CN205400809U - Interim fire dam of metal mesh - Google Patents
Interim fire dam of metal mesh Download PDFInfo
- Publication number
- CN205400809U CN205400809U CN201620170056.6U CN201620170056U CN205400809U CN 205400809 U CN205400809 U CN 205400809U CN 201620170056 U CN201620170056 U CN 201620170056U CN 205400809 U CN205400809 U CN 205400809U
- Authority
- CN
- China
- Prior art keywords
- metal
- wire netting
- metope
- mainstay
- airtight wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses interim fire dam of metal mesh relates to a fire dam structure that plays sealed effect in the production process of colliery. Its purpose is in order to provide the interim fire dam of metal mesh that a security height, intensity are high, with low costs. The utility model discloses interim fire dam of metal mesh includes inside frame and wall, inside frame includes the metal crossbeam that metal mainstay that a plurality of vertical directions in edge placed and n root edge horizontal direction were placed, a plurality of metal mainstay align to grid, and the high summary of metal mainstay is greater than the tunnel height, the metal crossbeam connects gradually with the branches such as n+1 of every metal mainstay respectively, and the length of metal crossbeam slightly is greater than the width in tunnel, the wall is located inside frame front and back both sides, and the wall is made by the metal mesh, and the wall surface scribbles fire -retardant sealable coating layer.
Description
Technical field
This utility model relates to technical field of mine safety, particularly relates to a kind of fire dam structure playing sealing function in coal production process.
Background technology
Efficient colliery requisite technology in downhole production of Shi Shuan lane exploitation constructed by underground coal mine temporary airtight wall, is controlling ventilation, is intercepting in the process of the harmful gas such as goaf gas and carbon monoxide and all play an important role.Tradition temporary airtight wall mainly has wooden partition, work stone wall, interim air duct fabric wall, brick wall etc..Protecting against shock fire dam as mining in the one disclosed in Chinese invention patent CN102777208A, arranges wood siding wall in concrete sandwich both sides and fixes.There is the not high defect of safety such as leak out, inflammable that easily ftractureed by down-hole dynamic pressure change in this temporary airtight wall, expend material and manpower, man-hour more simultaneously, relatively costly, is not suitable with the development of modernization high yield and high efficiency mine.
Utility model content
The technical problems to be solved in the utility model is to provide the wire netting temporary airtight wall that a kind of safety is high, intensity is high, cost is low.
This utility model wire netting temporary airtight wall, including inner frame and metope, the metal beam that described inner frame includes the some metal mainstays vertically placed and n root is placed in the horizontal direction, several metal mainstays are evenly distributed, and the height of metal mainstay is slightly larger than head-room, described metal beam is sequentially connected with the n+1 Along ent of each metal mainstay respectively, the length of metal beam is slightly larger than the width in tunnel, both sides before and after the internally positioned framework of described metope, metope is made up of wire netting, and metope outer surface scribbles fire-retardant seal coating.
This utility model wire netting temporary airtight wall, wherein said metal mainstay and metal beam are steel pipe.
This utility model wire netting temporary airtight wall, wherein said metope is spliced by polylith wallboard, and every block of wallboard is made up of one or more layers bar-mat reinforcement and the staggered overlap joint of wire gauze.
This utility model wire netting temporary airtight wall, the aperture of wherein said bar-mat reinforcement is more than 10cm, and the mesh of steel wire is less than 1mm.
This utility model wire netting temporary airtight wall, the thickness of wherein said coating is 3~6mm.
This utility model wire netting temporary airtight wall difference from prior art is in that this utility model wire netting temporary airtight wall adopts the inner frame being made up of metal mainstay and metal beam, and the metope being made up of wire netting is installed outside inner frame, metope scribbles fire-retardant seal coating.The whole inner frame of this utility model wire netting temporary airtight wall and metope adopt all-metal to make, it is ensured that body of wall high intensity under tunnel, will not deform because of down-hole dynamic pressure change and damage.Metope adopts wire netting to coordinate fire-retardant seal coating, it is possible to well play fire-retardant and anlistatig effect, it is prevented that the generation of down-hole contingency.Constitute all optional conventional metal material of material of inner frame and metope, such as steel pipe, reinforcing bar etc., it is possible to that effectively reduces fire dam constructs cost.
Below in conjunction with accompanying drawing, wire netting temporary airtight wall of the present utility model is described further.
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model wire netting temporary airtight wall.
Detailed description of the invention
As it is shown in figure 1, this utility model wire netting temporary airtight wall includes inner frame, inner frame includes four metal mainstays being vertically set up in parallel 5 and two metal beam being set up in parallel in the horizontal direction 4.Metal mainstay 5 and metal beam 4 are steel pipe.The diameter of metal mainstay 5 is 5cm, and length is slightly larger than head-room.Four metal mainstays 5 are arranged between the top board 1 in tunnel and base plate 6 uniformly.The top of metal mainstay 5 is arranged in the groove on the downside of back 1, and clamps with chock 7.Two metal beam 4 are fixed with four metal mainstays 5 respectively and are connected, and the diameter of metal beam 4 is 5cm, and length is slightly larger than span length.Two metal beam 4 are connected to two trisection point places of each metal mainstay 5.The two ends, left and right of metal beam 4 reach outside inner frame, and insert among the coal body 3 of the left and right sides, tunnel.Being provided with the metope being spliced into by polylith wallboard 2 on inner frame, wallboard 2 is made up of the staggered overlap joint of one or more layers bar-mat reinforcement and wire gauze, and wherein the aperture of bar-mat reinforcement is more than 10cm, and the mesh of steel wire is less than 1mm.Being coated with fire-retardant seal coating on metope, the thickness of coating is 3~6mm.
