CN205369035U - Bearing structure that topples is prevented in precast box girder boundary beam anticollision wall construction integration - Google Patents

Bearing structure that topples is prevented in precast box girder boundary beam anticollision wall construction integration Download PDF

Info

Publication number
CN205369035U
CN205369035U CN201620060792.6U CN201620060792U CN205369035U CN 205369035 U CN205369035 U CN 205369035U CN 201620060792 U CN201620060792 U CN 201620060792U CN 205369035 U CN205369035 U CN 205369035U
Authority
CN
China
Prior art keywords
box girder
small box
flange plate
pull bar
steel bracket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620060792.6U
Other languages
Chinese (zh)
Inventor
陈晖�
张义龙
黄卫东
崔伟
张荣桓
龙亮
刘琳
周向国
杨旻
刘晓林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, First Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201620060792.6U priority Critical patent/CN205369035U/en
Application granted granted Critical
Publication of CN205369035U publication Critical patent/CN205369035U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a bearing structure that topples is prevented in precast box girder boundary beam anticollision wall construction integration, characterized by: to the little case roof beam of hoist and mount on thoughtlessly congealing the support, set up the steel bracket between the little case flange board of crashproof wall place one side and concrete support, the little case flange board that makes steel bracket place one side is at the ascending holding power of bottom acquisition, set up the pull rod between little case flange board of opposite side and concrete support, make the little case flange board of pull rod place one side obtain the overdraft at the top. The utility model discloses draw a form that props with one and guaranteed the stability of case roof beam at crashproof wall integrated construction in -process, avoided the case roof beam to topple in the emergence of crashproof wall work progress, eliminated unsafe factor in construction of crashproof wall to guarantee the project progress, improve the engineering quality.

Description

Prefabricated case beam side bar anti-collision wall construction integration overturn-preventing supporting construction
Technical field
This utility model prefabricated case beam side bar anti-collision wall construction integration overturn-preventing supporting construction, more specifically during a kind of application prefabricated case beam side bar collision-prevention wall integrated construction, ensure the stability of box beam, it is prevented that box beam supporting construction of toppling of load because adding in anti-collision wall construction process.
Background technology
During prefabricated case beam side bar anti-collision wall construction integrated construction, in small box girder lifting to the concrete bearing mixing up vertical and horizontal gradient, the existence of the horizontal wall inscription due to 2% and the produced load such as anti-collision wall deadweight and template deadweight, there is the possibility toppled in oriented anti-collision wall side in box beam in the process of anti-collision wall construction.
Utility model content
This utility model is for avoiding the deficiency existing for above-mentioned prior art, a kind of prefabricated case beam side bar anti-collision wall construction integration overturn-preventing supporting construction is provided, ensure that the box beam stability in anti-collision wall construction process, eliminate the possibility that box beam is toppled in anti-collision wall construction process, reduce unsafe factor in anti-collision wall construction construction, thus ensureing project progress, improve construction quality.
This utility model adopts the following technical scheme that for solving technical problem
The feature of this utility model prefabricated case beam side bar anti-collision wall construction integration overturn-preventing supporting construction is: for being lifted on the small box girder on coagulation bearing, steel bracket is set between small box girder flange plate and the concrete bearing of anti-collision wall side, makes the small box girder flange plate of steel bracket side obtain support force upwards in bottom;Pull bar is set between opposite side small box girder flange plate and concrete bearing, makes the small box girder flange plate of pull bar side obtain lower pulling force at top.
The construction features of this utility model prefabricated case beam side bar anti-collision wall construction integration overturn-preventing supporting construction lies also in:
Described steel bracket is the framework being welded into by steel profile, and the concrete bearing of corresponding side is placed with sleeper, and described steel bracket props up and stands on described sleeper, arranges anti-skid rubber cushion between the end face and small box girder flange plate of described steel bracket.
Stating pull bar is the pull bar being become Len req by the fining twisted steel that length is 1m by sleeve connection, is embedded with shaped steel and forms groove in the concrete bearing of corresponding side, and the bottom of pull bar utilizes bolt and billet to be fixed in the trench;The top of pull bar is run through the embedded hole in small box girder flange plate and utilizes bolt and billet to be fixed.
Compared with the prior art, this utility model has the beneficial effect that:
1, this utility model draws the form of a support to ensure that box beam stability in collision-prevention wall integrated construction process with one, avoid box beam to topple in anti-collision wall construction process, eliminating unsafe factor in anti-collision wall construction construction, thus ensureing project progress, improving construction quality.
2, this utility model simple in construction, be easy to handling, its supporting member can be reused in prefabricated case beam side bar collision-prevention wall integrated construction.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation;
Fig. 2 a is steel bracket schematic front view in this utility model;
Fig. 2 b is steel bracket schematic side view in this utility model;
Number in the figure: 1 concrete bearing, 2 small box girder, 3 anti-collision walls, 4 steel brackets, 5 pull bars, 6 sleepers, 7 anti-skid rubber cushions, 8 embedded holes, 9 choose arm, 10 wet seam widened section, 11 jack resettlement grooves.
Detailed description of the invention
Referring to Fig. 1, in the present embodiment, prefabricated case beam side bar anti-collision wall construction integration overturn-preventing supporting construction is: for the small box girder 2 being lifted on coagulation bearing 1, steel bracket 4 is set between small box girder flange plate and the concrete bearing of anti-collision wall 3 side, makes the small box girder flange plate of steel bracket 4 side obtain support force upwards in bottom;Pull bar 5 is set between opposite side small box girder flange plate and concrete bearing, makes the small box girder flange plate of pull bar 5 side obtain lower pulling force at top.
For due to 2% the existence of horizontal wall inscription and the produced load such as anti-collision wall deadweight and template deadweight, the present embodiment utilizes steel bracket 4 and pull bar 5 support a form drawn with one and in anti-collision wall construction, box beam is played effect that is spacing and that support, it is to avoid topple.
In being embodied as, as shown in Figure 2 a and 2 b, steel bracket 4 is the framework being welded into by steel profile, the concrete bearing of corresponding side is placed with sleeper 6, steel bracket 4 stands on sleeper 6, utilize sleeper 6 and cushion block is set on sleeper to ensure that steel bracket 4 effectively supports, anti-skid rubber cushion 7 being set between the end face and small box girder flange plate of steel bracket 4, so that supporting construction is more firm.
Pull bar 5 is the pull bar being become Len req by Φ 20 fining twisted steel that length is 1m by sleeve connection, is embedded with shaped steel and forms inverted " t " type groove in the concrete bearing of corresponding side, and the bottom of pull bar utilizes bolt and billet to be fixed in the trench;The top of pull bar is run through the embedded hole 8 on small box girder flange plate and utilizes bolt and billet to be fixed, and utilizes billet to increase the contact area between pull bar and groove and embedded hole, it is ensured that stablizing effectively of pull bar system.
It is being the small box girder flange plate of steel bracket side is extended with choose arm 9 shown in Fig. 1, it is anti-collision wall 3 in the outer end choosing arm 9, the small box girder flange plate of pull bar 5 side extends to wet seam widened section 10, the twice that be arranged in parallel in concrete bearing 1 jack mounting groove 11, the jack for shoring small box girder 2 is arranged in jack resettlement groove 11.

Claims (3)

1. prefabricated case beam side bar anti-collision wall construction integration overturn-preventing supporting construction, it is characterized in that: for the small box girder (2) being lifted on coagulation bearing (1), steel bracket (4) is set between small box girder flange plate and the concrete bearing of anti-collision wall (3) side, makes the small box girder flange plate of steel bracket (4) side obtain support force upwards in bottom;Pull bar (5) is set between opposite side small box girder flange plate and concrete bearing, makes the small box girder flange plate of pull bar (5) side obtain lower pulling force at top.
2. prefabricated case beam side bar anti-collision wall construction integration overturn-preventing supporting construction according to claim 1, it is characterized in that: described steel bracket (4) is the framework being welded into by steel profile, the concrete bearing of corresponding side is placed with sleeper (6), described steel bracket (4) stands on described sleeper (6), arranges anti-skid rubber cushion (7) between the end face and small box girder flange plate of described steel bracket (4).
3. according to prefabricated case beam side bar anti-collision wall construction integration overturn-preventing supporting construction according to claim 1, it is characterized in that described pull bar (5) is the pull bar being become Len req by the fining twisted steel that length is 1m by sleeve connection, being embedded with shaped steel in the concrete bearing of corresponding side and form groove, the bottom of pull bar (5) utilizes bolt and billet to be fixed in the trench;The top of pull bar is run through the embedded hole (8) in small box girder flange plate and utilizes bolt and billet to be fixed.
CN201620060792.6U 2016-01-21 2016-01-21 Bearing structure that topples is prevented in precast box girder boundary beam anticollision wall construction integration Active CN205369035U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620060792.6U CN205369035U (en) 2016-01-21 2016-01-21 Bearing structure that topples is prevented in precast box girder boundary beam anticollision wall construction integration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620060792.6U CN205369035U (en) 2016-01-21 2016-01-21 Bearing structure that topples is prevented in precast box girder boundary beam anticollision wall construction integration

Publications (1)

Publication Number Publication Date
CN205369035U true CN205369035U (en) 2016-07-06

Family

ID=56274068

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620060792.6U Active CN205369035U (en) 2016-01-21 2016-01-21 Bearing structure that topples is prevented in precast box girder boundary beam anticollision wall construction integration

Country Status (1)

Country Link
CN (1) CN205369035U (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436557A (en) * 2016-10-26 2017-02-22 上海市政工程设计研究总院(集团)有限公司 Method for improving overturning resistance of single-column pier bridge
CN110863422A (en) * 2019-11-26 2020-03-06 上海市基础工程集团有限公司 Tool type overturn-preventing reinforcing device for precast concrete box girder with anti-collision wall
CN110983948A (en) * 2019-10-31 2020-04-10 上海市政工程设计研究总院(集团)有限公司 Pier capping beam capable of preventing beam body from overturning and using method thereof
CN111472303A (en) * 2018-12-07 2020-07-31 杭州江润科技有限公司 Middle pier anti-collision system and construction method
CN111809505A (en) * 2020-06-19 2020-10-23 中铁大桥局上海工程有限公司 Anchor pulling component and eccentric beam
CN112917669A (en) * 2021-02-09 2021-06-08 浙江交工集团股份有限公司 Synchronous prefabrication integral construction process for precast beam top anti-collision wall
CN114214952A (en) * 2021-12-23 2022-03-22 中国建筑土木建设有限公司 Overturn preventing device and method for side beam of small box beam of prefabricated anti-collision wall
CN114508051A (en) * 2021-12-28 2022-05-17 中铁二十五局集团第二工程有限公司 Steel plate laminated beam erecting system and method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106436557A (en) * 2016-10-26 2017-02-22 上海市政工程设计研究总院(集团)有限公司 Method for improving overturning resistance of single-column pier bridge
CN106436557B (en) * 2016-10-26 2023-12-01 上海市政工程设计研究总院(集团)有限公司 Method for improving anti-overturning performance of single-pier bridge
CN111472303A (en) * 2018-12-07 2020-07-31 杭州江润科技有限公司 Middle pier anti-collision system and construction method
CN111472303B (en) * 2018-12-07 2021-08-20 杭州江润科技有限公司 Middle pier anti-collision system and construction method
CN110983948A (en) * 2019-10-31 2020-04-10 上海市政工程设计研究总院(集团)有限公司 Pier capping beam capable of preventing beam body from overturning and using method thereof
CN110863422A (en) * 2019-11-26 2020-03-06 上海市基础工程集团有限公司 Tool type overturn-preventing reinforcing device for precast concrete box girder with anti-collision wall
CN111809505A (en) * 2020-06-19 2020-10-23 中铁大桥局上海工程有限公司 Anchor pulling component and eccentric beam
CN112917669A (en) * 2021-02-09 2021-06-08 浙江交工集团股份有限公司 Synchronous prefabrication integral construction process for precast beam top anti-collision wall
CN114214952A (en) * 2021-12-23 2022-03-22 中国建筑土木建设有限公司 Overturn preventing device and method for side beam of small box beam of prefabricated anti-collision wall
CN114508051A (en) * 2021-12-28 2022-05-17 中铁二十五局集团第二工程有限公司 Steel plate laminated beam erecting system and method

Similar Documents

Publication Publication Date Title
CN205369035U (en) Bearing structure that topples is prevented in precast box girder boundary beam anticollision wall construction integration
CN103669215B (en) Vertical-horizontal overall-sliding type side mold of fulcrum-few support
CN205348725U (en) Large -span, bearing structure that encorbelments by a wide margin
CN105507165B (en) Hanging basket for corrugated steel web plate construction and construction process
CN103194977B (en) Integration of transporting and building formula Bridge Erector sets up first hole case beam front launching nose machine installation method
CN105133501A (en) Method for constructing high pier through integrated lifting bracket
CN204455842U (en) Bridge precast beam plate plays roof beam structure
CN206680101U (en) A kind of simple and convenient guardrail model sheetinstallat chassis
CN103774841A (en) Track type sliding formwork device
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
CN202882376U (en) Elevator shaft template support platform
CN108946542A (en) A kind of small gun carriage and its construction method
CN202830889U (en) Rail type slip form device
CN205669313U (en) A kind of Universal adjustable hangs template system
CN205636521U (en) Basket is hung in construction of truss -like cantilever
CN209353734U (en) For installing the double-track device of curtain wall
CN208732495U (en) A kind of small gun carriage
CN201367730Y (en) A die plate supporting device convenient for dismounting die plates
CN203546612U (en) Wedge-shaped rail for bridge girder erection machine
CN205654375U (en) Prize board -like hydraulic support device of getting on bus
CN205314539U (en) Large -scale cantilever type combination steel form
CN203855879U (en) Novel high-pier turnout continuous beam support
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN206267039U (en) A kind of jack support platform of hollow slab girder jack-up construction
CN201567802U (en) Horizontal structural template supporting system in hoistway

Legal Events

Date Code Title Description
C14 Grant of patent or utility model