CN205436159U - Paint spray booth with bidirectional full flow paint fog catching function - Google Patents

Paint spray booth with bidirectional full flow paint fog catching function Download PDF

Info

Publication number
CN205436159U
CN205436159U CN201521098615.9U CN201521098615U CN205436159U CN 205436159 U CN205436159 U CN 205436159U CN 201521098615 U CN201521098615 U CN 201521098615U CN 205436159 U CN205436159 U CN 205436159U
Authority
CN
China
Prior art keywords
arc
spray booth
paint spray
plate
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201521098615.9U
Other languages
Chinese (zh)
Inventor
朱殿兴
冯正
谷德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Saizhi Technology & Development Co ltd
Original Assignee
Tianjin Saizhi Technology & Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Saizhi Technology & Development Co ltd filed Critical Tianjin Saizhi Technology & Development Co ltd
Priority to CN201521098615.9U priority Critical patent/CN205436159U/en
Application granted granted Critical
Publication of CN205436159U publication Critical patent/CN205436159U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a spray booth with function is caught to two -way complete flow coating cloud, the spray booth includes paint spray booth and gas -liquid separation chamber, the paint spray booth passes through the coating cloud and catches structure intercommunication gas -liquid separation chamber, the one end and the one end that the bottom plate extends arc -shaped guide plate of its bottom plate water conservancy diversion structure relative with water curtain plate lower extreme are connected, the logical elder member of a family of the other end that this bottom plate extends arc -shaped guide plate adorns serration plate admittedly, the below of extending arc -shaped guide plate at the bottom plate sets up cascade extension arc -shaped guide plate, this cascade extends arc -shaped guide plate's one end smoothness and installs the lower extreme at water curtain plate, other end installation serration plate, bottom plate water conservancy diversion structure, the bottom plate extends arc -shaped guide plate and the cascade extends the first atomizing space of formation between the arc -shaped guide plate, bottom plate water conservancy diversion structure and cascade extend and form second atomizing space between the arc -shaped guide plate, and this kind of structure has realized that the washing liquid complete flow through atomizing serration plate, has improved atomization efficiency greatly, make efficiency that the washing liquid caught the coating cloud more up to to 99.6%.

Description

There is spraying paint of two-way full flow coating cloud capture function
Technical field
This utility model belongs to paint spray booth field, a kind of paint spray booth with two-way full flow coating cloud capture function.
Background technology
It is used for catching coating cloud structure in existing paint spray booth and mainly passes through water curtain plate, cleaning mixture forms cascade on water curtain plate face and catches the unnecessary coating cloud sprayed paint, but this schematic capture is limited in one's ability, catch rate is relatively low, trace it to its cause be formed cascade surface area less, on limited water curtain plate, catch rate is relatively low, and existing coating cloud capturing structure can not realize full flow atomization, causing cleaning mixture nebulization efficiency low, capturing efficiency is low.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that a kind of paint spray booth with two-way full flow coating cloud capture function, and this simple in construction, design science are reasonable, low cost, cleaning mixture nebulization efficiency are high, and capturing efficiency is high.
This utility model solves its technical problem and is achieved through the following technical solutions:
A kind of paint spray booth with two-way full flow coating cloud capture function, including a paint spray booth, this paint spray booth includes paint spray booth and gas-liquid separation chamber, paint spray booth connects gas-liquid separation chamber by coating cloud capturing structure, paint spray booth inwall is provided with water curtain plate, bottom surface is provided with base plate flow-guiding structure, one end that one end of its base plate flow-guiding structure relative with water curtain plate lower end extends arc deflector with base plate is connected, this base plate extend arc deflector the other end elongated on be fixedly mounted with gullet plate, the lower section extending arc deflector at base plate arranges a cascade extension arc deflector, this cascade extends one end of arc deflector and smooths the lower end being arranged on water curtain plate, the other end installs gullet plate, base plate flow-guiding structure, base plate extends and forms the first atomization space between arc deflector and cascade extension arc deflector;This first atomization space connection paint spray booth, forms the second atomization space between base plate flow-guiding structure and cascade extension arc deflector, and this second atomization space connects gas-liquid separation chamber.
And, described base plate extends arc deflector and includes that the first arc and first arc one end integrally extend the base plate extension board made, this base plate extension board is in smoothing junction with base plate flow-guiding structure, and this first arc other end is formed down arc and integrally makes gullet plate.
And, the gullet plate of the first described arc lower end and lower section cascade extend and form the first atomization entrance between arc deflector.
And, described cascade extends the cascade connection arc deflector that arc deflector includes that the second arc and second arc one end one are upwards made, and this second arc other end is formed down arc and integrally makes gullet plate.
And, the base plate flow-guiding structure that the gullet plate of the second described arc lower end is corresponding is shaped with depression arcuate groove, between gullet plate and the depression arcuate groove of the second arc lower end, forms the second atomization entrance.
And, described water curtain plate lower end is provided with bayonet socket, and cascade extends arc deflector upper end and is installed on bayonet socket.
And, it is inclined-plane above described base plate flow-guiding structure, the high-end connection on inclined-plane has overflow launder, and the upper end of water curtain plate connects overflow launder.
And, demister is installed in the middle part of described gas-liquid separation chamber, gas-liquid separation chamber upper end is provided with air-introduced machine, is provided with water leg bottom gas-liquid separation chamber, and this water leg is connected by pipeline scrapes grit chamber.
And, described scraping connects the overflow launder in paint spray booth by pipeline and suction pump bottom grit chamber.
The application in coating process of a kind of paint spray booth with two-way full flow coating cloud capture function.
Advantage of the present utility model and having the beneficial effect that
1, originally there is the paint spray booth of two-way full flow coating cloud capture function, including a paint spray booth, this paint spray booth includes paint spray booth and gas-liquid separation chamber, paint spray booth connects gas-liquid separation chamber by coating cloud capturing structure, paint spray booth inwall is provided with water curtain plate, bottom surface is provided with base plate flow-guiding structure, one end that one end of its base plate flow-guiding structure relative with water curtain plate lower end extends arc deflector with base plate is connected, this base plate extend arc deflector the other end elongated on be fixedly mounted with gullet plate, the lower section extending arc deflector at base plate arranges a cascade extension arc deflector, this cascade extends one end of arc deflector and smooths the lower end being arranged on water curtain plate, the other end installs gullet plate, base plate flow-guiding structure, base plate extends and forms the first atomization space between arc deflector and cascade extension arc deflector;This first atomization space connection paint spray booth, base plate flow-guiding structure and cascade extend and form the second atomization space between arc deflector, this second atomization space connects gas-liquid separation chamber, this kind of structure achieves cleaning mixture full flow through atomization gullet plate, substantially increase nebulization efficiency, make cleaning mixture catch the in hgher efficiency of coating cloud and reach 99.6%.
2, the gullet plate of this utility model the first arc lower end and lower section cascade extend and form the first atomization entrance between arc deflector, base plate flow-guiding structure, base plate extends and forms the first atomization space between arc deflector and cascade extension arc deflector, effectively it is atomized the cleaning mixture collected by base plate flow-guiding structure, after first atomization space sucks cleaning mixture by air-flow, make cleaning mixture atomization form little water droplet and coating cloud is carried out parcel seizure, the little water droplet of atomization adds specific surface area, so capturing ability becomes geometrical progression to increase in the confined space, substantially increase the capturing ability of coating cloud.
3, originally it is shaped with depression arcuate groove on the base plate flow-guiding structure that the gullet plate of second arc lower end is corresponding, the second atomization entrance is formed between gullet plate and the depression arcuate groove of the second arc lower end, base plate flow-guiding structure and cascade extend and form the second atomization space between arc deflector, owing to break-in and space squeezing action form air-flow change rapidly, the cleaning mixture that the water curtain plate relative with bottom surface flow-guiding structure flows down is sucked the second atomization space by air-flow and is atomized more fully, thus preferably catch remaining coating cloud, improve overall nebulization efficiency and coating cloud capturing efficiency.
4, this utility model water curtain plate lower end is provided with bayonet socket, and cascade extends arc deflector upper end and is installed on bayonet socket, and when maintenance, easy accessibility, safety is time saving and energy saving.It is that inclined-plane can make bottom surface cleaning mixture flowing that the cleaning mixture of base plate flow-guiding structure collects face, prevents from painting slag deposits, and contributes to one-level coating cloud import and medicament water is sucked atomization.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the A portion enlarged drawing in Fig. 1.
Detailed description of the invention
Below by specific embodiment, the utility model is described in further detail, and following example are illustrative, is not determinate, it is impossible to limits protection domain of the present utility model with this.
A kind of paint spray booth with two-way full flow coating cloud capture function, including a paint spray booth, this paint spray booth includes paint spray booth 2 and gas-liquid separation chamber 6, paint spray booth connects gas-liquid separation chamber by coating cloud capturing structure, paint spray booth inwall is provided with water curtain plate 4, bottom surface is provided with base plate flow-guiding structure 21, one end that one end of its base plate flow-guiding structure relative with water curtain plate lower end extends arc deflector with base plate is connected, this base plate extend arc deflector the other end elongated on be fixedly mounted with gullet plate 15, the lower section extending arc deflector at base plate arranges a cascade extension arc deflector, this cascade extends one end of arc deflector and smooths the lower end being arranged on water curtain plate, the other end installs gullet plate.This gullet plate is elongated upper is all fixedly mounted with, base plate extension arc deflector includes that the first arc 13 and first arc one end integrally extend the base plate extension board 12 made furtherly, this base plate extension board is in smoothing junction with base plate flow-guiding structure, and this first arc other end is formed down arc and integrally makes gullet plate.The gullet plate of the first arc lower end and lower section cascade extend and form the first atomization entrance 16 between arc deflector.Gullet plate and the lower section cascade of the first arc lower end extends distance the shortest between arc deflector and forms the first atomization entrance in particular, and base plate flow-guiding structure, base plate extend and form the first atomization space 11 between arc deflector and cascade extension arc deflector.This first atomization space connection paint spray booth, cascade extends the cascade connection arc deflector 14 that arc deflector includes that the second arc 18 and second arc one end one are upwards made, and this second arc other end is formed down arc and integrally makes gullet plate.The base plate water conservancy diversion that the gullet plate of the second arc lower end is corresponding ties body plan depression arcuate groove 20, forms the second atomization entrance 19 between gullet plate and the depression arcuate groove of the second arc lower end.Base plate flow-guiding structure and cascade extend and form the second atomization space 17 between arc deflector.This second atomization space connects gas-liquid separation chamber, and water curtain plate lower end is provided with bayonet socket, and cascade extends arc deflector upper end and is installed on bayonet socket.Being inclined-plane above base plate flow-guiding structure, the high-end connection on inclined-plane has overflow launder 1, and the upper end of water curtain plate connects overflow launder.Being provided with demister 5 in the middle part of gas-liquid separation chamber, gas-liquid separation chamber upper end is provided with air-introduced machine 3, is provided with water leg 7 bottom gas-liquid separation chamber, and this water leg is connected by pipeline 8 scrapes grit chamber 9.Scrape the overflow launder connecting in paint spray booth by pipeline and suction pump 10 bottom grit chamber.
The application in coating process of a kind of paint spray booth with two-way full flow coating cloud capture function.
In this utility model paint spray booth, four walls are provided with water curtain plate, a coating cloud part after spraying paint is caught by the cleaning mixture on water curtain plate, remaining floating aerial coating cloud is due to the effect of air-introduced machine, it is inhaled into the first atomization space of the present utility model, the cleaning mixture that the cleaning mixture of the first atomization space converges essentially from base plate flow-guiding structure side, before entering the second atomization entrance, the cleaning mixture of atomization, the coating cloud caught at large swerves, the cleaning mixture that the water curtain plate of at this moment relative with base plate flow-guiding structure side converges enters the second atomization entrance to start effectively to be atomized, the cleaning mixture of the most two-way convergence is atomized the most entirely, coating cloud is captured substantially, capturing efficiency is the highest, the gas being washed ascends into industrial organic exhaust gas processing means, cleaning mixture enters water leg eliminating paint spray booth entrance and scrapes slag program.
This utility model is effectively improved coating cloud wash degree.Paint spray booth of the prior art is to utilize moisture film to carry out coating cloud washing, and detersive efficiency causes aerofluxus still to contain the existence of a large amount of coating cloud less than 80%, affects the down-stream process to gas.Clash into, after this utility model carries out prime atomization washing in the first atomization space and with arc turning, the coating cloud that the moisture film washing of liquefaction formation is impacted due to inertia and speedup, enter after the second atomization space is atomized again and gas is carried out secondary washing, Washing ratio can be promoted to more than 99.6% and greatly improved clean rate.

Claims (9)

1. a paint spray booth with two-way full flow coating cloud capture function, including a paint spray booth, this paint spray booth includes paint spray booth and gas-liquid separation chamber, paint spray booth connects gas-liquid separation chamber by coating cloud capturing structure, paint spray booth inwall is provided with water curtain plate, bottom surface is provided with base plate flow-guiding structure, it is characterized in that: one end that one end of the base plate flow-guiding structure relative with water curtain plate lower end extends arc deflector with base plate is connected, this base plate extend arc deflector the other end elongated on be fixedly mounted with gullet plate, the lower section extending arc deflector at base plate arranges a cascade extension arc deflector, this cascade extends one end of arc deflector and smooths the lower end being arranged on water curtain plate, the other end installs gullet plate, base plate flow-guiding structure, base plate extends and forms the first atomization space between arc deflector and cascade extension arc deflector;This first atomization space connection paint spray booth, forms the second atomization space between base plate flow-guiding structure and cascade extension arc deflector, and this second atomization space connects gas-liquid separation chamber.
The paint spray booth with two-way full flow coating cloud capture function the most according to claim 1, it is characterized in that: described base plate extends arc deflector and includes that the first arc and first arc one end integrally extend the base plate extension board made, this base plate extension board is in smoothing junction with base plate flow-guiding structure, and this first arc other end is formed down arc and integrally makes gullet plate.
The paint spray booth with two-way full flow coating cloud capture function the most according to claim 2, it is characterised in that: the gullet plate of the first described arc lower end and lower section cascade extend and form the first atomization entrance between arc deflector.
The paint spray booth with two-way full flow coating cloud capture function the most according to claim 1, it is characterized in that: described cascade extends the cascade connection arc deflector that arc deflector includes that the second arc and second arc one end one are upwards made, and this second arc other end is formed down arc and integrally makes gullet plate.
The paint spray booth with two-way full flow coating cloud capture function the most according to claim 4, it is characterized in that: on the base plate flow-guiding structure that the gullet plate of the second described arc lower end is corresponding, be shaped with depression arcuate groove, between gullet plate and the depression arcuate groove of the second arc lower end, form the second atomization entrance.
The paint spray booth with two-way full flow coating cloud capture function the most according to claim 1, it is characterised in that: described water curtain plate lower end is provided with bayonet socket, and cascade extends arc deflector upper end and is installed on bayonet socket.
The paint spray booth with two-way full flow coating cloud capture function the most according to claim 1, it is characterised in that: being inclined-plane above described base plate flow-guiding structure, the high-end connection on inclined-plane has overflow launder, and the upper end of water curtain plate connects overflow launder.
The paint spray booth with two-way full flow coating cloud capture function the most according to claim 1, it is characterized in that: in the middle part of described gas-liquid separation chamber, demister is installed, gas-liquid separation chamber upper end is provided with air-introduced machine, being provided with water leg bottom gas-liquid separation chamber, this water leg is connected by pipeline scrapes grit chamber.
The paint spray booth with two-way full flow coating cloud capture function the most according to claim 8, it is characterised in that: described scraping connects the overflow launder in paint spray booth by pipeline and suction pump bottom grit chamber.
CN201521098615.9U 2015-12-23 2015-12-23 Paint spray booth with bidirectional full flow paint fog catching function Withdrawn - After Issue CN205436159U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521098615.9U CN205436159U (en) 2015-12-23 2015-12-23 Paint spray booth with bidirectional full flow paint fog catching function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521098615.9U CN205436159U (en) 2015-12-23 2015-12-23 Paint spray booth with bidirectional full flow paint fog catching function

Publications (1)

Publication Number Publication Date
CN205436159U true CN205436159U (en) 2016-08-10

Family

ID=56578784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521098615.9U Withdrawn - After Issue CN205436159U (en) 2015-12-23 2015-12-23 Paint spray booth with bidirectional full flow paint fog catching function

Country Status (1)

Country Link
CN (1) CN205436159U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105413933A (en) * 2015-12-23 2016-03-23 天津赛智科技发展有限公司 Paint spraying room with two-way all-flow paint mist capturing function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105413933A (en) * 2015-12-23 2016-03-23 天津赛智科技发展有限公司 Paint spraying room with two-way all-flow paint mist capturing function

Similar Documents

Publication Publication Date Title
CN104437949B (en) Double-atomization capturing electrostatic paint spray booth
CN201940322U (en) Eddy paint spray chamber
CN105413934A (en) Symmetric paint spray booth having bidirectional full-flow paint spray purification function
CN204842065U (en) Water -curtain -type spray booth with circulation water purification function
CN104384057B (en) There is the electrostatic room of purification function
CN104399629B (en) There is the paint spray booth of double atomization coating cloud capturing structure
CN105396737B (en) Large-scale workpiece electrostatic spraying room
CN205436159U (en) Paint spray booth with bidirectional full flow paint fog catching function
CN205436158U (en) Symmetrical spray booth with bidirectional full-flow paint mist purifying function
CN104399630B (en) Paint spraying room allowing purification
CN205412529U (en) Structure is caught to two -way full flow atomizing coating cloud
CN204122299U (en) A kind of water-spinning spray chamber
CN104492641B (en) High-efficiency atomized capturing spray chamber
CN204429574U (en) Double atomization catches electrostatic japanning room
CN204486114U (en) High-efficient atomizing catches paint spray booth
CN206965506U (en) A kind of desulfurization and dedusting integrated device
CN105413933A (en) Paint spraying room with two-way all-flow paint mist capturing function
CN105413355A (en) Bidirectional full-flow atomized paint mist trapping structure
CN204429019U (en) Double atomization coating cloud capturing structure
CN104383773B (en) Double atomization coating cloud capturing structure
CN104906908A (en) Gas-water separation device
CN201534029U (en) Paint mist capturing device for paint spray booth
CN204583568U (en) There is the paint spray booth of double atomization coating cloud capturing structure
CN204429575U (en) There is the electrostatic room of purification function
CN208661499U (en) Waste oil paint recovering device for coating in a kind of paint line spray booth

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160810

Effective date of abandoning: 20170912

AV01 Patent right actively abandoned

Granted publication date: 20160810

Effective date of abandoning: 20170912

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned