CN205412529U CN201521083303.0U CN201521083303U CN205412529U CN 205412529 U CN205412529 U CN 205412529U CN 201521083303 U CN201521083303 U CN 201521083303U CN 205412529 U CN205412529 U CN 205412529U
Authority
CN
China
Prior art keywords
arc
plate
base plate
coating cloud
cascade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201521083303.0U
Other languages
Chinese (zh)
Inventor
朱殿兴
冯正
谷德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Saizhi Science And Technology Development Co Ltd
Original Assignee
Tianjin Saizhi Science And Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Saizhi Science And Technology Development Co Ltd filed Critical Tianjin Saizhi Science And Technology Development Co Ltd
Priority to CN201521083303.0U priority Critical patent/CN205412529U/en
Application granted granted Critical
Publication of CN205412529U publication Critical patent/CN205412529U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

The utility model relates to a structure is caught to two -way full flow atomizing coating cloud, including bottom plate water conservancy diversion structure and water curtain plate, the one end and the one end that the bottom plate extends arc -shaped guide plate of its bottom plate water conservancy diversion structure relative with water curtain plate lower extreme are connected, the logical elder member of a family of the other end that this bottom plate extends arc -shaped guide plate adorns serration plate admittedly, the below of extending arc -shaped guide plate at the bottom plate sets up cascade extension arc -shaped guide plate, this cascade extends arc -shaped guide plate's one end smoothness and installs the lower extreme at water curtain plate, other end installation serration plate, this kind of structure has realized that washing liquid full flow is through atomizing serration plate, the efficiency of the atomizing is greatly improved, make efficiency that the washing liquid caught the coating cloud more up to to 99.6%.

Description

Two-way full flow atomization coating cloud capturing structure
Technical field
This utility model belongs to coating cloud field of purification, a kind of two-way full flow atomization coating cloud capturing structure.
Background technology
It is used for catching coating cloud structure in existing paint spray booth and mainly passes through water curtain plate, cleaning mixture forms cascade on water curtain plate face and catches the unnecessary coating cloud sprayed paint, but this schematic capture is limited in one's ability, catch rate is relatively low, trace it to its cause be formed cascade surface area less, on limited water curtain plate, catch rate is relatively low, and existing coating cloud capturing structure can not realize full flow atomization, causing cleaning mixture nebulization efficiency low, capturing efficiency is low.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, it is provided that a kind of two-way full flow atomization coating cloud capturing structure, this simple in construction, design science are reasonable, low cost, cleaning mixture nebulization efficiency are high, and capturing efficiency is high.
This utility model solves its technical problem and is achieved through the following technical solutions:
A kind of two-way full flow atomization coating cloud capturing structure, including base plate flow-guiding structure and water curtain plate, one end that one end of its base plate flow-guiding structure relative with water curtain plate lower end extends arc deflector with base plate is connected, this base plate extend arc deflector the other end elongated on be fixedly mounted with gullet plate, the lower section extending arc deflector at base plate arranges a cascade extension arc deflector, this cascade extends one end of arc deflector and smooths the lower end being arranged on water curtain plate, and the other end installs gullet plate.
And, described base plate extends arc deflector and includes that the first arc and first arc one end integrally extend the base plate extension board made, this base plate extension board is in smoothing junction with base plate flow-guiding structure, and this first arc other end is formed down arc and integrally makes gullet plate.
And, the gullet plate of the first described arc lower end and lower section cascade extend and form the first atomization entrance between arc deflector.
And, described base plate flow-guiding structure, base plate extension arc deflector and cascade extend and form the first atomization space between arc deflector.
And, described cascade extends the cascade connection arc deflector that arc deflector includes that the second arc and second arc one end one are upwards made, and this second arc other end is formed down arc and integrally makes gullet plate.
And, the base plate water conservancy diversion that the gullet plate of the second described arc lower end is corresponding ties body plan depression arcuate groove, forms the second atomization entrance between gullet plate and the depression arcuate groove of the second arc lower end.
And, described base plate flow-guiding structure and cascade extend and form the second atomization space between arc deflector.
And, described water curtain plate lower end is provided with bayonet socket, and cascade extends arc deflector upper end and is installed on bayonet socket.
The atomization coating cloud capturing structure application in paint spray booth of a kind of two-way full flow.
The atomization coating cloud capturing structure application in mist cleaning system of a kind of two-way full flow.
Advantage of the present utility model and having the beneficial effect that
1, this two-way full flow atomization coating cloud capturing structure, including base plate flow-guiding structure and water curtain plate, one end that one end of its base plate flow-guiding structure relative with water curtain plate lower end extends arc deflector with base plate is connected, this base plate extend arc deflector the other end elongated on be fixedly mounted with gullet plate, the lower section extending arc deflector at base plate arranges a cascade extension arc deflector, this cascade extends one end of arc deflector and smooths the lower end being arranged on water curtain plate, the other end installs gullet plate, this kind of structure achieves cleaning mixture full flow through atomization gullet plate, substantially increase nebulization efficiency, make cleaning mixture catch the in hgher efficiency of coating cloud and reach 99.6%.
2, the gullet plate of this utility model the first arc lower end and lower section cascade extend and form the first atomization entrance between arc deflector, base plate flow-guiding structure, base plate extends and forms the first atomization space between arc deflector and cascade extension arc deflector, effectively it is atomized the cleaning mixture collected by base plate flow-guiding structure, after first atomization space sucks cleaning mixture by air-flow, make cleaning mixture atomization form little water droplet and coating cloud is carried out parcel seizure, the little water droplet of atomization adds specific surface area, so capturing ability becomes geometrical progression to increase in the confined space, substantially increase the capturing ability of coating cloud.
3, originally it is shaped with depression arcuate groove on the base plate flow-guiding structure that the gullet plate of second arc lower end is corresponding, the second atomization entrance is formed between gullet plate and the depression arcuate groove of the second arc lower end, base plate flow-guiding structure and cascade extend and form the second atomization space between arc deflector, owing to break-in and space squeezing action form air-flow change rapidly, the cleaning mixture that the water curtain plate relative with bottom surface flow-guiding structure flows down is sucked the second atomization space by air-flow and is atomized more fully, thus preferably catch remaining coating cloud, improve overall nebulization efficiency and coating cloud capturing efficiency.
3, this utility model water curtain plate lower end is provided with bayonet socket, and cascade extends arc deflector upper end and is installed on bayonet socket, and when maintenance, easy accessibility, safety is time saving and energy saving.It is that inclined-plane can make bottom surface cleaning mixture flowing that the cleaning mixture of base plate flow-guiding structure collects face, prevents from painting slag deposits, and contributes to one-level coating cloud import and medicament water is sucked atomization.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Detailed description of the invention
Below by specific embodiment, the utility model is described in further detail, and following example are illustrative, is not determinate, it is impossible to limits protection domain of the present utility model with this.
A kind of two-way full flow atomization coating cloud capturing structure, including base plate flow-guiding structure 12 and water curtain plate 4, one end that one end of its base plate flow-guiding structure relative with water curtain plate lower end extends arc deflector with base plate is connected, this base plate extend arc deflector the other end elongated on be fixedly mounted with gullet plate 6, the lower section extending arc deflector at base plate arranges a cascade extension arc deflector, this cascade extends one end of arc deflector and smooths the lower end being arranged on water curtain plate, and the other end installs gullet plate.This gullet plate is elongated upper is all fixedly mounted with, base plate extension arc deflector includes that the first arc 3 and first arc one end integrally extend the base plate extension board 2 made furtherly, this base plate extension board is in smoothing junction with base plate flow-guiding structure, and this first arc other end is formed down arc and integrally makes gullet plate.The gullet plate of the first arc lower end and lower section cascade extend and form the first atomization entrance 7 between arc deflector.Gullet plate and the lower section cascade of the first arc lower end extends distance the shortest between arc deflector and forms the first atomization entrance in particular, and base plate flow-guiding structure, base plate extend and form the first atomization space 1 between arc deflector and cascade extension arc deflector.Cascade extends the cascade connection arc deflector 5 that arc deflector includes that the second arc 9 and second arc one end one are upwards made, and this second arc other end is formed down arc and integrally makes gullet plate.The base plate water conservancy diversion that the gullet plate of the second arc lower end is corresponding ties body plan depression arcuate groove 11, forms the second atomization entrance 10 between gullet plate and the depression arcuate groove of the second arc lower end.Base plate flow-guiding structure and cascade extend and form the second atomization space 8 between arc deflector.Water curtain plate lower end is provided with bayonet socket, and cascade extends arc deflector upper end and is installed on bayonet socket.
nullThe atomization coating cloud capturing structure application in paint spray booth of a kind of two-way full flow,In paint spray booth, four walls are provided with water curtain plate,A coating cloud part after spraying paint is caught by the cleaning mixture on water curtain plate,Remaining floating aerial coating cloud is due to the effect of air-introduced machine,It is inhaled into the first atomization space of the present utility model,The cleaning mixture that the cleaning mixture of the first atomization space converges essentially from base plate flow-guiding structure side,Before entering the second atomization entrance,The cleaning mixture of atomization、The coating cloud caught at large swerves,The cleaning mixture that the water curtain plate of at this moment relative with base plate flow-guiding structure side converges enters the second atomization entrance to start effectively to be atomized,The cleaning mixture of the most two-way convergence is atomized the most entirely,Coating cloud is captured substantially,Capturing efficiency is the highest,The gas being washed ascends into industrial organic exhaust gas processing means,Cleaning mixture enters water leg eliminating paint spray booth entrance and scrapes slag program.
The atomization coating cloud capturing structure application in mist cleaning system of a kind of two-way full flow.
This utility model is effectively improved coating cloud wash degree.Paint spray booth of the prior art is to utilize moisture film to carry out coating cloud washing, and detersive efficiency causes aerofluxus still to contain the existence of a large amount of coating cloud less than 80%, affects the down-stream process to gas.Clash into, after this utility model carries out prime atomization washing in the first atomization space and with arc turning, the coating cloud that the moisture film washing of liquefaction formation is impacted due to inertia and speedup, enter after the second atomization space is atomized again and gas is carried out secondary washing, Washing ratio can be promoted to more than 99.6% and greatly improved clean rate.

Claims (8)

1. a two-way full flow atomization coating cloud capturing structure, including base plate flow-guiding structure and water curtain plate, it is characterized in that: one end that one end of the base plate flow-guiding structure relative with water curtain plate lower end extends arc deflector with base plate is connected, this base plate extend arc deflector the other end elongated on be fixedly mounted with gullet plate, the lower section extending arc deflector at base plate arranges a cascade extension arc deflector, this cascade extends one end of arc deflector and smooths the lower end being arranged on water curtain plate, and the other end installs gullet plate.
Two-way full flow the most according to claim 1 atomization coating cloud capturing structure, it is characterized in that: described base plate extends arc deflector and includes that the first arc and first arc one end integrally extend the base plate extension board made, this base plate extension board is in smoothing junction with base plate flow-guiding structure, and this first arc other end is formed down arc and integrally makes gullet plate.
Two-way full flow the most according to claim 2 atomization coating cloud capturing structure, it is characterised in that: the gullet plate of the first described arc lower end and lower section cascade extend and form the first atomization entrance between arc deflector.
Two-way full flow the most according to claim 1 atomization coating cloud capturing structure, it is characterised in that: described base plate flow-guiding structure, base plate extension arc deflector and cascade extend and form the first atomization space between arc deflector.
Two-way full flow the most according to claim 1 atomization coating cloud capturing structure, it is characterized in that: described cascade extends the cascade connection arc deflector that arc deflector includes that the second arc and second arc one end one are upwards made, and this second arc other end is formed down arc and integrally makes gullet plate.
Two-way full flow the most according to claim 5 atomization coating cloud capturing structure, it is characterized in that: on the base plate flow-guiding structure that the gullet plate of the second described arc lower end is corresponding, be shaped with depression arcuate groove, between gullet plate and the depression arcuate groove of the second arc lower end, form the second atomization entrance.
Two-way full flow the most according to claim 1 atomization coating cloud capturing structure, it is characterised in that: described base plate flow-guiding structure and cascade extend and form the second atomization space between arc deflector.
Two-way full flow the most according to claim 1 atomization coating cloud capturing structure, it is characterised in that: described water curtain plate lower end is provided with bayonet socket, and cascade extends arc deflector upper end and is installed on bayonet socket.
CN201521083303.0U 2015-12-23 2015-12-23 Structure is caught to two -way full flow atomizing coating cloud Withdrawn - After Issue CN205412529U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521083303.0U CN205412529U (en) 2015-12-23 2015-12-23 Structure is caught to two -way full flow atomizing coating cloud

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521083303.0U CN205412529U (en) 2015-12-23 2015-12-23 Structure is caught to two -way full flow atomizing coating cloud

Publications (1)

Publication Number Publication Date
CN205412529U true CN205412529U (en) 2016-08-03

Family

ID=56537908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521083303.0U Withdrawn - After Issue CN205412529U (en) 2015-12-23 2015-12-23 Structure is caught to two -way full flow atomizing coating cloud

Country Status (1)

Country Link
CN (1) CN205412529U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105413355A (en) * 2015-12-23 2016-03-23 天津赛智科技发展有限公司 Bidirectional full-flow atomized paint mist trapping structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105413355A (en) * 2015-12-23 2016-03-23 天津赛智科技发展有限公司 Bidirectional full-flow atomized paint mist trapping structure

Similar Documents

Publication Publication Date Title
CN104437949A (en) Double-atomization capturing electrostatic paint spray booth
CN204842065U (en) Water -curtain -type spray booth with circulation water purification function
CN105413934A (en) Symmetric paint spray booth having bidirectional full-flow paint spray purification function
CN105396737B (en) Large-scale workpiece electrostatic spraying room
CN104399629B (en) There is the paint spray booth of double atomization coating cloud capturing structure
CN104384057B (en) There is the electrostatic room of purification function
CN105413933A (en) Paint spraying room with two-way all-flow paint mist capturing function
CN205412529U (en) Structure is caught to two -way full flow atomizing coating cloud
CN104399630B (en) Paint spraying room allowing purification
CN205436159U (en) Paint spray booth with bidirectional full flow paint fog catching function
CN105413355A (en) Bidirectional full-flow atomized paint mist trapping structure
CN205436158U (en) Symmetrical spray booth with bidirectional full-flow paint mist purifying function
CN204816066U (en) Air purification pipeline structure reaches air purification ware including it
CN205613632U (en) Large -scale work piece electrostatic spraying room
CN104492641B (en) High-efficiency atomized capturing spray chamber
CN206965506U (en) A kind of desulfurization and dedusting integrated device
CN204429019U (en) Double atomization coating cloud capturing structure
CN204429574U (en) Double atomization catches electrostatic japanning room
CN204486114U (en) High-efficient atomizing catches paint spray booth
CN104383773B (en) Double atomization coating cloud capturing structure
CN205913975U (en) High -efficient desulfurization dust collector of single tower integration
CN204583568U (en) There is the paint spray booth of double atomization coating cloud capturing structure
CN201189503Y (en) Lacquer spraying chamber
CN204429575U (en) There is the electrostatic room of purification function
CN204583569U (en) Can the paint spray booth of purified treatment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160803

Effective date of abandoning: 20171229