CN205421992U - 一种承载力不够的楼板加固结构 - Google Patents
一种承载力不够的楼板加固结构 Download PDFInfo
- Publication number
- CN205421992U CN205421992U CN201620244943.3U CN201620244943U CN205421992U CN 205421992 U CN205421992 U CN 205421992U CN 201620244943 U CN201620244943 U CN 201620244943U CN 205421992 U CN205421992 U CN 205421992U
- Authority
- CN
- China
- Prior art keywords
- reinforcement
- reinforcement girder
- floor
- prestressing tendons
- bearing capacity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本实用新型公开了一种承载力不够的楼板加固方法,其特征是在楼板下面布置横向加固梁和纵向加固梁,横向加固梁和纵向加固梁高度相同,截面形状采用墩形,截面上部为矩形,截面下部为梯形,横向加固梁和纵向加固梁计算挠度控制为1/300~1/400跨度;加固梁下部布置预应力筋和非预应力筋,非预应力筋在离梁端0.1跨度部位弯起,预应力筋或非预应力筋穿过构造柱的钻孔后用环氧树脂植筋胶填塞空隙;预应力筋通长布置,预应力筋穿过构造柱的钻孔后用锚具固定在承压钢板;非预应力筋布置在加固梁的中部位置,预应力筋布置在加固梁的边部位置;加固梁设置抗剪筋。
Description
技术领域
本实用新型涉及建筑领域,特别涉及一种承载力不够的楼板加固结构。
背景技术
楼板在承载力不够时要进行加固,但是加固结构往往难以与原有结构形成整体,主要原因是原有混凝土楼板与加固结构在受力时变形不能协同一致,从而导致混凝土楼板与加固结构受力时不能共同承载,在承受较大荷载是混凝土楼板或者加固结构会出现开裂,加固效果不能体现。可以设置加固梁,提前在加固梁中施加预压力,使其能够产生平衡荷载效应,用以平衡全部或部分结构荷载产生的不利效应。通过施加预应力有效地延缓了楼板裂缝的产生同时减小了楼板的整体挠度。
实用新型内容
本实用新型的目的在于提供一种承载力不够的楼板加固结构来解决加固效果不好的问题。
本实用新型在楼板下面布置横向加固梁和纵向加固梁,横向加固梁和纵向加固梁高度相同,根据加固梁的受力特点,下部处于受拉状态为主要承力部位,加固梁下部进行加强,截面形状采用墩形,截面上部为矩形,截面下部为梯形,矩形高度与楼板厚度相同,矩形宽度为150~200mm,梯形底部长度为200~250mm,梯形高度为120~230mm。横向加固梁和纵向加固梁计算挠度控制为1/300~1/400跨度,这里跨度是指相邻排加固梁的距离。加固梁下部布置预应力筋和非预应力筋,非预应力筋在离梁端0.1跨度部位弯起,这里跨度是指构造柱与第一排纵向加固梁的长度,目的是为了应对上部负弯矩的需要,由于加固结构嵌入构造柱后形成嵌固结构,反弯点位置为0.1跨度,预应力筋或非预应力筋穿过构造柱的钻孔后用环氧树脂植筋胶填塞空隙。预应力筋通长布置,预应力筋穿过构造柱的钻孔后用锚具固定在承压钢板,由于在预应力张拉时构造柱局部会受到很大的压力,承压钢板目的是避免构造柱在张拉时局部承压破坏。非预应力筋布置在加固梁的中部位置,预应力筋布置在加固梁的边部位置。为了满足加固梁的抗剪需要,加固梁设置抗剪筋,抗剪筋设置范围为离加固梁端部5cm位置至加固梁1/3跨度位置,抗剪筋间距为75~100mm,这里跨度是指相邻排加固梁的距离。抗剪筋做成带翼边U形,抗剪筋直径为14~18mm,翼边长度为350~500mm。
本实用新型具有力学性能好、安全可靠的优点,具有较好的应用前景。
附图说明
图1为加固梁平面示意图,图2为加固梁截面示意图。
附图标志:1、加固梁,2、预应力筋,3、非预应力筋,4、抗剪筋,5、承压钢板,6、锚具,7、楼板,8、构造柱。
具体实施方式
以下结合附图对本实施例进行详细描述。
本实施例在楼板7下面布置横向加固梁和纵向加固梁,横向加固梁和纵向加固梁高度相同,截面形状采用墩形,截面上部为矩形,截面下部为梯形,矩形高度与楼板7厚度相同,矩形宽度为180mm,梯形底部长度为220mm,梯形高度为180mm。横向加固梁和纵向加固梁计算挠度控制为1/350跨度。加固梁1下部布置预应力筋2和非预应力筋3,非预应力筋3在离梁端0.1跨度部位弯起,预应力筋2或非预应力筋3穿过构造柱8的钻孔后用环氧树脂植筋胶填塞空隙。预应力筋2通长布置,预应力筋2穿过构造柱8的钻孔后用锚具6固定在承压钢板5。非预应力筋3布置在加固梁1的中部位置,预应力筋2布置在加固梁1的边部位置。加固梁1设置抗剪筋4,抗剪筋4设置范围为离加固梁1端部5cm位置至加固梁1/3跨度位置,抗剪筋4间距为100mm。抗剪筋4做成带翼边U形,抗剪筋4直径为16mm,翼边长度为400mm。
Claims (4)
1.一种承载力不够的楼板加固结构,其特征是在楼板下面布置横向加固梁和纵向加固梁,横向加固梁和纵向加固梁高度相同,截面形状采用墩形,截面上部为矩形,截面下部为梯形,横向加固梁和纵向加固梁计算挠度控制为1/300~1/400跨度;加固梁下部布置预应力筋和非预应力筋,非预应力筋在离梁端0.1跨度部位弯起,预应力筋或非预应力筋穿过构造柱的钻孔后用环氧树脂植筋胶填塞空隙;预应力筋通长布置,预应力筋穿过构造柱的钻孔后用锚具固定在承压钢板;非预应力筋布置在加固梁的中部位置,预应力筋布置在加固梁的边部位置;加固梁设置抗剪筋。
2.根据权利要求1所述的承载力不够的楼板加固结构,其特征是矩形高度与楼板厚度相同,矩形宽度为150~200mm,梯形底部长度为200~250mm,梯形高度为120~230mm。
3.根据权利要求1所述的承载力不够的楼板加固结构,其特征是抗剪筋设置范围为离加固梁端部5cm位置至加固梁1/3跨度位置,抗剪筋间距为75~100mm。
4.根据权利要求2所述的承载力不够的楼板加固结构,其特征是抗剪筋做成带翼边U形,抗剪筋直径为14~18mm,翼边长度为350~500mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620244943.3U CN205421992U (zh) | 2016-03-02 | 2016-03-02 | 一种承载力不够的楼板加固结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620244943.3U CN205421992U (zh) | 2016-03-02 | 2016-03-02 | 一种承载力不够的楼板加固结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205421992U true CN205421992U (zh) | 2016-08-03 |
Family
ID=56522565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620244943.3U Expired - Fee Related CN205421992U (zh) | 2016-03-02 | 2016-03-02 | 一种承载力不够的楼板加固结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205421992U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411797A (zh) * | 2018-02-09 | 2018-08-17 | 广西交通科学研究院有限公司 | 悬链线拱拱脚增大截面加固施工中拱顶挠度控制方法 |
CN109235733A (zh) * | 2018-10-16 | 2019-01-18 | 北京工业大学 | 一种采用预应力钢棒和内芯弯曲式防屈曲支撑的装配式板柱体系 |
-
2016
- 2016-03-02 CN CN201620244943.3U patent/CN205421992U/zh not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411797A (zh) * | 2018-02-09 | 2018-08-17 | 广西交通科学研究院有限公司 | 悬链线拱拱脚增大截面加固施工中拱顶挠度控制方法 |
CN109235733A (zh) * | 2018-10-16 | 2019-01-18 | 北京工业大学 | 一种采用预应力钢棒和内芯弯曲式防屈曲支撑的装配式板柱体系 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8020235B2 (en) | Concrete bridge | |
CN204252345U (zh) | 一种预制混凝土板与钢梁的连接构造 | |
CN109881910B (zh) | 楼板加固结构 | |
CN102182141B (zh) | 纵向不抗剪t型抗拔连接件及其施工方法 | |
CN102121289B (zh) | 叠合板用超高强超薄底板及其生产方法 | |
CN105781139A (zh) | 承载力不够的楼板加固方法 | |
CN203007856U (zh) | 空心板梁桥的体外预应力加固系统 | |
CN102086629B (zh) | 纵向可滑动的钢-混凝土抗掀起连接件及其施工方法 | |
CN102418386A (zh) | 一种新型钢筋砼预制整浇房屋结构体系及其施工方法 | |
CN204199189U (zh) | 一种圬工拱桥拱上建筑的肋板式加固结构 | |
CN201474152U (zh) | 一种lpm现浇混凝土空心板 | |
CN102797223B (zh) | 海塘区客运专线膺架法现浇道岔连续梁施工方法 | |
CN205421992U (zh) | 一种承载力不够的楼板加固结构 | |
CN102852276A (zh) | 一种大吨位预应力叠合吊车梁与施工方法 | |
CN102561212A (zh) | 一种独柱混凝土桥墩竖向开裂加固的方法 | |
CN103306495B (zh) | 木结构截柱加固施工方法 | |
CN105155868A (zh) | 一种无粘结钢绞线预应力拔柱方法 | |
CN104929279A (zh) | 预制剪力墙竖向钢筋集中约束搭接连接构造 | |
CN104863379B (zh) | 特殊钢筋混凝土梁加固构件及其有效加固方法和应用 | |
CN201785867U (zh) | 一种新型钢筋砼预制整浇房屋结构体系 | |
CN102852150B (zh) | 一种基坑支护用叠加内支撑结构 | |
CN102776828A (zh) | 一种用于桥梁的异形预制梁 | |
CN106592451A (zh) | 一种拱桥加固装置及方法 | |
CN209602942U (zh) | 一种v型桥墩复合抗震加固结构 | |
CN204898716U (zh) | 一种地下室扁梁板结构顶板中预应力筋搭接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160803 Termination date: 20170302 |