CN205445025U - Zinc pot overhauls platform subassembly - Google Patents
Zinc pot overhauls platform subassembly Download PDFInfo
- Publication number
- CN205445025U CN205445025U CN201521089537.6U CN201521089537U CN205445025U CN 205445025 U CN205445025 U CN 205445025U CN 201521089537 U CN201521089537 U CN 201521089537U CN 205445025 U CN205445025 U CN 205445025U
- Authority
- CN
- China
- Prior art keywords
- platform
- mobile
- fixed platform
- zinc pot
- zinc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a zinc pot overhauls platform subassembly, it includes: fixed platform, its upper surface are equipped with along the slide rail of fixed platform's length direction extension, be equipped with the heat preservation in the fixed platform, the last recess that has holding zinc boiler nose of fixed platform, moving platform, it is located fixed platform is last to by set up into can along the slide rail slides, be equipped with the heat preservation in the moving platform, the activity staircase, its bottom is equipped with the walking and takes turns, the activity staircase its operating position with fixed platform links together. The utility model discloses a zinc pot overhauls platform subassembly, it can provide the maintenance platform for the maintenance operation of zinc pot equipment, should overhaul the platform and can simplify the flow chart, further reduces operation ambient temperature, can use convenient to use for a long time.
Description
Technical field
This utility model relates to a kind of inspection platform, particularly relates to the inspection platform of a kind of upkeep operation for zinc pot equipment.
Background technology
Zinc pot, as the nucleus equipment of galvanizing unit, can produce important impact to galvanizing production quality.To this end, the cleannes of zinc pot equipment and function precision are just particularly important.Fig. 1 illustrates the structure of zinc pot equipment.As it is shown in figure 1, zinc pot equipment includes zinc pot 1, zinc boiler nose 2;Zinc pot 1 has the cavity A for accommodating zinc liquid.For ensureing cleannes and the function precision of zinc pot equipment, the associated components (such as zinc boiler nose 2) of zinc pot 1 region needs periodically to tie up inspection, change.The working environment temperature of zinc pot 1 region is high, and dust is big, and task difficulty is high, and easily produces zinc liquid and splash and the accident potential that can threaten personal safety for staff such as scald.
At present, means isolation dust, high temperature and zinc liquid that existing galvanized wire also can use cover plate to be covered in above zinc pot splash, but there is also following two problem:
1) needing cover plate hangs maintenance position, could be split out by zinc boiler nose, flow chart is cumbersome;
2) high due to zinc liquid surface temperature, even if cover plate is placed on above zinc liquid for a long time, working environment temperature is the highest, and cover plate is placed for a long time and is easily deformed depression, there is hidden danger.
Utility model content
The purpose of this utility model is to provide a kind of zinc pot inspection platform assembly, and it can be that zinc pot overhaul of the equipments operation provides inspection platform, and this inspection platform can simplify flow chart, reduces working environment temperature further, can use for a long time, easy to use.
To achieve these goals, the utility model proposes a kind of zinc pot inspection platform assembly, comprising:
Fixed platform, its upper surface is provided with the slide rail of the length direction extension along fixed platform, is provided with heat-insulation layer, described fixed platform has the groove of accommodating zinc boiler nose in described fixed platform;
Mobile platform, it is located in described fixed platform, and is arranged to slide along described slide rail, is provided with heat-insulation layer in described mobile platform;
Mobile stairway, is provided with road wheel bottom it, described mobile stairway links together with described fixed platform in its operating position.
Zinc pot inspection platform assembly described in the utility model, its central scope is, in order to simplify flow chart, it is provided for the groove of accommodating zinc boiler nose on the stationary platform, zinc boiler nose is made can freely to be lifted discrepancy from this groove, mobile platform is set in described fixed platform simultaneously, this mobile platform moves to the groove of fixed platform when upkeep operation be arranged above maintainer inspection platform is provided, mobile platform is moved to the mobile stairway of fixed platform and connects above side by upkeep operation after terminating, leave above the groove of fixed platform, thus the lifting not affecting zinc boiler nose comes in and goes out.
During zinc pot inspection platform assembly described in the utility model application, mobile stairway is pushed into its operating position be connected side with the mobile stairway of fixed platform and link together, maintainer enters the mobile platform being now placed in the carrying station above the mobile stairway connection side of fixed platform by this mobile stairway, then mobile platform is moved to the maintenance station above the groove of fixed platform, upkeep operation is carried out this maintenance station maintainer, the flange bolt of dismounting zinc boiler nose, after end, mobile platform is moved back to carrying station, maintainer leaves mobile platform by mobile stairway, now zinc boiler nose can freely be lifted discrepancy from this groove.Zinc boiler nose is after maintenance, lifting puts in place, maintainer enters the mobile platform being now placed in carrying station by mobile stairway, then move to mobile platform overhaul station, upkeep operation is carried out at maintenance station, installing the flange bolt of zinc boiler nose, mobile platform moves back to after terminating carrying station, maintainer leaves mobile platform by mobile stairway.This process need not cover plate hangs maintenance position as prior art, it is only necessary to mobile mobile platform, it is possible to the lifting not affecting zinc boiler nose comes in and goes out, thus simplifies flow chart.Simultaneously as be equipped with heat-insulation layer in fixed platform and mobile platform, add the two-layer iris action of fixed platform and mobile platform, reduce further working environment temperature, and can use for a long time.Additionally, employing mobile stairway so that use convenient.
Further, in zinc pot inspection platform assembly described in the utility model, described fixed platform includes the first fixed platform and the second fixed platform being stitched together.
Such scheme is generally using the first fixed platform as the main platform of support movable platform, and it has described slide rail, and the second fixed platform is as assistance platform.
Further, in zinc pot inspection platform assembly described in the utility model, described fixed platform and/or mobile platform are provided with hanger, and the bottom of described fixed platform is provided with a spike.
In such scheme, described hanger is used for lifting;Described spike is used for supporting fixed platform, and owing to zinc liquid temperature is higher, described fixed platform needs, far as possible from zinc liquid level surface, to set the height of fixed platform by setting the height of a spike.
Further, in zinc pot inspection platform assembly described in the utility model, described fixed platform is provided with pin-and-hole, and described mobile platform is provided with the safety pin adaptive with described pin-and-hole, when safety pin corresponding inserted is in pin-and-hole, the relative position between fixed platform and mobile platform is fixed.
In such scheme, mobile platform, generally at its station, especially overhauls station, and position relative with between fixed platform needs to be fixed, and therefore design such scheme is fixed to realize this.
Further, in zinc pot inspection platform assembly described in the utility model, the two ends of described slide rail length direction have stop block.
In such scheme, in order to prevent the movement of mobile platform from exceeding its carrying station scope to maintenance station, stop block is set at the two ends of described slide rail length direction.
Further, in zinc pot inspection platform assembly described in the utility model, described mobile platform is provided with dismountable safe fence.
Further, in zinc pot inspection platform assembly described in the utility model, described mobile platform is provided with handle, and described handle is hinged with mobile platform.
In such scheme, described handle can rotate around hinged end under the operation of maintainer, and described handle is generally connected with a drive mechanism, and this drive mechanism can drive mobile platform to move on the stationary platform under handle rotary action.
Further, in zinc pot inspection platform assembly described in the utility model, described mobile stairway is provided with latch, and described fixed platform is provided with the pin hole adaptive with latch, and described mobile stairway and fixed platform are linked together by latch and pin hole.
In such scheme, pin hole is positioned at the mobile stairway of fixed platform and connects side.
Further, in zinc pot inspection platform assembly described in the utility model, described mobile stairway is provided with dismountable security guardrail.
Zinc pot inspection platform assembly described in the utility model compared with prior art has an advantage that
1) need not during zinc pot inspection platform assembly described in the utility model application cover plate hangs maintenance position, it is only necessary to mobile mobile platform, it is possible to the lifting not affecting zinc boiler nose comes in and goes out, thus simplifies flow chart;
2) owing to being equipped with heat-insulation layer in fixed platform and mobile platform, add the two-layer iris action of fixed platform and mobile platform, reduce further working environment temperature, and can use for a long time.
3) mobile stairway is used, easy to use.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of zinc pot equipment.
Fig. 2 is the zinc pot inspection platform assembly described in the utility model front view under a kind of embodiment.
Fig. 3 is the top view of the zinc pot inspection platform assembly shown in Fig. 2.
Fig. 4 is the top view of the first fixed platform of the zinc pot inspection platform assembly shown in Fig. 2.
Fig. 5 is the left view of the first fixed platform of the zinc pot inspection platform assembly shown in Fig. 2.
Fig. 6 is the top view of the mobile platform of the zinc pot inspection platform assembly shown in Fig. 2.
Fig. 7 is the left view of the mobile platform of the zinc pot inspection platform assembly shown in Fig. 2.
Fig. 8 is the local G view of the mobile platform shown in Fig. 7.
Fig. 9 is the local H view of the mobile platform shown in Fig. 6.
Figure 10 is the left view of the mobile stairway of the zinc pot inspection platform assembly shown in Fig. 2.
Detailed description of the invention
Below in conjunction with Figure of description and specific embodiment, zinc pot inspection platform assembly described in the utility model is made further explanation to illustrate, but this explanation is not intended that the improper restriction to the technical solution of the utility model.
The zinc pot inspection platform assembly of the present embodiment is for the maintenance of the zinc pot equipment such as Fig. 1.
Fig. 2 shows the main TV structure of the zinc pot inspection platform assembly of the present embodiment;Fig. 3 shows the plan structure of the zinc pot inspection platform assembly of the present embodiment;Fig. 4 and Fig. 5 respectively illustrates plan structure and the left view structure of first fixed platform of the present embodiment;Fig. 6~Fig. 9 respectively illustrates the plan structure of the mobile platform of the present embodiment, left view structure and local G and the structure of local H;Figure 10 shows the left view structure of the mobile stairway of the present embodiment.
As shown in Figures 2 and 3, in conjunction with reference to Fig. 4~Figure 10, the zinc pot inspection platform assembly of the present embodiment includes: fixed platform 3, it includes the first fixed platform 31 and the second fixed platform 32 being stitched together, wherein the upper surface of the first fixed platform 31 is provided with the slide rail 33 of the length direction extension along the first fixed platform 31, is provided with heat-insulation layer I in the first fixed platform 31 and the second fixed platform 321, the first fixed platform 31 has the groove B of accommodating zinc boiler nose 2;Mobile platform 4, it is located in the first fixed platform 31, and is arranged to slide along slide rail 33, is provided with heat-insulation layer I in mobile platform 42;Mobile stairway 5, is provided with road wheel 51 bottom it, mobile stairway 5 links together at the mobile stairway connection side D of its operating position C and the first fixed platform 31.
As shown in Figure 4 and Figure 5, in conjunction with referring to figs. 2 and 3, in the present embodiment, the first fixed platform 31 is provided with hanger 34 and pin-and-hole E, and the bottom of the first fixed platform 31 is provided with spike 35;The two ends of slide rail 33 length direction have stop block 36, to limit the moving range of mobile platform 4 less than carrying station M to the scope overhauling station N;The mobile stairway of the first fixed platform 31 connects side D and is provided with pin hole F.
As shown in figs. 6-9, in conjunction with referring to figs. 2 and 3, in the present embodiment, the moving range of mobile platform 4 is carrying station M between maintenance station N;Mobile platform 4 is provided with hanger 41 and the safety pin 42 adaptive with the pin-and-hole E in above-mentioned first fixed platform 31;It is additionally provided with dismountable safe fence 43 on mobile platform 4, is fixed with stud pin bottom it, can conveniently remove when needing.The bottom of mobile platform 4 is provided with guide wheel 45, is specifically shown in Fig. 8, and guide wheel 45 has edge side block J, moves along above-mentioned slide rail 33 for coordinating and does not derails;Guide wheel bearing pin 451 is fixed on connection flange base 453 by bolt 452.Handle 44 it is additionally provided with on mobile platform 4, handle 44 is connected with a drive mechanism, this drive mechanism can drive mobile platform 4 to move in the first fixed platform 31 under handle 44 rotary action, handle 44 is hinged with mobile platform 4, it is specifically shown in Fig. 9, by attachment pegs 441 with couple guide 442 threaded and realize hinged, handle 44 head has split pin 443 locking, and attachment pegs 441 both sides are with jump ring 444.
As shown in Figure 10, in conjunction with referring to figs. 2 and 3, in the present embodiment, the latch 52 that mobile stairway 5 is provided with and above-mentioned pin hole F is adaptive;Dismountable security guardrail 53 it is additionally provided with on mobile stairway 5;Mobile stairway 5 has aisle platform K.
nullPlease continue to refer to Fig. 2 and Fig. 3,In conjunction with reference to Fig. 4~Figure 10,When the zinc pot inspection platform assembly of the present embodiment is applied,The mobile stairway connection side D that mobile stairway 5 is pushed into its operating position C and the first fixed platform 31 is linked together by latch 52 and pin hole F,Maintainer enters the mobile platform 4 being now placed in the carrying station M above the mobile stairway connection side D of the first fixed platform 31 by the aisle platform K of mobile stairway 5,Then mobile platform 4 is moved to the maintenance station N above the groove B of the first fixed platform 31,Upkeep operation is carried out maintenance station N maintainer,The flange bolt of dismounting zinc boiler nose 2,After end, mobile platform 4 is moved back to carrying station M,Maintainer leaves mobile platform 4 by the aisle platform K of mobile stairway 5,Now zinc boiler nose 2 can freely be lifted discrepancy from groove B.Zinc boiler nose 2 is after maintenance, lifting puts in place, maintainer enters the mobile platform 4 being now placed in carrying station M by the aisle platform K of mobile stairway 5, then move to mobile platform 4 overhaul station N, upkeep operation is carried out at maintenance station N, installing the flange bolt of zinc boiler nose 2, mobile platform 4 moves back to after terminating carrying station M, maintainer leaves mobile platform 4 by the aisle platform K of mobile stairway 5.In said process, maintainer drives mobile platform 4 to move in the first fixed platform 31 by operation handle 44 around hinged end rotation.At maintenance station N, in safety pin 42 corresponding inserted of mobile platform 4 pin-and-hole E in above-mentioned first fixed platform 31, now the relative position between the first fixed platform 31 and mobile platform 4 is fixed, and when preventing maintainer from overhauling, mobile platform 4 is moved.
It should be noted that only specific embodiment of the utility model listed above, it is clear that this utility model is not limited to above example, has the similar change of many therewith.If all deformation that those skilled in the art directly derives from this utility model disclosure or associates, protection domain of the present utility model all should be belonged to.
Claims (9)
1. a zinc pot inspection platform assembly, it is characterised in that including:
Fixed platform, its upper surface is provided with the slide rail of the length direction extension along fixed platform, is provided with heat-insulation layer, described fixed platform has the groove of accommodating zinc boiler nose in described fixed platform;
Mobile platform, it is located in described fixed platform, and is arranged to slide along described slide rail, is provided with heat-insulation layer in described mobile platform;
Mobile stairway, is provided with road wheel bottom it, described mobile stairway links together with described fixed platform in its operating position.
2. zinc pot inspection platform assembly as claimed in claim 1, it is characterised in that described fixed platform includes the first fixed platform and the second fixed platform being stitched together.
3. zinc pot inspection platform assembly as claimed in claim 1, it is characterised in that described fixed platform and/or mobile platform are provided with hanger, and the bottom of described fixed platform is provided with a spike.
4. zinc pot inspection platform assembly as claimed in claim 1, it is characterized in that, described fixed platform is provided with pin-and-hole, and described mobile platform is provided with the safety pin adaptive with described pin-and-hole, when safety pin corresponding inserted is in pin-and-hole, the relative position between fixed platform and mobile platform is fixed.
5. zinc pot inspection platform assembly as claimed in claim 1, it is characterised in that the two ends of described slide rail length direction have stop block.
6. zinc pot inspection platform assembly as claimed in claim 1, it is characterised in that described mobile platform is provided with dismountable safe fence.
7. zinc pot inspection platform assembly as claimed in claim 1, it is characterised in that described mobile platform is provided with handle, and described handle is hinged with mobile platform.
8. zinc pot inspection platform assembly as claimed in claim 1, it is characterised in that described mobile stairway is provided with latch, and described fixed platform is provided with the pin hole adaptive with latch, and described mobile stairway and fixed platform are linked together by latch and pin hole.
9. zinc pot inspection platform assembly as claimed in claim 1, it is characterised in that described mobile stairway is provided with dismountable security guardrail.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521089537.6U CN205445025U (en) | 2015-12-24 | 2015-12-24 | Zinc pot overhauls platform subassembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521089537.6U CN205445025U (en) | 2015-12-24 | 2015-12-24 | Zinc pot overhauls platform subassembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205445025U true CN205445025U (en) | 2016-08-10 |
Family
ID=56585842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521089537.6U Active CN205445025U (en) | 2015-12-24 | 2015-12-24 | Zinc pot overhauls platform subassembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205445025U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113249670A (en) * | 2021-03-11 | 2021-08-13 | 常州市左贤机械制造有限公司 | Automatic hot galvanizing assembly line |
-
2015
- 2015-12-24 CN CN201521089537.6U patent/CN205445025U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113249670A (en) * | 2021-03-11 | 2021-08-13 | 常州市左贤机械制造有限公司 | Automatic hot galvanizing assembly line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130240297A1 (en) | Motorized height access device for tower cranes | |
CN108798186A (en) | A kind of communication steel tower with wind-shielding function | |
CN208308354U (en) | A kind of automobile maintenance lifting platform | |
CN205187546U (en) | No computer lab elevator car hangs fixing device | |
CN101666206A (en) | Handrail-type guardrail and ladder thereof | |
CN205445025U (en) | Zinc pot overhauls platform subassembly | |
CN110761702A (en) | Aircraft engine maintenance work ladder | |
CN104627792A (en) | Toe guard device for lift car of elevator | |
CN207313070U (en) | A kind of small-sized aloft work lifting platform | |
CN207200093U (en) | Metal enclosed switchgear transformer installation servicing unit | |
CN202924620U (en) | Installing support that installation equipment was used in narrow and small space | |
CN205873582U (en) | Coupling mechanism and lift -draw style cat ladder of cat ladder | |
CN106337652B (en) | A kind of power equipment maintaining ladder | |
CN205553216U (en) | Rotation type riveter | |
CN210150536U (en) | Elevator pit overhauls special device of saving oneself | |
CN104278864A (en) | Locomotive servicing work platform | |
CN211173890U (en) | Aircraft engine maintenance work ladder | |
CN103693367B (en) | Tobacco baking room auxiliary hangs roasting device | |
CN208802796U (en) | A kind of manned lift mechanism for buried change | |
CN205638500U (en) | Large -scale steel shotcrete of variant formula installation movable trolley | |
CN203640291U (en) | Height-difference adjustable double-layer operating platform for construction of building body and external ornaments | |
US20160075344A1 (en) | Machine for manipulating pipes | |
CN201460700U (en) | Ladder with armrest type guard bar | |
CN210595138U (en) | Rail-mounted hydraulic elevator | |
CN219197222U (en) | Portable oil tank maintenance ladder |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |