CN205369827U - Ground that gypsum base was laid from levelling mortar warms up ground structure - Google Patents
Ground that gypsum base was laid from levelling mortar warms up ground structure Download PDFInfo
- Publication number
- CN205369827U CN205369827U CN201620046679.2U CN201620046679U CN205369827U CN 205369827 U CN205369827 U CN 205369827U CN 201620046679 U CN201620046679 U CN 201620046679U CN 205369827 U CN205369827 U CN 205369827U
- Authority
- CN
- China
- Prior art keywords
- layer
- gypsum base
- ground
- levelling mortar
- gravity flowing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Floor Finish (AREA)
Abstract
The utility model discloses a ground that gypsum base was laid from levelling mortar warms up ground structure, this structure be from down and go up each layer by the adjacent ground of floor inclusive AND soil (1) gypsum base from levelling mortar filling layer (5), gypsum base from levelling mortar layer (2), foamed plastic heat insulation layer or foaming cement heat insulation layer (3), heating coil (4), earth material layer (6) form. The ground that gypsum base was laid from levelling mortar warms up ground structure of this design becomes six processes with seven processes in warming up ground structure originally, it has substituted pea gravel concrete filling layer and mortar levelling layer from levelling mortar filling layer to be about to the gypsum base, this makes the construction process further simplify, simultaneously this has also reduced ground and has warmed up ground totality thickness, material saving, the load that the structure was born has been reduced, warm up ground structure and adopt the gypsum base from the levelling mortar, it is swift still to have the construction, short advantage of time limit for a project.
Description
Technical field
This utility model relates to the design category of a kind of floor heating earth construction, specifically, relates to the design category of the floor heating earth construction that a kind of gypsum base gravity flowing levelling mortar is laid.
Background technology
Underground heat radiant heating, being called for short floor heating is by the temperature hot water not higher than 60 degrees Celsius or heating cable, is secretly embedded in the coil system under heating floor Nei the whole ground of heating, by ground equably to a kind of heating system of indoor heat loss through radiation.Ground heating is listed in the energy-saving building technology of emphasis popularization and application.Floor heating is also a kind of New-type heating mode that China has started in northern area, the Yellow River rise in recent years, and on the Shandong of China, Tianjin, northeast, Inner Mongol, Hebei and other places, its application is quite extensive.From development prospect, following resident's heating, more than 60% will take ground heating, and application prospect is gratifying, has huge developing target market.
Wet type floor heating, is called for short floor heating, is the mounting process of current water-heating type floor heating maturation the most, and price is comparatively cheap, is the leading technique in domestic floor heating market.At present, floor heating earth construction each layer from below to up is respectively as follows: 1) floor or ground adjacent with soil;2) cement mortar screeding layer;3) foam insulation layer or foam cement heat insulation layer;4) floor heating pipe;5) pea gravel concrete packed layer;6) cement mortar screeding layer;7) earth material layer.In floor heating earth construction, pea gravel concrete packed layer, cement mortar screeding layer all need it is carried out maintenance, and after 72 hours, can go up people and carry out the construction of other operations.On the whole, such floor heating earth construction working procedure is various, construction period length, general thickness big, this also increases the load-bearing of building and decreases the clear height in room, and these all limit the popularization and application of floor heating to a certain extent.
Utility model content
The purpose of this utility model is to design the floor heating earth construction of a kind of working procedure simplicity, quick construction, the laying of the duration is short, general thickness is little gypsum base gravity flowing levelling mortar.
nullThis utility model design a kind of gypsum base gravity flowing levelling mortar lay floor heating earth construction be from below to up each layer by floor or ground adjacent with soil (1)、Gypsum base gravity flowing levelling mortar layer (2)、Foam insulation layer or foam cement heat insulation layer (3)、Floor heating pipe (4)、Gypsum base gravity flowing levelling mortar packed layer (5) and earth material layer (6) composition,It is namely gypsum base gravity flowing levelling mortar layer (2) on floor or ground adjacent with soil (1),It is foam insulation layer or foam cement heat insulation layer (3) above gypsum base gravity flowing levelling mortar layer (2),Foam insulation layer or foam cement heat insulation layer (3) are equipped with floor heating pipe (4) and gypsum base gravity flowing levelling mortar packed layer (5),Floor heating pipe (4) is in gypsum base gravity flowing levelling mortar packed layer (5),Upper for earth material layer (6) in gypsum base gravity flowing levelling mortar packed layer (5).In the floor heating earth construction that the gypsum base gravity flowing levelling mortar of the design is laid, gypsum base gravity flowing levelling mortar layer (2) and gypsum base gravity flowing levelling mortar packed layer (5) all select gypsum base gravity flowing levelling mortar, this is primarily due to gypsum base gravity flowing levelling mortar can Automatic Levelling, after solidification, ground is smooth, smooth, and loaded down with trivial details levelling and troweling can be avoided to work;Fast hard, people can be gone up after constructing seven, eight hours;Pliability is good, it is ensured that occurs without cracking and hollowing phenomenon, has good durability.The physical and mechanical property of gypsum base gravity flowing levelling mortar should meet table 1 requirement simultaneously.
Table 1 gypsum base gravity flowing levelling mortar physical and mechanical property
Seven procedures in original floor heating earth construction are become six procedures by the floor heating earth construction that a kind of gypsum base gravity flowing levelling mortar of the design is laid, pea gravel concrete packed layer and mortar levelling layer is instead of by gypsum base gravity flowing levelling mortar packed layer, this makes working procedure simplify further, this has also reduced floor heating ground general thickness simultaneously, save material, reduce the load that structure is born, increase building when floor height is constant and use the height in space or the situation low floor height of decline of identical interior net storey height can reached.The floor heating earth construction that a kind of gypsum base gravity flowing levelling mortar is laid adopts gypsum base gravity flowing levelling mortar, because the features such as gypsum base gravity flowing levelling mortar hard, Automatic Levelling soon make the floor heating earth construction that a kind of gypsum base gravity flowing levelling mortar of the design is laid also have quick construction, duration short advantage.
Accompanying drawing explanation
Fig. 1 is the floor heating earth construction schematic diagram that a kind of gypsum base gravity flowing levelling mortar is laid.
In figure: 1-floor or ground adjacent with soil;2-gypsum base gravity flowing levelling mortar layer;3-foam insulation layer or foam cement heat insulation layer;4-floor heating pipe;5-gypsum base gravity flowing levelling mortar packed layer;6-earth material layer.
Detailed description of the invention
The floor heating earth construction of a kind of gypsum base gravity flowing levelling mortar laying realizing this utility model design is that each layer is made up of floor or ground adjacent with soil (1), gypsum base gravity flowing levelling mortar layer (2), foam insulation layer (3), floor heating pipe (4), gypsum base gravity flowing levelling mortar packed layer (5) and earth material layer (6) from below to up, and its each layer embodiment is as follows:
Floor or ground adjacent with soil (1) this relate generally to and building itself.Before gypsum base gravity flowing levelling mortar layer (2) construction, need the above dust in floor or ground adjacent with soil (1), impurity are removed clean and ensure dry, no-sundries on its face, corner interface root should be straight and without fouling phenomenon, complete after gypsum base gravity flowing levelling mortar layer (2) without maintenance, people can be gone up after 7-8 hour and carry out next process;Lay foam insulation layer or foam cement heat insulation layer (3), floor heating pipe (4) can be installed after foam insulation layer or foam cement heat insulation layer complete;Floor heating pipe (4) installs and the water pressure test is qualified, heating cooling pipe has been in pressure condition, carries out the construction of gypsum base gravity flowing levelling mortar packed layer (5);Gypsum base gravity flowing levelling mortar packed layer (5), without maintenance, can go up people, carry out the construction of earth material layer (6) after general 1 day after 7-8 hour.
Claims (1)
- null1. the floor heating earth construction that a gypsum base gravity flowing levelling mortar is laid,It is characterized in that: this structure be from below to up each layer by floor or ground adjacent with soil (1)、Gypsum base gravity flowing levelling mortar layer (2)、Foam insulation layer or foam cement heat insulation layer (3)、Floor heating pipe (4)、Gypsum base gravity flowing levelling mortar packed layer (5) and earth material layer (6) composition,It is namely gypsum base gravity flowing levelling mortar layer (2) on floor or ground adjacent with soil (1),It is foam insulation layer or foam cement heat insulation layer (3) above gypsum base gravity flowing levelling mortar layer (2),Foam insulation layer or foam cement heat insulation layer (3) are equipped with floor heating pipe (4) and gypsum base gravity flowing levelling mortar packed layer (5),Floor heating pipe (4) is in gypsum base gravity flowing levelling mortar packed layer (5),Upper for earth material layer (6) in gypsum base gravity flowing levelling mortar packed layer (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620046679.2U CN205369827U (en) | 2016-01-19 | 2016-01-19 | Ground that gypsum base was laid from levelling mortar warms up ground structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620046679.2U CN205369827U (en) | 2016-01-19 | 2016-01-19 | Ground that gypsum base was laid from levelling mortar warms up ground structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205369827U true CN205369827U (en) | 2016-07-06 |
Family
ID=56277883
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620046679.2U Active CN205369827U (en) | 2016-01-19 | 2016-01-19 | Ground that gypsum base was laid from levelling mortar warms up ground structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205369827U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106587871A (en) * | 2016-11-03 | 2017-04-26 | 南京工业大学 | Self-leveling mortar terrace material used for under-floor heating facilities |
CN111608358A (en) * | 2020-05-21 | 2020-09-01 | 贵州开磷磷石膏综合利用有限公司 | Movable phosphogypsum floor heating device |
CN112095999A (en) * | 2020-07-29 | 2020-12-18 | 威海金象实业有限公司 | Warm-keeping building structure and preparation method thereof |
CN113235866A (en) * | 2021-06-29 | 2021-08-10 | 凯诺(青岛)新型建材有限公司 | Gypsum is from levelling system |
CN113250416A (en) * | 2021-04-15 | 2021-08-13 | 地王(上海)建筑材料有限公司 | Ground heating structure with graphite alkene gypsum base is from leveling backfill layer of making level |
CN113719069A (en) * | 2021-09-07 | 2021-11-30 | 上海建工七建集团有限公司 | Construction method for controlling floor cracking |
-
2016
- 2016-01-19 CN CN201620046679.2U patent/CN205369827U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106587871A (en) * | 2016-11-03 | 2017-04-26 | 南京工业大学 | Self-leveling mortar terrace material used for under-floor heating facilities |
CN111608358A (en) * | 2020-05-21 | 2020-09-01 | 贵州开磷磷石膏综合利用有限公司 | Movable phosphogypsum floor heating device |
CN112095999A (en) * | 2020-07-29 | 2020-12-18 | 威海金象实业有限公司 | Warm-keeping building structure and preparation method thereof |
CN113250416A (en) * | 2021-04-15 | 2021-08-13 | 地王(上海)建筑材料有限公司 | Ground heating structure with graphite alkene gypsum base is from leveling backfill layer of making level |
CN113235866A (en) * | 2021-06-29 | 2021-08-10 | 凯诺(青岛)新型建材有限公司 | Gypsum is from levelling system |
CN113719069A (en) * | 2021-09-07 | 2021-11-30 | 上海建工七建集团有限公司 | Construction method for controlling floor cracking |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205369827U (en) | Ground that gypsum base was laid from levelling mortar warms up ground structure | |
CN105371342B (en) | A kind of solar earth-a heatable brick bed face combination heating system | |
CN104193247B (en) | Light wall board of internal partition wall and its processing method | |
CN207846976U (en) | A kind of Floor Heating | |
CN207376801U (en) | A kind of basement | |
CN203928081U (en) | A kind of ground radiation heating pipe-line system | |
CN105804311A (en) | Furnace slag compound heat-preservation and sound-insulation brick for floor and construction method thereof | |
CN202850028U (en) | Circulating water cooling device for inner portion of concrete with large size | |
CN208473219U (en) | A kind of mortar floor heating ground structure | |
CN201865303U (en) | Ground thermal-insulation system for improving temperature of first floor of civil building | |
KR20100005255A (en) | Method of construction of flat heat ondol system | |
CN202831526U (en) | Hot water pipe heating structure | |
CN206722317U (en) | The capillary grid paving structure of expansion crack can be avoided the occurrence of | |
CN202511360U (en) | Radiation heating pipeline embedding structure | |
CN205399852U (en) | People's roofing heat preservation node construction on passive room | |
CN203857517U (en) | Novel cushion structure for ground heating paving | |
CN207919950U (en) | Imitative stone material vitreous brick wall paving structure | |
CN105442814A (en) | Construction method for bathroom ground structure | |
CN204112667U (en) | Floor Heating | |
CN100565020C (en) | Electric heating warming module | |
CN218028678U (en) | Novel heat preservation sound insulation floor heating plate system | |
CN202692211U (en) | Floor heating device | |
CN203240635U (en) | Water floor-heating rapid heating body integrated module | |
CN218562617U (en) | Heat-insulating layer structure for residential floor | |
CN213019822U (en) | High-rise building heating device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |