CN205369058U - Maintenance platform of straight king -post of detachable cable -stay bridge - Google Patents

Maintenance platform of straight king -post of detachable cable -stay bridge Download PDF

Info

Publication number
CN205369058U
CN205369058U CN201521060708.2U CN201521060708U CN205369058U CN 205369058 U CN205369058 U CN 205369058U CN 201521060708 U CN201521060708 U CN 201521060708U CN 205369058 U CN205369058 U CN 205369058U
Authority
CN
China
Prior art keywords
platform
post
king
dismantled
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521060708.2U
Other languages
Chinese (zh)
Inventor
刘宇峰
唐丰礼
陈开圣
荣劲松
王爱溪
周宇
黄国忠
梁鹏
刘任
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Fourth Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC Fourth Harbor Engineering Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Fourth Harbor Engineering Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC Fourth Harbor Engineering Co Ltd
Priority to CN201521060708.2U priority Critical patent/CN205369058U/en
Application granted granted Critical
Publication of CN205369058U publication Critical patent/CN205369058U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a maintenance platform of straight king -post of detachable cable -stay bridge, it is including suspending operation platform in midair, dismantled and assembled platform and hoist engine system, it includes the two sets of semiorbicular platform that hangs that centers on the king -post and build to suspend operation platform in midair, dismantled and assembled platform comprises a plurality of layers of platform, every layer of platform is formed by two sections detachable linkage segment butt joints, every section linkage segment is rather than adjacent hanging with the round pin hub connection between the platform, when the linkage segment is in the butt joint state, it forms closed ring shape around the king -post to hang platform and dismantled and assembled platform, the hoist engine system constitutes with shaped steel and the pulley guider who installs at the king -post top at the hoist engine of cable -stay bridge bridge floor by installing, the wire rope of hoist engine walks around pulley guider and the wire rope who hangs the platform hang hole suspension connection. The utility model discloses an examine and repair the platform and when running into barrier such as suspension cable, can dismantle the platform and the cut -through thing through dismantling it, especially be suitable for and carry out checksum maintenance operations to cable -stay bridge cable system.

Description

A kind of inspection platform of the straight king-post of detachable cable-stayed bridge
Technical field
What this utility model related to cable-stayed bridge cable system safeguards inspection platform used in construction and the maintenance of king-post lateral surface or decoration.
Background technology
In stayed bridge pylon cable work progress, generally adopting hydraulic climbing formwork to carry out the segmental construction of king-post, personnel channel generally adopts the method setting up steel pipe support.But after king-post has bound, steel pipe support carries out bridge deck and the construction of king-post affiliated facility after needing dismounting.As needed that in bridge operation process the suspension cable system on king-post checks, safeguards or king-post is carried out the constructions such as decoration, as set up, steel pipe support is time-consuming takes a lot of work again, and also suspension cable HPDE set can be had a negative impact in taking in the process of tearing open of steel pipe support, it is therefore desirable to a kind of inspection operation platform of research and development, this inspection operation platform need to meet lightweight, easy to operate, conveniently moving, safe and reliable, by the feature such as suspension cable or other barrier obstructions.
Utility model content
The purpose of this utility model is in that to provide a kind of bridge king-post that is suitable to that cable-stayed bridge cable system especially checks, safeguards or king-post is carried out the operating platform of detachable movable used during the constructions such as decoration.
nullTo achieve these goals,This utility model have employed techniques below scheme: the inspection platform of a kind of straight king-post of detachable cable-stayed bridge,Comprising: suspention operating platform、Dismantled and assembled platform and hoist system,Described suspention operating platform includes the two groups of semiorbicular suspension platforms built around king-post,Suspension platform is provided with steel wire hang structure,Described dismantled and assembled platform is arranged between two groups of semiorbicular suspension platforms,Dismantled and assembled platform is made up of some layers of platform,Every layer of platform is formed by two sections of dismountable linkage section docking,Connect with bearing pin between the suspension platform that every section of linkage section is adjacent,When linkage section is in mated condition,Suspension platform and dismantled and assembled platform form closed annular around king-post,Described hoist system is made up of with the shaped steel and pulley guider being arranged on king-post top the hoist engine being arranged on Cable-stayed Bridges,The steel wire rope of hoist engine is walked around described pulley guider and is connected with the steel wire hang hole suspension of suspension platform.
Described suspention operating platform, dismantled and assembled platform are the truss structure being welded by shaped steel and angle bar etc..
Described suspension platform is being provided with several jackings towards the one side of king-post, and jacking stays on king-post side by an adjusting screw rod thus carrying out stable to suspention operating platform.
Connect by ring flange and bolt are fixing between the linkage section that described dismantled and assembled platform is relative to each other.
Inspection platform of the present utility model is when running into the barriers such as suspension cable, it is possible to reach application target by dismantling its distachable platform.Operation workmen can hang its entrance suspention operating platform from bridge floor by hoist engine and construct.Suspention operating platform utilizes hoist system to move up and down, if running into suspension cable or other barriers can skip barrier by dismounting dismantled and assembled platform successively.This utility model adopts truss structure to significantly reduce the weight of inspection platform, and in use have only to by hoist system, suspention operating platform be moved up and down, contrast with setting up steel pipe support scheme along king-post surrounding, this scheme is greatly saved steel and puts into, greatly reduce labor intensity, effectively reduce the amount of labour of workmen, improve efficiency of construction and safety, improve economic benefit.This utility model is applicable to bridge king-post and cable-stayed bridge cable system especially checks, safeguards or king-post is carried out the construction use such as decoration.
Accompanying drawing explanation
Fig. 1 is inspection platform plan structure schematic diagram.
Fig. 2 a~Fig. 2 b is the A enlarged drawing of Fig. 1, and in Fig. 2 a, jacking is in stress, and in Fig. 2 b, jacking is in force-free state.
Fig. 3 is that the B of Fig. 1 is to schematic diagram.
Fig. 4 is the D enlarged drawing of Fig. 3.
Fig. 5 is the structural representation of ring flange.
Fig. 6 is the attachment structure schematic diagram of bearing pin and ring flange.
Fig. 7 is hoist system schematic diagram.
Fig. 8 a~Fig. 8 e be inspection platform along king-post move up operation time each step schematic diagram.
Wherein, suspention operating platform 1, jacking device 1.3, dismantled and assembled platform 2, dismantled and assembled platform ground floor 2.1, dismantled and assembled platform second layer frame 2.2, dismantled and assembled platform third layer 2.3, bearing pin and ring flange connection system 2.4, bearing pin 2.4.1, bolt 2.4.2, ring flange 2.4.3, bolt hole 2.4.4;Hoist system 3, hoist engine 3.1, tower top type steel skeleton 3.2, king-post 4
Detailed description of the invention
The straight king-post inspection platform entirety of detachable cable-stayed bridge of the present utility model is square type truss structure, it is possible to use hoist engine is shifted up and down by wire rope suspensioning.
As it is shown in figure 1, inspection platform is mainly made up of 3 parts, Part I is suspention operating platform 1, and Part II is dismantled and assembled platform 2, Part III is hoist system 3.Suspention operating platform 1 and dismantled and assembled platform 2 are welded by shaped steel and angle bar, and total is truss structure, and it includes the two groups of semiorbicular suspension platforms built around king-post, and suspension platform is provided with steel wire hang clasp.Dismantled and assembled platform is arranged between two groups of semiorbicular suspension platforms.Dismantled and assembled platform is made up of some layers of platform, every layer of platform is formed by the method dish 2.4.3 shown in Fig. 4, Fig. 5 and bolt 2.4.2 docking by two sections of dismountable linkage sections, connect with bearing pin 2.4.1 between the suspension platform that every section of linkage section is adjacent, when linkage section is in mated condition, suspension platform and dismantled and assembled platform form closed annular around king-post.It is connected with clasp by steel wire rope between suspention operating platform 1 and hoist system 3.
Suspention operating platform 1 is made up of the steel truss being positioned at king-post surrounding and the jacking device 1.3 being fixed on steel truss.Steel truss is welded into truss structure by shaped steel and angle bar etc.;Jacking device 1.3 is then made up of jacking and the little steel pipe being welded on steel truss, as shown in Figure 1.When, in suspention operating platform 1 raising and lowering process, jacking device 1.3 is in and king-post side released state;After suspention operating platform arrival requires position, by regulating the adjusting nut on the screw rod of jacking device 1.3, make jacking and king-post side against also stress, it is ensured that suspention operating platform 1 does not produce to wave and affect normal operation.
Dismantled and assembled platform 2 haves three layers, and dismantled and assembled platform 2 is arranged according to position and the size of barrier, as shown in Figure 3.When suspending operating platform 1 in midair and running into barrier in moving up and down process, remove successively and 3 layers of dismounting platform are installed, but to keep 2 layers of dismounting platform to be in connection status all the time.
Hoist system 3 is made up of with the shaped steel and pulley guider 3.2 being arranged on tower top the hoist engine 3.1 being arranged on bridge floor.The hoist engine of bridge floor is arranged on the position not affecting normal traffic and fixes, the shaped steel of tower top and pulley guider 3.2 are arranged according to the size of suspention operating platform 1, the shaped steel of tower top is fixed on tower top built-in fitting, and the steel wire rope of hoist engine is walked around described pulley guider and is connected with the steel wire hang hole suspension of suspension platform.Staff only need to operate hoist engine at bridge floor just can carry out lift work to suspention operating platform 1, if running into suspension cable or other barriers in lift work process, (to be promoted to example) can be carried out according to the technological process in Fig. 8 a~each figure of 8e:
(1) such as Fig. 8 a, promote inspection platform, run into barrier;
(2) such as Fig. 8 b, dismantled and assembled platform ground floor 2.1 of dismantling;
(3) inspection platform is promoted;
(4) the dismantled and assembled platform ground floor 2.1 dismantled is reinstalled connect;
(5) such as Fig. 8 c, the dismantled and assembled platform second layer 2.2 of dismantling;
(6) inspection platform is promoted;
(7) the dismantled and assembled platform second layer 2.2 dismantled is reinstalled connect;
(8) such as Fig. 8 d, dismantled and assembled platform third layer 2.3 of dismantling;
(9) inspection platform is promoted;
(10) such as Fig. 8 e, clear the jumps, the dismantled and assembled platform third layer 2.3 dismantled is reinstalled and connects.

Claims (4)

  1. null1. the inspection platform of the straight king-post of detachable cable-stayed bridge,It is characterized in that including: suspention operating platform、Dismantled and assembled platform and hoist system,Described suspention operating platform includes the two groups of semiorbicular suspension platforms built around king-post,Suspension platform is provided with steel wire hang structure,Described dismantled and assembled platform is arranged between two groups of semiorbicular suspension platforms,Dismantled and assembled platform is made up of some layers of platform,Every layer of platform is formed by two sections of dismountable linkage section docking,Connect with bearing pin between the suspension platform that every section of linkage section is adjacent,When linkage section is in mated condition,Suspension platform and dismantled and assembled platform form closed annular around king-post,Described hoist system is made up of with the shaped steel and pulley guider being arranged on king-post top the hoist engine being arranged on Cable-stayed Bridges,The steel wire rope of hoist engine is walked around described pulley guider and is connected with the steel wire hang hole suspension of suspension platform.
  2. 2. the inspection platform of the straight king-post of detachable cable-stayed bridge according to claim 1, it is characterised in that: described suspention operating platform, dismantled and assembled platform are the truss structure being welded by shaped steel and angle bar etc..
  3. 3. the inspection platform of the straight king-post of detachable cable-stayed bridge according to claim 1, it is characterized in that: described suspension platform is being provided with several jackings towards the one side of king-post, jacking stays on king-post side by an adjusting screw rod thus carrying out stable to suspention operating platform.
  4. 4. the inspection platform of the straight king-post of detachable cable-stayed bridge according to claim 1, it is characterised in that: connect by ring flange and bolt are fixing between the linkage section that described dismantled and assembled platform is relative to each other.
CN201521060708.2U 2015-12-17 2015-12-17 Maintenance platform of straight king -post of detachable cable -stay bridge Active CN205369058U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521060708.2U CN205369058U (en) 2015-12-17 2015-12-17 Maintenance platform of straight king -post of detachable cable -stay bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521060708.2U CN205369058U (en) 2015-12-17 2015-12-17 Maintenance platform of straight king -post of detachable cable -stay bridge

Publications (1)

Publication Number Publication Date
CN205369058U true CN205369058U (en) 2016-07-06

Family

ID=56258453

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521060708.2U Active CN205369058U (en) 2015-12-17 2015-12-17 Maintenance platform of straight king -post of detachable cable -stay bridge

Country Status (1)

Country Link
CN (1) CN205369058U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152296A (en) * 2021-04-19 2021-07-23 南京润华建设集团有限公司 A lift formula operation platform that hangs that is used for quick installation of cable-stay bridge dysmorphism steel tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152296A (en) * 2021-04-19 2021-07-23 南京润华建设集团有限公司 A lift formula operation platform that hangs that is used for quick installation of cable-stay bridge dysmorphism steel tower

Similar Documents

Publication Publication Date Title
CN103061506B (en) Construction method of steel structure dome
CN107338727B (en) Integrally-disassembled and assembled anti-collision wall template and walking type rail hanging and moving system thereof
CN102108676B (en) Arch bridge construction method for combined beam-steel arch combined system
US20120227353A1 (en) Method for installing a large-span cylindrical reticulated shell
CN103998690A (en) Self-launching movable scaffolding system
CN103882812B (en) Across the construction method of girder in stayed-cable bridge
CN102877637B (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN106087752A (en) Multispan cable-carried arch bridge construction method
CN101566005B (en) Chimney hydraulic mould lifting device
CN203654702U (en) Operating platform for construction of reinforced concrete chimney
CN110685433A (en) Chimney construction device and construction method applying hydraulic lifting and rollover technology
CN104652813A (en) Tower crane construction technology used for super high-rise building steel structure
CN102154990B (en) Electing method for side span overhang-middle span cable-stayed three-tower self-anchored type combination suspension bridge
CN106976797A (en) Three suspension centres turn round suspender
CN211286601U (en) Chimney construction device applying hydraulic lifting and rollover technology
CN114182647B (en) Construction method for lifting and turning weak arch
CN107939141A (en) A kind of steel structure tower and its construction method
CN205369058U (en) Maintenance platform of straight king -post of detachable cable -stay bridge
CN103132702A (en) Longspan pipe truss pulling bar lifting and overhead rotating emplacing construction method
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN112523090B (en) Initial internode installation mode of steel truss girder cable-stayed bridge
JP6344879B1 (en) Suspension scaffold construction method and suspension scaffold in bridge structure
CN107816209B (en) The large-scale Roof Truss construction technology of installation is lifted across outer two sides
CN101725114B (en) Method for hoisting hawser of long-span cable-stayed bridge and equipment thereof
CN203878979U (en) Bolt opposite-pulling type track sliding formwork