CN205472381U - A hoisting gear for among oblique pitshaft driving in power station - Google Patents

A hoisting gear for among oblique pitshaft driving in power station Download PDF

Info

Publication number
CN205472381U
CN205472381U CN201620174757.7U CN201620174757U CN205472381U CN 205472381 U CN205472381 U CN 205472381U CN 201620174757 U CN201620174757 U CN 201620174757U CN 205472381 U CN205472381 U CN 205472381U
Authority
CN
China
Prior art keywords
power station
hoisting gear
silo
main shaft
brake
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620174757.7U
Other languages
Chinese (zh)
Inventor
和孙文
李国瑞
张春洪
李新良
廖超平
彭太书
熊菊芳
陈经纬
马勋才
解迎夏
秦业
李根华
马军峰
刘亚军
许远志
张伟
欧阳秘
殷志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUNAN COAL MINING MACHINERY Ltd Co
Sinohydro Bureau 14 Co Ltd
Original Assignee
HUNAN COAL MINING MACHINERY Ltd Co
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUNAN COAL MINING MACHINERY Ltd Co, Sinohydro Bureau 14 Co Ltd filed Critical HUNAN COAL MINING MACHINERY Ltd Co
Application granted granted Critical
Publication of CN205472381U publication Critical patent/CN205472381U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Braking Arrangements (AREA)

Abstract

The utility model relates to a hoisting gear for among oblique pitshaft driving in power station. Including spindle unit, disc brake, gear coupling, reduction gear, shaft coupling, motor braking ware, motor, spindle unit passes through gear coupling and retarder connection, and the reduction gear passes through shaft coupling and the hookup of motor braking ware, the motor braking ware again with the motor hookup, spindle unit is last to have two reels, is equipped with four disc brake in the upper portion and the lower part at two reel both ends, reduction gear and spindle unit are 90 and arrange. Possess that the unit is synchronous two to be pull, light running power -balance, the complete synchronization of two haulage speed fix a positions accurately, and stability is good, the reliability height, humanized design, easy operation, the debugging is maintained conveniently, characteristics that occupation space is little.

Description

A kind of hoisting gear in the oblique Construction of Silo in power station
Technical field
This utility model belongs to Hydraulic and Hydro-Power Engineering technical field, a kind of 2JTP hoisting gear in the oblique Construction of Silo in power station.
Background technology
During the oblique Construction of Silo in domestic water power station, hoist engine selected mostly by personnel and materials transportation system lifting means at present, the safety of its equipment and reliability are difficult to ensure, and relevant specification of country prohibites hoist engine and must not be used for transporting personnel, therefore in construction, do not conform to rule with hoist engine as the lifting means of conveying people.
Winch has the biggest lifting compared with hoist engine in terms of safety and uses for many years in mine engineering, but the oblique Construction of Silo in power station makes common winch be difficult to directly use in the oblique Construction of Silo in power station because its space limits.Nowadays the oblique Construction of Silo in power station has started to use single-drum winch, but the oblique Construction of Silo in power station makes single-drum winch sometimes install limited because construction space is limited.It is in particular in following several respects:
(1) common winch motor, decelerator, reel are arranged on same straight line, take up space and are difficult to greatly in hydro arrange.
(2) common winch operating system is complex.
(3) the oblique Construction of Silo in power station need to install two single-drum winches according to code requirement, require that installing separate unit winch possesses the mode of operations such as per-unit synchronous double traction, Remotes, being limited two difficulties of mounting arrangements by underground chamber space, two unit gearing traction synchronization accuracies simultaneously are poor in addition.
(4) the oblique Construction of Silo in power station there are requirements at the higher level to stability when winch safety, reliability and work.
Utility model content
The purpose of this utility model is to provide a kind of hoisting gear in the oblique Construction of Silo in power station, thus decreases the width of complete machine, saves space, the feature that during the oblique Construction of Silo in suitable water power station, winch arrangement space in hole is limited.
The technical solution of the utility model is: a kind of hoisting gear in the oblique Construction of Silo in power station includes main shaft device, disk brake, gear coupling, decelerator, shaft coupling, electromotor brake, motor, main shaft device is connected with decelerator by gear coupling, decelerator is coupled with electromotor brake by shaft coupling, electromotor brake couples with motor again, two reels are had on main shaft device, in the upper and lower at two reel two ends equipped with four disk brakes, decelerator and main shaft device are 90 ° of layouts.
Described main shaft device holds the depth indicator being connected in opposite directions with decelerator.
Described main shaft device is two-fold barrel structure, and uses double traction electric control system, and reel uses 16Mn coiled sheet system to be welded, has the advantages that intensity is high, equivalent mass is little, and startup and the braking ability of winch are significantly improved.
Described disk brake uses rear-mounted disk brake; high-strength bolt can be crossed be connected on the reel of main shaft device; transmitting braking moment by big planar friction, disk brake has with reel and coordinates seam to make radially location, and disk brake is provided with brake clearance protection.
Described shaft coupling uses elastic plug tooth-type coupler.
Hoisting gear in the oblique Construction of Silo in power station of the present utility model uses 90 ° of layouts, decreases the width of complete machine, saves space, is suitable for the construction of the oblique vertical shaft of hydropower industry;Between motor and decelerator, it is provided with electromotor brake simultaneously, effectively changes hoisting gear and start and braking moment, the impact to decelerator formed because of motor inertia.Disk brake is provided with brake clearance protection, can report to the police when brake clearance exceedes setting and complete can not start shooting after this promotes;Use rear-mounted disk brake, pollution to brake disc when effectively changing disk brake leakage of oil, thus ensure that stationarity and security reliability when hoisting gear is braked.Main shaft device uses double-cylinder type, and uses double traction electric control system, meets the double traction control of per-unit synchronous.
Hoisting gear unit operation power-balance in the oblique Construction of Silo in power station of the present utility model, double hauling speed Complete Synchronization, accurate positioning, good stability, reliability is high;Human oriented design, simple to operate, debugging maintenance is convenient, takes up room little.
Accompanying drawing explanation
Fig. 1 is the structural representation of the hoisting gear in the oblique Construction of Silo in power station of the present utility model.
In figure: 1 depth indicator, 2 disk brakes, 3 main shaft devices, 4 gear couplings, 5 decelerators, 6 shaft couplings, 7 electromotor brakes, 8 motor.
Detailed description of the invention
As shown in Figure 1, hoisting gear in the oblique Construction of Silo in power station of the present utility model includes main shaft device 3, disk brake 2, gear coupling 4, decelerator 5, shaft coupling 6, electromotor brake 7, motor 8, main shaft device 3 is connected with decelerator 5 by gear coupling 4, decelerator 5 uses elastic plug tooth-type coupler by shaft coupling 6() couple with electromotor brake 7, electromotor brake 7 couples with motor 8 again, two reels are had on main shaft device, in the upper and lower at two reel two ends equipped with four disk brakes 2, decelerator 5 and main shaft device 3 are 90 ° of layouts.
Described main shaft device 3 holds the depth indicator 1 being connected in opposite directions with decelerator 5.
The two-fold barrel structure of described main shaft device uses double traction electric control system, and reel uses 16Mn coiled sheet system to be welded, has the advantages that intensity is high, equivalent mass is little, and startup and the braking ability of winch are significantly improved.
Described disk brake 2 uses rear-mounted disk brake; high-strength bolt can be crossed be connected on the reel of main shaft device; transmitting braking moment by big planar friction, disk brake has with reel and coordinates seam to make radially location, and disk brake is provided with brake clearance protection.
Hoisting gear of the present utility model uses the convenient adjustment of the electric two-stage brake hydraulic station of constant moment of force, two stage braking pressure and two stage braking time, can effectively reduce impact, protected host and steel wire rope during safety arrestment.Use two independent hydraulic circuits simultaneously;Hydraulic system maintenance, work is made to neglect neither (a set of work, a set of repairing can be accomplished).
Hoisting gear power of the present utility model is delivered to orthogonal parallel gears decelerator 5 by motor 8, elastic plug tooth-type coupler 6;Through being sent to main shaft device 3 by gear coupling 4 after deceleration.The forward and backward motion of main shaft device realizes lifting and the decline of goods (personnel).Disk brake 2 starts at hoisting gear, accelerates, slows down, shutdown phase participates in speed governing and reliable disk brake lock;In case of emergency reliable disk brake lock;Realize the steady parking of hoisting gear.Electromotor brake 7 is an up winch and carries out absorbing when safety arrestment and service braking the inertia impact inertia of motor rotor, a kind of buffer unit shielding decelerator.Depth indicator 1 instruction promote in dolly or the cage position in oblique, vertical shaft, send slow down, pulleying signal, carry out speed limit, fail safe.
Hoisting gear of the present utility model it possess the working methods such as the double traction of per-unit synchronous and Remote.Electric control system has safeguard protection and interlock is complete, has 12 big defencive functions.

Claims (8)

1. the hoisting gear in the oblique Construction of Silo in power station, it is characterized in that: include main shaft device, disk brake, gear coupling, decelerator, shaft coupling, electromotor brake, motor, main shaft device is connected with decelerator by gear coupling, decelerator is coupled with electromotor brake by shaft coupling, electromotor brake couples with motor again, two reels are had on main shaft device, in the upper and lower at two reel two ends equipped with four disk brakes, decelerator and main shaft device are 90 ° of layouts.
Hoisting gear in the oblique Construction of Silo in power station the most according to claim 1, it is characterised in that: described main shaft device holds the depth indicator being connected in opposite directions with decelerator.
Hoisting gear in the oblique Construction of Silo in power station the most according to claim 1, it is characterised in that: described main shaft device is two-fold barrel structure, and uses double traction electric control system.
Hoisting gear in the oblique Construction of Silo in power station the most according to claim 3, it is characterised in that: reel uses 16Mn coiled sheet system to be welded.
Hoisting gear in the oblique Construction of Silo in power station the most according to claim 1, it is characterised in that: described disk brake uses rear-mounted disk brake, can cross high-strength bolt and be connected on the reel of main shaft device.
Hoisting gear in the oblique Construction of Silo in power station the most according to claim 1, it is characterised in that: disk brake has with reel and coordinates seam to make radially location.
Hoisting gear in the oblique Construction of Silo in power station the most according to claim 1, it is characterised in that: disk brake is provided with brake clearance protection.
Hoisting gear in the oblique Construction of Silo in power station the most according to claim 1, it is characterised in that: described shaft coupling uses elastic plug tooth-type coupler.
CN201620174757.7U 2015-12-01 2016-03-08 A hoisting gear for among oblique pitshaft driving in power station Expired - Fee Related CN205472381U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201520979944 2015-12-01
CN2015209799448 2015-12-01

Publications (1)

Publication Number Publication Date
CN205472381U true CN205472381U (en) 2016-08-17

Family

ID=56658589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620174757.7U Expired - Fee Related CN205472381U (en) 2015-12-01 2016-03-08 A hoisting gear for among oblique pitshaft driving in power station

Country Status (1)

Country Link
CN (1) CN205472381U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106882721A (en) * 2017-04-14 2017-06-23 苏州标杆知识产权运营有限公司 Driving elevator brake system
CN107381390A (en) * 2017-07-05 2017-11-24 太原科技大学 Most light raising double crosslinking drum and method to set up
CN113860204A (en) * 2021-08-31 2021-12-31 华能沁北发电有限责任公司 Novel boiler manned maintenance inspection platform traction winch brake device
CN114105018A (en) * 2021-11-05 2022-03-01 幸伟健 Hydraulic winch for vehicle

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106882721A (en) * 2017-04-14 2017-06-23 苏州标杆知识产权运营有限公司 Driving elevator brake system
CN107381390A (en) * 2017-07-05 2017-11-24 太原科技大学 Most light raising double crosslinking drum and method to set up
CN113860204A (en) * 2021-08-31 2021-12-31 华能沁北发电有限责任公司 Novel boiler manned maintenance inspection platform traction winch brake device
CN114105018A (en) * 2021-11-05 2022-03-01 幸伟健 Hydraulic winch for vehicle

Similar Documents

Publication Publication Date Title
CN205472381U (en) A hoisting gear for among oblique pitshaft driving in power station
CN103643666A (en) Control system and control method suitable for enabling inclined frame car of inclined ship lift to stably pass through hump
CN203033695U (en) Novel winch rope guider
CN201077718Y (en) Collision proof and anti-pounding automatic speed-down braking control device of idler car
CN204251253U (en) A kind of humping hoister fast
CN108639985B (en) Efficient composite brake mode alternating-current variable-frequency winch and lowering control method thereof
CN104340864B (en) A kind of hoisting crane and lifting mechanism thereof
CN202897902U (en) Protection system for preventing handle from working under crane empty-hook-lowering working condition
CN205527508U (en) Multi -purpose winch of JSDB -Y series double speed
CN201012887Y (en) Winding machine for deep well pump maintenance
CN202625543U (en) Intelligent elevator rope slacking protection device
CN102701093B (en) Mechanically-driven double-gear winch for casing drilling machine
CN113443571A (en) Single-rail chain type hydraulic hoist for hoisting
CN206328089U (en) Tower crane dead electricity rotary braking device
CN203486781U (en) Control device for preventing gyration and power-off brake during power-off of tower crane
CN102628254B (en) Lifting mechanism for railway T-shaped girder bridge erecting machine
CN103552957B (en) A kind of pneumatic lifter for hanging basket
CN102644451B (en) The mutual reversing pumping unit of multi-change speed
CN202322085U (en) Soft slide type small-sized lifting machine
CN203728378U (en) Integrated mine hoist
CN202687841U (en) Speed regulating mechanism for endless rope speed regulating mechanical winch
CN215479372U (en) Single-rail chain type hydraulic hoist for hoisting
CN204173883U (en) Novel rope carries rope closing unit mahine
CN203728376U (en) Winding drum mechanism used for integrated mine hoist
CN203740789U (en) Individual double constant speed reduction system hydraulic station

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817