CN205425842U - Novel electric melting furnace furnace nozzle - Google Patents

Novel electric melting furnace furnace nozzle Download PDF

Info

Publication number
CN205425842U
CN205425842U CN201521122550.7U CN201521122550U CN205425842U CN 205425842 U CN205425842 U CN 205425842U CN 201521122550 U CN201521122550 U CN 201521122550U CN 205425842 U CN205425842 U CN 205425842U
Authority
CN
China
Prior art keywords
cooling cavity
converter nose
face
furnace
novel electric
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521122550.7U
Other languages
Chinese (zh)
Inventor
吕宏伟
吕桢浩
高冠军
袁建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201521122550.7U priority Critical patent/CN205425842U/en
Application granted granted Critical
Publication of CN205425842U publication Critical patent/CN205425842U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

Novel electric melting furnace furnace nozzle, including furnace nozzle, furnace nozzle's cross sectional shape be " U " shape, furnace nozzle include bottom and a body coupling on the left side of the left and right sides of bottom half one with half right one, the passageway that the confession metal melts the rivers warp is enclosed into on half one on a left side and half one on the right side, all is equipped with more than one cooling cavity in half one on half one on a left side and the right side, cooling cavity along the orientation setting of passageway is cooled off the cavity and is included top surface and bottom surface, be two when one -sided cooling cavity and separate each other between the adjacent cooling cavity when above, the utility model discloses can realize the cooling of furnace nozzle department, make outflow furnace nozzle's the satisfied production of molten iron temperature need.

Description

Novel electric smelting furnace converter nose
Technical field
This utility model relates to electric smelter field.
Background technology
The converter nose of existing electric smelter forms for directly casting, and when the metal melt such as molten iron of electric smelter flows to converter nose, converter nose plays the effect of guiding, is delivered in ladle by molten iron.Because molten iron temperature is higher in electric smelter, molten iron is during flowing to front end from the rear end of converter nose, and temperature is the highest, and too high temperature can not meet the requirement of temperature when cast.
Utility model content
The purpose of this utility model is to provide a kind of Novel electric smelting furnace converter nose, the metal flowing through converter nose can be melted water and carry out suitable cooling.
The technical solution of the utility model is:
Novel electric smelting furnace converter nose, including converter nose, the cross sectional shape of converter nose is " U " shape, converter nose includes bottom and the left side of the left and right sides being integrally attached to bottom and right-hand part, left side and right-hand part surround and melt, for metal, the passage that water flows through, more than one cooling cavity it is equipped with in left side and right-hand part, cooling cavity is arranged along the direction of passage, cooling cavity includes end face and bottom surface, when unilateral cooling cavity is two or more, it is spaced from each other between adjacent cooling cavity, upper spacer and the lower clapboard that some block gaps are arranged vertically it is provided with in cooling cavity, upper spacer and lower clapboard are arranged alternately, the upper end of upper spacer is fixing with end face to be connected, it is provided with spacing between lower end and the bottom surface of upper spacer;The lower end of lower clapboard is fixing with bottom surface to be connected, and is provided with spacing between upper end and the end face of lower clapboard;Cool down cavity is respectively provided on two sides with water inlet pipe and outlet pipe.
The spacing being smaller than between the upper end of lower clapboard and end face between lower end and the bottom surface of upper spacer.
Water inlet pipe is positioned close to the position of bottom surface, and outlet pipe is located at the position near end face.
This utility model can realize the cooling at converter nose, makes the molten iron temperature of outflow converter nose meet and produces needs, and without the method using other again, more safety is safe.Meet production requirement, improve production efficiency.Its investment is little simultaneously, low cost, and can reuse water resource, the requirement of composite energy-saving environment protection.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the A-A sectional view of Fig. 1.
Detailed description of the invention
Such as Fig. 1, shown in 2, Novel electric smelting furnace converter nose of the present utility model, including converter nose 1, the cross sectional shape of converter nose 1 is " U " shape, converter nose includes bottom 4 and the left side 2 of the left and right sides being integrally attached to bottom 4 and right-hand part 3, left side 2 and right-hand part 3 surround and melt, for metal, the passage 5 that water flows through, more than one cooling cavity 6 it is equipped with in left side 2 and right-hand part 3, cooling cavity 6 is arranged along the direction of passage 5, cooling cavity 6 includes end face 7 and bottom surface 8, be two when left side 2 or right-hand part 3 cool down cavity 6 (more than) time, it is spaced from each other between adjacent cooling cavity 6, can determine as required to cool down the most simultaneously, only use the in front or cooling cavity 6 of back.
The upper spacer 9 and lower clapboard 10, upper spacer 9 and the lower clapboard 10 that are vertically provided with the setting of some block gaps in cooling cavity 6 are arranged alternately, and the upper end of upper spacer 9 is fixing with end face 7 to be connected, and is provided with spacing between lower end and the bottom surface 8 of upper spacer 9;The lower end of lower clapboard 10 is fixing with bottom surface 8 to be connected, and is provided with spacing, the structure in whole composition labyrinth between upper end and the end face 7 of lower clapboard 10, and current length of flow across wherein is lengthened significantly, and current advance with snakelike state;As in figure 2 it is shown, cooling cavity 6 be respectively provided on two sides with water inlet pipe 11 and outlet pipe 12.Water inlet pipe 11 is positioned close to the position of bottom surface 8, and outlet pipe 12 is located at the position near end face 7.
In view of the gravity of water, the spacing between the upper end being smaller than lower clapboard 10 and end face 7 between lower end and the bottom surface of upper spacer 9, timely hydraulic pressure is little also can guarantee that current are logical forever, without being cut off by lower clapboard 10.

Claims (3)

1. Novel electric smelting furnace converter nose, including converter nose, the cross sectional shape of converter nose is " U " shape, converter nose includes bottom and the left side of the left and right sides being integrally attached to bottom and right-hand part, left side and right-hand part surround and melt, for metal, the passage that water flows through, it is characterized in that: in left side and right-hand part, be equipped with more than one cooling cavity, cooling cavity is arranged along the direction of passage, cooling cavity includes end face and bottom surface, when unilateral cooling cavity is two or more, it is spaced from each other between adjacent cooling cavity, upper spacer and the lower clapboard that some block gaps are arranged vertically it is provided with in cooling cavity, upper spacer and lower clapboard are arranged alternately, the upper end of upper spacer is fixing with end face to be connected, it is provided with spacing between lower end and the bottom surface of upper spacer;The lower end of lower clapboard is fixing with bottom surface to be connected, and is provided with spacing between upper end and the end face of lower clapboard;Cool down cavity is respectively provided on two sides with water inlet pipe and outlet pipe.
Novel electric smelting furnace converter nose the most according to claim 1, it is characterised in that: the spacing being smaller than between the upper end of lower clapboard and end face between lower end and the bottom surface of upper spacer.
Novel electric smelting furnace converter nose the most according to claim 1, it is characterised in that: water inlet pipe is positioned close to the position of bottom surface, and outlet pipe is located at the position near end face.
CN201521122550.7U 2015-12-31 2015-12-31 Novel electric melting furnace furnace nozzle Expired - Fee Related CN205425842U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521122550.7U CN205425842U (en) 2015-12-31 2015-12-31 Novel electric melting furnace furnace nozzle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521122550.7U CN205425842U (en) 2015-12-31 2015-12-31 Novel electric melting furnace furnace nozzle

Publications (1)

Publication Number Publication Date
CN205425842U true CN205425842U (en) 2016-08-03

Family

ID=56540019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521122550.7U Expired - Fee Related CN205425842U (en) 2015-12-31 2015-12-31 Novel electric melting furnace furnace nozzle

Country Status (1)

Country Link
CN (1) CN205425842U (en)

Similar Documents

Publication Publication Date Title
CN204657460U (en) A kind of aluminium liquid constant-current stabilizer
CN204770627U (en) Packing is put in middle of single current passageway formula induction heating bend pipe type passageway
CN203917843U (en) A kind of jockey for molten steel direct casting
CN201979055U (en) Horizontal continuous ingot casting crystallizer
CN105063366B (en) A kind of sub-sectional cooling type electroslag remelting wide plate billet crystallizer
CN101966562B (en) Non-electroslag remelting type clean metal ingot mould
CN205425842U (en) Novel electric melting furnace furnace nozzle
CN103170610A (en) Device for casting anode copper mould by using dual-mode disk casting machine tundish and casting method applicable to device
CN207695615U (en) A kind of bilayer dual control aluminium slag filter device
CN203265581U (en) Upper upward-casting process oxygen-free copper rod continuous casting T-shaped smelter
CN201799581U (en) Non-electroslag remelting type clean metal ingot mould
CN204800121U (en) Novel electro -gas (enclosed) welding welding device
CN107812904A (en) A kind of more metal step type compound casting devices and method
CN206104816U (en) Edulcoration the gating system
CN104117662A (en) Nickel and nickel alloy vacuum melting horizontal continuous casting closed type tundish
CN205008554U (en) High -efficient portable stalk
CN201999977U (en) Magnesium alloy smelting equipment
CN210059784U (en) Zinc alloy casting chute
CN2641557Y (en) Submerged current type industrial frequency cored combined electric furnace
CN202254860U (en) High efficiency heat exchange casting copper water jacket
CN203209685U (en) Quasi-four-hole immersed nozzle for FTSC thin slab continuous casting crystallizer
CN205907275U (en) But storage of life -saving iron formula ditch skimming tool
CN202793031U (en) Three-way type slag launder copper water sleeve
CN204912739U (en) Middle packing is put with streamlined lateral wall
CN205043087U (en) Casting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20161231

CF01 Termination of patent right due to non-payment of annual fee