This utility model wire netting temporary airtight wall carries out according to following steps when constructing:
1) four metal mainstays 5 of the parallel installation in left and right between the coal body 3 of the left and right sides, tunnel;
2) installing metal beam 4 at the Along ent place of metal mainstay 5, metal beam 4 is fixing with metal mainstay 5 successively to be connected, and constitutes inner frame;
3) metope being overlapped to form by bar-mat reinforcement or steel wire is installed on inner frame;
4) use spray pump at the fire-retardant seal coating of metope surface spraying.
Embodiment described above is only that preferred implementation of the present utility model is described; not scope of the present utility model is defined; under the premise designing spirit without departing from this utility model; various deformation that the technical solution of the utility model is made by those of ordinary skill in the art and improvement, all should fall in the protection domain that this utility model claims are determined.
Claims (5)
1. a wire netting temporary airtight wall, including inner frame and metope, it is characterized in that: the metal beam that described inner frame includes the some metal mainstays vertically placed and n root is placed in the horizontal direction, several metal mainstays are evenly distributed, and the height of metal mainstay is slightly larger than head-room, described metal beam is sequentially connected with the n+1 Along ent of each metal mainstay respectively, the length of metal beam is slightly larger than the width in tunnel, both sides before and after the internally positioned framework of described metope, metope is made up of wire netting, and metope outer surface scribbles fire-retardant seal coating.
2. wire netting temporary airtight wall according to claim 1, it is characterised in that: described metal mainstay and metal beam are steel pipe.
3. wire netting temporary airtight wall according to claim 1, it is characterised in that: described metope is spliced by polylith wallboard, and every block of wallboard is made up of one or more layers bar-mat reinforcement and the staggered overlap joint of wire gauze.
4. wire netting temporary airtight wall according to claim 3, it is characterised in that: the aperture of described bar-mat reinforcement is more than 10cm, and the mesh of steel wire is less than 1mm.
5. wire netting temporary airtight wall according to claim 1, it is characterised in that: the thickness of described coating is 3~6mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620170056.6U CN205400809U (en) | 2016-03-07 | 2016-03-07 | Interim fire dam of metal mesh |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620170056.6U CN205400809U (en) | 2016-03-07 | 2016-03-07 | Interim fire dam of metal mesh |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205400809U true CN205400809U (en) | 2016-07-27 |
Family
ID=56441253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620170056.6U Active CN205400809U (en) | 2016-03-07 | 2016-03-07 | Interim fire dam of metal mesh |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205400809U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184789A (en) * | 2018-11-15 | 2019-01-11 | 徐州和盛矿业科技有限公司 | A kind of quick vertical mold device of fire dam and construction method |
-
2016
- 2016-03-07 CN CN201620170056.6U patent/CN205400809U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109184789A (en) * | 2018-11-15 | 2019-01-11 | 徐州和盛矿业科技有限公司 | A kind of quick vertical mold device of fire dam and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102116169A (en) | Drainage method for pressure-relief gas baseboard stonehead of protected seam | |
CN109578056B (en) | Treatment method for coal mine goaf | |
CN105443143B (en) | A kind of coal mine gob roadway support device and its construction method | |
CN102797500A (en) | Gob sealing structure | |
CN110439560A (en) | A kind of construction technology of medium-thickness seam coal working face along the lane Kong Hu | |
CN205400809U (en) | Interim fire dam of metal mesh | |
US20140308079A1 (en) | C-Channel Panel, Overcast, Stopping and Method | |
CN104727847B (en) | Filled wall is from the gob-side entry retaining method without coal column eliminated | |
CN104594950A (en) | Coal mine underground flexible spray coating temporary sealing wall and building method thereof | |
CN105065060A (en) | Mine rolling-up curtain type supporting formwork and supporting method | |
CN202299177U (en) | Novel roof exhaust system | |
CN207646959U (en) | A kind of curtain wall interlayer fireproof plugging structure | |
CN205116436U (en) | Block structure at big space floor fireproof rolling shutter door upper portion entrance to a cave | |
CN205134980U (en) | Whole anti -seismic performance's of reinforcing adobe wall bearing local -style dwelling houses device | |
CN213360180U (en) | Side roadway side wall plugging prefabricated part for roof cutting roadway mining area of high-gas mine | |
CN211598755U (en) | Quick shutoff wall body of roof cutting entry retaining collecting space area gas | |
CN204552450U (en) | A kind of integral prefabricated thermal-insulating waterproof wafts window | |
CN210562784U (en) | Prefabricated corner wall | |
CN209603564U (en) | A kind of large-scale earthing warehouse of explosion-proof damage | |
CN204851324U (en) | Template is strutted to mining roll of curtain formula | |
CN106522266A (en) | Light high-strength anti-seepage anti-seismic pipe gallery and construction method | |
CN105201377B (en) | A kind of fire resistance rolling shutter door exposes the encapsulating structure of guide rail | |
CN206646687U (en) | A kind of spigot-and-socket aluminum plate curtain wall system | |
CN104964625B (en) | Anti-pick through blasting method harmless to existing pit shaft during a kind of Shaft extension | |
CN219411315U (en) | Waterproof structure of prefabricated link plate cross seam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |