CN205440247U - Checkpost pore structure - Google Patents

Checkpost pore structure Download PDF

Info

Publication number
CN205440247U
CN205440247U CN201521133870.2U CN201521133870U CN205440247U CN 205440247 U CN205440247 U CN 205440247U CN 201521133870 U CN201521133870 U CN 201521133870U CN 205440247 U CN205440247 U CN 205440247U
Authority
CN
China
Prior art keywords
clamp
checkpost
installing hole
hole
mounting hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521133870.2U
Other languages
Chinese (zh)
Inventor
汪会
周鹏
黄崇邦
文化
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Space Mould and Plastic Co Ltd
Original Assignee
Chengdu Space Mould and Plastic Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Space Mould and Plastic Co Ltd filed Critical Chengdu Space Mould and Plastic Co Ltd
Priority to CN201521133870.2U priority Critical patent/CN205440247U/en
Application granted granted Critical
Publication of CN205440247U publication Critical patent/CN205440247U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Clamps And Clips (AREA)

Abstract

The utility model discloses a checkpost pore structure, including inserting and block the checkpost mounting hole of the rectangle structure of checkpost, the orientation both sides still are out of shape including setting up to be out of shape orientation one side or to set up respectively at the checkpost mounting hole at the checkpost mounting hole to the setting of checkpost mounting hole on the checkpost adheres to the piece, have the deformation hole of a determining deviation with the checkpost mounting hole. This practical optimization of taking out the diplopore structure to the checkpost hole, it has increased a deformation hole to warp direction one side or warp the direction both sides at the checkpost mounting hole respectively at the checkpost mounting hole, overcome current similar checkpost because the checkpost mounting hole hard warp the assembly that arouses and dismantles difficult problem, not only the assembly is easier with the dismantlement, the work efficiency is improved, still reduced because of dismantling the difficulty, two products at checkpost and checkpost hole place can not part and cause one of them piece to scrap and another condemned risk only together, the recycle who improves the product is rateed, and simultaneously, the product has lacked certain materials and relatively more lightweight, and save cost.

Description

Clamp pore structure
Technical field
This utility model relates to clamp technical field, is specifically related to a kind of card sub-aperture with deformation hole.
Background technology
At present, existing clamp buckle structure (such as Fig. 1), clamp 3 is made up of the clamp head 31 of sphenoid structure and the clamp wall 32 under it, the clamp installing hole 4 of card sub-aperture only one of which rectangular configuration, when clamp head 31 inserts clamp installing hole 4, clamp installing hole 4 broadens by clamp head 31, and by rear, clamp installing hole 4 resiles.Existing clamp buckle structure there is problems in that due to card sub-aperture only one of which clamp installing hole 4 when dismounting, being all enclosed construction around clamp installing hole 4, it is more difficult that clamp installing hole 4 deforms, and when causing clamp 3 to assemble, contact engaging and separating force is bigger, during dismounting highly difficult, easily occur fracture, deformation damage.Conforming product rate only about 88%.
Utility model content
The technical problems to be solved in the utility model is: when existing buckle structure causes clamp 3 to assemble, contact engaging and separating force is relatively big, highly difficult during dismounting, the problem damage of fracture, deformation easily occur.
To achieve the above object of the invention, the technical scheme that this utility model is used is: provide a kind of clamp pore structure, clamp installing hole including the rectangular configuration inserting and blocking clamp, clamp installing hole is arranged on clamp attachment, it is characterized in that: also include being arranged on clamp installing hole deformation direction side or being separately positioned on clamp installing hole deformation direction both sides having deformation hole at regular intervals with clamp installing hole.
The rectangular opening that described deformation Kong Weiyu clamp installing hole is parallel.
1.5a≤b≤3a(I)
In formula: b-clamp installing hole length, a-clamp width;
b≤c≤2b(II)
In formula: c-clamp deformation hole length, b-clamp installing hole length.
2mm≤d≤7mm(III)
In formula: d-two pitch of holes.
f≤e≤f+1.5mm(IV)
In formula: e-clamp installing hole width, f-clamp wall thickness.
This practical optimization that card sub-aperture is taked out double-pore structure, clamp installing hole deformation direction side or add in clamp installing hole deformation direction both sides respectively one deformation hole, existing similar clamp is overcome to deform, due to clamp installing hole difficulty, the assembly or disassembly difficult problem caused, after using clamp pore structure, not only assembly or disassembly is easier to, improve productivity ratio, also reduce because of dismounting difficulty, clamp can not separate with the two pieces product at card sub-aperture place and cause wherein one scrap and another part only have together with the risk scrapped, improve the recovery utilization rate of product, conforming product rate increases to more than 98% from about 88%, simultaneously, product has lacked certain materials and more lightweight relatively, save cost.
Accompanying drawing explanation
Fig. 1 is existing clamp, clamp pore structure schematic diagram;
Fig. 2 is structural representation of the present utility model,
Fig. 3 is this utility model top view;
Fig. 4 is A-A sectional view in Fig. 3.
Wherein, clamp attachment (1), installing hole attachment (2), clamp (3), clamp head (31), clamp wall (32), clamp installing hole (4);Deformation hole (5);
A-clamp width, b-clamp installing hole length, c-deform hole length, d-two pitch of holes, e-clamp installing hole width, f-clamp wall thickness.
Detailed description of the invention
Such as the clamp pore structure of Fig. 2, including the clamp installing hole 4 of the rectangular configuration inserting and blocking clamp 3, clamp installing hole 4 is arranged on clamp attachment 1.Compared with existing clamp pore structure, this clamp pore structure also includes the clamp installing hole 4 deformation direction both sides being arranged on clamp installing hole 4 deformation direction side, has deformation hole 5 at regular intervals with clamp installing hole 4, named in this spacing this utility model.Of course, if required, such as material is harder, when deflection is inadequate, respectively arranging a deformation hole 5 in clamp installing hole 4 deformation direction both sides is also feasible.
The deformation direction of clamp installing hole 4 is its money direction.
In the present embodiment, described deformation hole 5 is the rectangular opening parallel with clamp installing hole 4.
Such as Fig. 3 and 4, installing hole attachment 2 in this example and clamp attachment 1 and respectively automobile front beam grid body and grid counterpart, it is PP material, between body material thickness 2mm to 3.5mm.Clamp is made up of the clamp head 31 of sphenoid structure and the clamp wall 32 under it, and clamp wall thickness f is 2mm≤f≤3.5mm, and in automobile interior exterior room, PP material general thickness is in this range.
In the present embodiment, other sizes are as follows:
(1) clamp width a: this size requires to take according to product size and card relay.Such as, in this specific embodiment example, clamp width a is 13.5mm.
(2) clamp installing hole length b:
1.5a≤b≤3a(I)
In formula: b-clamp installing hole length, a-clamp width.
(3) clamp deformation hole length c:
b≤c≤2b(II)
In formula: c-clamp deformation hole length, b-clamp installing hole length.
(4) two pitchs of holes d, this size is affected by clamp installing hole length b size, and clamp installing hole length b size is the biggest, and this size is the biggest:
2mm≤d≤7mm(III)
In formula: d-two pitch of holes.
(5) clamp installing hole width e, according to concrete positioning scenarios, value the most in this range:
f≤e≤f+1.5mm(IV)
In formula: e-clamp installing hole width, f-clamp wall thickness.
This practical optimization that card sub-aperture is taked out double-pore structure, clamp installing hole deformation direction side or add in clamp installing hole deformation direction both sides respectively one deformation hole, existing similar clamp is overcome to deform, due to clamp installing hole difficulty, the assembly or disassembly difficult problem caused, after using clamp pore structure, not only assembly or disassembly is easier to, improve productivity ratio, also reduce because of dismounting difficulty, clamp can not separate with the two pieces product at card sub-aperture place and cause wherein one scrap and another part only have together with the risk scrapped, improve the recovery utilization rate of product, conforming product rate increases to more than 98% from about 88%, simultaneously, product has lacked certain materials and more lightweight relatively, save cost.
Division name is explained:
Clamp attachment 1: the part at clamp place, arranges the part of described clamp in other words;
Installing hole attachment 2: the part at installing hole place, arranges the part of described installing hole in other words;
Card sub-aperture: in existing clamp buckle structure, card sub-aperture only includes a clamp installing hole 4;Novel the provided card sub-aperture of this practicality, in addition to clamp installing hole 4, also includes a deformation hole 5 being arranged on clamp installing hole deformation direction one or both sides;
Two pitchs of holes d: clamp installing hole and the deformation hole spacing on clamp installing hole width.

Claims (5)

1. clamp pore structure, clamp installing hole (4) including the rectangular configuration inserting and blocking clamp (3), clamp installing hole (4) is arranged on clamp attachment (1), it is characterized in that: also include being arranged on clamp installing hole (4) deformation direction side or being separately positioned on clamp installing hole (4) deformation direction both sides, have deformation hole (5) at regular intervals with clamp installing hole (4).
Clamp pore structure the most according to claim 1, it is characterised in that: described deformation hole (5) is the rectangular opening parallel with clamp installing hole (4).
Clamp pore structure the most according to claim 2, it is characterised in that:
1.5a≤b≤3a(I)
In formula: b-clamp installing hole length, a-clamp width;
b≤c≤2b(II)
In formula: c-clamp deformation hole length, b-clamp installing hole length.
Clamp pore structure the most according to claim 2, it is characterised in that:
2mm≤d≤7mm(III)
In formula: d-two pitch of holes.
Clamp pore structure the most according to claim 2, it is characterised in that:
f≤e≤f+1.5mm(IV)
In formula: e-clamp installing hole width, f-clamp wall thickness.
CN201521133870.2U 2015-12-31 2015-12-31 Checkpost pore structure Active CN205440247U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521133870.2U CN205440247U (en) 2015-12-31 2015-12-31 Checkpost pore structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521133870.2U CN205440247U (en) 2015-12-31 2015-12-31 Checkpost pore structure

Publications (1)

Publication Number Publication Date
CN205440247U true CN205440247U (en) 2016-08-10

Family

ID=56599483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521133870.2U Active CN205440247U (en) 2015-12-31 2015-12-31 Checkpost pore structure

Country Status (1)

Country Link
CN (1) CN205440247U (en)

Similar Documents

Publication Publication Date Title
CN103567282A (en) Integral molding process for profile
CN102773374A (en) Front frame, manufacturing method thereof and liquid crystal display device
CN203320865U (en) Stand column for aluminium material protective fence
CN205554324U (en) Truck is beam assembly for frame
CN205440247U (en) Checkpost pore structure
JP2014181514A (en) Rebar intersection fastener
CN204161464U (en) Automobile-used sectional beam, vehicle frame and vehicle
CN201995243U (en) Panel frame of display screen
CN104902726A (en) Laser welding structure of multi-piece display aluminum extruded front frame
AU2016100976A4 (en) Cellular confinement system
CN105501164A (en) Clip hole structure
CN202833454U (en) Stand column buckle mounting base
CN104139277A (en) Manufacturing method of small-sized hollow closed part
CN202304678U (en) Manufacturing and detecting tooling for guide plate
US10415209B2 (en) Cellular confinement system and manufacturing method thereof
CN205350835U (en) Double pin aluminium alloy ex -trusions coupling assembling
CN104563347A (en) Replaceable stone curtain wall
CN204161472U (en) Cross member of frame, vehicle frame and vehicle
CN203603449U (en) Tubular type right-angle fastener for construction
CN203887948U (en) Polygonal specimen stamping die
CN203061687U (en) Upper clamping plate of automobile die
CN204418583U (en) A kind of generous plate
CN202727070U (en) Assembly welding mould
CN105083752A (en) Lifting handle device used for lifting handle mounting machine
CN105371099A (en) Double-split aluminum alloy profile connecting assembly

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant