CN205399779U - Hyperbolic arc pendant - Google Patents

Hyperbolic arc pendant Download PDF

Info

Publication number
CN205399779U
CN205399779U CN201620149079.9U CN201620149079U CN205399779U CN 205399779 U CN205399779 U CN 205399779U CN 201620149079 U CN201620149079 U CN 201620149079U CN 205399779 U CN205399779 U CN 205399779U
Authority
CN
China
Prior art keywords
hanging
curved
piece
fixedly connected
hanging piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201620149079.9U
Other languages
Chinese (zh)
Inventor
梁炽英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FOSHAN PEARL BUILDING MATERIALS INDUSTRIAL Co Ltd
Original Assignee
FOSHAN PEARL BUILDING MATERIALS INDUSTRIAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FOSHAN PEARL BUILDING MATERIALS INDUSTRIAL Co Ltd filed Critical FOSHAN PEARL BUILDING MATERIALS INDUSTRIAL Co Ltd
Priority to CN201620149079.9U priority Critical patent/CN205399779U/en
Application granted granted Critical
Publication of CN205399779U publication Critical patent/CN205399779U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Securing Of Glass Panes Or The Like (AREA)

Abstract

本实用新型公开了双曲弧形挂件,包括曲挂片、龙骨、吊杆和连接件,曲挂片为弧形,曲挂片为多条并依次呈弧形排列,每条曲挂片均连接有连接件,龙骨与连接件固定连接而串联多条曲挂片,吊杆位于曲挂片上方并与连接件固定连接。由此,通过龙骨将多条曲挂片串接成整体结构,而吊杆则可将曲挂片固定于现有建筑物天花的下侧。多条曲挂片依次呈弧形排列可使天花吊顶在一个方向上形成弯曲延伸,而曲挂片自身的弧度可使天花吊顶在另一个方向上形成弯曲延伸。可形成空间立体感强的双曲天花吊顶,满足大型的建筑天花吊顶的多样化需求。

The utility model discloses a hyperbolic arc-shaped hanging part, which comprises a curved hanging piece, a keel, a suspender and a connecting piece. A connecting piece is connected, the keel is fixedly connected with the connecting piece and a plurality of curved hanging pieces are connected in series, and the suspender is located above the curved hanging piece and fixedly connected with the connecting piece. Thus, a plurality of curved hanging pieces are connected in series through the keel to form an overall structure, and the suspenders can fix the curved hanging pieces to the lower side of the ceiling of the existing building. A plurality of curved hanging pieces arranged in an arc in sequence can make the ceiling form a curved extension in one direction, and the curvature of the curved hanging pieces themselves can make the suspended ceiling form a curved extension in another direction. It can form a hyperbolic ceiling with a strong three-dimensional sense of space to meet the diverse needs of large architectural ceilings.

Description

双曲弧形挂件hyperbolic arc pendant

技术领域technical field

本实用新型涉及一种建筑结构,特别涉及一种双曲弧形挂件。The utility model relates to a building structure, in particular to a hyperbolic arc pendant.

背景技术Background technique

挂件作为建筑天花的吊顶结构,可对建筑物起到装饰作用。现有技术中的室外吊顶挂件通常做成直板结构直接固定在建筑天花下侧,这样连接结构简单,安装方便,但形式单调空间立体感不强,无法满足大型的建筑天花吊顶的多样化需求。As the ceiling structure of the building ceiling, the pendant can play a decorative role in the building. The outdoor ceiling pendant in the prior art is usually made into a straight plate structure and directly fixed on the lower side of the building ceiling, which has a simple connection structure and is easy to install, but the monotonous form and the lack of three-dimensionality of the space cannot meet the diverse needs of large building ceilings.

实用新型内容Utility model content

本实用新型提供了一种双曲弧形挂件,至少解决了上述技术问题之一。The utility model provides a hyperbolic arc pendant, which at least solves one of the above technical problems.

