CN209603564U - A kind of large-scale earthing warehouse of explosion-proof damage - Google Patents
A kind of large-scale earthing warehouse of explosion-proof damage Download PDFInfo
- Publication number
- CN209603564U CN209603564U CN201821942801.XU CN201821942801U CN209603564U CN 209603564 U CN209603564 U CN 209603564U CN 201821942801 U CN201821942801 U CN 201821942801U CN 209603564 U CN209603564 U CN 209603564U
- Authority
- CN
- China
- Prior art keywords
- corrugated steel
- layer corrugated
- outer layer
- internal layer
- warehouse
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
A kind of large-scale earthing warehouse of explosion-proof damage, belongs to depot establishment facility technology field, the influence for avoiding exploding to warehouse.Its technical solution is: reinforced concrete foundation is arranged in parallel along the length direction in warehouse, reinforced concrete foundation is securely connect with ground, internal layer corrugated steel and outer layer corrugated steel are overlapped placement up and down, internal layer corrugated steel and outer layer corrugated steel are respectively curved arch, internal layer corrugated steel is identical with the crooked radian of outer layer corrugated steel, the arch both ends of internal layer corrugated steel and outer layer corrugated steel are connected with the reinforced concrete foundation of two sides respectively, there is gap between internal layer corrugated steel and outer layer corrugated steel, it is filled securely in gap with filler, there is soil layer covering on outer layer corrugated steel.The utility model structure is simple, compression strength is big, and overburden layer, which is not easily susceptible to explosion, to be influenced, and construction speed is fast, can be particularly suitable for constructing large-scale military warehouse in wartime, be guaranteed the safety of personnel and goods and materials with Fast Construction bulk storage plant.
Description
Technical field
The utility model relates to a kind of large-scale earthing warehouses, belong to depot establishment facility technology field.
Background technique
Construction bulk storage plant is required in units such as industrial and mining enterprises, harbour, station, large-scale logistics centers, to meet production
Needs.Currently, bulk storage plant structure usually all uses reinforced concrete frame structure, then wall and roof are applied
Work.In the construction process, pouring reinforcement concrete frame is first had to, formwork supporting plate, maintenance is needed, then wants masonry panel, builds
Roof.Work progress is complicated, process procedure is more, the construction time is long, is not suitable for the needs of fast construction bulk storage plant.Steel corrugated plating
A kind of excellent New Building Materials, it is big using steel corrugated board structures intensity, the production of convenient and quick construction advantage variously
In various cities, traffic engineering of having stable political situation is widely applied lower and ground pipe gallery, including some bulk storage plants.It is adopting
With in some bulk storage plants construction of steel corrugated plating, especially some military depots for needing to keep the temperature or maintain secrecy typically make
Use steel corrugated plating as liner, outside earthing or concrete.Any problem is not present in peacetime in these warehouses, but is fighting
When, the earthing or concrete of outer layer can be scattered when by blast impulse or splashes, the effect of covering and protecting is lost, because
It is necessary to the structures to these large-scale earthing warehouses to improve for this.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of large-scale earthing warehouse of anti-burst damage, this storehouses
The overall structure in library is secured, and resistance to compression, tensile strength are big, when by blast impulse earthing or concrete will not splashes, no
It is easy to damage.
The technical solution for solving above-mentioned technical problem is:
A kind of large-scale earthing warehouse of anti-burst damage, it includes reinforced concrete foundation, internal layer corrugated steel, outer layer wave
Line steel plate, reinforced concrete foundation are arranged in parallel along the length direction in warehouse, and reinforced concrete foundation is securely connect with ground,
Internal layer corrugated steel and outer layer corrugated steel are overlapped placement up and down, and internal layer corrugated steel and outer layer corrugated steel are respectively curved
Arch, internal layer corrugated steel is identical with the crooked radian of outer layer corrugated steel, the arch of internal layer corrugated steel and outer layer corrugated steel
Shape both ends are connected with the reinforced concrete foundation of two sides respectively, have gap between internal layer corrugated steel and outer layer corrugated steel,
It is filled securely in gap with filler, there is soil layer covering, the domes two that the double-deck corrugated steel is constituted on outer layer corrugated steel
End is blocked by plane corrugated steel plate respectively, installs access door on plane corrugated steel plate.
The large-scale earthing warehouse of above-mentioned anti-burst damage, there are also arch springing connector, it is mixed that arch springing connector is cast in reinforcing bar for it
In solidifying earth foundation, the arch both ends of internal layer corrugated steel and outer layer corrugated steel pass through bolt respectively and are connected with arch springing connector
It connects.
The large-scale earthing warehouse of above-mentioned anti-burst damage, between the internal layer corrugated steel and outer layer corrugated steel in gap
Filler be soil or concrete or armored concrete.
The beneficial effects of the utility model are:
The utility model using the corrugated steel of double arch as warehouse main body, in the gap between the double-deck corrugated steel
Securely with filler filling, outer layer corrugated steel is covered with soil layer.This structure can make the overall structure in warehouse secured, resist
Pressure, tensile strength are big, concrete when by blast impulse on outer layer earthing or internal layer corrugated steel will not splashes, no
It is easy to damage.
The utility model structure is simple, compression strength is big, and overburden layer, which is not easily susceptible to explosion, to be influenced, and construction speed is fast, can be with
The needs for meeting Fast Construction bulk storage plant are particularly suitable for constructing large-scale military warehouse in wartime, guarantee the peace of personnel and substance
Entirely.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
In figure mark it is as follows: reinforced concrete foundation 1, internal layer corrugated steel 2, outer layer corrugated steel 3, arch springing connector 4,
Filler 5, earthing 6.
Specific embodiment
The utility model by reinforced concrete foundation 1, internal layer corrugated steel 2, outer layer corrugated steel 3, arch springing connector 4,
Filler 5, earthing 6 form.
Shown in figure, reinforced concrete foundation 1 is arranged in parallel along the length direction in warehouse, reinforced concrete foundation 1 with
Ground securely connects.
It is shown in figure, internal layer corrugated steel 2 and the overlapping of about 3 outer layer corrugated steel are placed, internal layer corrugated steel 2 and outer layer
Corrugated steel 3 is respectively curved arch, and internal layer corrugated steel 2 is identical with the crooked radian of outer layer corrugated steel 3, internal layer ripple
The arch both ends of steel plate 2 and outer layer corrugated steel 3 are connected with the reinforced concrete foundation 1 of two sides respectively.The double-deck corrugated steel
Structure increases the resistance to compression of arch, tensile strength.
It shows there is gap between internal layer corrugated steel 2 and outer layer corrugated steel 3 in figure, fills jail with filler 5 in gap
Gu.Filler 5 can choose soil or concrete or armored concrete.Filling soil can save fund, accelerate construction progress;And
Fill concrete or armored concrete can greatly increase the intensity in warehouse, but the construction time is long, and at high cost, construction enterprises can
Depending on the importance in warehouse and needs.
It is shown in figure, the arch both ends of internal layer corrugated steel 2 and outer layer corrugated steel 3 pass through bolt respectively and arch springing connects
It connects, 4 are connected, and arch springing connector 4 is cast in reinforced concrete foundation 1.Arch springing connector 4 is normal in steel corrugated plating building
With component, it can according to need and selected.
Show there is soil layer covering on outer layer corrugated steel 3, protects to warehouse in figure.
It is shown in figure, the domes both ends that the double-deck corrugated steel is constituted are blocked by plane corrugated steel plate respectively, plane wave
Access door is installed on line steel plate.
The utility model has following several forms of construction work in construction:
Method one: first installing internal layer corrugated steel 2, installs after internal layer corrugated steel 2 earthing on the steel plate, then installs
Outer layer corrugated steel 3, the finally overlying soil on outer layer corrugated steel 3.
Method two: first installing internal layer corrugated steel 2, then install outer layer corrugated steel 3, finally fills in intermediate space mixed
Solidifying soil or other materials;Outer layer corrugated steel 3 can also be first installed, then internal layer corrugated steel 2 is installed, finally in intermediate space
Fill concrete or other materials.In both forms of construction work, internal layer corrugated steel 2, outer layer corrugated steel 3 can be played
The effect of template.
Method three: internal layer corrugated steel 2 is first installed, then in the 2 outside assembling reinforcement of internal layer corrugated steel, then outer layer is installed
Corrugated steel 3, finally the fill concrete in intermediate space, forms armored concrete between two layers of corrugated steel.
One embodiment of the utility model is as follows:
The length in warehouse is 20m, width 14m, is highly 5m;
The length of reinforced concrete foundation 1 is 20m, width 1.2m, is highly 1m;
The specification of corrugated steel: inside is 380-140 waveform, thickness 10mm;Outside 178-45 waveform, thickness 7mm.
Filler 5 uses concrete.
Claims (3)
1. a kind of large-scale earthing warehouse of explosion-proof damage, it is characterised in that: it includes reinforced concrete foundation (1), internal layer wave
Line steel plate (2), outer layer corrugated steel (3), reinforced concrete foundation (1) are arranged in parallel along the length direction in warehouse, and reinforcing bar is mixed
Solidifying earth foundation (1) is securely connect with ground, and internal layer corrugated steel (2) and outer layer corrugated steel (3) are overlapped placement, internal layer wave up and down
Line steel plate (2) and outer layer corrugated steel (3) are respectively curved arch, internal layer corrugated steel (2) and outer layer corrugated steel (3)
Crooked radian is identical, the arch both ends of internal layer corrugated steel (2) and outer layer corrugated steel (3) armored concrete with two sides respectively
Basic (1) is connected, and has gap between internal layer corrugated steel (2) and outer layer corrugated steel (3), is filled out in gap with filler (5)
It fills securely, has soil layer covering on outer layer corrugated steel (3), the domes both ends that the double-deck corrugated steel is constituted are respectively by plane wave
Line steel plate blocks, and installs access door on plane corrugated steel plate.
2. the large-scale earthing warehouse of explosion-proof damage according to claim 1, it is characterised in that: there are also arch springing connectors for it
(4), arch springing connector (4) is cast in reinforced concrete foundation (1), internal layer corrugated steel (2) and outer layer corrugated steel (3)
Arch both ends pass through bolt respectively and are connected with arch springing connector (4).
3. the large-scale earthing warehouse of explosion-proof damage according to claim 1, it is characterised in that: the internal layer corrugated steel
(2) filler (5) between outer layer corrugated steel (3) in gap is soil or concrete or armored concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821942801.XU CN209603564U (en) | 2018-11-23 | 2018-11-23 | A kind of large-scale earthing warehouse of explosion-proof damage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821942801.XU CN209603564U (en) | 2018-11-23 | 2018-11-23 | A kind of large-scale earthing warehouse of explosion-proof damage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209603564U true CN209603564U (en) | 2019-11-08 |
Family
ID=68395962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821942801.XU Active CN209603564U (en) | 2018-11-23 | 2018-11-23 | A kind of large-scale earthing warehouse of explosion-proof damage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209603564U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111455850A (en) * | 2020-03-23 | 2020-07-28 | 衡水益通管业股份有限公司 | Ultrahigh filling corrugated steel arch structure and construction method |
-
2018
- 2018-11-23 CN CN201821942801.XU patent/CN209603564U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111455850A (en) * | 2020-03-23 | 2020-07-28 | 衡水益通管业股份有限公司 | Ultrahigh filling corrugated steel arch structure and construction method |
CN111455850B (en) * | 2020-03-23 | 2021-11-12 | 衡水益通管业股份有限公司 | Ultrahigh filling corrugated steel arch structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11339658B2 (en) | Method for recovering room-type coal pillars by cemented filling of reserved roadways | |
CN205422813U (en) | Detachable filling and retaining wall | |
CN109915138B (en) | Easy-to-self-fire coal layer top-cutting self-tunneling coal-pillar-free mining method | |
CN101400865A (en) | Unitized post tension block system for masonry structures | |
CN104099942B (en) | A kind of underground reinforced concrete box culvert structure temporary plugging wall construction method | |
CN103397660A (en) | Underground construction constructed in assembled mode and construction method of underground construction | |
CN109779653B (en) | Construction method for crossing of soft rock large-section tunnel | |
CN105735351A (en) | Pipe rack installation base structure, comprehensive pipe rack and installation and construction method of comprehensive pipe rack | |
CN103628911A (en) | Fully-mechanized coal mining/ caving working face sectional type gob-side entry retaining method | |
CN106836241A (en) | A kind of support replacement construction of pattern foundation pit supporting structure horizontal support structure | |
CN108385871A (en) | The precast wall body of fabricated structure | |
CN107130983A (en) | A kind of large cross-section tunnel tunneling construction grillage strengthening supporting method | |
CN209603564U (en) | A kind of large-scale earthing warehouse of explosion-proof damage | |
CN211899023U (en) | Explosion-proof building structure capable of being constructed quickly | |
CN103643681A (en) | Subway station foundation ditch inverse constructed supporting structure and construction method thereof | |
CN103244143A (en) | Underground engineering tunneling construction method and underground station | |
CN102251804A (en) | Mobile steel refuge chamber | |
CN111764939B (en) | High-stress carnallite seam roadway composite supporting structure and method | |
CN103114752B (en) | Fiber reinforce plastic (FRP) spherical tank - transposition support combination column system and construction method thereof | |
CN202810873U (en) | Pipe curtain connection buckle | |
CN205063097U (en) | Civil engineering is with preventing hot wall | |
CN108286267B (en) | Assembled corrugated steel Combined concrete pipe gallery | |
RU2431770C1 (en) | Underground storage of liquefied natural gas | |
CN203730069U (en) | Round concrete filled steel tubular column gob-side entry retaining filling wall body structure | |
CN207646626U (en) | A kind of corrugated steel construction snow defence channel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |