CN205415592U - Electricity recording pen subassembly for fuse tube connected convenient to use - Google Patents

Electricity recording pen subassembly for fuse tube connected convenient to use Download PDF

Info

Publication number
CN205415592U
CN205415592U CN201620197257.5U CN201620197257U CN205415592U CN 205415592 U CN205415592 U CN 205415592U CN 201620197257 U CN201620197257 U CN 201620197257U CN 205415592 U CN205415592 U CN 205415592U
Authority
CN
China
Prior art keywords
chute
pen
sliding sleeve
graduated tile
spout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620197257.5U
Other languages
Chinese (zh)
Inventor
钟艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Solidarity Mold Manufacturing Factory
Original Assignee
Chengdu Solidarity Mold Manufacturing Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Solidarity Mold Manufacturing Factory filed Critical Chengdu Solidarity Mold Manufacturing Factory
Priority to CN201620197257.5U priority Critical patent/CN205415592U/en
Application granted granted Critical
Publication of CN205415592U publication Critical patent/CN205415592U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an electricity recording pen subassembly for fuse tube connected convenient to use, including the scale plate, the scale plate is provided with chucking device and positioner, the scale plate middle part is provided with the spout along scale plate length direction, be provided with the sliding sleeve in the spout, the sliding sleeve is including setting up the guide block in the spout and connecting the reference column in the guide block upper end, the reference column card is at the spout up end, the scale plate is located inboard two the relative medial surfaces of spout and all is provided with rack groove, rack groove sets up with the spout syntropy, vertical side in the rack groove is provided with fixed rack, guide block lower extreme both sides still are provided with the locating piece, be provided with transmitting gear in the locating piece, the inside cavity of reference column forms holds the chamber, it is provided with expanding spring to hold the intracavity, still be provided with the recording pen in the sliding sleeve, the recording pen is located and holds the intracavity and still be provided with the holding ring, the holding ring is located the expanding spring upper end. The utility model discloses the translation is steady, can guarantee the vertical setting of recording pen all the time, takes notes more accurately.

Description

A kind of electric smelting pipe connection pen assembly easy to use
Technical field
This utility model relates to the aid that a kind of electric smelting pipe connects, and belongs to electric smelting pipe connection area, a kind of electric smelting pipe connection pen assembly easy to use.
Background technology
When electric smelting pipe in test or is connected with pipeline, it is required for carrying out electric smelting pipe connecting length to measure, the pipeline one end connected will be needed to insert in electric smelting pipe, then the root contacted with electric smelting pipe at insertion pipeline utilizes pen to carry out record of ruling, again additional length is excised, to ensure that the length of pipeline junction can be agreed with electric smelting pipe completely, it is ensured that fusion can be softened after connection at the thawing of electric smelting pipe completely with pipeline.
In the past when carrying out line record, it is typically all after pipeline is inserted, staff recycles simple paintbrush and carries out setting-out, but sometimes when conduit connection end is too short, cannot normally measure, simultaneously, sometimes due to the carelessness of staff, pipeline insert electric smelting pipe time easily because of insert angle reason, making electric smelting pipe and the mutually different axle of pipeline, the copper cash in electric smelting pipe is the most easily pulled or directly break when inserting by pipeline, thus damages electric smelting pipe, causing waste, this all use to electric smelting pipe brings the increase on inconvenience and cost.
And in up-to-date pen assembly, pen sliding part in chute uses ball to be connected with chute, pen is driven to translate along chute by ball, although translation is convenient, but but there is a problem, the directionality being exactly ball is poor, due to ball and the clearance issues in ball spout during slip, although sliding part vertical direction when sliding is fixed, but it is horizontally oriented and cannot fix, i.e. sliding part may swing in chute, when using pen record, vertical direction is likely to occur deviation, make pen and pipeline out of plumb, cause the mistake of length records, registration accuracy reduces, affect follow-up cutting to connect;Simultaneously, in pen assembly, pen is that frictionally is placed in sliding part, the problem having jam the most in use, and after using for a long time pen contact with sliding part smooth after, pen cannot use normally, need to change, extremely consume cost, and need in use to mention pen, use and press at present, to be recorded complete after also to be mentioned, extremely onerous.
Utility model content
This utility model overcomes the deficiencies in the prior art, it is provided that a kind of electric smelting pipe connection pen assembly easy to use, and the pen assembly solved uses inconvenience, the technical barrier that during record, precision is relatively low.
For solving above-mentioned technical problem, this utility model by the following technical solutions:
nullA kind of electric smelting pipe connection pen assembly easy to use,Including the graduated tile being carved with scale strip,Gripping mechanism and positioner it is respectively arranged with on the downside of graduated tile two ends,Described gripping mechanism includes the clamping post being connected with graduated tile,Clamping post lower end is provided with bayonet socket,Described positioner includes the connection post being connected with graduated tile,Connect post lower end and connect the soft rubber cushion having arc,It is additionally provided with chute along graduated tile length direction in the middle part of described graduated tile,It is provided with sliding sleeve in described chute,Sliding sleeve includes the guide pad being arranged in chute and is connected to the locating dowel of guide pad upper end,Locating dowel is stuck in chute upper surface,Described graduated tile be positioned at inside chute relative to two medial surface be provided with rach slot,Rach slot is arranged in the same direction with chute,And the vertical side in rach slot is provided with stationary rack,Both sides, described guide pad lower end are additionally provided with locating piece,Rotation gear it is provided with in locating piece,Described locating piece stretches into rach slot and makes rotation gear engage with stationary rack,Constitute and slide over the movable device rotating gear with translating along chute under the cooperation of stationary rack,Described locating dowel inner hollow is formed and accommodates chamber,Accommodate intracavity and be provided with coil tension spring,It is additionally provided with pen in described sliding sleeve,Pen stretches out after vertically running through receiving chamber and guide pad,Described pen is positioned at receiving intracavity and is additionally provided with locating ring,Locating ring is positioned at coil tension spring upper end.
As preferably, described scale strip is provided with two rows, is respectively provided with and is arranged on chute both sides, and described in two rows, scale strip is all uniformly arranged along graduated tile length direction.
As preferably, described locating dowel circumference is additionally provided with two graduation indication bars corresponding with scale strip, and graduation indication bar is perpendicular to chute and arranges.
Compared with prior art, the beneficial effects of the utility model are:
1, this utility model is by above design; problem too short with the conduit connection end that electric smelting pipe is connected normally to measure can not only be solved so that when electric smelting pipe connects, conduit connection end can normally be measured; said modules simple in construction simultaneously; easy to use, measure accurately, without inserting in electric smelting pipe during measurement; can be good at protecting electric smelting tube connection ports; certainty of measurement is high, and protectiveness is good, improves electric smelting pipe and connects precision.
2, sliding sleeve of the present utility model and graduated tile use the mode of rack and pinion engagement to be connected, and not only translation is steadily, and sliding sleeve can defined position completely, do not have and rock, can be always ensured that pen is vertically arranged, record more accurate.
3, this utility model is by arranging coil tension spring, it is possible to ensures that pen will not slide up and down voluntarily, can reset after a procedure simultaneously, and eliminating replacing pen and the trouble of operation note pen, pen uses convenient.
Accompanying drawing explanation
With detailed description of the invention, this utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the cross sectional representation in A-A face in Fig. 1;
Label in figure is expressed as: 1, bayonet socket;2, clamping post;3, graduated tile;31, rach slot;32, stationary rack;4, scale strip;5, chute;6, sliding sleeve;61, coil tension spring;62, chamber is accommodated;63, locating dowel;64, graduation indication bar;65, gear is rotated;66, locating piece;67, guide pad;7, pen;71, locating ring;8, post is connected;9, soft rubber cushion.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further described.Embodiment of the present utility model includes but not limited to the following example.
Embodiment 1
nullSuch as Fig. 1、Shown in Fig. 2,A kind of electric smelting pipe connection pen assembly easy to use,Including the graduated tile 3 being carved with scale strip 4,Graduated tile 3 is respectively arranged with gripping mechanism and positioner on the downside of two ends,Described gripping mechanism includes the clamping post 2 being connected with graduated tile 3,Clamping post 2 lower end is provided with bayonet socket 1,Described positioner includes the connection post 8 being connected with graduated tile 3,Connect post 8 lower end and connect the soft rubber cushion 9 having arc,It is additionally provided with chute 5 along graduated tile 3 length direction in the middle part of described graduated tile 3,It is provided with sliding sleeve 6 in described chute 5,Sliding sleeve 6 includes the guide pad 67 being arranged in chute 5 and is connected to the locating dowel 63 of guide pad 67 upper end,Locating dowel 63 is stuck in chute 5 upper surface,Described graduated tile 3 be positioned at inside chute 5 relative to two medial surface be provided with rach slot 31,Rach slot 31 is arranged in the same direction with chute 5,And the vertical side in rach slot 31 is provided with stationary rack 32,Both sides, described guide pad 67 lower end are additionally provided with locating piece 66,Rotation gear 65 it is provided with in locating piece 66,Described locating piece 66 stretches into rach slot 31 and makes rotation gear 65 engage with stationary rack 32,Constitute sliding sleeve 6 and rotate gear 65 and the movable device translated along chute 5 under the cooperation of stationary rack 32,Described locating dowel 63 inner hollow is formed and accommodates chamber 62,It is provided with coil tension spring 61 in accommodating chamber 62,It is additionally provided with pen 7 in described sliding sleeve 6,Pen 7 stretches out after vertically running through receiving chamber 62 and guide pad 67,Described pen 7 is positioned at receiving chamber 62 and is additionally provided with locating ring 71,Locating ring 71 is positioned at coil tension spring 61 upper end.
nullThe operation principle of the present embodiment is: stretch into the inner joint degree of depth measuring electric smelting pipe inside electric smelting pipe first with tape measure or scale,Length value measured in record,Measurement length value is deducted by the interface length of conduit connection end,Obtain pipe joint resection length value,Pen assembly is placed on the conduit connection end needing to connect,The bayonet socket 1 of clamping post 2 is stuck in the port plane of conduit connection end,Adjust rule 3,Bayonet socket 1 plane is made to fit completely with port surface,Then soft rubber cushion 9 is pressed in pipeline outer surface,Now graduated tile 3 is coaxial with pipeline,Slip sliding sleeve 6,Drive sliding sleeve 6 is coordinated to translate with stationary rack 32 by rotating gear 65,Stop when moving to pipe joint resection length value,Then pen is pressed for 7 times,Pen 7 lower end contacts with pipe surface and leaves labelling,Take off pen assembly,Cutting machine is utilized to excise pipeline additional length from mark.
The present embodiment soft rubber cushion 9 deformable when pressurized, more fits with pipe surface, is not easy to damage pipeline simultaneously so that line is more accurate, and protectiveness is good.
The present embodiment simple in construction; easy to use; not only eliminate conventional pipeline and be inserted directly into electric smelting pipe; easily cause the problem that copper wire damages in electric smelting pipe; fabulous protects electric smelting pipe and connects pipeline; the most also can remove from because pipe joint is too short and cannot connect the problem of the degree of depth by complete measument electric smelting pipe, measure convenient accurately;Meanwhile, the pen assembly of the present embodiment is used can also to improve the precision of setting-out, it is ensured that the length of junction is accurate, electric smelting pipe and pipeline are connected more agree with, connect more firm, better tightness, it is to avoid the problem that junction is revealed after not agreeing with and causing connection.
The present embodiment is by arranging rotation gear 65 and stationary rack 32, the slip of sliding sleeve 6 can not only be carried out smoothly, ensure that pen 7 is in vertical state all the time, it is ensured that record is accurate simultaneously, and pen 7 is supported by locating ring 71 and coil tension spring 61, pen 7 will not glide voluntarily, staff is in use without mentioning pen, and pen 7 remains to maintain the original state after permanent use, and is using pen 7 later stage meeting self-resetting, without manually mentioning, easy to use.
Embodiment 2
The present embodiment adds following structure on the basis of above-described embodiment 1: described scale strip 4 is provided with two rows, is respectively provided with and is arranged on chute 5 both sides, and scale strip 4 described in two rows is all uniformly arranged along graduated tile 3 length direction.
The present embodiment is by arranging two row's scale strips 4, and staff can carry out reading from any one row's scale strip 4 when line, it is to avoid because of work place, the impact of position and cannot the problem of normal reading, reading is convenient.
Embodiment 3
The present embodiment adds following structure on the basis of embodiment 2: described locating dowel 63 circumference is additionally provided with two graduation indication bars 64 corresponding with scale strip 4, and graduation indication bar 64 is perpendicular to chute 5 and arranges.
The present embodiment graduation indication bar 64 slides with sliding sleeve 6 and mobile, and it is corresponding with scale strip 4, it is simple to by graduation indication bar 64 reading numerical values, raising registration accuracy.
It is embodiment of the present utility model as mentioned above.Described previously for each preferred embodiment of the present utility model, preferred implementation in each preferred embodiment is if not the most contradictory or premised on a certain preferred implementation, each preferred implementation can arbitrarily stack combinations use, design parameter in described embodiment and embodiment is merely to clearly state the utility model proof procedure of utility model people, and be not used to limit scope of patent protection of the present utility model, scope of patent protection of the present utility model is still as the criterion with its claims, the equivalent structure change that every utilization description of the present utility model and accompanying drawing content are made, in like manner should be included in protection domain of the present utility model.

Claims (3)

  1. null1. an electric smelting pipe connection pen assembly easy to use,Including the graduated tile (3) being carved with scale strip (4),It is respectively arranged with gripping mechanism and positioner on the downside of graduated tile (3) two ends,Described gripping mechanism includes the clamping post (2) being connected with graduated tile (3),Clamping post (2) lower end is provided with bayonet socket (1),Described positioner includes the connection post (8) being connected with graduated tile (3),Connect post (8) lower end and connect the soft rubber cushion (9) having arc,Described graduated tile (3) middle part is additionally provided with chute (5) along graduated tile (3) length direction,It is characterized in that: in described chute (5), be provided with sliding sleeve (6),Sliding sleeve (6) includes the guide pad (67) being arranged in chute (5) and is connected to the locating dowel (63) of guide pad (67) upper end,Locating dowel (63) is stuck in chute (5) upper surface,Described graduated tile (3) is positioned at two relative medial surface of chute (5) inner side and is provided with rach slot (31),Rach slot (31) is arranged in the same direction with chute (5),And the vertical side in rach slot (31) is provided with stationary rack (32),Described guide pad (67) both sides, lower end are additionally provided with locating piece (66),Rotation gear (65) it is provided with in locating piece (66),Described locating piece (66) stretches into rach slot (31) and makes rotation gear (65) engage with stationary rack (32),Constitute sliding sleeve (6) and rotate gear (65) and the movable device translated along chute (5) under the cooperation of stationary rack (32),Described locating dowel (63) inner hollow is formed and accommodates chamber (62),It is provided with coil tension spring (61) in accommodating chamber (62),Pen (7) it is additionally provided with in described sliding sleeve (6),Pen (7) stretches out after vertically running through receiving chamber (62) and guide pad (67),Described pen (7) is positioned at receiving chamber (62) and is additionally provided with locating ring (71),Locating ring (71) is positioned at coil tension spring (61) upper end.
  2. A kind of electric smelting pipe connection pen assembly easy to use the most according to claim 1, it is characterized in that: described scale strip (4) is provided with two rows, it is respectively provided with and is arranged on chute (5) both sides, and described in two rows, scale strip (4) is all uniformly arranged along graduated tile (3) length direction.
  3. A kind of electric smelting pipe connection pen assembly easy to use the most according to claim 2, it is characterized in that: described locating dowel (63) circumference is additionally provided with two graduation indication bars (64) corresponding with scale strip (4), graduation indication bar (64) is perpendicular to chute (5) and arranges.
CN201620197257.5U 2016-03-15 2016-03-15 Electricity recording pen subassembly for fuse tube connected convenient to use Expired - Fee Related CN205415592U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620197257.5U CN205415592U (en) 2016-03-15 2016-03-15 Electricity recording pen subassembly for fuse tube connected convenient to use

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620197257.5U CN205415592U (en) 2016-03-15 2016-03-15 Electricity recording pen subassembly for fuse tube connected convenient to use

Publications (1)

Publication Number Publication Date
CN205415592U true CN205415592U (en) 2016-08-03

Family

ID=56546683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620197257.5U Expired - Fee Related CN205415592U (en) 2016-03-15 2016-03-15 Electricity recording pen subassembly for fuse tube connected convenient to use

Country Status (1)

Country Link
CN (1) CN205415592U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108356783A (en) * 2018-03-07 2018-08-03 山东明化新材料有限公司 A kind of inlet pipeline Fast Labeling device for waste heat for supplying initial station heat exchanger

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108356783A (en) * 2018-03-07 2018-08-03 山东明化新材料有限公司 A kind of inlet pipeline Fast Labeling device for waste heat for supplying initial station heat exchanger

Similar Documents

Publication Publication Date Title
CN105643585A (en) Convenient-to-use recording pen assembly for connecting electric fusion pipe
CN208366250U (en) Detector for outer diameter error measuring device
CN205415592U (en) Electricity recording pen subassembly for fuse tube connected convenient to use
CN206248461U (en) A kind of tension test is had no progeny apparatus for measuring gauge length
CN106197201B (en) Position degree gauge
CN205607311U (en) Electricity fuse tube connected appurtenance convenient to measure and record
CN204301627U (en) A kind of accurate vernier universal bevel protractor
CN206772264U (en) External diameter measuring device
CN205426032U (en) A recording pen subassembly for electric fuse tube connected
CN102147224B (en) Novel measuring tool for overall length of blade
CN205426031U (en) Electric smelting pipe connector mouth length measurement and recorder
CN201575778U (en) Detecting device for oscillating blade radius
CN105783645A (en) Recording pen assembly for connection of electric melting tube
CN110095047B (en) Tool for measuring inclination angle of directional drilling core
CN210014746U (en) Belt pulley system coplanarity detection tool
CN204007451U (en) A kind of cubing that detects robot use terminal-collecting machine chuck looseness
CN108508161B (en) Auxiliary cigarette feeding device for cigarette holder of smoking machine suitable for cigarettes of different specifications
CN202676064U (en) Tooth ring radial direction bounce rapid detection apparatus
CN201876216U (en) Novel measuring tool for detecting total length of blade
CN217654672U (en) Pressure gauge calibration device
CN214951083U (en) Measuring device for perpendicularity of main shaft hole channel and slide channel hole of box body
CN215825165U (en) Camshaft terminal surface straightness that hangs down detects anchor clamps
CN214095826U (en) Multifunctional standard ruler for detecting quality of housing construction engineering
CN209945170U (en) Portable dipperstick for mathematical education
CN219454890U (en) Geological core sampling ruler

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20170315

CF01 Termination of patent right due to non-payment of annual fee