CN205399471U - There is not basic compressor unit - Google Patents
There is not basic compressor unit Download PDFInfo
- Publication number
- CN205399471U CN205399471U CN201620121930.7U CN201620121930U CN205399471U CN 205399471 U CN205399471 U CN 205399471U CN 201620121930 U CN201620121930 U CN 201620121930U CN 205399471 U CN205399471 U CN 205399471U
- Authority
- CN
- China
- Prior art keywords
- sledge
- compressor unit
- manifold
- compressor bank
- compressor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model discloses a there is not basic compressor unit, be in including end sledge, setting air cooler and air compressor unit on the end sledge, compressor unit's manifold and outside manifold adopt the hose connection, end sledge sets up on compressor unit special basis to compress tightly through the rubble, reinforced concrete has irritated among the hollow structure of end sledge. The utility model discloses the installation cycle shortens: the scene need not once to be in the milk, secondary grouting, need not to prepare rag bolt, the unit removes conveniently, repeatedly usable.
Description
Technical field
This utility model relates to compressor field, particularly relates to a kind of foundation-free compressor bank.
Background technology
Conventional gas compressor is in order to prevent unit vibration, general employing immobilizing foundation, compressor foundation bolt and immobilizing foundation back-grouting mode are fixed, this mode shortcoming is that on-site installation work amount is big, first with wedge by levelling to sledge at the bottom of compressor and air cooler centering, then by manifold and end sledge, air cooler is connected as a single entity, then again by levelling for end sledge, foundation bolt is placed in grout groove and traverse end sledge simultaneously, then with epoxy resin by foundation bolt once grouting, reach that sledge of the whole end carries out after intensity secondary filling until epoxy resin to be fixed, and asphalt mixtures modified by epoxy resin grouting and maintenance need good atmospheric environment to can be only achieved Eligibility requirements.
Immobilizing foundation compressor bank shortcoming:
1, installment work is loaded down with trivial details;
2, installation period is long;
3, installation accuracy is high;
4, installation cost is high;
5, units' installation is complete immovable.
Utility model content
The purpose of this utility model is to provide a kind of foundation-free compressor bank, and installation period shortens: on-the-spot without once grouting, back-grouting;Without foundation bolt, unit conveniently moving, reusable.
To achieve these goals, the technical solution of the utility model is:
A kind of foundation-free compressor bank, including end sledge, the air cooler being arranged on sledge of the described end and compressor bank;The manifold of described compressor bank adopts hose connection with outside manifold;Sledge of the described end is arranged on the special basis of compressor, and is compressed by rubble;The hollow structure of sledge of the described end is inoculated with armored concrete.
Further, described rubble is formed around cofferdam.
This utility model has the advantage that relative to prior art
This utility model is to hot-metal carburized steel reinforced concrete in end sledge, to increase end sledge weight, reduces compressor bank operation vibration, in order to avoid causing damage;Hose connection being avoided that is adopted to make the damage of compressor bank manifold.
Accompanying drawing explanation
Fig. 1, end sledge structural representation
Fig. 2, air cooler mounting structure schematic diagram,
Fig. 3, manifold connection diagram figure
Fig. 4, compressor bank mounting structure schematic diagram
Detailed description of the invention
Embodiment of the present utility model is further illustrated below in conjunction with accompanying drawing.
Refer to shown in shown in Fig. 1 to Fig. 4, a kind of foundation-free compressor bank, it is characterised in that: the air cooler 2 include end sledge 1, being arranged on sledge of the described end 1 and compressor bank;The manifold of described compressor bank adopts flexible pipe 6 to be connected with outside manifold;Sledge of the described end 1 is arranged in compressor bank special basic 3, and is compressed by rubble 4;The hollow structure of sledge of the described end 1 is inoculated with armored concrete 5.
Hot-metal carburized steel reinforced concrete 5 in end sledge 1, to increase end sledge 1 weight, reduces compressor bank operation vibration, in order to avoid causing damage.
Being arranged on end sledge 1 by air cooler 2, process gas manifold on compressor can be directly connected by this design with air cooler, does not need to pull down during shipping, it is to avoid unit shipping is centering installation again to scene.
Being surrounded by sledge at the bottom of compressor 1 with rubble 4 prevents Compressor Group from producing displacement under various power effects, the manifold of compressor adopts flexible pipe 6 to be connected with outside manifold, owing to compressor does not have immobilizing foundation, work has a small amount of displacement, in order to avoid manifold mouth of pipe stress, adopting is flexible coupling just is avoided that making compressor bank manifold damages.
Preferably, described rubble 4 is formed around cofferdam, it is to avoid rubble 4 is scattering into elsewhere.
In sum, this utility model installation period shortens: on-the-spot without once grouting, back-grouting;Without foot bolt preparatively;Unit conveniently moving, reusable.
Claims (2)
1. a foundation-free compressor bank, it is characterised in that: the air cooler (2) include end sledge (1), being arranged on sledge of the described end (1) and compressor bank;The manifold of described compressor bank adopts flexible pipe (6) to be connected with outside manifold;Sledge of the described end (1), is arranged on the special basis of compressor bank (3), and is compressed by rubble (4);The hollow structure at sledge of the described end (1) is inoculated with armored concrete (5).
2. foundation-free compressor bank according to claim 1, it is characterised in that: described rubble (4) is formed around cofferdam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620121930.7U CN205399471U (en) | 2016-02-16 | 2016-02-16 | There is not basic compressor unit |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620121930.7U CN205399471U (en) | 2016-02-16 | 2016-02-16 | There is not basic compressor unit |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205399471U true CN205399471U (en) | 2016-07-27 |
Family
ID=56448208
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620121930.7U Active CN205399471U (en) | 2016-02-16 | 2016-02-16 | There is not basic compressor unit |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205399471U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106547982A (en) * | 2016-10-31 | 2017-03-29 | 沈阳鼓风机集团股份有限公司 | A kind of Compressor Group given tensile load computational methods and device |
-
2016
- 2016-02-16 CN CN201620121930.7U patent/CN205399471U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106547982A (en) * | 2016-10-31 | 2017-03-29 | 沈阳鼓风机集团股份有限公司 | A kind of Compressor Group given tensile load computational methods and device |
CN106547982B (en) * | 2016-10-31 | 2020-05-22 | 沈阳鼓风机集团股份有限公司 | Compressor unit basic load calculation method and device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104929148B (en) | The upside-down mounting hardened system of generation power foundation of wind power ring group plinth and reinforcement means thereof | |
CN201217890Y (en) | Nested grouting reinforced steel coupling sleeve | |
CN103278394B (en) | Comprehensive test device for joint sealing and hydraulic circulating of pipe body | |
CN210562975U (en) | Prefabricated assembled hollow sandwich concrete-filled steel tube component | |
CN108360508A (en) | The construction method of cast-in-place concrete core cement soil stirring pile | |
CN205399471U (en) | There is not basic compressor unit | |
CN104060616A (en) | Construction template used in retaining engineering and construction method thereof | |
CN207512620U (en) | Pile foundation of bridge pier ruggedized construction | |
CN201746830U (en) | Long screw bored concrete pile post-inserted cage tool | |
CN207525779U (en) | A kind of assembly type pipe gallery pattern foundation pit supporting structure of recycling and structure external mold composite structure | |
CN106400832B (en) | A kind of construction method of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation | |
CN205035741U (en) | Corrugated steel pipe culvert axial additional strengthening | |
CN207092104U (en) | A kind of steel-pipe pile attachment structure | |
CN204530666U (en) | A kind of high molecular polymer sheet pile | |
CN104831934A (en) | Pneumatic flat-plate vibrator | |
CN207453121U (en) | A kind of hydraulic structure flow-passing surface pre-embedded anchoring bolts | |
CN105587053A (en) | Industrialized residential wall bottom grouting construction method | |
CN203891000U (en) | Pipe circumference filling and tamping tool of small-clear-distance porous circular pipe culvert | |
CN105804293A (en) | Prefabricated concrete-filled steel tube construction column rammed earth wall | |
CN206273893U (en) | A kind of vibro-replacement stone column machine | |
CN206204985U (en) | A kind of environment-friendly type assembled grouting behind shaft or drift lining steel cylinder pile foundation | |
CN201730107U (en) | Pile foundation of electric steel tube tower | |
CN204715766U (en) | A kind of pneumatic flat-plate vibrator | |
CN201367756Y (en) | Armored concrete chimney with steel plate outer cylinder | |
CN202992463U (en) | Flexible rotating telescopic joint |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |