CN205445591U - A lining rope for drilled pile construction - Google Patents
A lining rope for drilled pile construction Download PDFInfo
- Publication number
- CN205445591U CN205445591U CN201620214974.4U CN201620214974U CN205445591U CN 205445591 U CN205445591 U CN 205445591U CN 201620214974 U CN201620214974 U CN 201620214974U CN 205445591 U CN205445591 U CN 205445591U
- Authority
- CN
- China
- Prior art keywords
- lining rope
- ran
- counting
- pile construction
- drilled pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
The utility model provides a lining rope for drilled pile construction, including the lining rope body, its characterized in that: the lining rope body divides the ran that a plurality of length equals into, has tied up 1 knot between the adjacent ran as dividing the segment mark. The utility model discloses a tie up a plurality of knot carry out calibration mark on the lining rope body, removed among the drilling process trouble that lining rope surface mud was wiped away to the survey crew from, improved the work efficiency of range finding.
Description
Technical field
This utility model relates to a kind of working survey tool, a kind of lining rope for drilled pile construction.
Background technology
During drilled pile construction, lining rope need to be utilized to measure hole depth, tradition lining rope is in its surface with putting on digital graduated metal, in use, need to wipe metal surface mud ability reading away, and use is inconvenient for, and when winter construction, survey crew is the most painful.Meanwhile, lining rope is during high-frequency use, and graduated metal often occurs that the handwriting is blurred, it is impossible to the phenomenons such as identification, scale loosen, dress work amount is big, the problems such as measuring error easily occurs.When there are the problems referred to above, on-the-spot general employing abandons the method renewed.Therefore at the construction field (site), lining rope is the easy-consumed goods of low value, and consumption is big.
Summary of the invention
The invention provides a kind of lining rope for drilled pile construction, simple in construction, and can be repeated several times utilization.
For achieving the above object, the technical solution of the utility model is:
A kind of lining rope for drilled pile construction, including lining rope body, it is characterised in that: described lining rope body is divided into the ran that several length are equal, has tied up 1 knot as segmentation markers between adjacent ran.
Preferably, a length of d, 0.5m≤d of described ran≤2m.
Further, from lining rope body bottom upwards, n the ran connected together is divided into a counting ran, n >=5, at segmentation markers, counting segmentation markers is had additional between adjacent counting ran, 1st counting segmentation markers is 1 knot, and the 2nd counting segmentation markers is 2 knots, and m-th counting segmentation markers is m knot.Further, length d of each ran is 1m, a length of 10m of each counting ran.
The lining rope for drilled pile construction of above structure, can use common lining rope, carries out scale marker by tying up several knots on lining rope body, carries out segmentation by fixing spacing, and this utility model has the advantages that
1, this utility model eliminates survey crew and wipes the trouble of lining rope surface mud away, improves the work efficiency of range finding;
2, this utility model principle is simple, easy to process, and scale is difficult to displacement, measures the most error-prone;
3, this utility model is easy to use, and rate of reading is fast, and is substantially not required to trimming during use;
4, this utility model expense is low, can realize having scrapped the reprocessing comprehensive utilization of lining rope, energy-conserving and environment-protective.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure, lining rope body 1, ran 2, count segmentation markers 3, segmentation markers 4.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described in further detail, but protection domain of the present utility model is not limited to following enforcement.Example.
As it is shown in figure 1, a kind of lining rope for drilled pile construction, including lining rope body 1, lining rope body 1 is divided into the equal ran of several length 2, has tied up 1 knot as segmentation markers 4 between adjacent ran 2.Consequently, it is possible to the hole depth that survey crew has only to can be completed drilled pile by the number of several segmentation markers 4 is measured.For improving the precision measured, a length of d, 0.5m≤d of ran≤2m.
For reducing the probability that mistake occurs during several segmentation markers, from the bottom of lining rope body 1 upwards, the ran 2 that n connects together is divided into a counting ran, n >=5, on the basis of above-described segmentation markers 4, counting segmentation markers 3 is had additional between adjacent counting ran, 1st counting segmentation markers is 1 knot, and the 2nd counting segmentation markers is 2 knots, and m-th counting segmentation markers is m knot.As a example by a length of 1m of each ran, 10 are published in instalments ran 2 together and is divided into a counting ran, the a length of 10m of the most each counting ran, from the bottom of lining rope body 1 upwards, 2 knots have been tied up between 1st counting ran and the 2nd counting ran, tie up 3 knots between 2nd counting ran and the 3rd counting ran, between the m-1 counting ran and m-th counting ran, tie up m knot.
Claims (4)
1. for a lining rope for drilled pile construction, including lining rope body, it is characterised in that: described lining rope body is divided into the ran that several length are equal, has tied up 1 knot as segmentation markers between adjacent ran.
Lining rope for drilled pile construction the most according to claim 1, it is characterised in that: a length of d, 0.5m≤d of described ran≤2m.
Lining rope for drilled pile construction the most according to claim 2, it is characterized in that: from lining rope body bottom upwards, n the ran connected together is divided into a counting ran, n >=5, at segmentation markers, counting segmentation markers is had additional between adjacent counting ran, 1st counting segmentation markers is 1 knot, and the 2nd counting segmentation markers is 2 knots, and m-th counting segmentation markers is m knot.
Lining rope for drilled pile construction the most according to claim 3, it is characterised in that: length d of each ran is 1m, a length of 10m of each counting ran.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620214974.4U CN205445591U (en) | 2016-03-21 | 2016-03-21 | A lining rope for drilled pile construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620214974.4U CN205445591U (en) | 2016-03-21 | 2016-03-21 | A lining rope for drilled pile construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205445591U true CN205445591U (en) | 2016-08-10 |
Family
ID=56573460
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620214974.4U Active CN205445591U (en) | 2016-03-21 | 2016-03-21 | A lining rope for drilled pile construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205445591U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761693A (en) * | 2016-11-25 | 2017-05-31 | 中铁上海工程局集团第五工程有限公司 | A kind of inspection aperture apparatus for different pile foundation hole footpaths |
-
2016
- 2016-03-21 CN CN201620214974.4U patent/CN205445591U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106761693A (en) * | 2016-11-25 | 2017-05-31 | 中铁上海工程局集团第五工程有限公司 | A kind of inspection aperture apparatus for different pile foundation hole footpaths |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105093352A (en) | Method for measuring and calculating rock mass fracture rate in field | |
CN103279636B (en) | A kind of method determining tree age | |
CN103791872A (en) | Method for measuring wood volume of stumpage by using novel breast height form factor | |
CN205445591U (en) | A lining rope for drilled pile construction | |
CN203657640U (en) | Vernier caliper with measuring claws moving vertically | |
CN106780740B (en) | Dam foundation rock mass dominant penetration channel identification method based on GOCAD software | |
CN105089597A (en) | Method for evaluating complexity of cracks | |
CN104455311A (en) | Parameterization involute tooth profile parameter calculating and drawing method | |
CN104652497A (en) | Underwater concrete pile foundation damage analyzing and estimating method | |
CN203534454U (en) | Vernier ice measuring device | |
CN105021104A (en) | Self-priming step trough measurement tool | |
CN105004400B (en) | A kind of simple underground water level measuring arrangement and measurement method | |
CN203949607U (en) | A kind of reinforcing bar is measured slide calliper rule | |
CN204421815U (en) | Geologic body revolves depth gauge | |
CN107918932A (en) | The method that corrosion character parameter is calculated based on reinforcing bar full angle corrosion morphological image | |
CN107356970B (en) | High-precision well seismic data matching method | |
CN107860891B (en) | Physical tracing method for measuring displacement flux of shale farming | |
CN108010104B (en) | A kind of well logging data index mutual mapping method more | |
CN203978255U (en) | Can depth measurement cable manhole ladder | |
CN206208161U (en) | Sugarcane plant height measuring scale | |
CN109505591B (en) | Method and system for determining permeability limit of unfilled karst cave of fracture-cavity oil reservoir | |
CN205262341U (en) | Mark line portrayal chi | |
CN205066650U (en) | Novel height indicator gauge head | |
CN204988137U (en) | Deep hole clearance groove measuring tool | |
CN203216405U (en) | Vernier bevel protractor with division value of 10 ' and measurement range of 0-320 degrees |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |