CN205387918U CN201620232594.3U CN201620232594U CN205387918U CN 205387918 U CN205387918 U CN 205387918U CN 201620232594 U CN201620232594 U CN 201620232594U CN 205387918 U CN205387918 U CN 205387918U
Authority
CN
China
Prior art keywords
mud
cyclone
boring
outlet
drilling rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620232594.3U
Other languages
Chinese (zh)
Inventor
胡国斌
谢慧兵
徐新战
王金山
马强
卫俊近
王海波
龙志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yitong Special Foundation Engineering Co.,Ltd.
Original Assignee
Yitong Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yitong Construction Co Ltd filed Critical Yitong Construction Co Ltd
Priority to CN201620232594.3U priority Critical patent/CN205387918U/en
Application granted granted Critical
Publication of CN205387918U publication Critical patent/CN205387918U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a mud circulation clean system during drilling, swirler (7) of this system by cylinder (7.1), the back taper body (7.2) and back taper funnel (7.3) constitutes, the shaking out of the back taper body (7.2) bottom mouthful (7.5) through last ring flange (8) and lower flange dish (9) and back taper funnel (7.3) spiro union, one back taper funnel (7.3) bottom mounting sand pipe (19) of swirler (7), be equipped with a flow control valve (20) on sand pipe (19). This clean system can reduce the energy consumption, improve clear hole slag removal efficiency.

Description

Mud circulating purification system during boring
Technical field
This utility model relates to drilling construction field in civil engineering, is especially mud circulating purification system during a kind of boring.
Background technology
During drilling rod pore-forming, it is necessary to substantial amounts of mud, mud primarily serves retaining wall, cools down drill bit, takes away boring mud and the effect of the softening soil body.Mud can be previously prepared and leave in pulping pond, and during rod boring, pumping mud is in boring, certainly, when creeping into if in viscous soil horizon, it is also possible to directly water filling generates mud, reduces the amount of prefabricated mud, to save cost.
Certainly, the stickiness of mud to be utilized to take away boring mud, it is necessary to adopt mud circulating purification system that mud is circulated.The mud circulating purification system of prior art includes the drilling rod of hollow, grout outlet, mud pit with filter screen and desander.Drilling rod bottom is pulp inlet and upper end is grout outlet, drilling rod is fixed with the air inlet pipe of inner space with drilling rod, air inlet pipe is blown to drilling rod inner chamber and is formed bubble, drilling rod inner chamber is made to produce pressure reduction with mud-filled boring, cause that the mud in boring enters drilling rod inner chamber through pulp inlet and discharges from grout outlet, provide power for mud circulating purification system.The grout outlet of drilling rod connects with grout outlet entrance, and grout outlet outlet is positioned at the top of the filter screen of mud pit, and mud falls inflow mud pit after larger particles through strainer filtering, and the outlet of mud pit is connected with desander through feed pipe for mortar.
Desander includes cyclone, motor, drive mechanism, screen cloth and frame, cyclone top is the cylinder of a hollow, bottom is the reverse taper connected with cylinder, cylinder and reverse taper are closed into work cylinder, the entrance of cyclone and cylinder are oriented in a tangential direction and cyclone inlet and feed pipe for mortar outlet, cyclone apex is provided with the slurry mouth that overflows, the slurry mouth that overflows connects with boring through the first return pipe, reverse taper bottom is sand export, motor is of reciprocating vibration through transmission mechanism control screen cloth, sand export is positioned at above screen cloth, screen cloth is connected with and the second return pipe connected of holing.
The operation principle of above-mentioned mud circulating purification system is: the mud in boring is upwardly into grout outlet through drilling rod, filter then through filter screen first time, bulky grain boring mud is filtered out, then feed pipe for mortar is entered through mud pit, the work cylinder of cyclone is tangentially entered then through feed pipe for mortar, the mud entering work cylinder realizes classification under centrifugal action, namely the boring mud of larger particles thrown to the barrel of work cylinder and rotate discharge from sand export downwards, after screen filtration, the second return pipe is entered with the mud of a part, finally return that boring, and the purer mud of the few part of boring mud is discharged from the excessive slurry mouth at top with bumpy flow on secondary, return in boring through the first return pipe.
The mud circulating purification system of above-mentioned prior art suffers from the drawback that one, the work of this circulating purification system time, the motor of desander does not stop task driven screen cloth and swings, and its energy consumption is relatively larger;Two, also it is more essential point is that, this system purification slagging-off efficiency is low, even if having passed through the screening again of screen cloth from the mud of sand export discharge, yet suffer from significant component of little boring mud cannot eliminate, this part boring mud has looped back boring again, so, in boring procedure, generally require the demand that mud circulation repeatedly be can be only achieved clear hole.
Utility model content
The technical problems to be solved in the utility model be to provide a kind of can reduce energy consumption, improve clear hole slagging-off efficiency boring time mud circulating purification system.
Technical solution of the present utility model is to provide mud circulating purification system during a kind of boring, and it includes the drilling rod of hollow, grout outlet and the mud pit with filter screen;Drilling rod bottom is pulp inlet and upper end is grout outlet, drilling rod is fixed with the air inlet pipe of inner space with drilling rod, the grout outlet of drilling rod connects with grout outlet entrance, and grout outlet outlet is positioned at the top of the filter screen of mud pit;This system also includes settling tank and cyclone;
Cyclone is by the hollow cylindrical body on top, the hollow reverse taper of bottom and the inverted cone hopper of bottom are constituted, the cylinder being interconnected and reverse taper composition work cylinder, cyclone inlet is oriented in a tangential direction with work cylinder, cyclone apex is provided with the slurry mouth that overflows, work cylinder body bottom is sand export, sand export periphery is fixed with upper flange plate, inverted cone hopper top is fixed with lower flange, upper flange plate and lower flange are spirally connected, the hole wall of the centre bore of upper flange plate and lower flange is the conical surface, the centre bore hole wall of upper flange plate, the centre bore hole wall of lower flange, the inner conical surface of reverse taper, the inner conical surface of inverted cone hopper is respectively positioned on the same conical surface;
The outlet of mud pit connects with the entrance of settling tank through the first feed pipe for mortar, first outlet of settling tank connects with cyclone inlet through the second feed pipe for mortar, the excessive slurry mouth of cyclone connects with boring through the first return pipe, the inverted cone hopper bottom of cyclone is fixed one and is gone out sandpipe, goes out sandpipe and is provided with first-class adjustable valve.
The method utilizing mud circulating purification system of the present utility model, its step includes:
When boring under a, drilling rod, to boring pumping mud;
B, through air inlet pipe drilling rod inner chamber being blown forms bubble so that drilling rod inner chamber produces pressure reduction with mud-filled boring, and the interior mud that causes holing enters grout outlet through pulp inlet and the grout outlet of drilling rod;
C, mud are discharged from grout outlet, fall bulky grain boring mud through strainer filtering, and flow in mud pit, enter settling tank then through the first feed pipe for mortar, and precipitation falls larger particles, then enters cyclone through the second feed pipe for mortar;
Mud in d, cyclone realizes classification under centrifugal action, major part boring mud thrown to the barrel of work cylinder and rotate down through sand export, inverted cone hopper and go out sandpipe thoroughly discharge mud circulation, and the purer mud of the few part of boring mud is discharged from the excessive slurry mouth at top, returns in boring through the first return pipe.
Mud circulating purification system when adopting the boring of above structure compared with prior art, has the following advantages.
One, this system eliminates the motor of prior art desander, drive mechanism and screen cloth, simplifies structure, reduces cost, more reduces the energy consumption that system is run;Two, this technical scheme creatively proposes, discharge original from the sand export of cyclone and be expelled directly out blood circulation through screen filtration but still this part mud that cannot eliminate, so, this part mud is no longer back to boring, and the efficiency that purifies slagging-off is greatly improved;Although three can be lost a part of mud from sand export, but owing to adding an inverted cone hopper at sand export, achieve the effect reduced by mouth, reduce the number of dropouts of mud so that the mud amount actually run off through sand export is maintained in an economically receptible zone of reasonableness;And, just because of adding inverted cone hopper, while reducing, increase the counteracting force of secondary vortex stream, accelerate the process that purer mud flows out from excessive slurry mouth, accelerate the speed of mud circulation, further increase purification efficiency;Three, a settling tank it is additionally arranged, it is possible to play natural sedimentation effect, add single filter so that the slagging-off effect of this system is better more.Four, fixing one due to inverted cone hopper bottom and go out sandpipe, go out sandpipe and be provided with first-class adjustable valve, as such, it is possible to regulate the aperture of this valve body, in mud, boring mud is few, it is possible to aperture reduced, and reduces mud loss, it is to avoid waste mud.Five, the hole wall of the centre bore of upper flange plate and lower flange is the conical surface, the centre bore hole wall of upper flange plate, the centre bore hole wall of lower flange, the inner conical surface of reverse taper, inverted cone hopper inner conical surface be respectively positioned on the same conical surface, such design can guarantee that the smooth whereabouts of mud, it is to avoid the dead angle that mud is piled up occurs.
As improvement, this system also includes the second return pipe, the second outlet of the second return pipe entrance and settling tank, and the second return pipe outlet connects with boring, and the second return pipe is provided with second adjustable valve;So, just in case occurring that cyclone efficiency is not enough, the situation that the interior mud liquid level that causes holing declines, second adjustable valve can be opened, according to the highly regulated directly amount of the mud of backflow from settling tank of mud liquid level, it is to avoid need significantly to supplement mud, save Financial cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of mud circulating purification system during this utility model boring.
Fig. 2 is the Zoom Side sectional structure schematic diagram of the cyclone of mud circulating purification system during this utility model boring.
Shown in figure 1, drilling rod, 2, grout outlet, 3, filter screen, 4, mud pit, 5, air inlet pipe, 6, settling tank, 7, cyclone, 7.1, cylinder, 7.2, reverse taper, 7.3, inverted cone hopper, 7.4, overflow slurry mouth, 7.5, sand export, 8, upper flange plate, 9, lower flange, the 10, first feed pipe for mortar, 11, the second feed pipe for mortar, 12, the first return pipe, the 13, second return pipe, 14, boring, 15, second adjustable valve, 16, drill bit, 17, slush pump, 18, pulping pond, 19, sandpipe is gone out, 20, first-class adjustable valve.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in Figure 1 and Figure 2, mud circulating purification system during this utility model boring, it includes the drilling rod 1 of hollow, grout outlet 2, mud pit 4 with filter screen 3, settling tank 6 and cyclone 7.Drilling rod 1 bottom is pulp inlet and upper end is grout outlet, drilling rod 1 is fixed with the air inlet pipe 5 of inner space with drilling rod 1, specifically, the bottom of drilling rod 1 is provided with drill bit 16, drill bit 16 sets box and drilling rod 1 sets pin thread, drill bit 16 coordinates to tighten with drilling rod 1 male and female and is connected, and pulp inlet is arranged on the bottom of the drill bit 16 of drilling rod 1, and air inlet pipe 5 passes pin thread and drilling rod 1 inner space of drilling rod 1.Certainly, this air inlet pipe 5 is through a static and dynamic sealing ring and an air compressor machine connection, and in particular, air inlet pipe 5 connects with rotating ring and guarantees that air inlet pipe 5 can rotate along with drilling rod 1, and stationary ring connects with air compressor machine.
The grout outlet of drilling rod 1 connects with grout outlet 2 entrance, and grout outlet 2 exports the top of the filter screen 3 being fixed on mud pit 4 by the support on mud pit 4.
Cyclone 7 is made up of the hollow cylindrical body 7.1 on top, the hollow reverse taper 7.2 of bottom and the inverted cone hopper 7.3 of bottom, the cylinder 7.1 and the reverse taper 7.2 that are interconnected constitute work cylinder, cyclone 7 entrance is oriented in a tangential direction with work cylinder, cyclone 7 top is provided with the slurry mouth 7.4 that overflows, it is sand export 7.5 bottom work cylinder body bottom and reverse taper 7.2, sand export 7.5 periphery is fixed with upper flange plate 8, inverted cone hopper 7.3 top is fixed with lower flange 9, upper flange plate 8 and lower flange 9 are spirally connected, and the hole wall of the centre bore of upper flange plate 8 and lower flange 9 is the conical surface.The centre bore hole wall of upper flange plate 8, the centre bore hole wall of lower flange 9, the inner conical surface of reverse taper 7.2, inverted cone hopper 7.3 inner conical surface be respectively positioned on the same conical surface.Above-mentioned design is the discharge inverted cone hopper 7.3 that glides smoothly for the ease of boring mud.
The outlet of mud pit 4 connects with the entrance of settling tank 6 through the first feed pipe for mortar 10, first outlet of settling tank 6 connects with cyclone 7 entrance through the second feed pipe for mortar 11, the excessive slurry mouth 7.4 of cyclone 7 connects with boring 14 through the first return pipe 12, inverted cone hopper 7.3 bottom of cyclone 7 is fixed one and is gone out sandpipe 19, going out sandpipe 19 and be provided with first-class adjustable valve 20, going out sandpipe 19 bottom is slag-drip opening.
This system also includes the second return pipe 13, the second outlet of the second return pipe 13 entrance and settling tank 6, and the second return pipe 13 outlet connects with boring 14, and the second return pipe 13 is provided with second adjustable valve 15.
The method of mud circulating purification system when utilizing this utility model to hole, its step is as follows.
When a, drilling rod bore for 1 time, to 14 pumping mud of holing;Specifically, it is utilize slush pump 17 to be sent in boring 14 by mud prefabricated in pulping pond 18.
B, through air inlet pipe 5 drilling rod 1 inner chamber being blown forms bubble so that drilling rod 1 inner chamber and mud-filled boring 14 produce pressure reduction, cause that the inner chamber that in boring 14, mud enters drilling rod 1 through pulp inlet discharges the inner chamber of drilling rod 1 hence into grout outlet 2 then through grout outlet.
C, mud are discharged from grout outlet 2 outlet, filter out bulky grain boring mud through filter screen 3, and flow in mud pit 4, i.e. first class purification, this step filters out the boring mud granule more than 20mm.Entering settling tank 6 then through the first feed pipe for mortar 10, precipitation falls larger particles, i.e. secondary purification, sinks the boring mud granule falling 0.25mm~20mm.Then cyclone 7 is entered through the second feed pipe for mortar 11.Certainly, after the mud liquid level in boring 14 declines, the second adjustable valve 15 of the second return pipe 13 can be opened so that a part of mud in settling tank 6 is passed straight back in boring 14 without cyclone 7.
Mud in d, cyclone 7 realizes classification under centrifugal action, major part boring mud is thrown to the barrel of work cylinder and rotates down through sand export 7.5, inverted cone hopper 7.3 and go out sandpipe 19 and thoroughly discharge mud and circulate, certainly, also having least a portion of mud follows boring mud to discharge circulation together, but owing to sand export 7.5 is reduced by inverted cone hopper 7.3, so few in the quality entity of the mud run off, economically can bear.And the purer mud of the few part of boring mud is discharged from the excessive slurry mouth 7.4 at top, return in boring 14 through the first return pipe 12.Namely three poles purify, and in this step, can discharge the boring mud granule less than 0.25mm.

Claims (2)

1. mud circulating purification system when holing, it includes the drilling rod (1) of hollow, grout outlet (2) and the mud pit (4) with filter screen (3);Drilling rod (1) bottom is pulp inlet and upper end is grout outlet, drilling rod (1) is fixed with the air inlet pipe (5) of inner space with drilling rod (1), the grout outlet of drilling rod (1) connects with grout outlet (2) entrance, and grout outlet (2) outlet is positioned at the top of the filter screen (3) of mud pit (4);It is characterized in that: this system also includes settling tank (6) and cyclone (7);
nullCyclone (7) is by the hollow cylindrical body (7.1) on top、The hollow reverse taper (7.2) of bottom and the inverted cone hopper (7.3) of bottom are constituted,The cylinder (7.1) being interconnected and reverse taper (7.2) constitute work cylinder,Cyclone (7) entrance is oriented in a tangential direction with work cylinder,Cyclone (7) top is provided with slurry mouth (7.4) that overflows,Work cylinder body bottom is sand export (7.5),Sand export (7.5) periphery is fixed with upper flange plate (8),Inverted cone hopper (7.3) top is fixed with lower flange (9),Upper flange plate (8) and lower flange (9) are spirally connected,The hole wall of the centre bore of upper flange plate (8) and lower flange (9) is the conical surface,The centre bore hole wall of upper flange plate (8)、The centre bore hole wall of lower flange (9)、The inner conical surface of reverse taper (7.2)、The inner conical surface of inverted cone hopper (7.3) is respectively positioned on the same conical surface;
The outlet of mud pit (4) connects through the entrance of the first feed pipe for mortar (10) with settling tank (6), first outlet of settling tank (6) connects with cyclone (7) entrance through the second feed pipe for mortar (11), the excessive slurry mouth (7.4) of cyclone (7) connects with boring (14) through the first return pipe (12), inverted cone hopper (7.3) bottom of cyclone (7) is fixed one and is gone out sandpipe (19), goes out sandpipe (19) and is provided with first-class adjustable valve (20).
2. mud circulating purification system during boring according to claim 1, it is characterized in that: this system also includes the second return pipe (13), second outlet of the second return pipe (13) entrance and settling tank (6), second return pipe (13) outlet connects with boring (14), and the second return pipe (13) is provided with second adjustable valve (15).
CN201620232594.3U 2016-03-24 2016-03-24 Mud circulation clean system during drilling Active CN205387918U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620232594.3U CN205387918U (en) 2016-03-24 2016-03-24 Mud circulation clean system during drilling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620232594.3U CN205387918U (en) 2016-03-24 2016-03-24 Mud circulation clean system during drilling

Publications (1)

Publication Number Publication Date
CN205387918U true CN205387918U (en) 2016-07-20

Family

ID=56380688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620232594.3U Active CN205387918U (en) 2016-03-24 2016-03-24 Mud circulation clean system during drilling

Country Status (1)

Country Link
CN (1) CN205387918U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696954A (en) * 2016-03-24 2016-06-22 宁波易通建设有限公司 Mud cyclic purification system and mud purification method during drilling
CN107143282A (en) * 2017-07-14 2017-09-08 冯克俊 A kind of hole-forming device of building lot construction slurry-sucking
CN111453792A (en) * 2020-05-09 2020-07-28 深圳市清研环境科技有限公司 Reflux bucket

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105696954A (en) * 2016-03-24 2016-06-22 宁波易通建设有限公司 Mud cyclic purification system and mud purification method during drilling
CN107143282A (en) * 2017-07-14 2017-09-08 冯克俊 A kind of hole-forming device of building lot construction slurry-sucking
CN111453792A (en) * 2020-05-09 2020-07-28 深圳市清研环境科技有限公司 Reflux bucket

Similar Documents

Publication Publication Date Title
CN205387918U (en) Mud circulation clean system during drilling
CN207941295U (en) Settlement of sewage processing system
CN209537204U (en) Magnetic loads water treatment facilities
CN104193027A (en) A gravity type integrated water purifier
CN105696954A (en) Mud cyclic purification system and mud purification method during drilling
CN109701728A (en) Building rubbish purification and separation device
CN109534553A (en) A kind of processing system and method for high suspended matter mine water
CN110252028B (en) Mud-sand separating device for hydraulic engineering
CN106669991A (en) Efficient self-cleaning composite cyclone separator
CN207793741U (en) A kind of desanding device that corrugation is used for paper processing
CN105836988A (en) Slurry reduction treatment system
CN203145870U (en) Energy-saving solid control system
CN206286079U (en) A kind of combined type is centrifuged silt cyclone separation device
CN205386498U (en) Swirler that is used for purification of drilling mud during drilling
CN108238662A (en) A kind of rotational flow strengthening mud settling tank
CN208115233U (en) A kind of high-efficiency cyclone sand-settling device
CN205999148U (en) Sand and water separating system
CN109879467A (en) Sludge condensation separator for treating mine drainage
CN205269219U (en) Interior aeration embrane method water treatment facilities
CN211367209U (en) Hydraulic cyclone sand removing device
CN207435184U (en) A kind of waste water and dregs processing system of concrete mixing plant
CN207839203U (en) Automatic washed-out sand hydrocyclone and automatic scrubbing system
CN208454699U (en) A kind of environmental protection use in water quality purifier
CN107083933A (en) A kind of petroleum drilling fluid solid particulate filters device
CN207823226U (en) A kind of novel desander

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190115

Address after: Room 9-168, Xingnong Building, Ningbo Bonded Zone, Zhejiang Province

Patentee after: Zhejiang Yitong Foundation Engineering Co. Ltd.

Address before: 315800 12, 12 building, 10 East Port Road, Ningbo, Zhejiang.

Patentee before: YITONG CONSTRUCTION CO., LTD.

TR01 Transfer of patent right
CP03 Change of name, title or address

Address after: 315800 Xingnong building, Ningbo Free Trade Zone, Zhejiang Province

Patentee after: Zhejiang Yitong Special Foundation Engineering Co.,Ltd.

Address before: Room 9-168, Xingnong Building, Ningbo Bonded Zone, Zhejiang Province

Patentee before: ZHEJIANG YITONG FOUNDATION ENGINEERING Co.,Ltd.

CP03 Change of name, title or address