根据本实用新型的一个方面,提供了双曲弧形挂件,包括曲挂片、龙骨、吊杆和连接件,曲挂片为弧形,曲挂片为多条并依次呈弧形排列,每条曲挂片均连接有连接件,龙骨与连接件固定连接而串联多条曲挂片,吊杆位于曲挂片上方并与连接件固定连接。According to one aspect of the utility model, a hyperbolic arc hanger is provided, including a curved hanging piece, a keel, a suspender and a connecting piece. The curved hanging pieces are all connected with connectors, the keel is fixedly connected with the connecting pieces and a plurality of curved hanging pieces are connected in series, and the suspender is located above the curved hanging pieces and is fixedly connected with the connecting pieces.

本实用新型的有益效果是:通过龙骨将多条曲挂片串接成整体结构,而吊杆则可将曲挂片固定于现有建筑物天花的下侧。多条曲挂片依次呈弧形排列可使天花吊顶在一个方向上形成弯曲延伸,而曲挂片自身的弧度可使天花吊顶在另一个方向上形成弯曲延伸。可形成空间立体感强的双曲天花吊顶,满足大型的建筑天花吊顶的多样化需求。The beneficial effect of the utility model is that a plurality of curved hanging pieces are connected in series through the keel to form an integral structure, and the suspension rod can fix the curved hanging pieces on the lower side of the ceiling of the existing building. A plurality of curved hanging pieces arranged in an arc in sequence can make the ceiling form a curved extension in one direction, and the curvature of the curved hanging pieces themselves can make the suspended ceiling form a curved extension in another direction. It can form a hyperbolic ceiling with a strong three-dimensional sense of space to meet the diverse needs of large architectural ceilings.

在一些实施方式中,连接件包括依次连接的第一脚板、第一侧板、第二侧板、顶板和第二脚板,第一脚板和第二脚板分别与曲挂片固定连接,第一侧板和第二侧板与龙骨固定连接,顶板与吊杆固定连接。由此,通过连接件可将曲挂片、龙骨和吊杆连接到一起。In some embodiments, the connector includes a first foot plate, a first side plate, a second side plate, a top plate and a second foot plate connected in sequence, the first foot plate and the second foot plate are respectively fixedly connected to the curved hanging piece, and the first side The board and the second side board are fixedly connected with the keel, and the top board is fixedly connected with the suspender. Thus, the curved hanging piece, the keel and the suspender can be connected together through the connecting piece.

在一些实施方式中,双曲弧形挂件还包括连接块,连接块位于曲挂片内并与曲挂片和连接件固定连接。由此,连接块可对曲挂片起支撑定位和分散受力的作用,避免曲挂片局部受力过大而易被拉裂损坏,延长曲挂片的使用寿命。In some embodiments, the hyperbolic arc hanger further includes a connecting block, which is located in the curved hanging piece and fixedly connected with the curved hanging piece and the connecting piece. Thus, the connecting block can support and position the curved hanging piece and disperse the force, so as to prevent the curved hanging piece from being easily cracked and damaged due to excessive local force, and prolong the service life of the curved hanging piece.

在一些实施方式中,连接块为型材结构,连接块包括方管主体和连接槽,连接槽位于方管主体一侧。由此,可以以螺钉插入连接槽内将挂片与连接件连接,连接槽可设置成通槽结构以方便安装。In some embodiments, the connecting block is a profile structure, and the connecting block includes a square pipe main body and a connecting groove, and the connecting groove is located on one side of the square pipe main body. Thus, the hanging piece can be connected with the connecting piece by inserting the screw into the connecting groove, and the connecting groove can be set as a through groove structure to facilitate installation.

在一些实施方式中,曲挂片包括第一挂片和第二挂片,第一脚板与第一挂片和连接块固定连接,第二脚板与第二挂片和连接块固定连接。由此,通过连接块和连接件使第一挂片和第二挂片连接成一体,可形成一条整体的吊顶挂件,还可通过与上述类似的连接结构连接多条挂片以形成大型整体的吊顶挂件。可适用于大型建筑的天花吊顶结构,安装方便、连接牢固。In some embodiments, the curved hanging piece includes a first hanging piece and a second hanging piece, the first foot plate is fixedly connected to the first hanging piece and the connecting block, and the second foot plate is fixedly connected to the second hanging piece and the connecting block. Thus, the first hanging piece and the second hanging piece are connected into one body through the connecting block and the connecting piece to form an integral ceiling hanging piece, and a plurality of hanging pieces can also be connected through a connection structure similar to the above to form a large integral ceiling hanging piece. Ceiling accessories. It can be applied to the ceiling structure of large buildings, with easy installation and firm connection.

在一些实施方式中,第一侧板和第二侧板均设有圆形通孔和弧形通孔。由此,圆形通孔和弧形通孔均用于连接件与龙骨进行螺纹连接,通过弧形通孔可调节曲挂片的安装角度。In some embodiments, both the first side plate and the second side plate are provided with circular through holes and arc-shaped through holes. Therefore, both the circular through hole and the arc through hole are used for threaded connection between the connector and the keel, and the installation angle of the curved hanging piece can be adjusted through the arc through hole.

在一些实施方式中,双曲弧形挂件还包括边挂梁和直挂片,边挂梁为两条,直挂片为多条并依次排列,边挂梁为两条并分别位于直挂片的两端,挂杆的两端分别与边挂梁固定连接,直挂片套装于挂杆外并与挂杆一一对应设置。由此,直挂片和曲挂片共同形成整体的吊顶结构。In some embodiments, the hyperbolic arc hanger also includes side hanging beams and straight hanging pieces. There are two side hanging beams, multiple straight hanging pieces arranged in sequence, and two side hanging beams respectively located The two ends of the hanging rod are respectively fixedly connected with the side hanging beams, and the straight hanging piece is set outside the hanging rod and arranged in one-to-one correspondence with the hanging rod. Thus, the straight hanging piece and the curved hanging piece together form an integral suspended ceiling structure.

在一些实施方式中,曲挂片的两端均设有边挂梁和直挂片并呈对称设置。In some embodiments, both ends of the curved hanging piece are provided with side hanging beams and straight hanging pieces, which are arranged symmetrically.

附图说明Description of drawings

图1为本实用新型一实施方式的双曲弧形挂件的主视结构示意图;Fig. 1 is a schematic diagram of the front view of a hyperbolic arc-shaped pendant according to an embodiment of the present invention;

图2为图1所示的双曲弧形挂件的仰视结构示意图;Fig. 2 is a schematic view of the structure of the hyperbolic arc pendant shown in Fig. 1;

图3为图1所示的双曲弧形挂件的A部侧视结构示意图;Fig. 3 is a side view structural diagram of part A of the hyperbolic arc pendant shown in Fig. 1;

图4为图3所示的双曲弧形挂件的B部放大示意图;Fig. 4 is an enlarged schematic diagram of part B of the hyperbolic arc pendant shown in Fig. 3;

图5为图4所示的双曲弧形挂件的曲挂片、龙骨、连接件和连接块连接结构示意图;Fig. 5 is a schematic diagram of the connection structure of the curved hanging piece, the keel, the connector and the connecting block of the hyperbolic arc hanger shown in Fig. 4;

图6为图5所示的双曲弧形挂件的连接块的结构示意图;Fig. 6 is a structural schematic diagram of the connecting block of the hyperbolic arc pendant shown in Fig. 5;

图7为图4所示的双曲弧形挂件的连接件的结构示意图;Fig. 7 is a structural schematic diagram of the connector of the hyperbolic arc pendant shown in Fig. 4;

图8为图7所示的连接件的侧视结构示意图。FIG. 8 is a schematic side view of the connector shown in FIG. 7 .

具体实施方式detailed description

下面结合附图对本实用新型作进一步详细的说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

图1示意性地显示了根据本实用新型的一种实施方式的双曲弧形挂件。Fig. 1 schematically shows a hyperbolic arc hanger according to an embodiment of the present invention.

参照图1,双曲弧形挂件包括曲挂片1、龙骨2、吊杆3、连接件4和连接块5。曲挂片1为弧形,曲挂片1为多条并依次平行排列呈弧形。每条曲挂片1均连接有连接件4,龙骨2与连接件4固定连接而串联多条曲挂片1,龙骨2至少为两条并与曲挂片1垂直。吊杆3位于曲挂片1上方并与连接件4固定连接。吊杆3的上端固定连接于现有建筑的天花下端将整个双曲弧形挂件挂接于现有建筑。Referring to FIG. 1 , the hyperbolic arc hanger includes a curved hanger 1 , a keel 2 , a boom 3 , a connecting piece 4 and a connecting block 5 . The curved hanging pieces 1 are arc-shaped, and the curved hanging pieces 1 are arranged in parallel in order to form an arc shape. Each curved hanging piece 1 is connected with a connector 4, and the keel 2 is fixedly connected with the connecting piece 4 to connect a plurality of curved hanging pieces 1 in series. There are at least two keels 2 and are perpendicular to the curved hanging piece 1. The suspension rod 3 is located above the curved hanging piece 1 and is fixedly connected with the connecting piece 4 . The upper end of the suspender 3 is fixedly connected to the lower end of the ceiling of the existing building to articulate the entire hyperbolic arc pendant to the existing building.

连接件4包括依次连接的第一脚板41、第一侧板43、第二侧板44、顶板45和第二脚板42。第一脚板41和第二脚板42分别与曲挂片1以螺钉固定连接,第一侧板43和第二侧板44与龙骨2通过螺钉固定连接,顶板45与吊杆3通过螺钉固定连接。The connecting piece 4 includes a first foot plate 41 , a first side plate 43 , a second side plate 44 , a top plate 45 and a second foot plate 42 which are sequentially connected. The first foot plate 41 and the second foot plate 42 are fixedly connected with the curved hanging piece 1 with screws respectively, the first side plate 43 and the second side plate 44 are fixedly connected with the keel 2 by screws, and the top plate 45 is fixedly connected with the suspension rod 3 by screws.

第一侧板43和第二侧板44均设有圆形通孔46和弧形通孔47,弧形通孔47弧线的中心与圆形通孔46的中心重合。第一侧板43和第二侧板44竖向设置,龙骨2穿过第一侧板43和第二侧板44之间,螺钉分别穿过圆形通孔46和弧形通孔47将龙骨2固定于第一侧板43和第二侧板44之间。通过调节螺钉在弧形通孔47内的位置,可调节连接件4与龙骨2之间的固定角度,由此调节曲挂片1的固定角度。Both the first side plate 43 and the second side plate 44 are provided with a circular through hole 46 and an arc-shaped through hole 47 , and the arc center of the arc-shaped through hole 47 coincides with the center of the circular through hole 46 . The first side plate 43 and the second side plate 44 are vertically arranged, the keel 2 passes between the first side plate 43 and the second side plate 44, and the screws pass through the circular through hole 46 and the arc through hole 47 respectively to connect the keel 2 is fixed between the first side plate 43 and the second side plate 44. By adjusting the position of the screw in the arc-shaped through hole 47 , the fixed angle between the connecting piece 4 and the keel 2 can be adjusted, thereby adjusting the fixed angle of the curved hanging piece 1 .

连接块5位于曲挂片1内并与曲挂片1和连接件4固定连接。The connecting block 5 is located in the curved hanging piece 1 and fixedly connected with the curved hanging piece 1 and the connecting piece 4 .

连接块5为型材结构,连接块5包括方管主体51和连接槽52,连接槽52位于方管主体51一侧并贯穿方管主体51,连接槽52可并列设置为两条。The connecting block 5 is a profile structure. The connecting block 5 includes a square pipe main body 51 and a connecting groove 52. The connecting groove 52 is located on one side of the square pipe main body 51 and runs through the square pipe main body 51. Two connecting grooves 52 can be arranged side by side.

方管主体51的外侧设有多条凸棱53。凸棱53贯穿方管主体51的外侧,凸棱53的尖端与曲挂片1的内壁接触,连接件4在曲挂片1内滑动时产生的摩擦力较小。The outer side of the square tube main body 51 is provided with a plurality of ribs 53 . The rib 53 runs through the outside of the square tube main body 51 , and the tip of the rib 53 is in contact with the inner wall of the curved hanging piece 1 , and the frictional force generated when the connecting piece 4 slides in the curved hanging piece 1 is relatively small.

曲挂片1可以包括第一挂片11和第二挂片12,第一脚板41与第一挂片11和连接块5以螺钉固定连接,第二脚板42与第二挂片12和连接块5以螺钉固定连接。通过连接件4和连接块5的配合使第一挂片11和第二挂片12连接成整体的曲挂片1。曲挂片1也可包括多条挂片并通过与上述类似的结构连接成一体,可适应大型建筑天花吊顶的安装需求。The curved hanging piece 1 can include the first hanging piece 11 and the second hanging piece 12, the first foot plate 41 is fixedly connected with the first hanging piece 11 and the connecting block 5, the second foot plate 42 is connected with the second hanging piece 12 and the connecting block 5 Fasten the connection with screws. The first hanging piece 11 and the second hanging piece 12 are connected to form an integral curved hanging piece 1 through the cooperation of the connecting piece 4 and the connecting block 5 . The curved hanging piece 1 can also include a plurality of hanging pieces and be connected into one body through a structure similar to the above, which can meet the installation requirements of large-scale building ceilings.

双曲弧形挂件还包括边挂梁6、直挂片7和挂杆8,边挂梁6为两条,直挂片7为多条并依次排列,边挂梁6为两条并分别位于直挂片7的两端,挂杆8的两端分别与边挂梁6以螺钉固定连接,直挂片7套装于挂杆8外并与挂杆8一一对应设置。边挂梁6的通过连接结构吊设于现有建筑天花的下侧。The hyperbolic arc pendant also includes side hanging beams 6, straight hanging pieces 7 and hanging rods 8, two side hanging beams 6, multiple straight hanging pieces 7 and arranged in sequence, and two side hanging beams 6 are located at The two ends of the straight hanging piece 7 and the two ends of the hanging rod 8 are respectively fixedly connected with the side hanging beam 6 with screws, and the straight hanging piece 7 is set on the outside of the hanging rod 8 and correspondingly arranged with the hanging rod 8 one by one. The connecting structure of the side hanging beam 6 is hoisted on the lower side of the existing building ceiling.

曲挂片1的两端均设有边挂梁6和直挂片7并呈对称设置。曲挂片1与直挂片7共同形成整体的吊顶结构的最下缘,使吊顶的下缘呈现曲面和直面相结合的多样结构,使吊顶更具美观、柔和且立体感强。Both ends of the curved hanging piece 1 are provided with side hanging beams 6 and straight hanging pieces 7 and are arranged symmetrically. The curved hanging piece 1 and the straight hanging piece 7 together form the lowermost edge of the overall suspended ceiling structure, so that the lower edge of the suspended ceiling presents a variety of structures combining curved surfaces and straight surfaces, making the suspended ceiling more beautiful, soft and three-dimensional.

以上所述的仅是本实用新型的一些实施方式。对于本领域的普通技术人员来说,在不脱离本实用新型创造构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。What have been described above are only some embodiments of the present utility model. For those skilled in the art, without departing from the inventive concept of the present utility model, several modifications and improvements can be made, and these all belong to the protection scope of the present utility model.

Claims (8)

1.双曲弧形挂件,其特征在于:包括曲挂片(1)、龙骨(2)、吊杆(3)和连接件(4),所述曲挂片(1)为弧形,所述曲挂片(1)为多条并依次呈弧形排列,每条所述曲挂片(1)均连接有连接件(4),所述龙骨(2)与连接件(4)固定连接而串联多条曲挂片(1),所述吊杆(3)位于曲挂片(1)上方并与连接件(4)固定连接。1. The hyperbolic arc hanger is characterized in that: it comprises a curved hanger (1), a keel (2), a suspender (3) and a connector (4), and the curved hanger (1) is arc-shaped, so The curved hanging pieces (1) are multiple and arranged in an arc in turn, each of the curved hanging pieces (1) is connected with a connecting piece (4), and the keel (2) is fixedly connected with the connecting piece (4) While a plurality of curved hanging pieces (1) are connected in series, the suspension rod (3) is positioned above the curved hanging piece (1) and is fixedly connected with the connector (4). 2.根据权利要求1所述的双曲弧形挂件,其特征在于:所述连接件(4)包括依次连接的第一脚板(41)、第一侧板(43)、第二侧板(44)、顶板(45)和第二脚板(42),所述第一脚板(41)和第二脚板(42)分别与曲挂片(1)固定连接,所述第一侧板(43)和第二侧板(44)与龙骨(2)固定连接,所述顶板(45)与吊杆(3)固定连接。2. The hyperbolic arc hanger according to claim 1, characterized in that: said connector (4) comprises a first foot plate (41), a first side plate (43), a second side plate ( 44), the top plate (45) and the second foot plate (42), the first foot plate (41) and the second foot plate (42) are fixedly connected with the curved hanging piece (1) respectively, and the first side plate (43) The second side plate (44) is fixedly connected with the keel (2), and the top plate (45) is fixedly connected with the suspender (3). 3.根据权利要求2所述的双曲弧形挂件,其特征在于:还包括连接块(5),所述连接块(5)位于曲挂片(1)内并与曲挂片(1)和连接件(4)固定连接。3. The hyperbolic arc hanger according to claim 2, characterized in that: it also includes a connecting block (5), the connecting block (5) is located in the curved hanging piece (1) and connected to the curved hanging piece (1) It is fixedly connected with the connector (4). 4.根据权利要求3所述的双曲弧形挂件,其特征在于:所述连接块(5)为型材结构,所述连接块(5)包括方管主体(51)和连接槽(52),所述连接槽(52)位于方管主体(51)一侧。4. The hyperbolic arc hanger according to claim 3, characterized in that: the connecting block (5) is a profile structure, and the connecting block (5) includes a square tube main body (51) and a connecting groove (52) , the connecting groove (52) is located on one side of the square pipe main body (51). 5.根据权利要求3所述的双曲弧形挂件,其特征在于:所述曲挂片(1)包括第一挂片(11)和第二挂片(12),所述第一脚板(41)与第一挂片(11)和连接块(5)固定连接,所述第二脚板(42)与第二挂片(12)和连接块(5)固定连接。5. The hyperbolic arc hanger according to claim 3, characterized in that: said curved hanging piece (1) comprises a first hanging piece (11) and a second hanging piece (12), said first foot plate ( 41) is fixedly connected with the first hanging piece (11) and the connecting block (5), and the second foot plate (42) is fixedly connected with the second hanging piece (12) and the connecting block (5). 6.根据权利要求3所述的双曲弧形挂件,其特征在于:所述第一侧板(43)和第二侧板(44)均设有圆形通孔(46)和弧形通孔(47)。6. The hyperbolic arc hanger according to claim 3, characterized in that: the first side plate (43) and the second side plate (44) are provided with circular through holes (46) and arc through holes. hole (47). 7.根据权利要求1所述的双曲弧形挂件,其特征在于:还包括边挂梁(6)、直挂片(7)和挂杆(8),所述边挂梁(6)为两条,所述直挂片(7)为多条并依次排列,所述边挂梁(6)为两条并分别位于直挂片(7)的两端,所述挂杆(8)的两端分别与边挂梁(6)固定连接,所述直挂片(7)套装于挂杆(8)外并与挂杆(8)一一对应设置。7. The hyperbolic arc hanger according to claim 1, characterized in that: it also includes a side hanging beam (6), a straight hanging piece (7) and a hanging rod (8), and the side hanging beam (6) is Two, the straight hanging pieces (7) are multiple and arranged in sequence, the side hanging beams (6) are two and are respectively located at the two ends of the straight hanging pieces (7), the hanging rods (8) The two ends are respectively fixedly connected with the side hanging beams (6), and the straight hanging pieces (7) are set outside the hanging rods (8) and arranged in one-to-one correspondence with the hanging rods (8). 8.根据权利要求1所述的双曲弧形挂件,其特征在于:所述曲挂片(1)的两端均设有边挂梁(6)和直挂片(7)并呈对称设置。8. The hyperbolic arc hanging piece according to claim 1, characterized in that: both ends of the curved hanging piece (1) are provided with side hanging beams (6) and straight hanging pieces (7) and are arranged symmetrically .
CN201620149079.9U 2016-02-26 2016-02-26 Hyperbolic arc pendant Expired - Lifetime CN205399779U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620149079.9U CN205399779U (en) 2016-02-26 2016-02-26 Hyperbolic arc pendant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620149079.9U CN205399779U (en) 2016-02-26 2016-02-26 Hyperbolic arc pendant

Publications (1)

Publication Number Publication Date
CN205399779U true CN205399779U (en) 2016-07-27

Family

ID=56425400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620149079.9U Expired - Lifetime CN205399779U (en) 2016-02-26 2016-02-26 Hyperbolic arc pendant

Country Status (1)

Country Link
CN (1) CN205399779U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098341A (en) * 2018-09-27 2018-12-28 广州康普顿至高建材有限公司 A kind of waveform winding adjusting smallpox
CN113356448A (en) * 2021-07-13 2021-09-07 浙江亚厦装饰股份有限公司 Installation device and installation method of curved surface metal ceiling
CN113530069A (en) * 2021-06-10 2021-10-22 深圳文业装饰设计工程有限公司 Metal furred ceiling with curved surface decorative board and disconnect-type connecting piece
CN114876119A (en) * 2022-05-31 2022-08-09 广东宏澳建设有限公司 Flexible dry wall grid member and use method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109098341A (en) * 2018-09-27 2018-12-28 广州康普顿至高建材有限公司 A kind of waveform winding adjusting smallpox
CN109098341B (en) * 2018-09-27 2023-12-12 广州康普顿至高建材有限公司 Wave winding adjusting ceiling
CN113530069A (en) * 2021-06-10 2021-10-22 深圳文业装饰设计工程有限公司 Metal furred ceiling with curved surface decorative board and disconnect-type connecting piece
CN113356448A (en) * 2021-07-13 2021-09-07 浙江亚厦装饰股份有限公司 Installation device and installation method of curved surface metal ceiling
CN114876119A (en) * 2022-05-31 2022-08-09 广东宏澳建设有限公司 Flexible dry wall grid member and use method thereof
CN114876119B (en) * 2022-05-31 2024-03-15 广东宏澳建设有限公司 Flexible dry wall grid member and use method thereof

Similar Documents

Publication Publication Date Title
CN205399779U (en) Hyperbolic arc pendant
CN204940660U (en) Full suspended ceiling combines self-contained provision for disengagement
CN213062596U (en) Suspended ceiling mounting structure with stable structure
CN204626738U (en) A kind of ceiling structure
CN104018610A (en) Suspended ceiling
CN205369649U (en) Novel ripple suspended ceiling
CN208251425U (en) A kind of modularization plaster tablet suspended ceiling structure with light trough
CN204185990U (en) A kind of ventilation and penetrating light furred ceiling
CN210049468U (en) Fast-assembling wall body smallpox binding off component and furred ceiling structure
CN207700390U (en) A kind of connection structure of furred ceiling conversion layer and frame ball
CN204715603U (en) A kind of parallel wide keel smallpox
CN216516420U (en) Multiple suspended ceiling connecting structure
CN105275123A (en) Pitched roof type integrated ceiling
CN104453053A (en) Light steel keel for interior decoration
CN215106837U (en) Seamless special-shaped plug-in type corrugated aluminum profile veneer system
CN205444782U (en) Install pendant structure of wall ceramic tile fast
CN209924249U (en) Ceiling mounting structure
CN212026800U (en) Decorative column molding suspended ceiling
CN205171796U (en) Integrated suspension ceiling duplex structure
CN210263598U (en) A prefabricated trapezoidal rhythm-shaped ceiling installation structure
CN219992857U (en) Assembled furred ceiling structure
CN1873151B (en) Tie rod device for building suspended ceiling
CN105464279A (en) Inserted connection type aluminum alloy ceiling mounting structure
CN222275914U (en) A kind of interior design and decoration ceiling structure
CN206273939U (en) A kind of wall decoration suspension member that can be dismantled

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20160727

CX01 Expiry of patent term