedly, tunnel top, bottom and Side is respectively provided with the solid layer (3) of top slurry, the solid layer (4) of bottom slurry and the solid layer (5) of side slurry, at the solid layer (4) of bottom slurry Bottom arranges bearing pile (11);In outside slurry solid retaining wall (2) outside and tunnel portal position, back-pressure retaining wall (12) is set, Oblique anchor rib body (13) is set to the slurry gear soil body admittedly from back-pressure retaining wall (12);Oblique reinforcing body (9) is solid by top slurry In incompact-deposit bodies (16) outside layer (3) insertion.
One the most according to claim 1 traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters hole structure, and it is special Levy and be: the solid retaining wall (1) of described inner side slurry and the solid retaining wall (2) of outside slurry are positioned at the outside of the solid layer (5) of side, tunnel slurry, Set downwards to lower stabilizer soil layer (17) from incompact-deposit bodies (16) upper surface;The pine at solid retaining wall (2) position of outside slurry Dissipate accumulation body (16) thickness loosely-packed body thickness less than solid retaining wall (1) position of inner side slurry;At the solid retaining wall (1) of inner side slurry The top of retaining wall (2) solid with outside slurry is respectively provided with Guan Liang (8).
One the most according to claim 1 traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters hole structure, and it is special Levy and be: the solid material of slurry that the solid layer (3) of described top slurry, the solid layer (4) of bottom slurry starch solid layer (5) with side is identical, uses Cement mortar, cement mortar or high polymer material.
One the most according to claim 1 traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters hole structure, and it is special Levy and be: described back-pressure retaining wall (12) uses cement concrete retaining wall, gravity retaining wall or flexible retaining wall;Along wall After wall, Rock And Soil lays oblique displacement hull (14) and oblique anchor rib body (13).
One the most according to claim 1 traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters hole structure, and it is special Levy and be: described bearing pile (11) sets downwards from the bottom solid layer (4) of slurry, plane set scope include inside tunnel portal and Outside, back-pressure retaining wall (12) bottom.
One the most according to claim 4 traversing shallow-buried bias incompact-deposit bodies longspan tunnel comprehensively enters hole structure, and it is special Levy and be: described oblique displacement hull (14) uses plastic drain-pipe, and its external part is positioned at outside the metope of back-pressure retaining wall (12) Side.
CN201620233573.3U 2016-03-24 2016-03-24 Pass through shallow loose accumulation body longspan tunnel of bias voltage that buries and synthesize hole structure Active CN205477644U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620233573.3U CN205477644U (en) 2016-03-24 2016-03-24 Pass through shallow loose accumulation body longspan tunnel of bias voltage that buries and synthesize hole structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620233573.3U CN205477644U (en) 2016-03-24 2016-03-24 Pass through shallow loose accumulation body longspan tunnel of bias voltage that buries and synthesize hole structure

Publications (1)

Publication Number Publication Date
CN205477644U true CN205477644U (en) 2016-08-17

Family

ID=56652961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620233573.3U Active CN205477644U (en) 2016-03-24 2016-03-24 Pass through shallow loose accumulation body longspan tunnel of bias voltage that buries and synthesize hole structure

Country Status (1)

Country Link
CN (1) CN205477644U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127900A (en) * 2020-09-07 2020-12-25 中国水利水电第十四工程局有限公司 Construction method for hidden half-wall and half-arch protection structure of exposed arch of shallow-buried bias tunnel penetrating through accumulation body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112127900A (en) * 2020-09-07 2020-12-25 中国水利水电第十四工程局有限公司 Construction method for hidden half-wall and half-arch protection structure of exposed arch of shallow-buried bias tunnel penetrating through accumulation body

Similar Documents

Publication Publication Date Title
CN105840207A (en) Cross shallow buried bias pressure loose accumulation body large-span tunnel comprehensive entrance structure construction method
CN205742213U (en) Foundation pit supporting construction
CN104196034A (en) Foundation pit construction method employing steel sheet piles as support cofferdam
CN105672348A (en) Construction method for cropping bridge pile foundation at sandy gravel stratum of abyssal region
CN105133620A (en) Supporting structure for pit-in-pit with local fluidal plastic sludge soil mass and construction method of supporting structure
CN104563131B (en) Rectangular enclosure pile, and construction method using rectangular enclosure pile as main structure
CN106121722A (en) A kind of method quickly constructing fire dam
CN101725155A (en) Multi-direction rotary jetting stirring grouting reinforcement construction method for constructing underground structure and soil body by cover excavation and underground excavation and supporting structure thereof
CN106368219A (en) Supporting reinforcing structure of deep foundation pit and construction method
CN203701127U (en) Underwater gravity type foundation
CN104790412A (en) Large-width foundation pit supporting construction method under confined water condition
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN205242424U (en) Brick child mode structure of soft soil area superelevation pile foundation cushion cap
CN206616565U (en) Door font double-row pile and double high-pressed spin-spewing water-stopping curtain combined retaining structure
CN205776246U (en) A kind of Structure About Soldier Pile
CN202644591U (en) A reinforced bridge pile foundation in tunnel construction under the geological condition of water-rich quicksand
CN1333139C (en) Column supported underground continuous wall
CN205477644U (en) Pass through shallow loose accumulation body longspan tunnel of bias voltage that buries and synthesize hole structure
CN204435407U (en) A kind of batter post group anchor formula rock foundation
CN105625480A (en) Anti-floating method and structure for open-segment tunnel structure
CN202730796U (en) Existing retaining wall rib plate type unloading reinforcing structure
CN107975040A (en) Circular top pipe working pit multiple material handling method of deep foundation pit construction method
CN209838435U (en) Unloading arch backfill structure for penetrating through large-sized non-filling karst cave tunnel
CN105113513B (en) Anti-seepage foundation pit supporting structure and construction method
CN205776258U (en) A kind of Pile-Anchor Supporting for Deep Excavation system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Yu Wenyin

Inventor after: Xu Hengfei

Inventor after: Li Jun

Inventor after: Sun An

Inventor after: Gao Pengzhi

Inventor before: Wang Xinquan

TR01 Transfer of patent right

Effective date of registration: 20170207

Address after: 159 No. 253000 Shandong city in Dezhou Province Economic and Technological Development Zone Jinghua Road

Patentee after: DEZHOU ROAD ENGINEERING Corp.

Address before: 310015 Hangzhou Wanda Commercial Center, Zhejiang, building 3, unit 1901, room 3

Patentee before: HANGZHOU JIANGRUN TECHNOLOGY Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 253000 159 Jinghua Avenue, Dezhou Economic and Technological Development Zone, Shandong Province

Patentee after: Deda Transportation Construction and Development Group Co.,Ltd.

Address before: 253000 159 Jinghua Avenue, Dezhou Economic and Technological Development Zone, Shandong Province