CN205369476U - Long -pending water treatment facilities of underground ceiling - Google Patents

Long -pending water treatment facilities of underground ceiling Download PDF

Info

Publication number
CN205369476U
CN205369476U CN201521029918.5U CN201521029918U CN205369476U CN 205369476 U CN205369476 U CN 205369476U CN 201521029918 U CN201521029918 U CN 201521029918U CN 205369476 U CN205369476 U CN 205369476U
Authority
CN
China
Prior art keywords
basement roof
collecting container
water treatment
basement
treatment device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521029918.5U
Other languages
Chinese (zh)
Inventor
栗升卫
彭小辉
刘伟
梁海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201521029918.5U priority Critical patent/CN205369476U/en
Application granted granted Critical
Publication of CN205369476U publication Critical patent/CN205369476U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a long -pending water treatment facilities of underground ceiling, including collecting container, branch pipe and the person in charge, thereby collecting container is arranged in installing on the lower surface of roof board underground and lies in the ponding that is provided with the position of outlet or is used for installing on outlet gathering basement roof and flows down via the outlet of basement roof, and collecting container passes through branch pipe pipeline intercommunication to be responsible for, is responsible for to be used for feeding through with the sump pit pipeline. Better, collecting container's figure is more than 2, and 2 above collecting container all are responsible for through branch pipe pipeline intercommunication. Still including consolidating the rope, one end is used for connecting the lower surface of basement roof, other end connected manifolds. The utility model discloses a basement ponding problem is effectively solved to long -pending water treatment facilities of underground ceiling ability efficient handling basement roof ponding, avoids basement ponding to cause huge loss, design benefit, and the structure is succinct, and the installation is simple quick, and is with low costs, is suitable for extensive popularization and application.

Description

Basement roof accumulated water treatment device
Technical field
This utility model relates to accumulated water treatment device technical field, particularly to basement accumulated water treatment device technical field, specifically refers to a kind of basement roof accumulated water treatment device.
Background technology
Current most of engineering basement roof is designed with landscape planting engineering, generally can reserve the landscape construction face of 50~80cm on basement roof, thus causing basement roof absolute altitude generally lower than town road, basement roof defines a piece of depression, and hydrops cannot be discharged smoothly.
Particularly in rainy season, typhoon season, the discharge pressure of short time is very big, easily occurs that surface water recharges the phenomenon of basement in typhoon, rainy season in work progress, therefore carries out the process of basement roof hydrops at Construction stage imperative.Especially, in basement decorations stage ceiling, wall surface putty, ground surface finishing, installation, occur that basement hydrops will cause huge loss.
Accordingly, it is desirable to provide a kind of basement roof accumulated water treatment device, it can effectively process basement roof hydrops, effectively solves basement hydrops problem, it is to avoid basement hydrops brings about great losses, and simple for structure, installs simple and quick, and cost is low.
Utility model content
In order to overcome above-mentioned shortcoming of the prior art, a purpose of the present utility model is in that to provide a kind of basement roof accumulated water treatment device, and it can effectively process basement roof hydrops, effectively solves basement hydrops problem, avoid basement hydrops to bring about great losses, be suitable to large-scale promotion application.
Another object of the present utility model is in that to provide a kind of basement roof accumulated water treatment device, and its design is ingenious, simple for structure, installs simple and quick, and cost is low, is suitable to large-scale promotion application.
For reaching object above, this utility model provides a kind of basement roof accumulated water treatment device, is characterized in, described basement roof accumulated water treatment device includes:
Collecting container, described collecting container is on the lower surface be arranged on basement roof and is arranged in the position being provided with spilled water hole of described basement roof or for being arranged on described spilled water hole thus assembling the hydrops flowed down on described basement roof and via described spilled water hole;
Arm;And
Supervisor, described collecting container is by supervisor described in described arm pipeline connection, and described supervisor is used for and sump pipeline connection.
It is preferred that described collecting container is funnel.
More preferably, described funnel is cylindrical funnel.
It is preferred that the number of described collecting container is more than 2,2 the above collecting containers are responsible for each through described in described arm pipeline connection.
It is preferred that described collecting container for being fixed on the lower surface of described basement roof by tapping screw.
Arrange it is preferred that the installation place of the lower surface of described collecting container and described basement roof seals.
Arrange it is preferred that the junction of described arm and described collecting container seals.
It is preferred that described basement roof accumulated water treatment device also includes reinforcing rope, one end of described reinforcing rope is for connecting the lower surface of described basement roof, and the other end of described reinforcing rope connects described arm.
More preferably, described arm has interconnective vertical portion and horizontal part, described vertical portion and described collecting container pipeline connection, described horizontal part and described supervisor's pipeline connection, and the described other end reinforcing rope connects described horizontal part.
More preferably, described reinforcing rope is steel wire.
The beneficial effects of the utility model essentially consist in:
1, basement roof accumulated water treatment device of the present utility model includes collecting container, arm and supervisor, collecting container on the lower surface be arranged on basement roof and the position being provided with spilled water hole of ceiling plate located underground or for being arranged in spilled water hole thus assembling the hydrops flowed down on basement roof and via spilled water hole, collecting container is responsible for by arm pipeline connection, supervisor is used for and sump pipeline connection, it is thus possible to effectively process basement roof hydrops, effectively solve basement hydrops problem, basement hydrops is avoided to bring about great losses, be suitable to large-scale promotion application.
2, basement roof accumulated water treatment device of the present utility model includes collecting container, arm and supervisor, collecting container on the lower surface be arranged on basement roof and the position being provided with spilled water hole of ceiling plate located underground or for being arranged in spilled water hole thus assembling the hydrops flowed down on basement roof and via spilled water hole, collecting container is responsible for by arm pipeline connection, supervisor is used for and sump pipeline connection, design ingenious, simple for structure, install simple and quick, cost is low, is suitable to large-scale promotion application.
These and other objects of the present utility model, feature and advantage, by following detailed description, drawings and claims are fully demonstrated, and means, device and their combination that can pass through specially to point out in claims be achieved.
Accompanying drawing explanation
Fig. 1 is that the master that a specific embodiment of the present utility model is installed to basement roof looks cross-sectional schematic.
(symbol description)
1 collecting container;2 arms;3 supervisors;4 basement roofs;5 spilled water holes;6 sumps;7 reinforce rope;8 basements bear a laminate;9 basements bear two laminates;10 basement bottom boards;11 supervisor's decks.
Detailed description of the invention
In order to be more clearly understood that technology contents of the present utility model, describe in detail especially exemplified by following example.
Refer to shown in Fig. 1, in a specific embodiment of the present utility model, basement roof accumulated water treatment device of the present utility model includes collecting container 1, arm 2 and supervisor 3, described collecting container 1 is on the lower surface being arranged on basement roof 4 and is arranged in the position being provided with spilled water hole 5 of described basement roof 4 or for being arranged on described spilled water hole 5 thus assembling the hydrops flowed down on described basement roof 4 and via described spilled water hole 5, described collecting container 1 is by supervisor 3 described in described arm 2 pipeline connection, and described supervisor 3 is used for and sump 6 pipeline connection.
Described collecting container 1 can be any suitable collecting container, refers to shown in Fig. 1, and in a specific embodiment of the present utility model, described collecting container 1 is funnel.In the case, described funnel is by supervisor 3 described in described arm 2 pipeline connection.
Described funnel can have any suitable shape, refers to shown in Fig. 1, and in a specific embodiment of the present utility model, described funnel is cylindrical funnel.
The bore of described cylindrical funnel can be determined as required, and the size generally according to spilled water hole 5 is determined, the bore of described cylindrical funnel should be not less than the diameter of spilled water hole 5 (if spilled water hole 5 is circular hole).In a specific embodiment of the present utility model, the bore of described cylindrical funnel is 200mm.
Described collecting container 1 can adopt any suitable material, and in a specific embodiment of the present utility model, described collecting container 1 is PVC collecting container.Certainly, described collecting container 1 can also adopt other material such as plastics, metal.
The size of described arm 2 and described supervisor 3 can be determined as required, refers to shown in Fig. 1, and in a specific embodiment of the present utility model, described arm 2 and described supervisor 3 are pipe, and diameter is such as 100mm.
Described arm 2 and described supervisor 3 can adopt any suitable material, and in a specific embodiment of the present utility model, described arm 2 and described supervisor 3 are pvc pipes.Certainly, described arm 2 and described supervisor 3 can also adopt other material such as plastics, metal.
The number of described collecting container 1 can be determined as required, it is preferred that, the number of described collecting container 1 is more than 2, and 2 the above collecting containers 1 are responsible for 3 each through described in described arm 2 pipeline connection.Referring to shown in Fig. 1, in a specific embodiment of the present utility model, the number of described collecting container 1 is 3, and 3 described collecting containers 1 are responsible for 3 each through described in described arm 2 pipeline connection.
Described collecting container 1 can adopt any suitable structure on the lower surface being arranged on basement roof 4, and in a specific embodiment of the present utility model, described collecting container 1 for being fixed on the lower surface of described basement roof 4 by tapping screw.
In order to prevent leaking, it is preferred that, the installation place of the lower surface of described collecting container 1 and described basement roof 4 seals and arranges.In a specific embodiment of the present utility model, the installation place of the lower surface of described collecting container 1 and described basement roof 4 is sealed by silicone sealant.
In order to prevent leaking, it is preferred that, the junction of described arm 2 and described collecting container 1 seals and arranges.In a specific embodiment of the present utility model, the junction of described arm 2 and described collecting container 1 is sealed by silicone sealant.
Being responsible for 3 described in described arm 2 pipeline connection and can adopt any suitable structure, in a specific embodiment of the present utility model, described arm 2 is by supervisor 3 described in pipe joint pipeline connection.
In order to reinforce this utility model, refer to shown in Fig. 1, in a specific embodiment of the present utility model, described basement roof accumulated water treatment device also includes reinforcing rope 7, one end of described reinforcing rope 7 is for connecting the lower surface of described basement roof 4, and the other end of described reinforcing rope 7 connects described arm 2.
Described arm 2 can have any suitable structure, refer to shown in Fig. 1, in a specific embodiment of the present utility model, described arm 2 has interconnective vertical portion 21 and horizontal part 22, described vertical portion 21 and described collecting container 1 pipeline connection, described horizontal part 22 and described supervisor 3 pipeline connection, when being provided with reinforcing rope 7, the described other end reinforcing rope 7 connects described horizontal part 22.
Described reinforcing rope 7 can be any suitable reinforcing rope, and in a specific embodiment of the present utility model, described reinforcing rope 7 is steel wire.Such as 8# zinc-coated wire.
When this utility model is installed, firstly the need of arranging spilled water hole 5 on basement roof 4, drain gully position is chosen according to engineering structure construction drawing and on-the-spot practice of construction situation, choose the construction elevation minimum point of basement roof 4 as draw-off point, the reinforcement location of basement roof 4 is detected again, it is ensured that during perforate, do not destroy the reinforcing bar of basement roof 4 with reinforcing bar survey meter.Position adopts concrete drill core sampling machine to carry out perforate after determining, boring aperture is such as 100mm, is consequently formed spilled water hole 5.After completing boring, spilled water hole 5 and surrounding are cleaned out, installing bore 200mm cylinder funnel, adopt tapping screw to be fixed on the lower surface of basement roof, the gap between funnel and structural slab adopts silicone sealant joint filling, prevent rainwater from oozing out from gap, pollute ceiling.Funnel is installed reinforcing and is improved laggard row Pipe installing, directly arm 2 one end is enclosed within funnel, arm 2 and funnel seaming position adopt silicone sealant to close, arm 2 other end adopts pipe joint to be connected with supervisor 3, the lower surface of steel wire connecting branch 2 and basement roof 4, supervisor 3 is directly communicated to sump 6 through basement structure plate (the negative laminate 8 of such as basement, basement negative two laminates 9, basement bottom board 10), forms basement roof hydrops drainage system.
Each sump 6 can be provided with the suction pump of a set of such as 7.5KW, is discharged into the rainwater (hydrops) of sump 6 by a suction pump part directly draining municipal pipeline, and a part enters engineering rain water collecting system, by precipitating, utilization being recovered by filtration.
It is of course also possible to adopt other mounting means, for instance first funnel, arm 2 and supervisor 3 are installed, then funnel is mounted to basement roof 4.
Adopt this utility model, efficiently solve basement hydrops situation, chamber ventilated system is descended to effectively improve basement humidity phenomenon ordinatedly, improve the visual image on basement and ground, basement metope emulsion paint, ceiling putty Signs of Mould are well contained, avoid doing over again of causing owing to body of wall, ceiling are mouldy, save rework cost.
After the hydrops of basement roof 4 drains into sump 6, drain into engineering rain water collecting system by suction pump and recycle, having saved construction water, also having reached the effect of saving water resource simultaneously.Such as in Shenzhen, every daily water consumption of constructing is about 150m3, about 4.15 yuan/m of Shenzhen's water price3, every day, construction water expense was about 650 yuan, rainy season this system substantially can meet engineering construction water requirement, Shenzhen's 4~JIUYUE is rainy season, this system experience two rainy seasons, it is contemplated that use water rate can be saved with 23.4 ten thousand yuan.
In sum, basement roof accumulated water treatment device of the present utility model can effectively process basement roof hydrops, effectively solves basement hydrops problem, avoid basement hydrops to bring about great losses, design ingenious, simple for structure, installing simple and quick, cost is low, is suitable to large-scale promotion application.
It should be understood by those skilled in the art that the embodiment of the present utility model shown in foregoing description and accompanying drawing is only used as citing and is not limiting as this utility model.
As can be seen here, the purpose of this utility model completely and is effectively achieved.Function of the present utility model and structural principle are shown in an embodiment and are illustrated, without departing substantially under described principle, embodiment can do any amendment.So, this utility model includes all variant embodiment based on claim spirit and right.

Claims (10)

1. a basement roof accumulated water treatment device, it is characterised in that described basement roof accumulated water treatment device includes:
Collecting container, described collecting container is on the lower surface be arranged on basement roof and is arranged in the position being provided with spilled water hole of described basement roof or for being arranged on described spilled water hole thus assembling the hydrops flowed down on described basement roof and via described spilled water hole;
Arm;And
Supervisor, described collecting container is by supervisor described in described arm pipeline connection, and described supervisor is used for and sump pipeline connection.
2. basement roof accumulated water treatment device according to claim 1, it is characterised in that described collecting container is funnel.
3. basement roof accumulated water treatment device according to claim 2, it is characterised in that described funnel is cylindrical funnel.
4. basement roof accumulated water treatment device according to claim 1, it is characterised in that the number of described collecting container is more than 2,2 the above collecting containers are responsible for each through described in described arm pipeline connection.
5. basement roof accumulated water treatment device according to claim 1, it is characterised in that described collecting container for being fixed on the lower surface of described basement roof by tapping screw.
6. basement roof accumulated water treatment device according to claim 1, it is characterised in that the installation place of the lower surface of described collecting container and described basement roof seals and arranges.
7. basement roof accumulated water treatment device according to claim 1, it is characterised in that the junction of described arm and described collecting container seals and arranges.
8. basement roof accumulated water treatment device according to claim 1, it is characterized in that, described basement roof accumulated water treatment device also includes reinforcing rope, and one end of described reinforcing rope is for connecting the lower surface of described basement roof, and the other end of described reinforcing rope connects described arm.
9. basement roof accumulated water treatment device according to claim 8, it is characterized in that, described arm has interconnective vertical portion and horizontal part, described vertical portion and described collecting container pipeline connection, described horizontal part and described supervisor's pipeline connection, the described other end reinforcing rope connects described horizontal part.
10. basement roof accumulated water treatment device according to claim 8, it is characterised in that described reinforcing rope is steel wire.
CN201521029918.5U 2015-12-11 2015-12-11 Long -pending water treatment facilities of underground ceiling Expired - Fee Related CN205369476U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521029918.5U CN205369476U (en) 2015-12-11 2015-12-11 Long -pending water treatment facilities of underground ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521029918.5U CN205369476U (en) 2015-12-11 2015-12-11 Long -pending water treatment facilities of underground ceiling

Publications (1)

Publication Number Publication Date
CN205369476U true CN205369476U (en) 2016-07-06

Family

ID=56279771

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521029918.5U Expired - Fee Related CN205369476U (en) 2015-12-11 2015-12-11 Long -pending water treatment facilities of underground ceiling

Country Status (1)

Country Link
CN (1) CN205369476U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104177A (en) * 2017-12-26 2018-06-01 中国建筑第六工程局有限公司 A kind of basement roof construction drainage system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104177A (en) * 2017-12-26 2018-06-01 中国建筑第六工程局有限公司 A kind of basement roof construction drainage system

Similar Documents

Publication Publication Date Title
CN101285397B (en) Submarine tunnel transverse water collecting tank
CN203878608U (en) Underground utility tunnel structure
CN205369476U (en) Long -pending water treatment facilities of underground ceiling
CN206396785U (en) The common cabin pattern synthesis piping lane section structure of the rain sewage of easy access
CN203176574U (en) Seepage resistant convenient concrete layer drainage pipe connecting embedding device
CN102182225A (en) Automatic foundation ground water collecting system
CN203947519U (en) Multifunctional rain storage pool
CN207277486U (en) A kind of mill tailings storehouse is met an urgent need self-draining arrangement
CN206418520U (en) A kind of comprehensive pipe gallery structure for accessing storm sewer
CN202248218U (en) Structure for connecting drainage open trenches with drainage inspection well
CN101812846B (en) Drainage structure of upstream wall of shore type hydropower station workshop and construction method thereof
CN206396786U (en) Suitable for the pipe gallery section structure of area of heavy rainfull
CN203961002U (en) Locomotive inspection and repair trench drainage system
CN206143900U (en) Sewer manhole structure suitable for in utility tunnel
CN219080473U (en) Wall-mounted rainwater collecting device
CN202969543U (en) Restoration system of process water regulating reservoir
CN202055256U (en) Concentrated water diversion and drainage device for large-area water seepage slope surface
CN201883523U (en) Rainwater inspection well
CN204645066U (en) Dewatering installation
CN204370546U (en) A kind of novel drainage inspection well of the draining that crosses
CN204850009U (en) Modularization drainage pipe
CN204328234U (en) A kind of sewer assembly
CN207512825U (en) The interim water supply pump system of project is built in a kind of room
CN204199313U (en) Water level observation well pumping system around foundation ditch
CN215211450U (en) Device for preventing drainage vertical pipe of multi-storey building from returning water

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706

Termination date: 20201211

CF01 Termination of patent right due to non-payment of annual fee