CN205458472U - Curtain cleaning service equipment - Google Patents
Curtain cleaning service equipment Download PDFInfo
- Publication number
- CN205458472U CN205458472U CN201620014518.5U CN201620014518U CN205458472U CN 205458472 U CN205458472 U CN 205458472U CN 201620014518 U CN201620014518 U CN 201620014518U CN 205458472 U CN205458472 U CN 205458472U
- Authority
- CN
- China
- Prior art keywords
- steel
- rope
- curtain cleaning
- orthogonal strut
- equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Emergency Lowering Means (AREA)
Abstract
The utility model provides a curtain cleaning service equipment, belongs to building curtain cleaning equipment field, including supporting mechanism, rope mechanism and crane ship mechanism, its characterized in that: crane ship mechanism is connected with the supporting mechanism through rope mechanism, the supporting mechanism includes embedded steel otic placode in the roof, steel pull rod, oblique pull rod, steel base, perpendicular vaulting pole and horizontal strut, the perpendicular vaulting pole of horizontal strut perpendicular to and rather than fixed connection, between perpendicular vaulting pole and the horizontal strut respectively with the both ends fixed connection of oblique pull rod, a fixed connection steel pull rod between perpendicular vaulting pole and steel otic placode. Through mutually supporting of supporting mechanism, rope mechanism and crane ship mechanism, especially supporting mechanism can be convenient setting in building top layer, have solved partial building and can not use abluent problems such as wiping the window machine, and this equipment safe and reliable, easy operation, the construction degree of difficulty are little, low in cost, require low, durable to the major structure, are suitable for popularization and application.
Description
Technical field
This utility model belongs to constructure screen wall cleaning equipment field, particularly relates to a kind of curtain cleaning and safeguards equipment.
Background technology
In recent years, along with economic fast development, the continuous expansion of city size, during urban construction, substantial amounts of high-rise occurs in a large number, for the cleaning of curtain wall of these skyscrapers and safeguard and still use at present big rope boatswain chair to carry out manual cleaning, the relevant Aided design even not taking into account window cleaning equipment when architectural design having, cause and window cleaning equipment equipment cannot be installed, relatively big because of window cleaning equipment equipment self-weight the most again, agent structure is required height, operator are required height, operator are difficult to grasp hints on operation, cause operation to encounter difficulties.And window cleaning equipment cost is high, later maintenance cost is relatively big, and part owner the reason of aspect such as cannot accept and work to the clean and maintenance of building curtain wall and bring the biggest inconvenience.
Summary of the invention
This utility model aims to solve the problem that the problems referred to above, it is provided that a kind of curtain cleaning maintenance equipment that can conveniently carry out the outside Wall Cleaning of building curtain wall and the replacing of plate.
A kind of curtain cleaning described in the utility model safeguards equipment, including supporting mechanism, rope mechanism and Diao Chuan mechanism;It is characterized in that: described Diao Chuan mechanism is connected with supporting mechanism by rope mechanism;Described supporting mechanism is arranged on building roof;Described supporting mechanism includes being embedded in the steel otic placode on roof, steel pull bar, brace, steel base, orthogonal strut and triatic stay;Described steel base is fixedly installed on roof surface;Described orthogonal strut is perpendicular to roof and arranges, and one end is socketed in steel base;Described triatic stay is perpendicular to orthogonal strut and is secured to connect;Fix with the two ends of brace respectively between described orthogonal strut and triatic stay and be connected;Fix between described orthogonal strut with steel otic placode and be connected a steel pull bar;Described rope mechanism one end is fixed, with triatic stay and steel pull bar, the one end being connected and is connected, and the other end is connected with Diao Chuan mechanism.
Curtain cleaning described in the utility model safeguards equipment, and described rope mechanism is parallel to be arranged with wall face;Described rope mechanism includes rope rolling apparatus, steel wire rope and safety lock;Described steel wire rope is connected with rope rolling apparatus;Described safety lock is arranged on steel wire rope.
Curtain cleaning described in the utility model safeguards equipment, and described Diao Chuan mechanism includes that aluminium alloy hangs ship framework;Described aluminium alloy is provided with elevator and power controling box in hanging ship framework;Described aluminium alloy hangs ship framework and the side in skin face is provided with roller;Described roller fits with skin face.
Curtain cleaning described in the utility model safeguards equipment, and described orthogonal strut is provided with turning handle;When the assembling being supported mechanism, after first installing triatic stay and brace in orthogonal strut on building roof, by rotating the turning handle in orthogonal strut, triatic stay and brace are gone to constructure screen wall side, after allowing, realize the fixing of orthogonal strut at installation steel pull bar.The setting of turning handle, the triatic stay towards constructure screen wall side made and brace can complete to install at building end face, greatly reduce the difficulty of installation, it is provided that the efficiency of construction.
Curtain cleaning described in the utility model safeguards equipment, and described orthogonal strut is included some sections, is connected by ring flange between each section;When required orthogonal strut is higher, in order to ensure the safety of orthogonal strut, orthogonal strut need to be divided into some sections, realize connecting by ring flange between each section.
Curtain cleaning described in the utility model safeguards equipment, and described triatic stay is provided with some adjustment hole positions in the one end away from orthogonal strut;Can be according to the setting of constructure screen wall, by regulation rope mechanism connecting hole position thereon, regulate the distance between Diao Chuan mechanism and curtain wall, it is achieved Diao Chuan mechanism fits with the effective of curtain wall part, without because away from too far away, and have influence on the operation of clean and maintenance.
Curtain cleaning described in the utility model safeguards equipment, and described roller is rubber wheel;Because rubber wheel has certain elasticity, it is when curtain wall contacts, the impact pressure between Diao Chuan mechanism and curtain wall can be effectively slowed down with glass curtain wall when especially contacting, effectively reduce the damage that curtain wall is brought by Diao Chuan mechanism, too increase the stability of Diao Chuan mechanism so that Diao Chuan mechanism does not haves bigger rocking simultaneously.
Curtain cleaning described in the utility model safeguards equipment, and described steel pull bar and steel otic placode are provided with three;Before and after orthogonal strut in four orientation, left and right, then being provided with brace and triatic stay on the right side of it, its excess-three side is provided with a steel pull bar and steel otic placode respectively, is realized the steadiness of orthogonal strut by three steel pull bars with this.
Curtain cleaning described in the utility model safeguards equipment, described steel pull bar with between steel otic placode and orthogonal strut, orthogonal strut is connected with all using steel pin axle between triatic stay and brace.
Curtain cleaning described in the utility model safeguards equipment, by cooperating of supporting mechanism, rope mechanism and Diao Chuan mechanism, especially supporting mechanism can be arranged at building top layer easily, application scope is wide, efficiently solve the problem that part building can not use the cleaning equipments such as window cleaning equipment, and be curtain cleaning described in the utility model safeguard equipment is safe and reliable, simple to operate, difficulty of construction is little, cheap, to agent structure require low, durable in use, be suitable to popularization and application.
Accompanying drawing explanation
Fig. 1 is the structural representation that curtain cleaning described in the utility model safeguards equipment;
Fig. 2 is the A-A generalized section in this utility model Fig. 1 schematic diagram.
Wherein 1-agent structure, 2-steel otic placode, 3-steel pull bar, 4-turning handle, 5-ring flange, 6-orthogonal strut, 7-steel base, 8-bottom roller, 9-built-in fitting, 10-triatic stay, 11-steel pin axle, 12-rope rolling apparatus, 13-steel wire rope, 14-safety lock, 15-elevator, 16-power controling box, 17-aluminium alloy hang ship framework, 18-building curtain wall surface, 19-adjustment hole position, 20-rubber wheel, 21-brace, 22-safety rope.
Detailed description of the invention
A kind of curtain cleaning described in the utility model safeguards equipment, as it is shown in figure 1, include supporting mechanism, rope mechanism and Diao Chuan mechanism;Described Diao Chuan mechanism is connected with supporting mechanism by rope mechanism;Described supporting mechanism is arranged on building roof;Described supporting mechanism includes being embedded in the steel otic placode 2 on roof, steel pull bar 3, brace 21, steel base 7, orthogonal strut 6 and triatic stay 10;Described steel base 7 is fixedly installed on roof surface;Described orthogonal strut 6 is perpendicular to roof and arranges, and one end is socketed in steel base 7;Described triatic stay 10 is perpendicular to orthogonal strut 6 and is secured to connect;Fix with the two ends of brace 21 respectively between described orthogonal strut 6 and triatic stay 10 and be connected;Described orthogonal strut 6 is fixing with between steel otic placode 2 is connected a steel pull bar 3;Described rope mechanism one end is connected with triatic stay 10 and the fixing one end being connected of steel pull bar 3, and the other end is connected with Diao Chuan mechanism.
Curtain cleaning described in the utility model safeguards equipment, and described rope mechanism is parallel to be arranged with wall face;Described rope mechanism includes rope rolling apparatus 12, steel wire rope 13 and safety lock 14;Described steel wire rope 13 is connected with rope rolling apparatus 12;Described safety lock 14 is arranged on steel wire rope 13.It is provided with turning handle 4 in described orthogonal strut 6.Described orthogonal strut 6 includes some sections, is connected by ring flange 5 between each section.Described triatic stay 10 is provided with some adjustment hole positions 17 in the one end away from orthogonal strut 6.Described steel pull bar 3 with between steel otic placode 2 and orthogonal strut 6, orthogonal strut 6 is connected with all using steel pin axle 11 between triatic stay 10 and brace 21.
Diao Chuan mechanism described in the utility model includes that aluminium alloy hangs ship framework 17;Described aluminium alloy is provided with elevator 15 and power controling box 16 in hanging ship framework 17;Hanging ship framework to be made by alloy aluminum, surrounding is provided with protection metal lath, joins roll type lifter, rope-arranging mechanism, brakes, dynamical system and various safety device, electric-control system, CAS in hanging ship.The brakes of this dynamical system uses major-minor brake gear.Main brake is that disk type electromagnetic brake directly acts on motor;Auxiliary brake is to use Powerless mechanical standby speed-limiting brake on-line equipment on reel.When hanging ship and normally working, speed-limiting brake does not works;When drive system break down in operation process and cause hang ship hypervelocity fall time, the centrifugal force produced due to the change of gear speed, force limiter of speed action, instant stop reel operating.Hang boat bottom and be provided with bottom roller 8.This hangs ship two reels of same driven by motor and works simultaneously, two reels are made to synchronize, therefore hang ship and remain balance, again because hanging the elevating mechanism of steel wire rope 13 of ship and steel wire rope 13 jack is that same set of mechanism performs, therefore this to hang the lifting system structure of ship simple, safe and reliable.This system is equipped with steel wire rope 13 length limit device and steel wire rope 13 slack rope device on emergency stop (apparatus), overload protection device, hanging basket high-low-position stopping means, stroke end stopping means, reel, each safety device connects in control chamber alarm lamp and buzzer, when safety device starts, alarm lamp is open-minded and sounds a buzzer.This system is also equipped with special nylon rope and safety card, and safety coefficient is completely independent and this system, individually plays its safety effect.When having a power failure or chance failure occurs, manually mechanism will can hang ship and be slowly decreased to home, and this device will be equipped with two set Double-suckers, in period interim positioning action of blowing.Described aluminium alloy hangs ship framework 17 and the side in skin face is provided with roller;Described roller fits with skin face.
nullDuring enforcement,Pre-embedded steel slab in the agent structure 1 be arranged at building end face,And welding processing is good on built-in fitting 9 steel otic placode 2 and circular steel base 7,Steel base 7 is inserted by being provided with the orthogonal strut 6 connecting otic placode in advance on the top that factory process is good,As shown in Figure 2,Before and after orthogonal strut 6 in four orientation, left and right,Then by turning handle 4, orthogonal strut 6 is used for installing the otic placode side of triatic stay 10 and brace 21 to turn to directly over roof,Carried out the installation of triatic stay 10 and brace 21 by steel pin axle 11 above roof,Then rope rolling apparatus 12、Steel wire rope 13 one end is arranged on triatic stay 10,Adjustment hole position 17 scalable framework on triatic stay 10 and the distance on building curtain wall surface 16,Triatic stay 10 is made to turn to side, building curtain wall outer by turning handle 4 again after installation,By steel pin axle 11, orthogonal strut 6 is fixed with steel base 7,To prevent it from rotating,Steel pull bar 3 is connected with the steel otic placode 2 installed and orthogonal strut 6 by steel pin axle 11,The most successively by steel wire rope 13、Safety rope 22 is positioned on first layer ground,Another supporting mechanism is installed in the same manner.The steel wire rope 13 being placed on first layer ground after steelframe installation is connected through safety lock 14 with the elevator 15 associated mechanisms parts such as grade being fixed on aluminium alloy frame body.Operator hang, by the operation of the electric-control system that is connected on power controling box 16, the rubber wheel 20 that ship makes to be arranged on aluminium alloy frame body and move up and down along building curtain wall outer surface, the cleaning completing constructure screen wall with this and maintenance.
Claims (9)
1. curtain cleaning safeguards an equipment, including supporting mechanism, rope mechanism and Diao Chuan mechanism;It is characterized in that: described Diao Chuan mechanism is connected with supporting mechanism by rope mechanism;Described supporting mechanism is arranged on building roof;Described supporting mechanism includes being embedded in the steel otic placode (2) on roof, steel pull bar (3), brace (21), steel base, orthogonal strut (6) and triatic stay (10);Described steel base is fixedly installed on roof surface;Described orthogonal strut (6) is perpendicular to roof and arranges, and one end is socketed in steel base;Described triatic stay (10) is perpendicular to orthogonal strut (6) and is secured to connect;Fix with the two ends of brace (21) respectively between described orthogonal strut (6) with triatic stay (10) and be connected;Fix between described orthogonal strut (6) with steel otic placode (2) and be connected a steel pull bar (3);One end of being connected fixing with triatic stay (10) and steel pull bar (3), described rope mechanism one end is connected, and the other end is connected with Diao Chuan mechanism.
Curtain cleaning the most according to claim 1 safeguards equipment, it is characterised in that: described rope mechanism is parallel to be arranged with wall face;Described rope mechanism includes rope rolling apparatus (12), steel wire rope (13) and safety lock (14);Described steel wire rope (13) is connected with rope rolling apparatus (12);Described safety lock (14) is arranged on steel wire rope (13).
Curtain cleaning the most according to claim 1 and 2 safeguards equipment, it is characterised in that: described Diao Chuan mechanism includes that aluminium alloy hangs ship framework (17);Described aluminium alloy is provided with elevator (15) and power controling box (16) in hanging ship framework (17);Described aluminium alloy hangs ship framework (17) and the side in skin face is provided with roller;Described roller fits with skin face.
Curtain cleaning the most according to claim 3 safeguards equipment, it is characterised in that: it is provided with turning handle (4) in described orthogonal strut (6).
Curtain cleaning the most according to claim 4 safeguards equipment, it is characterised in that: described orthogonal strut (6) includes some sections, is connected by ring flange (5) between each section.
Curtain cleaning the most according to claim 5 safeguards equipment, it is characterised in that: described triatic stay (10) is provided with some adjustment hole positions (19) in the one end away from orthogonal strut (6).
Curtain cleaning the most according to claim 6 safeguards equipment, it is characterised in that: described roller is rubber wheel (20).
Curtain cleaning the most according to claim 7 safeguards equipment, it is characterised in that: described steel pull bar (3) and steel otic placode (2) are provided with three.
Curtain cleaning the most according to claim 8 safeguards equipment, it is characterised in that: described steel pull bar (3) with between steel otic placode (2) and orthogonal strut (6), orthogonal strut (6) is connected with all using steel pin axle (11) between triatic stay (10) and brace (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620014518.5U CN205458472U (en) | 2016-01-08 | 2016-01-08 | Curtain cleaning service equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620014518.5U CN205458472U (en) | 2016-01-08 | 2016-01-08 | Curtain cleaning service equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205458472U true CN205458472U (en) | 2016-08-17 |
Family
ID=56664798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620014518.5U Expired - Fee Related CN205458472U (en) | 2016-01-08 | 2016-01-08 | Curtain cleaning service equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205458472U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107381376A (en) * | 2017-08-07 | 2017-11-24 | 中国建筑第八工程局有限公司 | Implement the devices and methods therefor of lifting using curtain wall embedded part |
CN110015622A (en) * | 2018-01-09 | 2019-07-16 | 高建文 | Cage for personnel's carrying to overhaul exterior wall |
CN110754989A (en) * | 2019-11-04 | 2020-02-07 | 中宇博机械制造股份有限公司 | Electric crane ship for window cleaning machine |
-
2016
- 2016-01-08 CN CN201620014518.5U patent/CN205458472U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107381376A (en) * | 2017-08-07 | 2017-11-24 | 中国建筑第八工程局有限公司 | Implement the devices and methods therefor of lifting using curtain wall embedded part |
CN110015622A (en) * | 2018-01-09 | 2019-07-16 | 高建文 | Cage for personnel's carrying to overhaul exterior wall |
CN110754989A (en) * | 2019-11-04 | 2020-02-07 | 中宇博机械制造股份有限公司 | Electric crane ship for window cleaning machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205458472U (en) | Curtain cleaning service equipment | |
CN110528863B (en) | Hanging basket device for outer inclined plane construction and construction method | |
CN202445989U (en) | Full-automatic window cleaning machine | |
KR20080089057A (en) | Go up and down device for a hammer drill | |
CN111962855A (en) | Aerial working hanging basket for building construction | |
CN113483210A (en) | Building engineering environment monitoring device | |
CN215924185U (en) | Device for preventing rubbing and cutting of unit curtain wall in vertical transportation | |
CN102406485A (en) | Full-automatic window cleaning machine | |
JP2002138659A (en) | Simple knockdown gondola suspension type work apparatus | |
CN116397861A (en) | Operation frame for installation and maintenance of sump pump | |
CN104401830A (en) | Electric rescue barring device for elevator with machine room | |
CN205802807U (en) | A kind of household building elevator | |
CN211143684U (en) | A remove scaffold frame for building engineering | |
CN107311060B (en) | Mechanical whole-course weight-limiting power-off protection device and jack applied by same | |
CN220705226U (en) | Auxiliary support for installing ALC light partition wall | |
CN217003945U (en) | Intelligent monitoring equipment fixing device | |
CN220283482U (en) | Safety plate lifter | |
CN210286562U (en) | Building engineering lifting device | |
CN214885623U (en) | Building construction stagnant water steel sheet fixing device | |
CN219346029U (en) | Monitoring equipment fixing device | |
CN212249123U (en) | Aerial working hanging basket for building construction | |
CN220555619U (en) | Building material lifting machine | |
CN220131639U (en) | Safety pin for elevator maintenance | |
CN215756292U (en) | Multi-functional convenient mobilizable material lifting operation frame | |
CN219823443U (en) | Horizontal hoisting device for building construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20200108 |
|
CF01 | Termination of patent right due to non-payment of annual fee |